Learning Objectives
 Describe the systems view of project management
and how it applies to information technology (IT)
projects
 Understand organizations, including the four
frames, organizational structures, and
organizational culture
 Explain why stakeholder management and top
management commitment are critical for a
project’s success
Information Technology Project Management,
Seventh Edition
2
Learning Objectives
 Understand the concept of a project phase
and the project life cycle, and distinguish
between project development and product
development
 Discuss the unique attributes and diverse
nature of IT projects
 Describe recent trends affecting IT project
management, including globalization,
outsourcing, virtual teams, and agile project
management
Information Technology Project Management,
Seventh Edition
3
Projects Cannot Be Run In Isolation
 Projects must operate in a broad organizational
environment
 Project managers need to use systems
thinking
 Senior managers must make sure projects
continue to support current business needs
4
A Systems View of Project Management
 A systems approach emerged in the 1950s to
describe a more analytical approach to
management and problem solving
 Includes:
 Systems philosophy
 Systems analysis
 Systems management
5
Three Sphere Model for Systems
Management
Information Technology Project Management,
Seventh Edition
6
Perspectives on Organizations
Information Technology Project Management,
Seventh Edition
7
What Went Wrong?
Information Technology Project Management,
Seventh Edition
8
• In a paper titled “A Study in Project Failure,” two
researchers examined the success and failure of 214 IT
projects over an eight-year period in several European
countries.
• The researchers found that only one in eight (12.5 percent)
were considered successful in terms of meeting scope,
time, and cost goals.
• The authors said that the culture within many organizations
is often to blame
• Among other things, people often do not discuss important
leadership, stakeholder, and risk management issues
Factors Influencing IT Project
Management
 Organizational Structure
 Organizational Culture
 Top Management Commitment
 Stakeholder Management
 Commitment to IT
 IT Governance/Organizational Standards
9
Organizational Structures
 3 basic organization structures
 Functional
 Project
 Matrix
10
Organizational Structure Influences on Projects
Information Technology Project Management,
Seventh Edition
11
Organizational Culture
 Organizational culture is a set of shared
assumptions, values, and behaviors that characterize
the functioning of an organization
Characteristics of Org. Culture
12
 Member identity*
 Group emphasis*
 People focus
 Unit integration*
 Control
 Risk tolerance*
 Reward criteria*
 Conflict tolerance*
 Means-ends orientation
 Open-systems focus*
Top Management Commitment
 People in top management positions are key
stakeholders in projects
 A very important factor in helping project
managers successfully lead projects is the level
of commitment and support they receive from
top management
How does Top Management help a project?
13
Stakeholder Management
 Project managers must take time to identify,
understand, and manage relationships with all
project stakeholders
 Using the four frames of organizations can help
meet stakeholder needs and expectations
Who is often considered one of the most
important stakeholders?
14
Organizational Commitment to IT
 If the organization has a negative attitude
toward IT, it will be difficult for an IT project to
succeed
 Having a Chief Information Officer (CIO) at a
high level in the organization helps IT projects
 Assigning non-IT people to IT projects also
encourage more commitment
Information Technology Project Management,
Seventh Edition
15
IT Governance / Standards
 IT governance addresses the authority and
control for key IT activities in organizations,
including IT infrastructure, IT use, and project
management
 Standards
 PMO or simply having templates/forms
 Example: Texas Tech IT PM Standards
16
Project Phases and the Project Life
Cycle
 A project life cycle is a collection of project
phases that defines
 what work will be performed in each phase
 what deliverables will be produced and when
 who is involved in each phase, and
 how management will control and approve
work produced in each phase
 A deliverable is a product or service
produced or provided as part of a project
Information Technology Project Management,
Seventh Edition
17
Phases of the Traditional Project Life
Cycle
18
Product Life Cycles
 The Systems Development Life Cycle (SDLC)
is a framework for describing the phases
involved in developing and maintaining
information systems
 Systems development projects can follow
 Predictive life cycle
 Adaptive Software Development (ASD) life
