SlideShare a Scribd company logo
1 of 15
Download to read offline
Assignment # 1
RAHEEM ULLAH
CS120162098
Section B
Page No. 1
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
CPEC ITS MISSION AND VISION:
China–Pakistan Economic Corridor ( ‫راہداری‬ ‫اقتصادی‬ ‫پاكستان-چین‬‎) is a part of china one belt
one road Economic corridor and it is a collection of infrastructure projects that are currently
under construction through Pakistan. It is more than just a $47 billion dollar investment in
Pakistan. China Pakistan Economic Corridor is a 3,218 km long route, to be built over next
several years, consisting of highways, railways and pipelines.
To improve the lives of people of Pakistan and China by building an economic
corridor promoting joint connectivity, construction, explore potential bilateral investment,
economic and trade, logistics and people to people contact for regional connectivity.
Regional and global connectivity for economic prosperity and development.
One Belt project Map CPEC Map overall Asia
MAIN PURPOSES OF CPEC :
CPEC is just a part of the huge One Belt project. Specifically
for CPEC the purposes to help China avoid the long sea route and directly have a
road route from China to Gwadar and access to warm waters and from there to
beyond. For this China is investing in the proper infrastructure and power projects in
Pakistan. It has a major portion in Pakistan and a small portion in China.
Page No. 2
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Basically, the transportation network of roads and railways connecting the city of Kashgar,
located in the Xinjiang province of China, to the China-Pakistan Border to Gwadar.
IMPACT OF CPEC ON OTHER COUNTRIES :
CPEC Corridor is a framework of regional connectivity. CPEC will not only benefit
China and Pakistan but will have positive impact on Iran, Afghanistan, India, Central Asian
Republic, and the region.
The enhancement of geographical linkages having improved road, rail and air
transportation system with frequent and free exchanges of growth and people to people
contact, enhancing understanding through academic, cultural and regional knowledge and
culture, activity of higher volume of flow of trade and businesses, producing and moving
energy to have more optimal businesses and enhancement of co-operation.
WHY CPEC IS IMPORTANT FOR PAKISTAN :
CPEC investment will be made in Pakistan much needed energy sector to
overcome electricity shortage for sustained growth of Pakistan economy.
Pakistan will become the most strategically important country in the region because it will
improve trade and economic connectivity between Asia, the Middle East and Europe. China
Pakistan Economic Corridor is journey towards economic regionalization in the globalized
world.
The corridor will be a strategic game changer in the region and would go a long way
in making Pakistan a richer and stronger entity Pakistan into a regional economic center.
Page No. 3
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Booster for investors and attract investment not only from China but other parts of the world
as well. 700,000 direct jobs between 2015–2030, for the people of Pakistan.
Add 2 to 2.5 percentage points to the country's annual economic growth.
PROJECT IN CPEC
1. INFRASTRUCTURE PROJECT
1.1 Highway Network for CPEC
1.2 Railway Network for CPEC7
2. ENERGY PROJECT
2.1 Energy shortfall in Pakistan is 4500
2.2 10,400MW energy generates 2020.
2.3 16,400 MW total Energy generate in project.
3. GWADAR PROJECT
3.1 Airport
3.2 Hospitals
3.3 University
4. OTHER PROJECT
4.1 Fiber optic Project.
Page No. 4
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
1 INFRASTRUCTURE PROJECT :
Highway Roads Projects
KKH Phase II (Thakot -Havelian Section)
Project Description Length: 118km
 Thakot-Havelian (118km) is in early harvest Project category and it is in
implementation phase after signing of commercial and financial
agreements.
 Start Point: Havelian
 End Point: Thakot
 Scope: Construction of 39 km 06 Lane Access Controlled MW, 79 km
Class-II Highway
