SlideShare a Scribd company logo
1 of 4
Download to read offline
Pre-Formedbaseunits
ContractorBenefits
Thebenefitstothecontractorare:
•RobustDesign
•Speedandeaseofinstallation
•Lightweightsections
•150mmdeepsectionsforgreaterflexibilityandlesswaste
•Pre-Trepannedguideholesforeasyaccess
•Interlockingsections
•Pre-Formedbaseunits
•Costcompetitiveagainsttraditionalproducts
•Canbeinstalledwithorwithoutconcretesurround
benefits
premier
PremierDuctAccessChamber
PlastechisproudtointroducethePremierDuctAccessChamber.
AlthoughitisaimedprimarilyattheStreetLightingandTrafficSignals
industries,itissuitableformostapplicationswhereaductaccesschamber
isrequired.
Therobustdesignmeansthattheboxesarenotpronetodeformationwhilst
beingbackfilledwithconcrete,unlikesomeothersystemsonthemarket,
givingthecontractorandclientpeaceofmind.
Plastech Limited, Park Industrial Estate, Liverpool Road, Ashton-in-Makerfield, Wigan WN4 0YU
Tel: 01942 717110 Fax: 01942 717115 Email: info@plastech-stakka.co.uk Website: www.plastech-stakka.co.uk.
plastech
plastic systems for industry
Recommended Installation Guide
The ‘Premier’ Chamber should be bedded on a base of 100mm thick C20 drymix concrete and the base be
chamfered to obtain a natural soakaway outlet. Alternatively use a ‘Premier’ pre-formed base set in no-fines semi
porous concrete mix.
The sides can be backfilled with dug material, granular material or concrete.
Specification
The duct inspection chamber shall be manufactured from 32mm thick, high density polyethylene and have a
smooth inner wall with reinforcing ribs on the external wall for extra rigidity.
They shall be capable of withstanding a 12.5 tonne wheel load, without the need for structural concrete surround.
They shall be manufactured from separate, interlocking sections and have the capability to be assembled or
disassembled on site without the need for sawing or specialist equipment.
They shall come complete with pre-formed knock out sections to accommodate duct sizes of 50mm, 66mm and
110mm outside diameters.
The chambers shall be supplied with a pre-formed GRP base unit for ease and speed of installation which should be
bedded in a no-fines, semi porous, concrete mix to allow any ground water to flow away.
The chambers shall be supplied with a 150mm long, pre-formed raising pin where required, to enable the
contractor to lift and tilt the frame as required.
The sections shall be 150mm overall depth and be supplied with a locating flange to the top section for ease of
assembly and shall be available in a range of standard sizes, as follows.
Other sizes can be manufactured at short notice.
The duct inspection chamber lid shall be manufactured from high strength, polyester composite material and shall
conform to BSEN 124, 12.5 tonne wheel loading.
The lid shall locate into a 2.5mm thick, lockable, galvanised frame, with a 100mm internal flange which allows for
lift and tilt adjustment and a 70mm external flange to the top section.
Model Number Clear Opening Section Depth Load Rating
Premier P3030 300 x 300 150 B125
Premier P3045 300 x 450 150 B125
Premier P4545 450 x 450 150 B125
Premier P4560 450 x 600 150 B125
Premier P6060 600 x 600 150 B125
Premier P4590 450 x 900 150 B125
Premier P6090 600 x 900 150 B125
All dimensions in mm. Clear Opening measurements are width x length.
The Premier Duct Access Chambers Range
04/1600
Premier Duct Access Chambers
plastech
plastic systems for industry
Pre-Formed base units
Contractor Benefits
The benefits to the contractor are:
• Robust Design
• Speed and ease of installation
• Light weight sections
• 150mm deep sections for greater flexibility and less waste
• Pre-Trepanned guide holes for easy access
• Interlocking sections
• Pre-Formed base units
• Cost competitive against traditional products
• Can be installed with or without concrete surround
benefits
premier
Premier Duct Access Chamber
Plastech is proud to introduce the Premier Duct Access Chamber.
Although it is aimed primarily at the Street Lighting and Traffic Signals
industries, it is suitable for most applications where a duct access chamber
is required.
The robust design means that the boxes are not prone to deformation whilst
being backfilled with concrete, unlike some other systems on the market,
giving the contractor and client peace of mind.
