SlideShare a Scribd company logo
1 of 3
Download to read offline
1
Esakkiappa, Ramasamy
From: McKenzie, Don
Sent: 01 February 2016 16:21
To: Esakkiappa, Ramasamy; Siyad, Muhammed; Amarnath Santh; Kuppusamy, Ratheesh; Rais,
Nasir; Thiagarajan, Manickam; Raja, Rajkumar
Cc: Chandrasekaran, Sriranjani; Cherian, Sunny; Francu, George; Hashmi, Muhammad; Jacob,
Raji; Kalarikkel, Syam; Malusare, Yogesh; Mathew, Ajith Abu Dhabi; Nayipadiyil,
Rajeshkumar; Purayil, Manu; Sashindran, Sumith; Treherne, Alex; Noel Watiwat; Modgil,
Vishal; Jeganathan, Subaraj; Ahmed, Furqan; Kalanithi Sambandaswamy; Chacko, Shaju;
Denton, Noel; Shinde, Ravi; Curson, Nigel; Quiggin, Barry; Simm, Michael; Karanikis, Mario
Subject: RE: 11366: A34501-SN-PL-LT-0066 - Review UG Composite - Appreciation note
Dear Abu Dhabi Civil & Composite team,
Well done guys! Sorry I could not be there to support you in the final phase, but hopefully the groundwork was laid in
getting everything to the first LD cut-off last summer.
Echoing Ravi’s comments, the U/G exercise was a very good example of how the disciplines can and should work closer
together. To my knowledge we have never had to produce anything like this before, and I hope the exercise has given each
discipline a better understanding and appreciation of the problems facing the other disciplines in putting together a
complex site like this. Closer cooperation as early in the design process as possible enables us to resolve common interface
issues, save time and money, and also hopefully make the whole project experience a bit more enjoyable, particularly in the
face of a client like Sini, and Marco in particular!
Hopefully it has also been enlightening for the area and project management, in understanding just what is involved in
putting together a detailed design like this from the Civil perspective. Apart from being at the end of the project
‘production line’ in terms of available (and very occasionally ‘frozen’!) data, there were 6 separate layers of site layout
required (earthworks, roads, drainage, piling, foundations and finally the UG composite). On top of that every individual
steel structure, concrete structure, foundation, pipe support and sleeper had to be analysed and designed.
I’m aware that the other disciplines also have their own issues in successfully completing the complexities of their scopes,
also in the face of a difficult client and project resourcing. Again, well done everyone.
All the best,
Don
Don McKenzie | Head of Civil & Structural Engineering
Penspen | 3 Water Lane, Richmond upon Thames, Surrey. TW9 1TJ
SwBd +44 (0) 20 8334 2700 | Direct +44 (0) 20 8334 2780
W www.penspen.com| E d.mckenzie@penspen.com
From: Shinde, Ravi
Sent: 26 January 2016 11:39
To: Cherian, Sunny; Amarnath Santh; Chandrasekaran, Sriranjani; Chithambaram, Rajesh; Francu, George; Hashmi,
Muhammad; Herrera, Enero B.; Hussain, Narghis; Jacob, Raji; Kalarikkel, Syam; Kuppusamy, Ratheesh; Malusare, Yogesh;
Mathew, Ajith Abu Dhabi; Nayipadiyil, Rajeshkumar; Purayil, Manu; Rais, Nasir; Sashindran, Sumith; Thiagarajan, Manickam;
Treherne, Alex; Noel Watiwat; Siyad, Muhammed; Modgil, Vishal; Jeganathan, Subaraj; Ahmed, Furqan; Kalanithi
Sambandaswamy; Raja, Rajkumar; Chithambaram, Rajesh; Esakkiappa, Ramasamy
Cc: Denton, Noel; Chacko, Shaju
Subject: RE: 11366: A34501-SN-PL-LT-0066 - Review UG Composite - Appreciation note