 Type of Road: Expressway/ Access Controlled Highway (Class-II)
Responsibility:
 Proposing Agency: Ministry of Communications
 Implementing Agency: National Highway Authority
 Supervising Agency: Ministry of Communications, Government of
Pakistan
Location (Thakot -Havelian) Khyber Pakhtunkhwa
Province Khyber Pakhtunkhwa
Estimated Cost (US $ Million) 1,315
Executing Company / Sponsors M/s China Communications Construction Company Ltd
Financing Government Concessional Loan(GCL)
Supervising Agency Ministry of Communications, Government of Pakistan
Project Progress Update  Work commenced in September, 2016
 Contractor mobilized
 To be completed by March 2020
Page No. 5
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Peshawar-Karachi Motorway (Multan-Sukkur Section)
Project Description Length: 392km
Project Name: Peshawar – Karachi Motorway
Project Title (Section): Multan – Sukkur: 392 KM
 Karachi – Peshawar Motorway envisages
construction / development of 6-Lane access
controlled Motorway having total length of
1,100 Km. the proposed Motorway shall be a
tolled facility. It shall originate from Karachi
through Motorway M-9 (136 Km) up to
Hyderabad. From Hyderabad onwards, the
proposed alignment shall follow a virgin
alignment for 345 Km up to Sukkur. The
Sukkur Multan section, 392 Km essentially
follows the Left Bank of River Indus.
 Type of Road: 06 Lane Access Controlled
Motorway
 Start Point: Multan
 End Point: Sukkar
Responsibility:
 Proposing Agency: Ministry of
Communications
 Implementing Agency: National Highway
Authority
 Supervising Agency: Ministry of
Communications, Government of Pakistan
Location Province of Punjab and Sindh
Province Punjab and Sindh
Estimated Cost (US $ Million) 2,889
Executing Company / Sponsors M/s China State Construction Engineering
Corporation
Financing Government Concessional Loan(GCL)
Supervising Agency Ministry of Communications, Government of
Pakistan
Khuzdar-Basima Road N-30 (110 km)
Project Description The project is located in District Khuzdar in
Baluchistan province. The project is construction of
2-lane highway from Basima to Khuzdar. The
project length is 110 km.
Location District Khuzdar in Baluchistan
Province Balochistan
Estimated Cost (US $ Million) 19.19 Billion Rupee
Executing Company / Sponsors National Highway Authority
Supervising Agency Ministry of Communications
Project Progress Update  Feasibility and PC-I completed
 PC-I has been approved by ECNEC on 12-
04-2017
 Procurement of Civil Work is under
process
 The project Basima Khuzdar has been
taken up through PSDP
Page No. 6
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km)
Project Description Salient Features of the Project:
 On existing alignment (section of N-50) with
geometric improvements
 210 km in length. Improvement / Upgradation
of 2 lane existing road to 4 lane. 100m R.O.W
will be acquired to upgrade it to 6 lanes in
future
Estimated Cost:
 Total (Construction plus land
acquisition): Rs.76,486 million
Province Khyber Pakhtunkhwa - Balochistan
Executing Company / Sponsors National Highway Authority
Supervising Agency Ministry of Communications
Project Progress Update  PC-I Approved by ECNEC on 12th April,
2017.
 Land acquisition in Progress.
 Accorded highest priority in 8th JCC
Page No. 7
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
KKH Thakot-Raikot N35 remaining portion (136 Km)
Province Khyber Pakhtunkhwa
Estimated Cost (US $ Million) Rs. 8.15 Billion
Executing Company / Sponsors National Highway Authority
Supervising Agency Ministry of Communications
Project Progress Update  Feasibility and PC-I completed
 PC-I has been approved by ECNEC on 18-
03-2017
 LOI forwarded to Chinese side
 Procedural formalities to be completed
shortly
Rail Sector Projects
Expansion and reconstruction of existing Line ML-1
Project Description Project Title: Rehabilitation & Up-gradation of
Karachi-Lahore Peshawar (ML-1) Railway Track
(1,872 kms)
Scope:
 Doubling of entire track from Karachi to
Peshawar
 Speed of passenger trains to be raise from
65/110km/h to 160 km/h
 Freight trains to operate at 120 km/h
