PM Footprints
Impact of RERA on Project Management Service
& Role of Project Manager (Project Lead)
By : Rudresh.KV
20th May 2017
2Impact of RERA on Project Management Services and Role of Project Manager
Its time to shakeup
3Impact of RERA on Project Management Services and Role of Project Manager
Agenda
1. About RERA
2. Direct Impact
3. Project Registration
4. Implications
5. New Approach
6. Project & Management of it
7. Skillsets to be acquired
4Impact of RERA on Project Management Services and Role of Project Manager
About RERA
• Real Estate (Regulations and Development)Act 2016
• 25 March 2016 it received the assent from President of India
• Respective State Governments to roll out in one year
• Appellate Tribunal (Court), 60 days Trial period
• Commercial & Residential Projects to register
• 500 Smt or 8 units or more to register
• Ongoing projects to be registered
• Phase wise project registration is allowed
• Karnataka is yet to form the authority, likely by end July 17
5Impact of RERA on Project Management Services and Role of Project Manager
Impact of RERA…Transparency
Financial discipline Responsibility
Customer focus Accurate
Non Compliance: Financial Penalty or 3 Year jail
6Impact of RERA on Project Management Services and Role of Project Manager
Project Registration
1. Ownership of land, encumbrance free
2. Insurance of land title to be done
3. All applicable statutory approvals obtained
4. Total number of units & respective Carpet Area, Phase wise
5. Amenities details to be provided
6. Project Schedule and Handing over date to be committed
7. Estimated cost to completion of project, Land + Construction
8. List of Associate Design Consultants engaged in project
# Design development has to be near GFC grade
7Impact of RERA on Project Management Services and Role of Project Manager
New Approach
1. Well thought and clear design brief by Promoter
2. Phase wise development, independent operation of phase
3. Shorter time period design development, each phase
4. Importance for accuracy : Design, Cost & Schedule
5. Increased Accountability on each Stake holder
6. Revised agreement clauses & Conditions of contract
7. Clear roles and responsibility, flowers / bricks
8. Closer review of MIS, Less tolerance for non performance
9. Emphasis on collaboration and communication
10. Adoption of technology like BIM, ERP, PMO
8
What is a Project ?
“ A collection of linked activities, carried out in an
organised manner with clearly defined start and
finish point, to achieve some specific results that
satisfy the needs of an organisation as derived
from the current business plans”
Impact of RERA on Project Management Services and Role of Project Manager
9
What is project management
Project management, is the application of knowledge, skills, tools,
and techniques to project activities to meet the project requirements.
In simple words, it is the management of people.
Balancing the needs & demands between Scope, Time, Quality and
Costs by a dedicated team to ensure efficient way of Initiation,
commencement, progress and closure of a project.
Impact of RERA on Project Management Services and Role of Project Manager
10
Client
Stakeholders
Statutory
compliance
Design
Consultants
Contractors
End users
Project
Manager
Construction Projects : Quality -> Cost -> Time -> Quality
Project Management Service…will change
Impact of RERA on Project Management Services and Role of Project Manager
11
Scope..
• Design management : Concept to Detail Design
• Budget and cost management
• Planning : WBS , Sequencing and Scheduling of works
• Procurement and Contracts management
• Construction Management
o Quality Management
o Contractors Management, Coordination of works
o Risk assessment and mitigation
o Health, Safety, Environmental
 Change management
 Communication management
 Handing over with Training and documentation
Impact of RERA on Project Management Services and Role of Project Manager
12
Cause for delays till now…
1. Land related issues
2. Change in design
3. Budget & Cash flow delays
4. Progressive design development
i. Inadequate Planning of resources
ii. Less control over Budget
iii. Change orders, and regularization
Spiral effect, Conflict resolution, interpretation, debate, argument,
time loss.
Addressed
Impact of RERA on Project Management Services and Role of Project Manager
13Impact of RERA on Project Management Services and Role of Project Manager
What will continue to cause delay…
If not addressed at the beginning
1. Design inaccuracy, clash detection, detailing of elements
2. Constructability
a) Ease of construction, with existing skill sets of labours
b) Site logistics and Infrastructure
c) Construction Equipment's and deployment at right time
d) Health and Safety
3. lack of understanding, scope and project by bidders
4. Battery limits and Interdependency of agencies working
5. Collaboration and Communication
14Impact of RERA on Project Management Services and Role of Project Manager