PlastechLimited,ParkIndustrialEstate,LiverpoolRoad,Ashton-in-Makerfield,WiganWN40YU
Tel:01942717110Fax:01942717115Email:info@plastech-stakka.co.ukWebsite:www.plastech-stakka.co.uk.
plastech
plasticsystemsforindustry
RecommendedInstallationGuide
The‘Premier’Chambershouldbebeddedonabaseof100mmthickC20drymixconcreteandthebasebe
chamferedtoobtainanaturalsoakawayoutlet.Alternativelyusea‘Premier’pre-formedbasesetinno-finessemi
porousconcretemix.
Thesidescanbebackfilledwithdugmaterial,granularmaterialorconcrete.
Specification
Theductinspectionchambershallbemanufacturedfrom32mmthick,highdensitypolyethyleneandhavea
smoothinnerwallwithreinforcingribsontheexternalwallforextrarigidity.
Theyshallbecapableofwithstandinga12.5tonnewheelload,withouttheneedforstructuralconcretesurround.
Theyshallbemanufacturedfromseparate,interlockingsectionsandhavethecapabilitytobeassembledor
disassembledonsitewithouttheneedforsawingorspecialistequipment.
Theyshallcomecompletewithpre-formedknockoutsectionstoaccommodateductsizesof50mm,66mmand
110mmoutsidediameters.
Thechambersshallbesuppliedwithapre-formedGRPbaseunitforeaseandspeedofinstallationwhichshouldbe
beddedinano-fines,semiporous,concretemixtoallowanygroundwatertoflowaway.
Thechambersshallbesuppliedwitha150mmlong,pre-formedraisingpinwhererequired,toenablethe
contractortoliftandtilttheframeasrequired.
Thesectionsshallbe150mmoveralldepthandbesuppliedwithalocatingflangetothetopsectionforeaseof
assemblyandshallbeavailableinarangeofstandardsizes,asfollows.
Othersizescanbemanufacturedatshortnotice.
Theductinspectionchamberlidshallbemanufacturedfromhighstrength,polyestercompositematerialandshall
conformtoBSEN124,12.5tonnewheelloading.
Thelidshalllocateintoa2.5mmthick,lockable,galvanisedframe,witha100mminternalflangewhichallowsfor
liftandtiltadjustmentanda70mmexternalflangetothetopsection.
ModelNumberClearOpeningSectionDepthLoadRating
PremierP3030300x300150B125
PremierP3045300x450150B125
PremierP4545450x450150B125
PremierP4560450x600150B125
PremierP6060600x600150B125
PremierP4590450x900150B125
PremierP6090600x900150B125
Alldimensionsinmm.ClearOpeningmeasurementsarewidthxlength.
ThePremierDuctAccessChambersRange
04/1600
PremierDuctAccessChambers
plastech
plasticsystemsforindustry
Pre-Formed base units
Contractor Benefits
The benefits to the contractor are:
• Robust Design
• Speed and ease of installation
• Light weight sections
• 150mm deep sections for greater flexibility and less waste
• Pre-Trepanned guide holes for easy access
• Interlocking sections
• Pre-Formed base units
• Cost competitive against traditional products
• Can be installed with or without concrete surround
benefits
premier
Premier Duct Access Chamber
Plastech is proud to introduce the Premier Duct Access Chamber.
Although it is aimed primarily at the Street Lighting and Traffic Signals
industries, it is suitable for most applications where a duct access chamber
is required.
The robust design means that the boxes are not prone to deformation whilst
being backfilled with concrete, unlike some other systems on the market,
giving the contractor and client peace of mind.
PlastechLimited,ParkIndustrialEstate,LiverpoolRoad,Ashton-in-Makerfield,WiganWN40YU
Tel:01942717110Fax:01942717115Email:info@plastech-stakka.co.ukWebsite:www.plastech-stakka.co.uk.
plastech
plasticsystemsforindustry
RecommendedInstallationGuide
The‘Premier’Chambershouldbebeddedonabaseof100mmthickC20drymixconcreteandthebasebe
chamferedtoobtainanaturalsoakawayoutlet.Alternativelyusea‘Premier’pre-formedbasesetinno-finessemi
porousconcretemix.
Thesidescanbebackfilledwithdugmaterial,granularmaterialorconcrete.
Specification
Theductinspectionchambershallbemanufacturedfrom32mmthick,highdensitypolyethyleneandhavea
smoothinnerwallwithreinforcingribsontheexternalwallforextrarigidity.
Theyshallbecapableofwithstandinga12.5tonnewheelload,withouttheneedforstructuralconcretesurround.
Theyshallbemanufacturedfromseparate,interlockingsectionsandhavethecapabilitytobeassembledor
disassembledonsitewithouttheneedforsawingorspecialistequipment.
Theyshallcomecompletewithpre-formedknockoutsectionstoaccommodateductsizesof50mm,66mmand
110mmoutsidediameters.
Thechambersshallbesuppliedwithapre-formedGRPbaseunitforeaseandspeedofinstallationwhichshouldbe
beddedinano-fines,semiporous,concretemixtoallowanygroundwatertoflowaway.
Thechambersshallbesuppliedwitha150mmlong,pre-formedraisingpinwhererequired,toenablethe