 Computer based signaling and control system
 Grade separation to ensure safety of train
operations
Responsibility:
 Proposing Agency: Ministry of Railways
 Implementing Agency: Pakistan Railways
 Supervising Agency: Ministry of
Communications, Government of Pakistan
Location Karachi to Peshawar via Hyderabad, Nawabshah,
Rohri, RahimyarKhan, Bahawalpur, Khanewal,
Sahiwal, Lahore, Gujranwala, Rawalpindi,
Peshawar
Estimated Cost (US $ Million) 8,172
Page No. 8
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Havelian Dry port (450 M. Twenty-Foot Equivalent Units)
Project Description Project Title: Construction of Havelian Dry port
including cargo handling facilities.
Responsibility:
 Proposing Agency: Ministry of Railways
 Implementing Agency: Pakistan Railways
 Supervising Agency: Ministry of
Communications, Government of Pakistan
To meet the demand of containerized future freight
traffic in connection with Pak-China Economic
Corridor, the dry port will be established at
Havelian by utilizing the railway land, railhead
facilities, high speed / capacity stock, and potential
of well-established off-dock terminal for handling
bonded import / export containers. Pakistan
Railway network exist up to Havelian Railway
Station situated at more than 680 Kms from
Khunjrab (China border). The station is coming on
Pak-China economic corridor. Initially it will act as
Dry Port / container terminal for goods traffic
coming through road from China through KKH.
Transshipment arrangement will be provided at
Havelian for loading / unloading on railway wagons.
Location Havelian, District Haripur, KPK
Estimated Cost (US $ Million) 65
Page No. 9
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
ENERGY PROJECT
Zonergy Solar Power Plant
Located At Bahawalpur
World Largest solar Power Plant
$1.5 Billion Project
900 MV Production Expected
Build In 3 Phases
Complete At The end Of 2016 By
Zonergy Company
Suki Kinari Hydro Power Plant
It is in KPK
870 MW Produce
Started In 2014
End In 2020
Page No. 10
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Karot hydro Power plant
It is on Jhelum River near to the
Islamabad
Produce 720 MW
$1.65 Billion Project
Complete in 2020
By Three Goreges Corporation
Port Qasim Coal-Fired Power
Plant
$2.085 Billion Project
Complete By the End Of 2017
Produce 1320MW
By China Resource Limited
Page No. 11
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Wind Power Projects
Thatta Project (100 MW)
Hydro China Project (50 MW)
Sachal Project (50 MW)
GWADAR PROJECT
Page No. 12
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Gwadar International Airport
$230 million Project
On 3000 acres
Gwadar to Karachi, Turbat and
Muscat
Operational by December 2017
Gwadar City And Port
Gawadar Coal Power Project (360 million dollars)
construction of breakwaters (130 million dollars)
Water treatment plant (114 million dollars)
State-of-the-art hospital (100 million dollars)
Free Economic Zones (35 million dollars)
Technical and vocational institute (10 million dollars)
Page No. 13
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
Pak China Friendship Hospital
Location Gwadar district, Balochistan
Province Balochistan
Estimated Cost (US $ Million) 100
Company Gwadar Development Authority
Cross Border Optical Fiber Cable
The fiber optical cable covers an area of 820 km.The projects will help
improve the telecom and ICT industry of Pakistan, promote tourism
and create trading opportunities for northern areas of the country. It
will also provide the ICT infrastructure for 3G/4G services in the
northern areas and enhance communication security with an alternative
fiber route.
Location Gilgit Baltistan, Khyber Pakhtunkhwa, Punjab
Province Gilgit Baltistan, Khyber Pakhtunkhwa, Punjab
Estimated Cost (US $ Million) 37
“China Pakistan Economic Corridor is hope of better region
of the future with peace, development and growth of economy.”
Page No. 14
China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎)
References :
http://cpec.gov.pk
https://en.wikipedia.org/wiki/China%E2%80%93Pakistan_Economic_Corridor