All,
At last some positive notes from the Client to be happy about.
Appreciate Civil team’s efforts in achieving this success for the UG Composite Plans and expect the same level of
contribution for the rest of the project deliverables.
2
A Big thanks to all the supporting discipline engineers who contributed and exhibited excellent teamwork to make the Civil
team achieve this.
We need to continue to show the same team spirit to achieve greater success in the future.
Regards
Ravi
From: Cherian, Sunny
Sent: 26 January 2016 08:48
To: Amarnath Santh; Chandrasekaran, Sriranjani; Chithambaram, Rajesh; Francu, George; Hashmi, Muhammad; Herrera,
Enero B.; Hussain, Narghis; Jacob, Raji; Kalarikkel, Syam; Kuppusamy, Ratheesh; Malusare, Yogesh; Mathew, Ajith Abu
Dhabi; Nayipadiyil, Rajeshkumar; Purayil, Manu; Rais, Nasir; Sashindran, Sumith; Thiagarajan, Manickam; Treherne, Alex;
Noel Watiwat; Siyad, Muhammed; Modgil, Vishal; Jeganathan, Subaraj; Shinde, Ravi; Ahmed, Furqan; Kalanithi
Sambandaswamy; Raja, Rajkumar; Chithambaram, Rajesh; Esakkiappa, Ramasamy
Cc: Denton, Noel; Chacko, Shaju
Subject: 11366: A34501-SN-PL-LT-0066 - Review UG Composite - Appreciation note
Dear team,
I am very happy to share the attached letters received from SINI regarding the result of UG composite review.
The UG composite drawing was the most difficult deliverable of this project.
It includes all UG facilities of Civil, Mechanical, piping, LP, Electrical & Instrumentation.
The UG composite was managed by Civil team by taking input from other disciplines. Well done, Vishal & team……
I should mention the names of Ramasamy, Siyad, Subaraj , Noel Watiwat for their excellent contribution
With regards,
Sunny Cherian
Project Manager
Penspen | Business Avenue Tower, Salam Street, Abu Dhabi, UAE.
T +971 2 6792526 Ext. 373| F +971 2 6780913| P.O. Box 46562
M +971 50 6838242
W www.penspen.com| E s.cherian@penspen.com
We have rebranded. Visit www.penspen.com to take a look.
From: G.Schieppati@sini.it [mailto:G.Schieppati@sini.it]
Sent: Monday, January 25, 2016 7:23 PM
To: Cherian, Sunny
Cc: 'A34501-2013@sini.it'; Purayil, Manu; F.Giudici@sini.it; V.Taiocchi@sini.it; M.Marisca@sini.it; M.Bonati@sini.it;
Nayipadiyil, Rajeshkumar; v.zolla@sini.it; S.Mallia@sini.it; Amarnath Santh
Subject: A34501-SN-PL-LT-0066 - Review UG Composite Plan rev.1 - UNIT 400
To PL:
Date: 25.01.2016
Siirtec Nigi Letter No A34501-SN-PL-LT-0066
3
Giorgio Schieppati
Project Engineer
Siirtec Nigi S.p.A
tel. 0239223247(direct)
e.mail: g.schieppati@sini.it
SIIRTEC NIGI Spa con socio unico
Via Algardi 2 - 20148 Milano, Italy
Phone: +3902392231 Fax: +390239223010 website: http://www.sini.it
Capitale sociale EUR 10.000.000 i.v.- Partita IVA 07612390968 -Reg.Imprese di Milano n? 07612390968
Società soggetta ad attività di Direzione e Coordinamento da parte dell'unico socio SIIRTEC NIGI HOLDING
Spa
Confidentiality Notice
This e-mail and any attached files contain confidential information for the exclusive use of the intended
recipient(s) only.
The unauthorised use, disclosure or copying of this e-mail or any information contained within it is strictly
prohibited and may be illegal.
If you are not the intended recipient, please notify the author immediately by e-mail then delete this e-mail
and destroy any copies of it.
********************

