CO-INNOVATION
INNOVATION PROJECT BL4 Calendar Roll, Backing Roll and Coating Station Improvement 2012.doc Page 1 of 3
INNOVATION PROJECT(BL4 Calendar Roll and TeraHartz)
1.1 Project Overview and Status
Project Title: Backing Line 4 Calendar Roll, Backing Roll & Nip
Station Improvement (CEA 3524)
Project Maturity:
(Highlight as required)
P1/2/3Project Status: (Highlight as required) Completed
Project start date: 2/15/2012 Estimated completion date: 9/2013, 1/23/2014
Project Number: CEA 3524 Project Leader: Ray Shen
Related project(s): Department: Project engineering
Location: LaGrange Sponsor(s) (if any):
Project objective: (One-liner elevator pitch):
Reduce paste usage on Backing Line 4.
Reduce non-destructive thickness test of
backing.
Size of the problem or opportunity - summary:
(Including time frame and location)
Planned revenue: $
Planned cost saving: $2,900,000/yr. ROI > 1 yr.
Actual saving: $1,700,000/yr. ROI < 1 Month
Contribution to Mission Zero (%): No
Project abstract: (<100 words: What is it? Why do we need it? How much will it cost?)
Progress updates (One or two lines on status and next steps to be completed at regular intervals. Click 'edit' to add)
Goal #1- Purchase and install a nip station with calendar roll and backing roll. A set of
temporary calendar roll and backing roll are included so they can be used in the short term.
Status: Completed. Installed temporary new calendar roll and backing roll in July 2012.
Actual cost saving: $1,700,000/yr. New nip station is not economically justifiable (remove
from project at this time).
Goal #2 - Paste viscosity will be tempered by controlling temperature of delivery pipe.
Status: On going. Complete design in Jan. Secure quote in Feb. Place equipment order in
Mar. Installation in Jun. /Jul. Startup in July.
Goal #3 - A thickness measurement device will detect total add-on (was to measure paste
thickness and close-loop control the gap between the calendar roll and backing roll.).
Status: Installed THz & Training on 1/23/14. Await verification test result. Identified
Terahertz as best of class in gauge scanner. Evaluate vendor financial stability in Jan.,
2013.
All files are in Maint. Drive and Engrg. Drive.
How does the project align with our strategy? (Which Vector or enabler does it support?)
CO-INNOVATION
INNOVATION PROJECT BL4 Calendar Roll, Backing Roll and Coating Station Improvement 2012.doc Page 2 of 3
Project key words/Primary focus area: Calendar, Backing, Roll, Paste, Plastisol, Gauge, Scanner, Beta,
Coater, Coating, Cost Reduction, Temperature, Viscosity, TeraHertz.
1.2 Problem or opportunity definition
Problem/opportunity summary (One-liner on the basic need): Cost Reduction ($/sq. yd.) - Reduce plastisol
purchase.
Why is it a problem (or opportunity) and what is the size of the problem (or opportunity)?
1. Old calendar roll and backing roll were not strong enough for our process. We have been using
addition paste to over-come bow/gap between the rolls.
2. Ambient temperature change changes viscosity of paste. Operators do additional weight check and
adjust coater more when the temperatures change. If we can temper the temperature (range), we
can control viscosity (range).
3. Existing paste thickness test requires labor, finished goods, and time (delay result).
4. Lack of paste process control and process understanding.
Intellectual Property (Has patents/design rights/trademarks/copyright work been initiated? N/A
1.3 Size of the problem or opportunity - further information
Total addressable market / total potential savings:
Calendar/backing roll saving is $715M (7/16/12 to 12/16/12) YTD. Annualized saving is
$1,690M.
The expected saving of the project is approximately $2,900M per year. A 6.65 oz./sq. yd.
thick paste improvement is equal to approximately $2.9MM annual saving (2012 based).
Contribution to Mission Zero (%): (And rationale) ([Energy Efficiency][Renewable Energy][Waste Elimination][Water
Intake][Recycled Materials])
What are the criteria for success?
Goal #1 – Creation of a process capable of delivering an even paste add-on for first station
that is within the current spec of +/- 1 oz./sq. yd. Reduction of total paste add-
on.
Goal #2 – Control paste temperature at 85 F +/- 2 F. Control delivered paste viscosity.
Goal #3 – Elimination of destructive weight checks.
What does success look like? (Including who stands to benefit and how)
Everyone will benefit from reducing amount of raw material usage. It reduces the
amount of materials consumed in manufacturing our product that has a positive LCA
impact and reduces the cost of manufacturing the product.
Controlling paste temperature/viscosity will reduce process variation and will benefit both
the operations and technical teams. It is also expected to simplify the process of starting
the line in the mornings because there will no longer be a need to clear out the paste
delivery pipes.
Installing a gauge scanner will provide real time total add-on information allowing for
better control of add on, and eliminates the waste (material and time) of the current
destructive weight checks.
CO-INNOVATION
INNOVATION PROJECT BL4 Calendar Roll, Backing Roll and Coating Station Improvement 2012.doc Page 3 of 3
1.4 Gap analysis
What existing whole or partial solutions exist at Interface or externally?
1. Gauge scanning systems are in use by Interface Europe on some processes.
2. Paste oz. per sq. yd. is currently lower in Asia Pacific than in US but due to material
and process speed differences, there is not a technical advantage to use TeraHertz
(http://www.autocontroltech.com). It does show that the product can perform
satisfactorily at the lower weight.
How are others solving this problem today? Is there any Interface experience relevant to solving this problem? Have
there been past attempts that can be learned from.
1. A Beta Gauge was used previously on BL4 but was set up to measure a layer of PVC applied to
the carpet. The variation in the previous processes made this difficult to use and it was not a
reliable measure. Other divisions of the company have beta gauges in use but have found it that
even with before and after measurements, that reliability can be an issue.
2. Paste heating was tried previously on BL4 and in Shanghai facility. In both instances, the paste
began to cure inside the tank/pipes when wall temperature reaches 110 F. This has helped us to
investigate using a jacketed pipe with temperature controlled water loop to controlling paste
temperature. However, this concept is economically unfeasible.
1.5 Leadership, core team, networks & resources
Project Leader(s):
Ray Shen
Technical champion(s): Tim Mitchell, Zah,
Secondary leader(s): Pat Briggs, Chris Gleaton.
Team Members: Please provide details of the wider team or expert network, including details of
recruitment, briefing, current relationship and know-how:
Production – Dale Bowen, Tripp Skinner, BL4 operators.
Maint. – Chris Gleaton, Steve Miles,
Technical – Tim Mitchell.
R&D – C. H. Zah, James Wood, James White.
Project – Eddie Bradley, Pat Briggs, Walter Monk
EHS – Steve Decker, Byron Parker
Finance – Kerry Gibson
Purchasing – Sherri Bernasconi, Terri Landreth
External Project Partner(s) (if any): (Please provide details, summarise their role, level of involvement and whether
the relationship is past, present or future)
N/A