More Related Content

What's hot

Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...
Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...
Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...Sustainable Development Policy Institute
 
Cpec issue and its significance in international diplomacy
Cpec issue and its significance in international diplomacyCpec issue and its significance in international diplomacy
Cpec issue and its significance in international diplomacyAshish jha
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic CorridorMubshir Hussain
 
Cpec( m.ehsan)
Cpec( m.ehsan)Cpec( m.ehsan)
Cpec( m.ehsan)Ahsan Rao
 
Cpec prestation by happy kumar
Cpec prestation by happy kumarCpec prestation by happy kumar
Cpec prestation by happy kumarHappy Ladher
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic CorridorShahNawazmangi2
 
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.MWaqasAkbar3
 
CPEC, A game changer
CPEC, A game changerCPEC, A game changer
CPEC, A game changerKinza Irshad
 
China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)Annie1199
 
CHINA-PAKISTAN ECONOMIC CORRIDOR
CHINA-PAKISTAN ECONOMIC CORRIDORCHINA-PAKISTAN ECONOMIC CORRIDOR
CHINA-PAKISTAN ECONOMIC CORRIDORNIZAM UL HAK
 
PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR Tanweer Sudhan
 
CPEC advantages and disadvantages
CPEC advantages and disadvantagesCPEC advantages and disadvantages
CPEC advantages and disadvantagesMuhammad salman
 

What's hot (20)

The Dark Side of CPEC
The Dark Side of CPECThe Dark Side of CPEC
The Dark Side of CPEC
 
Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...
Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...
Belt and Road Initiative and China-Pakistan Economic Corridor: Impact on Deve...
 
Cpec issue and its significance in international diplomacy
Cpec issue and its significance in international diplomacyCpec issue and its significance in international diplomacy
Cpec issue and its significance in international diplomacy
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic Corridor
 
Cpec new
Cpec newCpec new
Cpec new
 
China Pakistan Economic Cooperation
China Pakistan Economic Cooperation China Pakistan Economic Cooperation
China Pakistan Economic Cooperation
 
Cpec( m.ehsan)
Cpec( m.ehsan)Cpec( m.ehsan)
Cpec( m.ehsan)
 
What is cpec (pak.st)
What is cpec (pak.st)What is cpec (pak.st)
What is cpec (pak.st)
 
Cpec prestation by happy kumar
Cpec prestation by happy kumarCpec prestation by happy kumar
Cpec prestation by happy kumar
 
india vs china
india vs chinaindia vs china
india vs china
 
China Pakistan Economic Corridor
China Pakistan Economic CorridorChina Pakistan Economic Corridor
China Pakistan Economic Corridor
 
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.
 
Cpec, by Egr Khalil Dawar
Cpec,  by Egr Khalil DawarCpec,  by Egr Khalil Dawar
Cpec, by Egr Khalil Dawar
 
CPEC, A game changer
CPEC, A game changerCPEC, A game changer
CPEC, A game changer
 
China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)
 
CHINA-PAKISTAN ECONOMIC CORRIDOR
CHINA-PAKISTAN ECONOMIC CORRIDORCHINA-PAKISTAN ECONOMIC CORRIDOR
CHINA-PAKISTAN ECONOMIC CORRIDOR
 
Hurdles in CPEC
Hurdles in CPECHurdles in CPEC
Hurdles in CPEC
 
Cpec
CpecCpec
Cpec
 
PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR
 
CPEC advantages and disadvantages
CPEC advantages and disadvantagesCPEC advantages and disadvantages
CPEC advantages and disadvantages
 

Similar to CPEC OverView

China pakistan economic corridor (CPEC)
China pakistan economic corridor (CPEC)China pakistan economic corridor (CPEC)
China pakistan economic corridor (CPEC)ShahzaibSohail8
 
Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...
Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...
Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...Qadir Hassan
 
Pak china economic corridor
Pak china economic corridorPak china economic corridor
Pak china economic corridorshamroz kakar
 
