3. PRESENTATION OUTLINE
4:00pm
Introduction
In this part of subtopic,
Introduction of Decomville
company will be presented.
project background, Initial design
& final design will be introduce.
4:05pm
Technical/Loading/Standar
dsFeasibility study was conducted
and will be presented in this
subtopic
4:15pm
HSE/Environmental
Health safety and environmental
precautions is properly
constructed and will be presented
in this subtopic. 4:25pm
Construction Cost
Investment capital cost and value
engineering will be presented in
this subtopic.
4:30pm
Q & A
Question & Answer session.
4. A B O U T U S
DecomVille (M) Sdn Bhd | El Mundo Perdido De Kumang
10. PLATFROM DETAILS
2010 2035 2050
Service Operational Period
(25 years)
Decommissioning (15 years)
ENTERTAINMENT HUB
OPERATION PERIOD
End of Platform
Service Life
Estimated Design Service Life (EDSL) = Reference Service Life (RSL) x Materials x Environmental
RSL = 25 years
Material = 1
Environmental = 0.6
EDSL = 15 Years
* Reference on ISO 15686
18. EQUIPMENTS ON DECK
SEWAGE TREATMENT
PLANT ( 2 Units )
WATER TANK
( 3 Units )
WATER DESALINATION
( 2 Units )
AIR PRESSURE TANK
( 4 Units )
POWER GENERATOR
( 2 Units )
WASTE MANAGEMENT
( 1 Unit )
20. CODES & STANDARD
PETRONAS Technical Standards: Design of Fixed Offshore Structures, PTS 34. 19. 10. 30, Revision
7, April 2012
American Petroleum Institute: Recommended Practice for Planning, Designing and Constructing
Fixed Offshore Platforms – Working Stress Design, 21st Edition, October 2007
ISO 15686 – Building Service Life Planning
21. T E C H N I C A L
D E S I G N
Load Consideration
40. LOAD CONSIDERATION
OMNI-DIRECTION WIND CRITERIA FOR EL MUNDO PERDIDO DE KUMANG
Wind speed (m/s)
1-YEAR
(Operating)
5-YEAR 50-YEAR
100-YEAR
(Storm)
1-min mean 17 20 22 24
Data source: Model hindcast model data grid points #11012 (vicinity of F9JT-A)
OMNI-DIRECTION WAVE CRITERIA FOR EL MUNDO PERDIDO DE KUMANG
1-YEAR (Operating) 100-YEAR (Storm)
Hmax (m) 9.1 11.7
Tass (s) 9.4 10.6
OMNI-DIRECTION OCEAN CURRENT CRITERIA FOR EL MUNDO PERDIDO DE KUMANG
Layer in water column Height above seabed 1-YEAR 100-YEAR
Surface 1.0*D 0.85 m/s 1.20 m/s
Mid depth 0.5*D 0.67 m/s 0.95 m/s
Near seabed 0.01*D 0.39 m/s 0.55 m/s
80. T R A N S P O R T A T I O N &
C O N S T R U C T I O N C O S T
Cost Estimation
81. Transportation
Fast Crew Boat (FCB) Fast Support Vessels (FSV)
This boat are dispensable vessels that
serve many vital functions. High speed
heavy weather crew changes.
This type of vessel is used in case an
emergency occurred
Passenger Passenger
82. Transportation
Dumb Barge Crane Barge
Bring variety of heavy machines and
materials. Main transportation for
underwater restaurant.
To hoist/lift heavy machineries and
structures. Also for aid in construction
process
Construction Construction