More Related Content

What's hot

one_page_teaser_
one_page_teaser_one_page_teaser_
one_page_teaser_Alex Feerer
 
Greenlab services and tests
Greenlab services and testsGreenlab services and tests
Greenlab services and testsShaaz Vsm
 
Contract Risk Assessment by using integrated systems
Contract Risk Assessment by using integrated systemsContract Risk Assessment by using integrated systems
Contract Risk Assessment by using integrated systemsPedram Danesh-Mand
 
Your Field is Getting Older: Is your Process Engineering Still Cost Effective?
Your Field is Getting Older: Is your Process Engineering Still Cost Effective?Your Field is Getting Older: Is your Process Engineering Still Cost Effective?
Your Field is Getting Older: Is your Process Engineering Still Cost Effective?Society of Petroleum Engineers
 

What's hot (7)

Rengaraj n c vdone
Rengaraj  n c vdoneRengaraj  n c vdone
Rengaraj n c vdone
 
one_page_teaser_
one_page_teaser_one_page_teaser_
one_page_teaser_
 
Lean - Tight Oil Design & Construction
Lean - Tight Oil Design & ConstructionLean - Tight Oil Design & Construction
Lean - Tight Oil Design & Construction
 
The Green Buiding Debate
The Green Buiding DebateThe Green Buiding Debate
The Green Buiding Debate
 
Greenlab services and tests
Greenlab services and testsGreenlab services and tests
Greenlab services and tests
 
Contract Risk Assessment by using integrated systems
Contract Risk Assessment by using integrated systemsContract Risk Assessment by using integrated systems
Contract Risk Assessment by using integrated systems
 
Your Field is Getting Older: Is your Process Engineering Still Cost Effective?
Your Field is Getting Older: Is your Process Engineering Still Cost Effective?Your Field is Getting Older: Is your Process Engineering Still Cost Effective?
Your Field is Getting Older: Is your Process Engineering Still Cost Effective?
 