cycle
19
Examples of Predictive Life Cycle
Models
 Waterfall model
 Spiral model
 Incremental build model
 Prototyping model
 Rapid Application Development (RAD) model
20
Agile Software Development
 Agile software development has become
popular to describe new approaches that
focus on close collaboration between
programming teams and business experts
21
The Importance of Project Phases and
Management Reviews
 A project should successfully pass through
each of the project phases in order to
continue on to the next
 Management reviews, also called phase
exits or kill points, should occur after each
phase to evaluate the project’s progress,
likely success, and continued compatibility
with organizational goals
22
What Went Right?
23
"The real improvement that I saw was in our ability toin the
words of Thomas Edisonknow when to stop beating a dead
horse.…Edison's key to success was that he failed fairly often; but
as he said, he could recognize a dead horse before it started
to smell...In information technology we ride dead
horsesfailing projectsa long time before we give up. But
what we are seeing now is that we are able to get off them; able
to reduce cost overrun and time overrun. That's where the major
impact came on the success rate.”*
Many organizations, like Huntington Bancshares, Inc., use an
executive steering committee to help keep projects on track.
*Cabanis, Jeannette, "'A Major Impact': The Standish Group's Jim Johnson On
Project Management and IT Project Success," PM Network, PMI, Sep.1998, p. 7
The Context of IT Projects
 Diverse in terms of size, complexity, products
produced, application area, and resource
requirements
 Diverse IT Project Team Members
 Diverse Technologies
24
Article: Tech Project and
Direction
 What have they been doing due to the
recession and what direction are the moving
into?
 What are some of the top projects?
 What industries are seeing growth in major IT
projects?
25
Article: Project Management &
Software Development
 Software development projects have distinct
characteristics not found in other projects
 Based on the article, what are some of these
characteristics?
 Which did you feel was the number one
mistake a PM could do in software
development projects?
26
Closer to home….State Projects
Information Technology Project Management,
Seventh Edition
27
• Were state IT projects considered to be successful?
• What were some of the main issues with state IT projects?
• What are the recommendations for the review board?
• Do you feel these are sufficient to fix the issues?
Improving Likelihood of Success
for IT Projects
28
• Value-Driven Approach
• Socio-Technical Approach
• Commit to Project Management Principles (Chaos Report)
• Knowledge-Management Approach
Recent Trends Affecting IT Project
Management
 Globalization
 Outsourcing
 Virtual teams
Information Technology Project Management,
Seventh Edition
29
Important Issues and Suggestions
Related to Globalization
 Issues
 Communications
 Trust
 Common work practices
 Tools
 Suggestions
 Employ greater project discipline
 Think global but act local
 Keep project momentum going
 Use newer tools and technology 30
Outsourcing
 Organizations remain competitive by using
outsourcing to their advantage, such as finding
ways to reduce costs
 Their next challenge is to make strategic IT
investments with outsourcing by improving their
enterprise architecture to ensure that IT
infrastructure and business processes are
integrated and standardized
31
Virtual Teams: Advantages/Disadvantages
 Advantages:
 Increasing competiveness and responsiveness
 Lowering costs
 Increased expertise and flexibility
 Increased work/life balance
 Disadvantages:
 Isolation &Interpersonal Relationships
 Communication Problems
 Dependence on Technology
32
Approaches and Philosophy
 eXtreme Project Management (XPM)
 Holistic veiw of planning and managing
 Projects don’t always fit traditional scheduling and
formal techniques (they are chaotic)
 Focuses on the “human side” of PM
 Agile Project Management
 Iterative, incremental approach
 Popular
 http://www.pmi.org/Certification/New-PMI-Agile-
Certification.aspx 33
Discussion
 Given our past two lectures, do you feel it is
harder to manage an IT project compared to
a traditional project?
 Name a few approaches you would use to
manage stakeholders.
Information Technology Project Management,
Seventh Edition
34
Chapter Summary
 Systems approach when working on projects
 Organization frames: structural, human resources,
political, and symbolic
 Project managers need to consider several factors
due to the unique context of information technology
projects
 Recent trends affecting IT project management
include globalization, outsourcing, virtual teams,
and Agile
Information Technology Project Management,
Seventh Edition
35