Feasibility Design
Contract &
Procurement
Execution Closure
Construction Management TeamPromoter Controlled
Traditional Operation
Design
Design
Consultants
Contracts
Cost & QS
Consultants
Procurement
Material
Suppliers
Finance
Auditors
Quality
CRM
Legal
Planning
15Impact of RERA on Project Management Services and Role of Project Manager
Feasibility Design
Contract &
Procurement
Execution Closure
Dedicated Project Management Team
Process realignment..
Design
Design
Consultants
Contracts
Cost & QS
Consultants
Procurement
Material
Suppliers
Finance
Auditors
Quality
CRM
Legal
Planning
Promoter Approval
16
Techniques and Skills
for Project Manager Role
Impact of RERA on Project Management Services and Role of Project Manager
17
Before commencement
1. Accurate information on site boundary
2. Topographic survey of land with surrounding information
3. Soil test reports from two different agencies
4. List of applicable bylaws and statutory approvals to be obtained
5. Arrive at FSI available ,
6. Wind direction and velocity, Seasonal weather condition
7. Suitable form work to be adopted , especially for lift core
8. Scope of services for respective design consultants with clear
battery limits ,stage wise deliverables and qualification of team
members, accountability on design coordination
Comprehensive design brief document
Impact of RERA on Project Management Services and Role of Project Manager
18
Design development process. Evolve
1. Adopt BIM from beginning
2. Concept Design – FSI, Statutory compliance, floor plate, looks
3. Schematic Design – 25%, 50%, 75% & 100% sign off
4. Material specifications & base rates
5. Conduct value engineering workshops
6. Design Basis Report – Sign off for all packages
7. Detail design development by respective consultants
8. Conduct design progress review meetings
9. Design progress trackers – Open issue tracker
10. Continuously evaluate cost and schedule of project
Impact of RERA on Project Management Services and Role of Project Manager
19
Challenges during Design development
• Compliance to fire authority requirements
• Selection of Shuttering system
• Vertical transportation analysis – number of lifts required
• Shafts required for MEP services
• Location of sump tanks, fire tanks, DG and electrical transformers
• DG, Exhaust stacks
• Landscape features
Always evaluate the design progress from constructability,
Safety, cost implications and ease of maintenance
Impact of RERA on Project Management Services and Role of Project Manager
20
Keep an eye on .... design developement
• Avoid dependency works, particularly in RCC
• Ramps along retaining wall
• Staircase around lift core
• Sump tanks along retaining walls
• Transfer Girder floor and Service floors
• Tower crane location, on erection and dismantling
• Material and labour hoist
• Location of RMC plant and Concrete Pump
• Terrace works, Water tank, LMR, Pipes
• Access roads for construction activities
• Lead time for supply of suitable system form work
• External painting methodology
Impact of RERA on Project Management Services and Role of Project Manager
21
Contract management strategy
Depending on scale and duration of project..
• Prepare a work break down structure
• Obtain consent from Legal & tax experts before floating tenders
• Arrive on number of Contract packages and Procurement packages
• Ensure to define battery limits for each contractor
• Provide well defined NSC options, as well as coordination charges
• Ensure clauses on Infra support for minor contractors, attendances
• Focus on Types of Insurances by whom, CAR, WCI,TPL
• Multiple make’s of material - consent from QS & design consultants
• Issue Micro level schedule, Milestone based Bonus and Penalty
• Your Quality and Safety manual should be part of tender document
Impact of RERA on Project Management Services and Role of Project Manager
22
Suggestions on Contract management
Selection of the right contractor at optimum cost is key to success
• Pre qualification process is an important activity
• If Possible, Involve contractors on constructability perspective
• Ensure project is understood in totality before bidding by contractors
• Provide detailed micro level schedule along with tender document
• Conduct two stage bidding process, Technical first, then commercial
• Focus of Construction logistics, equipment's, shuttering proposed
• Technical staff by the bidders, Qualification and experience
• Seek Deployment schedule for equipment and man power, correlate.
• Proposed Construction Manager should present the Pitch
Impact of RERA on Project Management Services and Role of Project Manager
23
WWWW…Instruct or receive
• What to be done - Job
• Why it has to be done - Reason
• When it has to be done – Time
• Where to be done - Location
Impact of RERA on Project Management Services and Role of Project Manager
24
THANK YOU
Questions if any
Impact of RERA on Project Management Services and Role of Project Manager