contractortoliftandtilttheframeasrequired.
Thesectionsshallbe150mmoveralldepthandbesuppliedwithalocatingflangetothetopsectionforeaseof
assemblyandshallbeavailableinarangeofstandardsizes,asfollows.
Othersizescanbemanufacturedatshortnotice.
Theductinspectionchamberlidshallbemanufacturedfromhighstrength,polyestercompositematerialandshall
conformtoBSEN124,12.5tonnewheelloading.
Thelidshalllocateintoa2.5mmthick,lockable,galvanisedframe,witha100mminternalflangewhichallowsfor
liftandtiltadjustmentanda70mmexternalflangetothetopsection.
ModelNumberClearOpeningSectionDepthLoadRating
PremierP3030300x300150B125
PremierP3045300x450150B125
PremierP4545450x450150B125
PremierP4560450x600150B125
PremierP6060600x600150B125
PremierP4590450x900150B125
PremierP6090600x900150B125
Alldimensionsinmm.ClearOpeningmeasurementsarewidthxlength.
ThePremierDuctAccessChambersRange
04/1600
PremierDuctAccessChambers
plastech
plasticsystemsforindustry
Pre-Formedbaseunits
ContractorBenefits
Thebenefitstothecontractorare:
•RobustDesign
•Speedandeaseofinstallation
•Lightweightsections
•150mmdeepsectionsforgreaterflexibilityandlesswaste
•Pre-Trepannedguideholesforeasyaccess
•Interlockingsections
•Pre-Formedbaseunits
•Costcompetitiveagainsttraditionalproducts
•Canbeinstalledwithorwithoutconcretesurround
benefits
premier
PremierDuctAccessChamber
PlastechisproudtointroducethePremierDuctAccessChamber.
AlthoughitisaimedprimarilyattheStreetLightingandTrafficSignals
industries,itissuitableformostapplicationswhereaductaccesschamber
isrequired.
Therobustdesignmeansthattheboxesarenotpronetodeformationwhilst
beingbackfilledwithconcrete,unlikesomeothersystemsonthemarket,
givingthecontractorandclientpeaceofmind.
Plastech Limited, Park Industrial Estate, Liverpool Road, Ashton-in-Makerfield, Wigan WN4 0YU
Tel: 01942 717110 Fax: 01942 717115 Email: info@plastech-stakka.co.uk Website: www.plastech-stakka.co.uk.
plastech
plastic systems for industry
Recommended Installation Guide
The ‘Premier’ Chamber should be bedded on a base of 100mm thick C20 drymix concrete and the base be
chamfered to obtain a natural soakaway outlet. Alternatively use a ‘Premier’ pre-formed base set in no-fines semi
porous concrete mix.
The sides can be backfilled with dug material, granular material or concrete.
Specification
The duct inspection chamber shall be manufactured from 32mm thick, high density polyethylene and have a
smooth inner wall with reinforcing ribs on the external wall for extra rigidity.
They shall be capable of withstanding a 12.5 tonne wheel load, without the need for structural concrete surround.
They shall be manufactured from separate, interlocking sections and have the capability to be assembled or
disassembled on site without the need for sawing or specialist equipment.
They shall come complete with pre-formed knock out sections to accommodate duct sizes of 50mm, 66mm and
110mm outside diameters.
The chambers shall be supplied with a pre-formed GRP base unit for ease and speed of installation which should be
bedded in a no-fines, semi porous, concrete mix to allow any ground water to flow away.
The chambers shall be supplied with a 150mm long, pre-formed raising pin where required, to enable the
contractor to lift and tilt the frame as required.
The sections shall be 150mm overall depth and be supplied with a locating flange to the top section for ease of
assembly and shall be available in a range of standard sizes, as follows.
Other sizes can be manufactured at short notice.
The duct inspection chamber lid shall be manufactured from high strength, polyester composite material and shall
conform to BSEN 124, 12.5 tonne wheel loading.
The lid shall locate into a 2.5mm thick, lockable, galvanised frame, with a 100mm internal flange which allows for
lift and tilt adjustment and a 70mm external flange to the top section.
Model Number Clear Opening Section Depth Load Rating
Premier P3030 300 x 300 150 B125
Premier P3045 300 x 450 150 B125
Premier P4545 450 x 450 150 B125
Premier P4560 450 x 600 150 B125
Premier P6060 600 x 600 150 B125
Premier P4590 450 x 900 150 B125
Premier P6090 600 x 900 150 B125
All dimensions in mm. Clear Opening measurements are width x length.
The Premier Duct Access Chambers Range
04/1600
Premier Duct Access Chambers
plastech
plastic systems for industry

