The LDI Project – Venture Success Story in  Shell Presented by 7 August 2008
Agenda <ul><li>Background </li></ul><ul><li>Objectives </li></ul><ul><li>Workflow </li></ul><ul><li>Benefits </li></ul><ul...
Project Background <ul><li>Outcome RBI project  </li></ul><ul><li> –  No consistent capturing of critical log data. </li><...
Project Objectives <ul><li>Populate Recall database with complete set of Raw high value curves for each wellbore (2000). <...
Additional Project  Deliverables <ul><li>Published audit trail (LSS, Validation report, issue log) </li></ul><ul><li>Loadi...
Project Workflow Information retrieval (~1100) Data gathering (~580) Data improvement (~400) QA/QC Publish (~240) CDA Live...
Example of In-complete CDA Listing
Example of Completed CDA Listing
Example of Completed LSS
Example of Unclean (Sonde) Well
Example of Cleaned Well
Environmental data before
Environmental Data after
Project Quality Control <ul><ul><li>QA/QC by Fugro (senior staff) </li></ul></ul><ul><ul><li>QC by dedicated Shell staff i...
Example of QC Process - 1 Inconsistency of FDSL Processors In Batch 12, for 2 different wells (DTI 211/29-A10 & DTI 211/29...
Example of QC Process - 2
Project Benefits <ul><li>Cleaned Set of Log Data in Shell Production RECALL </li></ul><ul><li>Complete and Consistent set ...
Client’s Feedback “ They have integrated well with the rest of the team and are extremely keen! Both are performing a grea...
More Client’s Feedback Team,  w ith this e-mail I would like to:   - express my (i.e. the Business) appreciation of the ha...
THANKS
???
Upcoming SlideShare
Loading in …5
×

Ldi Venture In Shell

571 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
571
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Ldi Venture In Shell

    1. 1. The LDI Project – Venture Success Story in Shell Presented by 7 August 2008
    2. 2. Agenda <ul><li>Background </li></ul><ul><li>Objectives </li></ul><ul><li>Workflow </li></ul><ul><li>Benefits </li></ul><ul><li>Client’s Remarks </li></ul><ul><li>Questions??? </li></ul>
    3. 3. Project Background <ul><li>Outcome RBI project </li></ul><ul><li> – No consistent capturing of critical log data. </li></ul><ul><ul><li>– Inferior Quality of Recall database </li></ul></ul><ul><li>Best practice – WDQ project Assen. (1999- 2003) </li></ul>
    4. 4. Project Objectives <ul><li>Populate Recall database with complete set of Raw high value curves for each wellbore (2000). </li></ul><ul><li>Populate Recall database with depth matched joined curves for high value curves for most complete interval from surface to TD. </li></ul><ul><li>Assurance of completeness of Log data towards regulatory bodies (CDA) </li></ul>
    5. 5. Additional Project Deliverables <ul><li>Published audit trail (LSS, Validation report, issue log) </li></ul><ul><li>Loading Image and DIP logs to RECALL </li></ul><ul><li>Capturing MUD log data on RECALL/CDA </li></ul><ul><li>Loading of Cased-hole data (PLT/RST/TDT/PNT, etc) into RECALL and CDA </li></ul><ul><li>Changed ownership of third party field prints. (Fugro - Shell) </li></ul>
    6. 6. Project Workflow Information retrieval (~1100) Data gathering (~580) Data improvement (~400) QA/QC Publish (~240) CDA Livelink Recall TPA Recall IQM File sharing environment Recall
    7. 7. Example of In-complete CDA Listing
    8. 8. Example of Completed CDA Listing
    9. 9. Example of Completed LSS
    10. 10. Example of Unclean (Sonde) Well
    11. 11. Example of Cleaned Well
    12. 12. Environmental data before
    13. 13. Environmental Data after
    14. 14. Project Quality Control <ul><ul><li>QA/QC by Fugro (senior staff) </li></ul></ul><ul><ul><li>QC by dedicated Shell staff in LDI team (e.g. adherence to procedures by detailed spot-checks) </li></ul></ul><ul><ul><li>QC by experienced asset staff (spot-check) </li></ul></ul><ul><ul><li>Standard QA/QC monitoring with the help of Recall templates and IQM queries </li></ul></ul><ul><ul><li>Direct accessible audit trail documents in Livelink from recall and discovery. </li></ul></ul>
    15. 15. Example of QC Process - 1 Inconsistency of FDSL Processors In Batch 12, for 2 different wells (DTI 211/29-A10 & DTI 211/29-A19), one Processor named the 2 wireline logs ran for DTI 211/29-A19 correctly, while for DTI 211/29-A10, the other Processor did not.
    16. 16. Example of QC Process - 2
    17. 17. Project Benefits <ul><li>Cleaned Set of Log Data in Shell Production RECALL </li></ul><ul><li>Complete and Consistent set of Well log data in CDA </li></ul><ul><li>Data Synchronization and Integration between RECALL and other Shell database – OpenWorks </li></ul><ul><li>Best Data Management Practise in Shell EPE Europe </li></ul><ul><li>Revenue for Venture </li></ul><ul><li>More Opportunities for Venture in Shell EPE Europe </li></ul>
    18. 18. Client’s Feedback “ They have integrated well with the rest of the team and are extremely keen! Both are performing a great job and Israel is a real star, he is helping to drive the project along. Both of them are an asset to the project” (J. Rowe – LDI Project Team Lead
    19. 19. More Client’s Feedback Team, w ith this e-mail I would like to: - express my (i.e. the Business) appreciation of the hard work the LDI team has delivered and - demonstrate my (i.e. the Business) commitment to the LDI project I know you have been working, contrary to expectations, much more in a QC mode than in a QA mode (and therefore the project has not YET delivered the volumes we would have hoped for) but I can assure you that the Business has been very happy with the quality of the final results. Also through your efforts we now slowly see a change in the quality and speed of Fugro's deliverables. We still have a long way to go but I am sure that through your efforts we will get there. Once again: thanks !!! Regards Goos Bakker Chief Petrophysicist Shell EPE
    20. 20. THANKS
    21. 21. ???

    ×