More Related Content

What's hot

Impact of RERA 2016 on property markets - Sandeep Jhunjhunwala
Impact of RERA 2016 on property markets - Sandeep JhunjhunwalaImpact of RERA 2016 on property markets - Sandeep Jhunjhunwala
Impact of RERA 2016 on property markets - Sandeep Jhunjhunwala
Sandeep Jhunjhunwala
 
THE REAL ESTATE (REGULATION AND DEVELOPMENT)
THE REAL ESTATE (REGULATION AND DEVELOPMENT)THE REAL ESTATE (REGULATION AND DEVELOPMENT)
THE REAL ESTATE (REGULATION AND DEVELOPMENT)
Vaishali Mahlyan
 

What's hot (20)

Real estate bill 2016
Real estate bill 2016Real estate bill 2016
Real estate bill 2016
 
Impact of RERA 2016 on property markets - Sandeep Jhunjhunwala
Impact of RERA 2016 on property markets - Sandeep JhunjhunwalaImpact of RERA 2016 on property markets - Sandeep Jhunjhunwala
Impact of RERA 2016 on property markets - Sandeep Jhunjhunwala
 
Real Estate (Regulation and Development) Act, 2016
Real Estate (Regulation and Development) Act, 2016Real Estate (Regulation and Development) Act, 2016
Real Estate (Regulation and Development) Act, 2016
 
Tamil Nadu RERA Rules - Sandeep Jhunjhunwala FCA
Tamil Nadu RERA Rules - Sandeep Jhunjhunwala FCATamil Nadu RERA Rules - Sandeep Jhunjhunwala FCA
Tamil Nadu RERA Rules - Sandeep Jhunjhunwala FCA
 
Karnataka RERA Rules - Significant Points
Karnataka RERA Rules - Significant PointsKarnataka RERA Rules - Significant Points
Karnataka RERA Rules - Significant Points
 
RERA ACT and its impact
RERA ACT and its impactRERA ACT and its impact
RERA ACT and its impact
 
Karnataka RERA Rules - Sandeep Jhunjhunwala
Karnataka RERA Rules - Sandeep JhunjhunwalaKarnataka RERA Rules - Sandeep Jhunjhunwala
Karnataka RERA Rules - Sandeep Jhunjhunwala
 
Obligations of promoters, penalties under RERA
Obligations of promoters, penalties under RERAObligations of promoters, penalties under RERA
Obligations of promoters, penalties under RERA
 
Impact of RERA on consumer buying behaviour summer project complete(1)
Impact of RERA on consumer buying behaviour summer project complete(1)Impact of RERA on consumer buying behaviour summer project complete(1)
Impact of RERA on consumer buying behaviour summer project complete(1)
 
Real Estate Regulatory Bill' 2015
Real Estate Regulatory Bill' 2015Real Estate Regulatory Bill' 2015
Real Estate Regulatory Bill' 2015
 
Rera
ReraRera
Rera
 
RERA | Real Estate Regulatory Act
RERA | Real Estate Regulatory ActRERA | Real Estate Regulatory Act
RERA | Real Estate Regulatory Act
 
Deciphering Real Estate Regulations - Sandeep Jhunjhunwala
Deciphering Real Estate Regulations - Sandeep JhunjhunwalaDeciphering Real Estate Regulations - Sandeep Jhunjhunwala
Deciphering Real Estate Regulations - Sandeep Jhunjhunwala
 
THE REAL ESTATE (REGULATION AND DEVELOPMENT)
THE REAL ESTATE (REGULATION AND DEVELOPMENT)THE REAL ESTATE (REGULATION AND DEVELOPMENT)
THE REAL ESTATE (REGULATION AND DEVELOPMENT)
 
Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)
 
Real Estate Regulation and Developement Act (RERA) and Related Rules - Sandee...
Real Estate Regulation and Developement Act (RERA) and Related Rules - Sandee...Real Estate Regulation and Developement Act (RERA) and Related Rules - Sandee...
Real Estate Regulation and Developement Act (RERA) and Related Rules - Sandee...
 
RERA FOR BUYERS
RERA FOR BUYERSRERA FOR BUYERS
RERA FOR BUYERS
 
Things you should know about RERA Act by Hp Tripathi
Things you should know about RERA Act by Hp TripathiThings you should know about RERA Act by Hp Tripathi
Things you should know about RERA Act by Hp Tripathi
 
Rera 2017
Rera 2017Rera 2017
Rera 2017
 
The Real Estate (Development and Regulation) Bill, 2016
The Real Estate (Development and Regulation) Bill, 2016The Real Estate (Development and Regulation) Bill, 2016
The Real Estate (Development and Regulation) Bill, 2016
 