Economic outcomes through cpec
Economic outcomes through cpecEconomic outcomes through cpec
Economic outcomes through cpecIqbal Naqvi
 
China Pakistan Economic Corridor(CPEC).pptx
China Pakistan Economic Corridor(CPEC).pptxChina Pakistan Economic Corridor(CPEC).pptx
China Pakistan Economic Corridor(CPEC).pptxHssainhmed
 
China pakistan economic corridor
China pakistan economic corridorChina pakistan economic corridor
China pakistan economic corridorTouseef Ahmad
 
Presentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor ProjectPresentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor ProjectAamir Gill
 
Pak china economic corridor (pcec)
Pak china economic corridor (pcec)Pak china economic corridor (pcec)
Pak china economic corridor (pcec)Umar Saeed
 
China pakistan economic corriddor
China pakistan economic corriddorChina pakistan economic corriddor
China pakistan economic corriddorSiddhartha Singh
 
Cpec internship report 2020 (1) 2
Cpec internship report 2020 (1) 2Cpec internship report 2020 (1) 2
Cpec internship report 2020 (1) 2RahatAhmad1
 
CPEC deloitte overview
CPEC   deloitte overviewCPEC   deloitte overview
CPEC deloitte overviewFarhan Munir
 
The significance, importance, challenges and opportunities of CPEC. (China-Pa...
The significance, importance, challenges and opportunities of CPEC. (China-Pa...The significance, importance, challenges and opportunities of CPEC. (China-Pa...
The significance, importance, challenges and opportunities of CPEC. (China-Pa...GulshanIdress
 
cpec expository essay
 cpec expository essay cpec expository essay
cpec expository essayzain ul hassan
 

Similar to CPEC OverView (20)

China pakistan economic corridor (CPEC)
China pakistan economic corridor (CPEC)China pakistan economic corridor (CPEC)
China pakistan economic corridor (CPEC)
 
Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...
Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...
Introduction to China Pakistan Economic Corridor(CPEC) and prospects of CPEC ...
 
CPEC and Economic Development
CPEC and Economic DevelopmentCPEC and Economic Development
CPEC and Economic Development
 
Pak china economic corridor
Pak china economic corridorPak china economic corridor
Pak china economic corridor
 
cpec
cpeccpec
cpec
 
Economic outcomes through cpec
Economic outcomes through cpecEconomic outcomes through cpec
Economic outcomes through cpec
 
Cpec
CpecCpec
Cpec
 
China Pakistan Economic Corridor(CPEC).pptx
China Pakistan Economic Corridor(CPEC).pptxChina Pakistan Economic Corridor(CPEC).pptx
China Pakistan Economic Corridor(CPEC).pptx
 
Cpec
CpecCpec
Cpec
 
China pakistan economic corridor
China pakistan economic corridorChina pakistan economic corridor
China pakistan economic corridor
 
Gwadar port (CEPEC)
Gwadar port (CEPEC)Gwadar port (CEPEC)
Gwadar port (CEPEC)
 
Presentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor ProjectPresentation on China Pakistan Economic Corridor Project
Presentation on China Pakistan Economic Corridor Project
 
Pak china economic corridor (pcec)
Pak china economic corridor (pcec)Pak china economic corridor (pcec)
Pak china economic corridor (pcec)
 
Cpec
CpecCpec
Cpec
 
China pakistan economic corriddor
China pakistan economic corriddorChina pakistan economic corriddor
China pakistan economic corriddor
 
Cpec internship report 2020 (1) 2
Cpec internship report 2020 (1) 2Cpec internship report 2020 (1) 2
Cpec internship report 2020 (1) 2
 
CPEC deloitte overview
CPEC   deloitte overviewCPEC   deloitte overview
CPEC deloitte overview
 
The significance, importance, challenges and opportunities of CPEC. (China-Pa...
The significance, importance, challenges and opportunities of CPEC. (China-Pa...The significance, importance, challenges and opportunities of CPEC. (China-Pa...
The significance, importance, challenges and opportunities of CPEC. (China-Pa...
 