More Related Content

What's hot

What's hot (8)

Polypipe - LV & HV Underground Power Cable Ducting & Cable Protection
Polypipe - LV & HV Underground Power Cable Ducting & Cable ProtectionPolypipe - LV & HV Underground Power Cable Ducting & Cable Protection
Polypipe - LV & HV Underground Power Cable Ducting & Cable Protection
 
Rivset Brochure
Rivset BrochureRivset Brochure
Rivset Brochure
 
Stress Joint
Stress JointStress Joint
Stress Joint
 
AKSHAT ENGINEERS PRIVATE LIMITED
AKSHAT ENGINEERS PRIVATE LIMITEDAKSHAT ENGINEERS PRIVATE LIMITED
AKSHAT ENGINEERS PRIVATE LIMITED
 
Cook Interventional Radiology Percutaneous Drainage
Cook Interventional Radiology Percutaneous DrainageCook Interventional Radiology Percutaneous Drainage
Cook Interventional Radiology Percutaneous Drainage
 
Crabtree PVC trunking
Crabtree PVC trunkingCrabtree PVC trunking
Crabtree PVC trunking
 
Hydrodif Products Company Profile
Hydrodif Products Company ProfileHydrodif Products Company Profile
Hydrodif Products Company Profile
 
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes FittingsIdol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
Idol Plasto Pvt. Ltd., Rajkot, UPVC Plumbing Pipes Fittings
 

Viewers also liked

Pengaruh nonlinier pada gejala transien
Pengaruh nonlinier pada gejala transienPengaruh nonlinier pada gejala transien
Pengaruh nonlinier pada gejala transienprehatama
 
El ordenador
El ordenadorEl ordenador
El ordenador_marcos99
 
17 апреля в детском саду прошел день древонасаждения
17 апреля в детском саду прошел день древонасаждения17 апреля в детском саду прошел день древонасаждения
17 апреля в детском саду прошел день древонасажденияvirtualtaganrog
 
Zingy - Pet Service(s) Marketplace
Zingy - Pet Service(s) MarketplaceZingy - Pet Service(s) Marketplace
Zingy - Pet Service(s) MarketplaceTobi Skovron
 
Ηνωμένες Πολιτείες Αμερικής
Ηνωμένες Πολιτείες ΑμερικήςΗνωμένες Πολιτείες Αμερικής
Ηνωμένες Πολιτείες Αμερικήςfikro2003
 
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014France Travail
 
Засоби реалізації відкритої освіти
Засоби реалізації відкритої освітиЗасоби реалізації відкритої освіти
Засоби реалізації відкритої освітиAndriushchenko
 