Similar to Impact of RERA in India on Real Estate Project Management Service

CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction Projects
Brown Smith Wallace
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
sombat nirund
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
IOSR Journals
 

Similar to Impact of RERA in India on Real Estate Project Management Service (20)

CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction Projects
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
4
44
4
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 
Cost and time overruns in indian construction industry
Cost and time overruns in indian construction industryCost and time overruns in indian construction industry
Cost and time overruns in indian construction industry
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
 
TechM Experience
TechM ExperienceTechM Experience
TechM Experience
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
BIM from an FM perspective
BIM from an FM perspectiveBIM from an FM perspective
BIM from an FM perspective
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
Analysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction ProjectsAnalysis of Cost Over Run in Construction Projects
Analysis of Cost Over Run in Construction Projects
 
Resume - R1.Docx
Resume - R1.DocxResume - R1.Docx
Resume - R1.Docx
 
Early contractor involvement (eci) procurement approach spm talk 2016
Early contractor involvement (eci) procurement approach   spm talk 2016Early contractor involvement (eci) procurement approach   spm talk 2016
Early contractor involvement (eci) procurement approach spm talk 2016
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
PROFILE BALAKRISHNAN
PROFILE BALAKRISHNANPROFILE BALAKRISHNAN
PROFILE BALAKRISHNAN
 

Recently uploaded

Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
Listing Turkey
 
Mtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait City
Mtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait CityMtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait City
Mtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait City
ahmedjiabur940
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ - Mainstreet Equity Corp.
 

Recently uploaded (20)

Unique NIBM Flat In Pune E-Brochure.pdf
Unique NIBM Flat In Pune  E-Brochure.pdfUnique NIBM Flat In Pune  E-Brochure.pdf
Unique NIBM Flat In Pune E-Brochure.pdf
 
San Francisco Market Update -February 2024
San Francisco Market Update -February 2024San Francisco Market Update -February 2024
San Francisco Market Update -February 2024
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Are You Thinking About Selling Your House Soon? | KM Realty Group LLC
Are You Thinking About Selling Your House Soon?  | KM Realty Group LLCAre You Thinking About Selling Your House Soon?  | KM Realty Group LLC
Are You Thinking About Selling Your House Soon? | KM Realty Group LLC
 
Kohinoor Viva Pixel Dhanori Pune Brochure.pdf
Kohinoor Viva Pixel Dhanori Pune Brochure.pdfKohinoor Viva Pixel Dhanori Pune Brochure.pdf
Kohinoor Viva Pixel Dhanori Pune Brochure.pdf
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
 
Lodha Baner Flat In Pune E-Brochure.pdf
Lodha Baner Flat In Pune  E-Brochure.pdfLodha Baner Flat In Pune  E-Brochure.pdf
Lodha Baner Flat In Pune E-Brochure.pdf
 
Improvise, Adapt, Overcome - Sales Meeting, May '24
Improvise, Adapt, Overcome - Sales Meeting, May '24Improvise, Adapt, Overcome - Sales Meeting, May '24
Improvise, Adapt, Overcome - Sales Meeting, May '24
 
VTP Dhanori Pune Residential Apartment Brochure.pdf
VTP Dhanori Pune Residential Apartment Brochure.pdfVTP Dhanori Pune Residential Apartment Brochure.pdf
VTP Dhanori Pune Residential Apartment Brochure.pdf
 
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfVanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
 
SVN Live 5.13.24 Weekly Property Broadcast
SVN Live 5.13.24 Weekly Property BroadcastSVN Live 5.13.24 Weekly Property Broadcast
SVN Live 5.13.24 Weekly Property Broadcast
 
Dynamic Grandeur Undri Pune | A Space For You To Find Your Space
Dynamic Grandeur Undri Pune | A Space For You To Find Your SpaceDynamic Grandeur Undri Pune | A Space For You To Find Your Space
Dynamic Grandeur Undri Pune | A Space For You To Find Your Space
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdf
 
Mtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait City
Mtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait CityMtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait City
Mtp kit Available in Kuwait City +919101817206)) Get Mifty kit in Kuwait City
 
Unveiling the Veil: The Top Challenges with Estate Agents?
Unveiling the Veil: The Top Challenges with Estate Agents?Unveiling the Veil: The Top Challenges with Estate Agents?
Unveiling the Veil: The Top Challenges with Estate Agents?
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
Kalpataru Exquisite Wakad Pune  E-Brochure.pdfKalpataru Exquisite Wakad Pune  E-Brochure.pdf
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
 