More Related Content

Similar to 02_Ch2a.pptx

Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02Rizwan Khurram
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptAhmadTawfigAlRadaide
 
1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptxAddayKhan
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pmAsa Chan
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptAhmadTawfigAlRadaide
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementNathanielAddoQuaye1
 
An Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology ProjectsAn Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology ProjectsIOSR Journals
 
Chapter 1(1).pptx
Chapter 1(1).pptxChapter 1(1).pptx
Chapter 1(1).pptxmegzgreat
 
Cooper Untech10 IT Program Mgmt Final
Cooper Untech10 IT Program Mgmt FinalCooper Untech10 IT Program Mgmt Final
Cooper Untech10 IT Program Mgmt FinalBonnie Cooper
 
Spa - Systemic Project Alignment
Spa - Systemic Project AlignmentSpa - Systemic Project Alignment
Spa - Systemic Project AlignmentDaniel Ofek
 

Similar to 02_Ch2a.pptx (20)

1. introduction
1. introduction1. introduction
1. introduction
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.ppt
 
1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pm
 
Project management
Project managementProject management
Project management
 
Lecture 2
Lecture 2 Lecture 2
Lecture 2
 
01 itpm6
01 itpm601 itpm6
01 itpm6
 
Ch01
Ch01Ch01
Ch01
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.ppt
 
Ch01
Ch01Ch01
Ch01
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
An Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology ProjectsAn Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology Projects
 
978285452340_01.pptx
978285452340_01.pptx978285452340_01.pptx
978285452340_01.pptx
 
Chapter 1(1).pptx
Chapter 1(1).pptxChapter 1(1).pptx
Chapter 1(1).pptx
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
13115 intro to project management presentation
13115 intro to project management presentation13115 intro to project management presentation
13115 intro to project management presentation
 
Cooper Untech10 IT Program Mgmt Final
Cooper Untech10 IT Program Mgmt FinalCooper Untech10 IT Program Mgmt Final
Cooper Untech10 IT Program Mgmt Final
 
Spa - Systemic Project Alignment
Spa - Systemic Project AlignmentSpa - Systemic Project Alignment
Spa - Systemic Project Alignment
 

More from RedhaElhuni

Key Key Key peformance Indicators KPI's.pptx
Key Key Key peformance Indicators KPI's.pptxKey Key Key peformance Indicators KPI's.pptx
Key Key Key peformance Indicators KPI's.pptxRedhaElhuni
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptRedhaElhuni
 
طريقة تيريز.ppt
طريقة تيريز.pptطريقة تيريز.ppt
طريقة تيريز.pptRedhaElhuni
 
01-Decision-Making.ppt
01-Decision-Making.ppt01-Decision-Making.ppt
01-Decision-Making.pptRedhaElhuni
 
التفكير الابداعي 2.pdf
التفكير الابداعي 2.pdfالتفكير الابداعي 2.pdf
التفكير الابداعي 2.pdfRedhaElhuni
 
قبعات ستة.pdf
قبعات ستة.pdfقبعات ستة.pdf
قبعات ستة.pdfRedhaElhuni
 
التفكير الابداعي.pdf
التفكير الابداعي.pdfالتفكير الابداعي.pdf
التفكير الابداعي.pdfRedhaElhuni
 
طريقة تيريز.ppt
طريقة تيريز.pptطريقة تيريز.ppt
طريقة تيريز.pptRedhaElhuni
 
القبعات الستة.pdf
القبعات الستة.pdfالقبعات الستة.pdf
القبعات الستة.pdfRedhaElhuni
 

More from RedhaElhuni (20)

Key Key Key peformance Indicators KPI's.pptx
Key Key Key peformance Indicators KPI's.pptxKey Key Key peformance Indicators KPI's.pptx
Key Key Key peformance Indicators KPI's.pptx
 
Presentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.pptPresentation_about_Fundamentals_Of_Project_Management.ppt
Presentation_about_Fundamentals_Of_Project_Management.ppt
 
tqm.ppt
tqm.ppttqm.ppt
tqm.ppt
 
EV.pdf
EV.pdfEV.pdf
EV.pdf
 
EV.pdf
EV.pdfEV.pdf
EV.pdf
 
8.3_2.ppt
8.3_2.ppt8.3_2.ppt
8.3_2.ppt
 
8.2_2.ppt
8.2_2.ppt8.2_2.ppt
8.2_2.ppt
 
8.1_2.ppt
8.1_2.ppt8.1_2.ppt
8.1_2.ppt
 
8.5_2.ppt
8.5_2.ppt8.5_2.ppt
8.5_2.ppt
 
طريقة تيريز.ppt
طريقة تيريز.pptطريقة تيريز.ppt
طريقة تيريز.ppt
 
16.ppt
16.ppt16.ppt
16.ppt
 
14580842.ppt
14580842.ppt14580842.ppt
14580842.ppt
 
01-Decision-Making.ppt
01-Decision-Making.ppt01-Decision-Making.ppt
01-Decision-Making.ppt
 
التفكير الابداعي 2.pdf
التفكير الابداعي 2.pdfالتفكير الابداعي 2.pdf
التفكير الابداعي 2.pdf
 
قبعات ستة.pdf
قبعات ستة.pdfقبعات ستة.pdf
قبعات ستة.pdf
 
التفكير الابداعي.pdf
التفكير الابداعي.pdfالتفكير الابداعي.pdf
التفكير الابداعي.pdf
 