cpec expository essay
 cpec expository essay cpec expository essay
cpec expository essay
 
Cpec
CpecCpec
Cpec
 

Recently uploaded

Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 

Recently uploaded (20)

Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 

CPEC OverView

  • 1. Assignment # 1 RAHEEM ULLAH CS120162098 Section B
  • 2. Page No. 1 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) CPEC ITS MISSION AND VISION: China–Pakistan Economic Corridor ( ‫راہداری‬ ‫اقتصادی‬ ‫پاكستان-چین‬‎) is a part of china one belt one road Economic corridor and it is a collection of infrastructure projects that are currently under construction through Pakistan. It is more than just a $47 billion dollar investment in Pakistan. China Pakistan Economic Corridor is a 3,218 km long route, to be built over next several years, consisting of highways, railways and pipelines. To improve the lives of people of Pakistan and China by building an economic corridor promoting joint connectivity, construction, explore potential bilateral investment, economic and trade, logistics and people to people contact for regional connectivity. Regional and global connectivity for economic prosperity and development. One Belt project Map CPEC Map overall Asia MAIN PURPOSES OF CPEC : CPEC is just a part of the huge One Belt project. Specifically for CPEC the purposes to help China avoid the long sea route and directly have a road route from China to Gwadar and access to warm waters and from there to beyond. For this China is investing in the proper infrastructure and power projects in Pakistan. It has a major portion in Pakistan and a small portion in China.
  • 3. Page No. 2 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Basically, the transportation network of roads and railways connecting the city of Kashgar, located in the Xinjiang province of China, to the China-Pakistan Border to Gwadar. IMPACT OF CPEC ON OTHER COUNTRIES : CPEC Corridor is a framework of regional connectivity. CPEC will not only benefit China and Pakistan but will have positive impact on Iran, Afghanistan, India, Central Asian Republic, and the region. The enhancement of geographical linkages having improved road, rail and air transportation system with frequent and free exchanges of growth and people to people contact, enhancing understanding through academic, cultural and regional knowledge and culture, activity of higher volume of flow of trade and businesses, producing and moving energy to have more optimal businesses and enhancement of co-operation. WHY CPEC IS IMPORTANT FOR PAKISTAN : CPEC investment will be made in Pakistan much needed energy sector to overcome electricity shortage for sustained growth of Pakistan economy. Pakistan will become the most strategically important country in the region because it will improve trade and economic connectivity between Asia, the Middle East and Europe. China Pakistan Economic Corridor is journey towards economic regionalization in the globalized world. The corridor will be a strategic game changer in the region and would go a long way in making Pakistan a richer and stronger entity Pakistan into a regional economic center.
  • 4. Page No. 3 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Booster for investors and attract investment not only from China but other parts of the world as well. 700,000 direct jobs between 2015–2030, for the people of Pakistan. Add 2 to 2.5 percentage points to the country's annual economic growth. PROJECT IN CPEC 1. INFRASTRUCTURE PROJECT 1.1 Highway Network for CPEC 1.2 Railway Network for CPEC7 2. ENERGY PROJECT 2.1 Energy shortfall in Pakistan is 4500 2.2 10,400MW energy generates 2020. 2.3 16,400 MW total Energy generate in project. 3. GWADAR PROJECT 3.1 Airport 3.2 Hospitals 3.3 University 4. OTHER PROJECT 4.1 Fiber optic Project.