Yashone Eternitee Mann-Hinjawadi Pune | E-Brochure
Yashone Eternitee Mann-Hinjawadi Pune | E-BrochureYashone Eternitee Mann-Hinjawadi Pune | E-Brochure
Yashone Eternitee Mann-Hinjawadi Pune | E-Brochure
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)
 

Impact of RERA in India on Real Estate Project Management Service

  • 1. 1 PM Footprints Impact of RERA on Project Management Service & Role of Project Manager (Project Lead) By : Rudresh.KV 20th May 2017
  • 2. 2Impact of RERA on Project Management Services and Role of Project Manager Its time to shakeup
  • 3. 3Impact of RERA on Project Management Services and Role of Project Manager Agenda 1. About RERA 2. Direct Impact 3. Project Registration 4. Implications 5. New Approach 6. Project & Management of it 7. Skillsets to be acquired
  • 4. 4Impact of RERA on Project Management Services and Role of Project Manager About RERA • Real Estate (Regulations and Development)Act 2016 • 25 March 2016 it received the assent from President of India • Respective State Governments to roll out in one year • Appellate Tribunal (Court), 60 days Trial period • Commercial & Residential Projects to register • 500 Smt or 8 units or more to register • Ongoing projects to be registered • Phase wise project registration is allowed • Karnataka is yet to form the authority, likely by end July 17
  • 5. 5Impact of RERA on Project Management Services and Role of Project Manager Impact of RERA…Transparency Financial discipline Responsibility Customer focus Accurate Non Compliance: Financial Penalty or 3 Year jail
  • 6. 6Impact of RERA on Project Management Services and Role of Project Manager Project Registration 1. Ownership of land, encumbrance free 2. Insurance of land title to be done 3. All applicable statutory approvals obtained 4. Total number of units & respective Carpet Area, Phase wise 5. Amenities details to be provided 6. Project Schedule and Handing over date to be committed 7. Estimated cost to completion of project, Land + Construction 8. List of Associate Design Consultants engaged in project # Design development has to be near GFC grade
  • 7. 7Impact of RERA on Project Management Services and Role of Project Manager New Approach 1. Well thought and clear design brief by Promoter 2. Phase wise development, independent operation of phase 3. Shorter time period design development, each phase 4. Importance for accuracy : Design, Cost & Schedule 5. Increased Accountability on each Stake holder 6. Revised agreement clauses & Conditions of contract 7. Clear roles and responsibility, flowers / bricks 8. Closer review of MIS, Less tolerance for non performance 9. Emphasis on collaboration and communication 10. Adoption of technology like BIM, ERP, PMO
  • 8. 8 What is a Project ? “ A collection of linked activities, carried out in an organised manner with clearly defined start and finish point, to achieve some specific results that satisfy the needs of an organisation as derived from the current business plans” Impact of RERA on Project Management Services and Role of Project Manager
  • 9. 9 What is project management Project management, is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. In simple words, it is the management of people. Balancing the needs & demands between Scope, Time, Quality and Costs by a dedicated team to ensure efficient way of Initiation, commencement, progress and closure of a project. Impact of RERA on Project Management Services and Role of Project Manager
  • 10. 10 Client Stakeholders Statutory compliance Design Consultants Contractors End users Project Manager Construction Projects : Quality -> Cost -> Time -> Quality Project Management Service…will change Impact of RERA on Project Management Services and Role of Project Manager
  • 11. 11 Scope.. • Design management : Concept to Detail Design • Budget and cost management • Planning : WBS , Sequencing and Scheduling of works • Procurement and Contracts management • Construction Management o Quality Management o Contractors Management, Coordination of works o Risk assessment and mitigation o Health, Safety, Environmental  Change management  Communication management  Handing over with Training and documentation Impact of RERA on Project Management Services and Role of Project Manager
  • 12. 12 Cause for delays till now… 1. Land related issues 2. Change in design 3. Budget & Cash flow delays 4. Progressive design development i. Inadequate Planning of resources ii. Less control over Budget iii. Change orders, and regularization Spiral effect, Conflict resolution, interpretation, debate, argument, time loss. Addressed Impact of RERA on Project Management Services and Role of Project Manager
  • 13. 13Impact of RERA on Project Management Services and Role of Project Manager What will continue to cause delay… If not addressed at the beginning 1. Design inaccuracy, clash detection, detailing of elements 2. Constructability a) Ease of construction, with existing skill sets of labours b) Site logistics and Infrastructure c) Construction Equipment's and deployment at right time d) Health and Safety 3. lack of understanding, scope and project by bidders 4. Battery limits and Interdependency of agencies working 5. Collaboration and Communication