Similar to Reduce Plastisol Usage and Improve Backing Process Control

A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...Phillip Chan
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ finalScott Coombes
 
NQC Best of the best 2014 slide March 22 2015 Final version
NQC Best of the best 2014 slide  March 22 2015 Final versionNQC Best of the best 2014 slide  March 22 2015 Final version
NQC Best of the best 2014 slide March 22 2015 Final versionMo'ath Thwapiah
 
Building Energy Efficiency Metrics: From Title 24 to EUI
Building Energy Efficiency Metrics: From Title 24 to EUIBuilding Energy Efficiency Metrics: From Title 24 to EUI
Building Energy Efficiency Metrics: From Title 24 to EUIRed Car Analytics
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...q-Maxim
 
Lean Management
Lean ManagementLean Management
Lean ManagementAshish Dev
 
Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)
Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)
Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)Kartik Suvarna
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman LewisEvan Lewis
 
Atos Worldline Project I Rui Zhu Telerex
Atos Worldline Project I Rui Zhu TelerexAtos Worldline Project I Rui Zhu Telerex
Atos Worldline Project I Rui Zhu TelerexRui Zhu
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxfestockton
 
Ldi Venture In Shell
Ldi Venture In ShellLdi Venture In Shell
Ldi Venture In ShellDayo Adebayo
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.Raheem Arif
 
Nrmca Webinar "Reducing Concrete Variability"
Nrmca Webinar "Reducing Concrete Variability"Nrmca Webinar "Reducing Concrete Variability"
Nrmca Webinar "Reducing Concrete Variability"guest9a80233
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 

Similar to Reduce Plastisol Usage and Improve Backing Process Control (20)

A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
 
Innovation in Structural Pack Design
Innovation in Structural Pack DesignInnovation in Structural Pack Design
Innovation in Structural Pack Design
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
NQC Best of the best 2014 slide March 22 2015 Final version
NQC Best of the best 2014 slide  March 22 2015 Final versionNQC Best of the best 2014 slide  March 22 2015 Final version
NQC Best of the best 2014 slide March 22 2015 Final version
 
Pierson 06012016
Pierson 06012016Pierson 06012016
Pierson 06012016
 
Ppx
PpxPpx
Ppx
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Building Energy Efficiency Metrics: From Title 24 to EUI
Building Energy Efficiency Metrics: From Title 24 to EUIBuilding Energy Efficiency Metrics: From Title 24 to EUI
Building Energy Efficiency Metrics: From Title 24 to EUI
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...
 
E04712935
E04712935E04712935
E04712935
 
E04712935
E04712935E04712935
E04712935
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)
Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)
Senior Design Project - B.S. Mechanical Engineering (ITV Research and analysis)
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
Atos Worldline Project I Rui Zhu Telerex
Atos Worldline Project I Rui Zhu TelerexAtos Worldline Project I Rui Zhu Telerex
Atos Worldline Project I Rui Zhu Telerex
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
 
Ldi Venture In Shell
Ldi Venture In ShellLdi Venture In Shell
Ldi Venture In Shell
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
 
Nrmca Webinar "Reducing Concrete Variability"
Nrmca Webinar "Reducing Concrete Variability"Nrmca Webinar "Reducing Concrete Variability"
Nrmca Webinar "Reducing Concrete Variability"
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 