  • 5. Page No. 4 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) 1 INFRASTRUCTURE PROJECT : Highway Roads Projects KKH Phase II (Thakot -Havelian Section) Project Description Length: 118km  Thakot-Havelian (118km) is in early harvest Project category and it is in implementation phase after signing of commercial and financial agreements.  Start Point: Havelian  End Point: Thakot  Scope: Construction of 39 km 06 Lane Access Controlled MW, 79 km Class-II Highway  Type of Road: Expressway/ Access Controlled Highway (Class-II) Responsibility:  Proposing Agency: Ministry of Communications  Implementing Agency: National Highway Authority  Supervising Agency: Ministry of Communications, Government of Pakistan Location (Thakot -Havelian) Khyber Pakhtunkhwa Province Khyber Pakhtunkhwa Estimated Cost (US $ Million) 1,315 Executing Company / Sponsors M/s China Communications Construction Company Ltd Financing Government Concessional Loan(GCL) Supervising Agency Ministry of Communications, Government of Pakistan Project Progress Update  Work commenced in September, 2016  Contractor mobilized  To be completed by March 2020
  • 6. Page No. 5 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Peshawar-Karachi Motorway (Multan-Sukkur Section) Project Description Length: 392km Project Name: Peshawar – Karachi Motorway Project Title (Section): Multan – Sukkur: 392 KM  Karachi – Peshawar Motorway envisages construction / development of 6-Lane access controlled Motorway having total length of 1,100 Km. the proposed Motorway shall be a tolled facility. It shall originate from Karachi through Motorway M-9 (136 Km) up to Hyderabad. From Hyderabad onwards, the proposed alignment shall follow a virgin alignment for 345 Km up to Sukkur. The Sukkur Multan section, 392 Km essentially follows the Left Bank of River Indus.  Type of Road: 06 Lane Access Controlled Motorway  Start Point: Multan  End Point: Sukkar Responsibility:  Proposing Agency: Ministry of Communications  Implementing Agency: National Highway Authority  Supervising Agency: Ministry of Communications, Government of Pakistan Location Province of Punjab and Sindh Province Punjab and Sindh Estimated Cost (US $ Million) 2,889 Executing Company / Sponsors M/s China State Construction Engineering Corporation Financing Government Concessional Loan(GCL) Supervising Agency Ministry of Communications, Government of Pakistan Khuzdar-Basima Road N-30 (110 km) Project Description The project is located in District Khuzdar in Baluchistan province. The project is construction of 2-lane highway from Basima to Khuzdar. The project length is 110 km. Location District Khuzdar in Baluchistan Province Balochistan Estimated Cost (US $ Million) 19.19 Billion Rupee Executing Company / Sponsors National Highway Authority Supervising Agency Ministry of Communications Project Progress Update  Feasibility and PC-I completed  PC-I has been approved by ECNEC on 12- 04-2017  Procurement of Civil Work is under process  The project Basima Khuzdar has been taken up through PSDP
  • 7. Page No. 6 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km) Project Description Salient Features of the Project:  On existing alignment (section of N-50) with geometric improvements  210 km in length. Improvement / Upgradation of 2 lane existing road to 4 lane. 100m R.O.W will be acquired to upgrade it to 6 lanes in future Estimated Cost:  Total (Construction plus land acquisition): Rs.76,486 million Province Khyber Pakhtunkhwa - Balochistan Executing Company / Sponsors National Highway Authority Supervising Agency Ministry of Communications Project Progress Update  PC-I Approved by ECNEC on 12th April, 2017.  Land acquisition in Progress.  Accorded highest priority in 8th JCC
  • 8. Page No. 7 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) KKH Thakot-Raikot N35 remaining portion (136 Km) Province Khyber Pakhtunkhwa Estimated Cost (US $ Million) Rs. 8.15 Billion Executing Company / Sponsors National Highway Authority Supervising Agency Ministry of Communications Project Progress Update  Feasibility and PC-I completed  PC-I has been approved by ECNEC on 18- 03-2017  LOI forwarded to Chinese side  Procedural formalities to be completed shortly Rail Sector Projects Expansion and reconstruction of existing Line ML-1 Project Description Project Title: Rehabilitation & Up-gradation of Karachi-Lahore Peshawar (ML-1) Railway Track (1,872 kms) Scope:  Doubling of entire track from Karachi to Peshawar  Speed of passenger trains to be raise from 65/110km/h to 160 km/h  Freight trains to operate at 120 km/h  Computer based signaling and control system  Grade separation to ensure safety of train operations Responsibility:  Proposing Agency: Ministry of Railways  Implementing Agency: Pakistan Railways  Supervising Agency: Ministry of Communications, Government of Pakistan Location Karachi to Peshawar via Hyderabad, Nawabshah, Rohri, RahimyarKhan, Bahawalpur, Khanewal, Sahiwal, Lahore, Gujranwala, Rawalpindi, Peshawar Estimated Cost (US $ Million) 8,172