More Related Content

Viewers also liked

Viewers also liked (18)

Team 2 Appreciation
Team 2 AppreciationTeam 2 Appreciation
Team 2 Appreciation
 
Servicios ftp
Servicios ftpServicios ftp
Servicios ftp
 
Disolucion de sociedades mercantiles
Disolucion de sociedades mercantilesDisolucion de sociedades mercantiles
Disolucion de sociedades mercantiles
 
Resume
ResumeResume
Resume
 
Ichlazul expoooo
Ichlazul expooooIchlazul expoooo
Ichlazul expoooo
 
Đáp án chính thức môn Toán - Khối A - Kỳ thi Đại học năm 2010
Đáp án chính thức môn Toán - Khối A - Kỳ thi Đại học năm 2010Đáp án chính thức môn Toán - Khối A - Kỳ thi Đại học năm 2010
Đáp án chính thức môn Toán - Khối A - Kỳ thi Đại học năm 2010
 
Giới thiệu khu đô thị Hồng Vũ Sông Công - Thái Nguyên
Giới thiệu khu đô thị Hồng Vũ Sông Công - Thái NguyênGiới thiệu khu đô thị Hồng Vũ Sông Công - Thái Nguyên
Giới thiệu khu đô thị Hồng Vũ Sông Công - Thái Nguyên
 
rohith
rohithrohith
rohith
 
Resume
ResumeResume
Resume
 
6WINDGate™ - Powering the New Generation of Network Appliances
6WINDGate™ - Powering the New Generation of Network Appliances6WINDGate™ - Powering the New Generation of Network Appliances
6WINDGate™ - Powering the New Generation of Network Appliances
 
6WINDGate™ - Accelerated Data Plane Solution for EPC and vEPC
6WINDGate™ - Accelerated Data Plane Solution for EPC and vEPC6WINDGate™ - Accelerated Data Plane Solution for EPC and vEPC
6WINDGate™ - Accelerated Data Plane Solution for EPC and vEPC
 
Plc introduction
Plc  introductionPlc  introduction
Plc introduction
 
Pre Opening Team Training
Pre Opening Team TrainingPre Opening Team Training
Pre Opening Team Training
 
Hoisting Ltd
Hoisting LtdHoisting Ltd
Hoisting Ltd
 
Intrapreneurship
IntrapreneurshipIntrapreneurship
Intrapreneurship
 
Resume
ResumeResume
Resume
 
Karanjeet Singh Resume
Karanjeet Singh ResumeKaranjeet Singh Resume
Karanjeet Singh Resume
 