Mejores lectores 2015
Mejores lectores 2015Mejores lectores 2015
Mejores lectores 2015yoligijon
 
Serveur web sur lindux debian
Serveur web sur lindux debianServeur web sur lindux debian
Serveur web sur lindux debiancharlielefebvre14
 
Digitizing and digital archiving: where is the haystack?
Digitizing and digital archiving: where is the haystack?Digitizing and digital archiving: where is the haystack?
Digitizing and digital archiving: where is the haystack?Gemeente Almere
 
Ed2 constructivist bruner. report
Ed2 constructivist bruner. reportEd2 constructivist bruner. report
Ed2 constructivist bruner. reportEddie Abug
 
調布マッピングパーティ03 開催概要
調布マッピングパーティ03 開催概要調布マッピングパーティ03 開催概要
調布マッピングパーティ03 開催概要Satoshi Shibata
 
Ускоряване на World Wide Wait
Ускоряване на World Wide WaitУскоряване на World Wide Wait
Ускоряване на World Wide WaitSEOM
 

Viewers also liked (20)

Prickly pear
Prickly pearPrickly pear
Prickly pear
 
Arif_resume
Arif_resumeArif_resume
Arif_resume
 
Pengaruh nonlinier pada gejala transien
Pengaruh nonlinier pada gejala transienPengaruh nonlinier pada gejala transien
Pengaruh nonlinier pada gejala transien
 
El ordenador
El ordenadorEl ordenador
El ordenador
 
17 апреля в детском саду прошел день древонасаждения
17 апреля в детском саду прошел день древонасаждения17 апреля в детском саду прошел день древонасаждения
17 апреля в детском саду прошел день древонасаждения
 
Zingy - Pet Service(s) Marketplace
Zingy - Pet Service(s) MarketplaceZingy - Pet Service(s) Marketplace
Zingy - Pet Service(s) Marketplace
 
Ηνωμένες Πολιτείες Αμερικής
Ηνωμένες Πολιτείες ΑμερικήςΗνωμένες Πολιτείες Αμερικής
Ηνωμένες Πολιτείες Αμερικής
 
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014
 
Plastech Titan
Plastech TitanPlastech Titan
Plastech Titan
 
Засоби реалізації відкритої освіти
Засоби реалізації відкритої освітиЗасоби реалізації відкритої освіти
Засоби реалізації відкритої освіти
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Mejores lectores 2015
Mejores lectores 2015Mejores lectores 2015
Mejores lectores 2015
 
SAFADORE 2016
SAFADORE 2016SAFADORE 2016
SAFADORE 2016
 
Marketing Plan
Marketing PlanMarketing Plan
Marketing Plan
 
Serveur web sur lindux debian
Serveur web sur lindux debianServeur web sur lindux debian
Serveur web sur lindux debian
 
Digitizing and digital archiving: where is the haystack?
Digitizing and digital archiving: where is the haystack?Digitizing and digital archiving: where is the haystack?
Digitizing and digital archiving: where is the haystack?
 
Ed2 constructivist bruner. report
Ed2 constructivist bruner. reportEd2 constructivist bruner. report
Ed2 constructivist bruner. report
 
Đánh giá hiệu quả điều trị viêm gan B virut
Đánh giá hiệu quả điều trị viêm gan B virutĐánh giá hiệu quả điều trị viêm gan B virut
Đánh giá hiệu quả điều trị viêm gan B virut
 
調布マッピングパーティ03 開催概要
調布マッピングパーティ03 開催概要調布マッピングパーティ03 開催概要
調布マッピングパーティ03 開催概要
 
Ускоряване на World Wide Wait
Ускоряване на World Wide WaitУскоряване на World Wide Wait
Ускоряване на World Wide Wait
 

Similar to PLASTECH PREMIER BOX

Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm
Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm
Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm Thorne & Derrick International
 
CoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113ccCoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113ccPierce Piyanart
 
CoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113ccCoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113ccPierce Piyanart
 