Reduce Plastisol Usage and Improve Backing Process Control

  • 1. CO-INNOVATION INNOVATION PROJECT BL4 Calendar Roll, Backing Roll and Coating Station Improvement 2012.doc Page 1 of 3 INNOVATION PROJECT(BL4 Calendar Roll and TeraHartz) 1.1 Project Overview and Status Project Title: Backing Line 4 Calendar Roll, Backing Roll & Nip Station Improvement (CEA 3524) Project Maturity: (Highlight as required) P1/2/3Project Status: (Highlight as required) Completed Project start date: 2/15/2012 Estimated completion date: 9/2013, 1/23/2014 Project Number: CEA 3524 Project Leader: Ray Shen Related project(s): Department: Project engineering Location: LaGrange Sponsor(s) (if any): Project objective: (One-liner elevator pitch): Reduce paste usage on Backing Line 4. Reduce non-destructive thickness test of backing. Size of the problem or opportunity - summary: (Including time frame and location) Planned revenue: $ Planned cost saving: $2,900,000/yr. ROI > 1 yr. Actual saving: $1,700,000/yr. ROI < 1 Month Contribution to Mission Zero (%): No Project abstract: (<100 words: What is it? Why do we need it? How much will it cost?) Progress updates (One or two lines on status and next steps to be completed at regular intervals. Click 'edit' to add) Goal #1- Purchase and install a nip station with calendar roll and backing roll. A set of temporary calendar roll and backing roll are included so they can be used in the short term. Status: Completed. Installed temporary new calendar roll and backing roll in July 2012. Actual cost saving: $1,700,000/yr. New nip station is not economically justifiable (remove from project at this time). Goal #2 - Paste viscosity will be tempered by controlling temperature of delivery pipe. Status: On going. Complete design in Jan. Secure quote in Feb. Place equipment order in Mar. Installation in Jun. /Jul. Startup in July. Goal #3 - A thickness measurement device will detect total add-on (was to measure paste thickness and close-loop control the gap between the calendar roll and backing roll.). Status: Installed THz & Training on 1/23/14. Await verification test result. Identified Terahertz as best of class in gauge scanner. Evaluate vendor financial stability in Jan., 2013. All files are in Maint. Drive and Engrg. Drive. How does the project align with our strategy? (Which Vector or enabler does it support?)
  • 2. CO-INNOVATION INNOVATION PROJECT BL4 Calendar Roll, Backing Roll and Coating Station Improvement 2012.doc Page 2 of 3 Project key words/Primary focus area: Calendar, Backing, Roll, Paste, Plastisol, Gauge, Scanner, Beta, Coater, Coating, Cost Reduction, Temperature, Viscosity, TeraHertz. 1.2 Problem or opportunity definition Problem/opportunity summary (One-liner on the basic need): Cost Reduction ($/sq. yd.) - Reduce plastisol purchase. Why is it a problem (or opportunity) and what is the size of the problem (or opportunity)? 1. Old calendar roll and backing roll were not strong enough for our process. We have been using addition paste to over-come bow/gap between the rolls. 2. Ambient temperature change changes viscosity of paste. Operators do additional weight check and adjust coater more when the temperatures change. If we can temper the temperature (range), we can control viscosity (range). 3. Existing paste thickness test requires labor, finished goods, and time (delay result). 4. Lack of paste process control and process understanding. Intellectual Property (Has patents/design rights/trademarks/copyright work been initiated? N/A 1.3 Size of the problem or opportunity - further information Total addressable market / total potential savings: Calendar/backing roll saving is $715M (7/16/12 to 12/16/12) YTD. Annualized saving is $1,690M. The expected saving of the project is approximately $2,900M per year. A 6.65 oz./sq. yd. thick paste improvement is equal to approximately $2.9MM annual saving (2012 based). Contribution to Mission Zero (%): (And rationale) ([Energy Efficiency][Renewable Energy][Waste Elimination][Water Intake][Recycled Materials]) What are the criteria for success? Goal #1 – Creation of a process capable of delivering an even paste add-on for first station that is within the current spec of +/- 1 oz./sq. yd. Reduction of total paste add- on. Goal #2 – Control paste temperature at 85 F +/- 2 F. Control delivered paste viscosity. Goal #3 – Elimination of destructive weight checks. What does success look like? (Including who stands to benefit and how) Everyone will benefit from reducing amount of raw material usage. It reduces the amount of materials consumed in manufacturing our product that has a positive LCA impact and reduces the cost of manufacturing the product. Controlling paste temperature/viscosity will reduce process variation and will benefit both the operations and technical teams. It is also expected to simplify the process of starting the line in the mornings because there will no longer be a need to clear out the paste delivery pipes. Installing a gauge scanner will provide real time total add-on information allowing for better control of add on, and eliminates the waste (material and time) of the current destructive weight checks.
  • 3. CO-INNOVATION INNOVATION PROJECT BL4 Calendar Roll, Backing Roll and Coating Station Improvement 2012.doc Page 3 of 3 1.4 Gap analysis What existing whole or partial solutions exist at Interface or externally? 1. Gauge scanning systems are in use by Interface Europe on some processes. 2. Paste oz. per sq. yd. is currently lower in Asia Pacific than in US but due to material and process speed differences, there is not a technical advantage to use TeraHertz (http://www.autocontroltech.com). It does show that the product can perform satisfactorily at the lower weight. How are others solving this problem today? Is there any Interface experience relevant to solving this problem? Have there been past attempts that can be learned from. 1. A Beta Gauge was used previously on BL4 but was set up to measure a layer of PVC applied to the carpet. The variation in the previous processes made this difficult to use and it was not a reliable measure. Other divisions of the company have beta gauges in use but have found it that even with before and after measurements, that reliability can be an issue. 2. Paste heating was tried previously on BL4 and in Shanghai facility. In both instances, the paste began to cure inside the tank/pipes when wall temperature reaches 110 F. This has helped us to investigate using a jacketed pipe with temperature controlled water loop to controlling paste temperature. However, this concept is economically unfeasible. 1.5 Leadership, core team, networks & resources Project Leader(s): Ray Shen Technical champion(s): Tim Mitchell, Zah, Secondary leader(s): Pat Briggs, Chris Gleaton. Team Members: Please provide details of the wider team or expert network, including details of recruitment, briefing, current relationship and know-how: Production – Dale Bowen, Tripp Skinner, BL4 operators. Maint. – Chris Gleaton, Steve Miles, Technical – Tim Mitchell. R&D – C. H. Zah, James Wood, James White. Project – Eddie Bradley, Pat Briggs, Walter Monk EHS – Steve Decker, Byron Parker Finance – Kerry Gibson Purchasing – Sherri Bernasconi, Terri Landreth External Project Partner(s) (if any): (Please provide details, summarise their role, level of involvement and whether the relationship is past, present or future) N/A