Meu perfil
Meu perfilMeu perfil
Meu perfil
 

Appreciation Mail

  • 1. 1 Esakkiappa, Ramasamy From: McKenzie, Don Sent: 01 February 2016 16:21 To: Esakkiappa, Ramasamy; Siyad, Muhammed; Amarnath Santh; Kuppusamy, Ratheesh; Rais, Nasir; Thiagarajan, Manickam; Raja, Rajkumar Cc: Chandrasekaran, Sriranjani; Cherian, Sunny; Francu, George; Hashmi, Muhammad; Jacob, Raji; Kalarikkel, Syam; Malusare, Yogesh; Mathew, Ajith Abu Dhabi; Nayipadiyil, Rajeshkumar; Purayil, Manu; Sashindran, Sumith; Treherne, Alex; Noel Watiwat; Modgil, Vishal; Jeganathan, Subaraj; Ahmed, Furqan; Kalanithi Sambandaswamy; Chacko, Shaju; Denton, Noel; Shinde, Ravi; Curson, Nigel; Quiggin, Barry; Simm, Michael; Karanikis, Mario Subject: RE: 11366: A34501-SN-PL-LT-0066 - Review UG Composite - Appreciation note Dear Abu Dhabi Civil & Composite team, Well done guys! Sorry I could not be there to support you in the final phase, but hopefully the groundwork was laid in getting everything to the first LD cut-off last summer. Echoing Ravi’s comments, the U/G exercise was a very good example of how the disciplines can and should work closer together. To my knowledge we have never had to produce anything like this before, and I hope the exercise has given each discipline a better understanding and appreciation of the problems facing the other disciplines in putting together a complex site like this. Closer cooperation as early in the design process as possible enables us to resolve common interface issues, save time and money, and also hopefully make the whole project experience a bit more enjoyable, particularly in the face of a client like Sini, and Marco in particular! Hopefully it has also been enlightening for the area and project management, in understanding just what is involved in putting together a detailed design like this from the Civil perspective. Apart from being at the end of the project ‘production line’ in terms of available (and very occasionally ‘frozen’!) data, there were 6 separate layers of site layout required (earthworks, roads, drainage, piling, foundations and finally the UG composite). On top of that every individual steel structure, concrete structure, foundation, pipe support and sleeper had to be analysed and designed. I’m aware that the other disciplines also have their own issues in successfully completing the complexities of their scopes, also in the face of a difficult client and project resourcing. Again, well done everyone. All the best, Don Don McKenzie | Head of Civil & Structural Engineering Penspen | 3 Water Lane, Richmond upon Thames, Surrey. TW9 1TJ SwBd +44 (0) 20 8334 2700 | Direct +44 (0) 20 8334 2780 W www.penspen.com| E d.mckenzie@penspen.com From: Shinde, Ravi Sent: 26 January 2016 11:39 To: Cherian, Sunny; Amarnath Santh; Chandrasekaran, Sriranjani; Chithambaram, Rajesh; Francu, George; Hashmi, Muhammad; Herrera, Enero B.; Hussain, Narghis; Jacob, Raji; Kalarikkel, Syam; Kuppusamy, Ratheesh; Malusare, Yogesh; Mathew, Ajith Abu Dhabi; Nayipadiyil, Rajeshkumar; Purayil, Manu; Rais, Nasir; Sashindran, Sumith; Thiagarajan, Manickam; Treherne, Alex; Noel Watiwat; Siyad, Muhammed; Modgil, Vishal; Jeganathan, Subaraj; Ahmed, Furqan; Kalanithi Sambandaswamy; Raja, Rajkumar; Chithambaram, Rajesh; Esakkiappa, Ramasamy Cc: Denton, Noel; Chacko, Shaju Subject: RE: 11366: A34501-SN-PL-LT-0066 - Review UG Composite - Appreciation note All, At last some positive notes from the Client to be happy about. Appreciate Civil team’s efforts in achieving this success for the UG Composite Plans and expect the same level of contribution for the rest of the project deliverables.
  • 2. 2 A Big thanks to all the supporting discipline engineers who contributed and exhibited excellent teamwork to make the Civil team achieve this. We need to continue to show the same team spirit to achieve greater success in the future. Regards Ravi From: Cherian, Sunny Sent: 26 January 2016 08:48 To: Amarnath Santh; Chandrasekaran, Sriranjani; Chithambaram, Rajesh; Francu, George; Hashmi, Muhammad; Herrera, Enero B.; Hussain, Narghis; Jacob, Raji; Kalarikkel, Syam; Kuppusamy, Ratheesh; Malusare, Yogesh; Mathew, Ajith Abu Dhabi; Nayipadiyil, Rajeshkumar; Purayil, Manu; Rais, Nasir; Sashindran, Sumith; Thiagarajan, Manickam; Treherne, Alex; Noel Watiwat; Siyad, Muhammed; Modgil, Vishal; Jeganathan, Subaraj; Shinde, Ravi; Ahmed, Furqan; Kalanithi Sambandaswamy; Raja, Rajkumar; Chithambaram, Rajesh; Esakkiappa, Ramasamy Cc: Denton, Noel; Chacko, Shaju Subject: 11366: A34501-SN-PL-LT-0066 - Review UG Composite - Appreciation note Dear team, I am very happy to share the attached letters received from SINI regarding the result of UG composite review. The UG composite drawing was the most difficult deliverable of this project. It includes all UG facilities of Civil, Mechanical, piping, LP, Electrical & Instrumentation. The UG composite was managed by Civil team by taking input from other disciplines. Well done, Vishal & team…… I should mention the names of Ramasamy, Siyad, Subaraj , Noel Watiwat for their excellent contribution With regards, Sunny Cherian Project Manager Penspen | Business Avenue Tower, Salam Street, Abu Dhabi, UAE. T +971 2 6792526 Ext. 373| F +971 2 6780913| P.O. Box 46562 M +971 50 6838242 W www.penspen.com| E s.cherian@penspen.com We have rebranded. Visit www.penspen.com to take a look. From: G.Schieppati@sini.it [mailto:G.Schieppati@sini.it] Sent: Monday, January 25, 2016 7:23 PM To: Cherian, Sunny Cc: 'A34501-2013@sini.it'; Purayil, Manu; F.Giudici@sini.it; V.Taiocchi@sini.it; M.Marisca@sini.it; M.Bonati@sini.it; Nayipadiyil, Rajeshkumar; v.zolla@sini.it; S.Mallia@sini.it; Amarnath Santh Subject: A34501-SN-PL-LT-0066 - Review UG Composite Plan rev.1 - UNIT 400 To PL: Date: 25.01.2016 Siirtec Nigi Letter No A34501-SN-PL-LT-0066
  • 3. 3 Giorgio Schieppati Project Engineer Siirtec Nigi S.p.A tel. 0239223247(direct) e.mail: g.schieppati@sini.it SIIRTEC NIGI Spa con socio unico Via Algardi 2 - 20148 Milano, Italy Phone: +3902392231 Fax: +390239223010 website: http://www.sini.it Capitale sociale EUR 10.000.000 i.v.- Partita IVA 07612390968 -Reg.Imprese di Milano n? 07612390968 Società soggetta ad attività di Direzione e Coordinamento da parte dell'unico socio SIIRTEC NIGI HOLDING Spa Confidentiality Notice This e-mail and any attached files contain confidential information for the exclusive use of the intended recipient(s) only. The unauthorised use, disclosure or copying of this e-mail or any information contained within it is strictly prohibited and may be illegal. If you are not the intended recipient, please notify the author immediately by e-mail then delete this e-mail and destroy any copies of it. ********************