Ce-Tek - Industrial, High Voltage & Hazardous Area Electrical Enclosures
Ce-Tek - Industrial, High Voltage & Hazardous Area Electrical EnclosuresCe-Tek - Industrial, High Voltage & Hazardous Area Electrical Enclosures
Ce-Tek - Industrial, High Voltage & Hazardous Area Electrical EnclosuresThorne & Derrick International
 
Gillard_2013_Product_Leaflet
Gillard_2013_Product_LeafletGillard_2013_Product_Leaflet
Gillard_2013_Product_LeafletConrad Grandal
 
Brant Engineering Inc
Brant Engineering IncBrant Engineering Inc
Brant Engineering Incjeffmac1
 
PLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHUREPLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHURELee Fifield
 
2015-05-20_pg_c_en_lr
2015-05-20_pg_c_en_lr2015-05-20_pg_c_en_lr
2015-05-20_pg_c_en_lrAnkur Chopra
 
C4917 Case Study - Acoustic enclosures for Plasma Cutting Machines
C4917 Case Study - Acoustic enclosures for Plasma Cutting MachinesC4917 Case Study - Acoustic enclosures for Plasma Cutting Machines
C4917 Case Study - Acoustic enclosures for Plasma Cutting MachinesChristian Senior
 
EJOT Flat Roofing Brochure
EJOT Flat Roofing BrochureEJOT Flat Roofing Brochure
EJOT Flat Roofing BrochureNathan Handley
 
Roxtec industry oem
Roxtec industry oemRoxtec industry oem
Roxtec industry oemRADOME-IT
 
Sathyadeep Engineering Company Limited, Noida, Welded Wire Mesh Plants
Sathyadeep Engineering Company Limited, Noida, Welded Wire Mesh PlantsSathyadeep Engineering Company Limited, Noida, Welded Wire Mesh Plants
Sathyadeep Engineering Company Limited, Noida, Welded Wire Mesh PlantsIndiaMART InterMESH Limited
 
Cs product presentation 2017 slideshow
Cs  product presentation 2017  slideshow Cs  product presentation 2017  slideshow
Cs product presentation 2017 slideshow cleanseal
 
Anchor Channel Technical Catalog
Anchor Channel Technical CatalogAnchor Channel Technical Catalog
Anchor Channel Technical CatalogHazMetal
 
Overview_EN_2016_WEB
Overview_EN_2016_WEBOverview_EN_2016_WEB
Overview_EN_2016_WEBKalyani Sahu
 

Similar to PLASTECH PREMIER BOX (20)

Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm
Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm
Cable Chambers (Pits) - Type A Concrete Cable Chamber, 1300x850mm
 
BPA GmbH English 2014
BPA GmbH English 2014BPA GmbH English 2014
BPA GmbH English 2014
 
Gamma industries
Gamma industries Gamma industries
Gamma industries
 
CoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113ccCoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113cc
 
CoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113ccCoverCat 20 Page Brochure 171113cc
CoverCat 20 Page Brochure 171113cc
 
Ce-Tek - Industrial, High Voltage & Hazardous Area Electrical Enclosures
Ce-Tek - Industrial, High Voltage & Hazardous Area Electrical EnclosuresCe-Tek - Industrial, High Voltage & Hazardous Area Electrical Enclosures
Ce-Tek - Industrial, High Voltage & Hazardous Area Electrical Enclosures
 
Gillard_2013_Product_Leaflet
Gillard_2013_Product_LeafletGillard_2013_Product_Leaflet
Gillard_2013_Product_Leaflet
 
Brant Engineering Inc
Brant Engineering IncBrant Engineering Inc
Brant Engineering Inc
 
IDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & VaultsIDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & Vaults
 
PLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHUREPLASTECH 2015 BROCHURE
PLASTECH 2015 BROCHURE
 
2015-05-20_pg_c_en_lr
2015-05-20_pg_c_en_lr2015-05-20_pg_c_en_lr
2015-05-20_pg_c_en_lr
 
OPT brouchure N
OPT brouchure NOPT brouchure N
OPT brouchure N
 
C4917 Case Study - Acoustic enclosures for Plasma Cutting Machines
C4917 Case Study - Acoustic enclosures for Plasma Cutting MachinesC4917 Case Study - Acoustic enclosures for Plasma Cutting Machines
C4917 Case Study - Acoustic enclosures for Plasma Cutting Machines
 