  • 9. Page No. 8 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Havelian Dry port (450 M. Twenty-Foot Equivalent Units) Project Description Project Title: Construction of Havelian Dry port including cargo handling facilities. Responsibility:  Proposing Agency: Ministry of Railways  Implementing Agency: Pakistan Railways  Supervising Agency: Ministry of Communications, Government of Pakistan To meet the demand of containerized future freight traffic in connection with Pak-China Economic Corridor, the dry port will be established at Havelian by utilizing the railway land, railhead facilities, high speed / capacity stock, and potential of well-established off-dock terminal for handling bonded import / export containers. Pakistan Railway network exist up to Havelian Railway Station situated at more than 680 Kms from Khunjrab (China border). The station is coming on Pak-China economic corridor. Initially it will act as Dry Port / container terminal for goods traffic coming through road from China through KKH. Transshipment arrangement will be provided at Havelian for loading / unloading on railway wagons. Location Havelian, District Haripur, KPK Estimated Cost (US $ Million) 65
  • 10. Page No. 9 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) ENERGY PROJECT Zonergy Solar Power Plant Located At Bahawalpur World Largest solar Power Plant $1.5 Billion Project 900 MV Production Expected Build In 3 Phases Complete At The end Of 2016 By Zonergy Company Suki Kinari Hydro Power Plant It is in KPK 870 MW Produce Started In 2014 End In 2020
  • 11. Page No. 10 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Karot hydro Power plant It is on Jhelum River near to the Islamabad Produce 720 MW $1.65 Billion Project Complete in 2020 By Three Goreges Corporation Port Qasim Coal-Fired Power Plant $2.085 Billion Project Complete By the End Of 2017 Produce 1320MW By China Resource Limited
  • 12. Page No. 11 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Wind Power Projects Thatta Project (100 MW) Hydro China Project (50 MW) Sachal Project (50 MW) GWADAR PROJECT
  • 13. Page No. 12 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Gwadar International Airport $230 million Project On 3000 acres Gwadar to Karachi, Turbat and Muscat Operational by December 2017 Gwadar City And Port Gawadar Coal Power Project (360 million dollars) construction of breakwaters (130 million dollars) Water treatment plant (114 million dollars) State-of-the-art hospital (100 million dollars) Free Economic Zones (35 million dollars) Technical and vocational institute (10 million dollars)
  • 14. Page No. 13 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) Pak China Friendship Hospital Location Gwadar district, Balochistan Province Balochistan Estimated Cost (US $ Million) 100 Company Gwadar Development Authority Cross Border Optical Fiber Cable The fiber optical cable covers an area of 820 km.The projects will help improve the telecom and ICT industry of Pakistan, promote tourism and create trading opportunities for northern areas of the country. It will also provide the ICT infrastructure for 3G/4G services in the northern areas and enhance communication security with an alternative fiber route. Location Gilgit Baltistan, Khyber Pakhtunkhwa, Punjab Province Gilgit Baltistan, Khyber Pakhtunkhwa, Punjab Estimated Cost (US $ Million) 37 “China Pakistan Economic Corridor is hope of better region of the future with peace, development and growth of economy.”
  • 15. Page No. 14 China–Pakistan Economic Corridor ( ‫رادہاری‬‫ااصتقدی‬‫اپاتسكن-نیچ‬‎) References : http://cpec.gov.pk https://en.wikipedia.org/wiki/China%E2%80%93Pakistan_Economic_Corridor