طريقة تيريز.ppt
طريقة تيريز.pptطريقة تيريز.ppt
طريقة تيريز.ppt
 
SSTB11225.ppt
SSTB11225.pptSSTB11225.ppt
SSTB11225.ppt
 
11.ppt
11.ppt11.ppt
11.ppt
 
القبعات الستة.pdf
القبعات الستة.pdfالقبعات الستة.pdf
القبعات الستة.pdf
 

Recently uploaded

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Recently uploaded (20)

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

02_Ch2a.pptx

  • 1. Project Management & Information Technology Information Technology Project Management, Seventh Edition Chapter 2
  • 2. Learning Objectives  Describe the systems view of project management and how it applies to information technology (IT) projects  Understand organizations, including the four frames, organizational structures, and organizational culture  Explain why stakeholder management and top management commitment are critical for a project’s success Information Technology Project Management, Seventh Edition 2
  • 3. Learning Objectives  Understand the concept of a project phase and the project life cycle, and distinguish between project development and product development  Discuss the unique attributes and diverse nature of IT projects  Describe recent trends affecting IT project management, including globalization, outsourcing, virtual teams, and agile project management Information Technology Project Management, Seventh Edition 3
  • 4. Projects Cannot Be Run In Isolation  Projects must operate in a broad organizational environment  Project managers need to use systems thinking  Senior managers must make sure projects continue to support current business needs 4
  • 5. A Systems View of Project Management  A systems approach emerged in the 1950s to describe a more analytical approach to management and problem solving  Includes:  Systems philosophy  Systems analysis  Systems management 5
  • 6. Three Sphere Model for Systems Management Information Technology Project Management, Seventh Edition 6
  • 7. Perspectives on Organizations Information Technology Project Management, Seventh Edition 7
  • 8. What Went Wrong? Information Technology Project Management, Seventh Edition 8 • In a paper titled “A Study in Project Failure,” two researchers examined the success and failure of 214 IT projects over an eight-year period in several European countries. • The researchers found that only one in eight (12.5 percent) were considered successful in terms of meeting scope, time, and cost goals. • The authors said that the culture within many organizations is often to blame • Among other things, people often do not discuss important leadership, stakeholder, and risk management issues
  • 9. Factors Influencing IT Project Management  Organizational Structure  Organizational Culture  Top Management Commitment  Stakeholder Management  Commitment to IT  IT Governance/Organizational Standards 9
  • 10. Organizational Structures  3 basic organization structures  Functional  Project  Matrix 10
  • 11. Organizational Structure Influences on Projects Information Technology Project Management, Seventh Edition 11
  • 12. Organizational Culture  Organizational culture is a set of shared assumptions, values, and behaviors that characterize the functioning of an organization Characteristics of Org. Culture 12  Member identity*  Group emphasis*  People focus  Unit integration*  Control  Risk tolerance*  Reward criteria*  Conflict tolerance*  Means-ends orientation  Open-systems focus*
  • 13. Top Management Commitment  People in top management positions are key stakeholders in projects  A very important factor in helping project managers successfully lead projects is the level of commitment and support they receive from top management How does Top Management help a project? 13
  • 14. Stakeholder Management  Project managers must take time to identify, understand, and manage relationships with all project stakeholders  Using the four frames of organizations can help meet stakeholder needs and expectations Who is often considered one of the most important stakeholders? 14
  • 15. Organizational Commitment to IT  If the organization has a negative attitude toward IT, it will be difficult for an IT project to succeed  Having a Chief Information Officer (CIO) at a high level in the organization helps IT projects  Assigning non-IT people to IT projects also encourage more commitment Information Technology Project Management, Seventh Edition 15
  • 16. IT Governance / Standards  IT governance addresses the authority and control for key IT activities in organizations, including IT infrastructure, IT use, and project management  Standards  PMO or simply having templates/forms  Example: Texas Tech IT PM Standards 16
  • 17. Project Phases and the Project Life Cycle  A project life cycle is a collection of project phases that defines  what work will be performed in each phase  what deliverables will be produced and when  who is involved in each phase, and  how management will control and approve work produced in each phase  A deliverable is a product or service produced or provided as part of a project Information Technology Project Management, Seventh Edition 17
  • 18. Phases of the Traditional Project Life Cycle 18