  • 14. 14Impact of RERA on Project Management Services and Role of Project Manager Feasibility Design Contract & Procurement Execution Closure Construction Management TeamPromoter Controlled Traditional Operation Design Design Consultants Contracts Cost & QS Consultants Procurement Material Suppliers Finance Auditors Quality CRM Legal Planning
  • 15. 15Impact of RERA on Project Management Services and Role of Project Manager Feasibility Design Contract & Procurement Execution Closure Dedicated Project Management Team Process realignment.. Design Design Consultants Contracts Cost & QS Consultants Procurement Material Suppliers Finance Auditors Quality CRM Legal Planning Promoter Approval
  • 16. 16 Techniques and Skills for Project Manager Role Impact of RERA on Project Management Services and Role of Project Manager
  • 17. 17 Before commencement 1. Accurate information on site boundary 2. Topographic survey of land with surrounding information 3. Soil test reports from two different agencies 4. List of applicable bylaws and statutory approvals to be obtained 5. Arrive at FSI available , 6. Wind direction and velocity, Seasonal weather condition 7. Suitable form work to be adopted , especially for lift core 8. Scope of services for respective design consultants with clear battery limits ,stage wise deliverables and qualification of team members, accountability on design coordination Comprehensive design brief document Impact of RERA on Project Management Services and Role of Project Manager
  • 18. 18 Design development process. Evolve 1. Adopt BIM from beginning 2. Concept Design – FSI, Statutory compliance, floor plate, looks 3. Schematic Design – 25%, 50%, 75% & 100% sign off 4. Material specifications & base rates 5. Conduct value engineering workshops 6. Design Basis Report – Sign off for all packages 7. Detail design development by respective consultants 8. Conduct design progress review meetings 9. Design progress trackers – Open issue tracker 10. Continuously evaluate cost and schedule of project Impact of RERA on Project Management Services and Role of Project Manager
  • 19. 19 Challenges during Design development • Compliance to fire authority requirements • Selection of Shuttering system • Vertical transportation analysis – number of lifts required • Shafts required for MEP services • Location of sump tanks, fire tanks, DG and electrical transformers • DG, Exhaust stacks • Landscape features Always evaluate the design progress from constructability, Safety, cost implications and ease of maintenance Impact of RERA on Project Management Services and Role of Project Manager
  • 20. 20 Keep an eye on .... design developement • Avoid dependency works, particularly in RCC • Ramps along retaining wall • Staircase around lift core • Sump tanks along retaining walls • Transfer Girder floor and Service floors • Tower crane location, on erection and dismantling • Material and labour hoist • Location of RMC plant and Concrete Pump • Terrace works, Water tank, LMR, Pipes • Access roads for construction activities • Lead time for supply of suitable system form work • External painting methodology Impact of RERA on Project Management Services and Role of Project Manager
  • 21. 21 Contract management strategy Depending on scale and duration of project.. • Prepare a work break down structure • Obtain consent from Legal & tax experts before floating tenders • Arrive on number of Contract packages and Procurement packages • Ensure to define battery limits for each contractor • Provide well defined NSC options, as well as coordination charges • Ensure clauses on Infra support for minor contractors, attendances • Focus on Types of Insurances by whom, CAR, WCI,TPL • Multiple make’s of material - consent from QS & design consultants • Issue Micro level schedule, Milestone based Bonus and Penalty • Your Quality and Safety manual should be part of tender document Impact of RERA on Project Management Services and Role of Project Manager
  • 22. 22 Suggestions on Contract management Selection of the right contractor at optimum cost is key to success • Pre qualification process is an important activity • If Possible, Involve contractors on constructability perspective • Ensure project is understood in totality before bidding by contractors • Provide detailed micro level schedule along with tender document • Conduct two stage bidding process, Technical first, then commercial • Focus of Construction logistics, equipment's, shuttering proposed • Technical staff by the bidders, Qualification and experience • Seek Deployment schedule for equipment and man power, correlate. • Proposed Construction Manager should present the Pitch Impact of RERA on Project Management Services and Role of Project Manager
  • 23. 23 WWWW…Instruct or receive • What to be done - Job • Why it has to be done - Reason • When it has to be done – Time • Where to be done - Location Impact of RERA on Project Management Services and Role of Project Manager
  • 24. 24 THANK YOU Questions if any Impact of RERA on Project Management Services and Role of Project Manager