  • 19. Product Life Cycles  The Systems Development Life Cycle (SDLC) is a framework for describing the phases involved in developing and maintaining information systems  Systems development projects can follow  Predictive life cycle  Adaptive Software Development (ASD) life cycle 19
  • 20. Examples of Predictive Life Cycle Models  Waterfall model  Spiral model  Incremental build model  Prototyping model  Rapid Application Development (RAD) model 20
  • 21. Agile Software Development  Agile software development has become popular to describe new approaches that focus on close collaboration between programming teams and business experts 21
  • 22. The Importance of Project Phases and Management Reviews  A project should successfully pass through each of the project phases in order to continue on to the next  Management reviews, also called phase exits or kill points, should occur after each phase to evaluate the project’s progress, likely success, and continued compatibility with organizational goals 22
  • 23. What Went Right? 23 "The real improvement that I saw was in our ability toin the words of Thomas Edisonknow when to stop beating a dead horse.…Edison's key to success was that he failed fairly often; but as he said, he could recognize a dead horse before it started to smell...In information technology we ride dead horsesfailing projectsa long time before we give up. But what we are seeing now is that we are able to get off them; able to reduce cost overrun and time overrun. That's where the major impact came on the success rate.”* Many organizations, like Huntington Bancshares, Inc., use an executive steering committee to help keep projects on track. *Cabanis, Jeannette, "'A Major Impact': The Standish Group's Jim Johnson On Project Management and IT Project Success," PM Network, PMI, Sep.1998, p. 7
  • 24. The Context of IT Projects  Diverse in terms of size, complexity, products produced, application area, and resource requirements  Diverse IT Project Team Members  Diverse Technologies 24
  • 25. Article: Tech Project and Direction  What have they been doing due to the recession and what direction are the moving into?  What are some of the top projects?  What industries are seeing growth in major IT projects? 25
  • 26. Article: Project Management & Software Development  Software development projects have distinct characteristics not found in other projects  Based on the article, what are some of these characteristics?  Which did you feel was the number one mistake a PM could do in software development projects? 26
  • 27. Closer to home….State Projects Information Technology Project Management, Seventh Edition 27 • Were state IT projects considered to be successful? • What were some of the main issues with state IT projects? • What are the recommendations for the review board? • Do you feel these are sufficient to fix the issues?
  • 28. Improving Likelihood of Success for IT Projects 28 • Value-Driven Approach • Socio-Technical Approach • Commit to Project Management Principles (Chaos Report) • Knowledge-Management Approach
  • 29. Recent Trends Affecting IT Project Management  Globalization  Outsourcing  Virtual teams Information Technology Project Management, Seventh Edition 29
  • 30. Important Issues and Suggestions Related to Globalization  Issues  Communications  Trust  Common work practices  Tools  Suggestions  Employ greater project discipline  Think global but act local  Keep project momentum going  Use newer tools and technology 30
  • 31. Outsourcing  Organizations remain competitive by using outsourcing to their advantage, such as finding ways to reduce costs  Their next challenge is to make strategic IT investments with outsourcing by improving their enterprise architecture to ensure that IT infrastructure and business processes are integrated and standardized 31
  • 32. Virtual Teams: Advantages/Disadvantages  Advantages:  Increasing competiveness and responsiveness  Lowering costs  Increased expertise and flexibility  Increased work/life balance  Disadvantages:  Isolation &Interpersonal Relationships  Communication Problems  Dependence on Technology 32
  • 33. Approaches and Philosophy  eXtreme Project Management (XPM)  Holistic veiw of planning and managing  Projects don’t always fit traditional scheduling and formal techniques (they are chaotic)  Focuses on the “human side” of PM  Agile Project Management  Iterative, incremental approach  Popular  http://www.pmi.org/Certification/New-PMI-Agile- Certification.aspx 33
  • 34. Discussion  Given our past two lectures, do you feel it is harder to manage an IT project compared to a traditional project?  Name a few approaches you would use to manage stakeholders. Information Technology Project Management, Seventh Edition 34
  • 35. Chapter Summary  Systems approach when working on projects  Organization frames: structural, human resources, political, and symbolic  Project managers need to consider several factors due to the unique context of information technology projects  Recent trends affecting IT project management include globalization, outsourcing, virtual teams, and Agile Information Technology Project Management, Seventh Edition 35

Editor's Notes

  1. 4
  2. 5
  3. 6
  4. 7
  5. 9
  6. 10
  7. 11
  8. 12
  9. 13
  10. 14
  11. 16
  12. 17
  13. 19
  14. 20
  15. 24
  16. 28
  17. 29
  18. 31
  19. 32