EJOT Flat Roofing Brochure
EJOT Flat Roofing BrochureEJOT Flat Roofing Brochure
EJOT Flat Roofing Brochure
 
Roxtec industry oem
Roxtec industry oemRoxtec industry oem
Roxtec industry oem
 
Sathyadeep Engineering Company Limited, Noida, Welded Wire Mesh Plants
Sathyadeep Engineering Company Limited, Noida, Welded Wire Mesh PlantsSathyadeep Engineering Company Limited, Noida, Welded Wire Mesh Plants
Sathyadeep Engineering Company Limited, Noida, Welded Wire Mesh Plants
 
Cs product presentation 2017 slideshow
Cs  product presentation 2017  slideshow Cs  product presentation 2017  slideshow
Cs product presentation 2017 slideshow
 
Anchor Channel Technical Catalog
Anchor Channel Technical CatalogAnchor Channel Technical Catalog
Anchor Channel Technical Catalog
 
Overview_EN_2016_WEB
Overview_EN_2016_WEBOverview_EN_2016_WEB
Overview_EN_2016_WEB
 
Overview_EN_2016_WEB
Overview_EN_2016_WEBOverview_EN_2016_WEB
Overview_EN_2016_WEB
 

PLASTECH PREMIER BOX

  • 1. Pre-Formedbaseunits ContractorBenefits Thebenefitstothecontractorare: •RobustDesign •Speedandeaseofinstallation •Lightweightsections •150mmdeepsectionsforgreaterflexibilityandlesswaste •Pre-Trepannedguideholesforeasyaccess •Interlockingsections •Pre-Formedbaseunits •Costcompetitiveagainsttraditionalproducts •Canbeinstalledwithorwithoutconcretesurround benefits premier PremierDuctAccessChamber PlastechisproudtointroducethePremierDuctAccessChamber. AlthoughitisaimedprimarilyattheStreetLightingandTrafficSignals industries,itissuitableformostapplicationswhereaductaccesschamber isrequired. Therobustdesignmeansthattheboxesarenotpronetodeformationwhilst beingbackfilledwithconcrete,unlikesomeothersystemsonthemarket, givingthecontractorandclientpeaceofmind. Plastech Limited, Park Industrial Estate, Liverpool Road, Ashton-in-Makerfield, Wigan WN4 0YU Tel: 01942 717110 Fax: 01942 717115 Email: info@plastech-stakka.co.uk Website: www.plastech-stakka.co.uk. plastech plastic systems for industry Recommended Installation Guide The ‘Premier’ Chamber should be bedded on a base of 100mm thick C20 drymix concrete and the base be chamfered to obtain a natural soakaway outlet. Alternatively use a ‘Premier’ pre-formed base set in no-fines semi porous concrete mix. The sides can be backfilled with dug material, granular material or concrete. Specification The duct inspection chamber shall be manufactured from 32mm thick, high density polyethylene and have a smooth inner wall with reinforcing ribs on the external wall for extra rigidity. They shall be capable of withstanding a 12.5 tonne wheel load, without the need for structural concrete surround. They shall be manufactured from separate, interlocking sections and have the capability to be assembled or disassembled on site without the need for sawing or specialist equipment. They shall come complete with pre-formed knock out sections to accommodate duct sizes of 50mm, 66mm and 110mm outside diameters. The chambers shall be supplied with a pre-formed GRP base unit for ease and speed of installation which should be bedded in a no-fines, semi porous, concrete mix to allow any ground water to flow away. The chambers shall be supplied with a 150mm long, pre-formed raising pin where required, to enable the contractor to lift and tilt the frame as required. The sections shall be 150mm overall depth and be supplied with a locating flange to the top section for ease of assembly and shall be available in a range of standard sizes, as follows. Other sizes can be manufactured at short notice. The duct inspection chamber lid shall be manufactured from high strength, polyester composite material and shall conform to BSEN 124, 12.5 tonne wheel loading. The lid shall locate into a 2.5mm thick, lockable, galvanised frame, with a 100mm internal flange which allows for lift and tilt adjustment and a 70mm external flange to the top section. Model Number Clear Opening Section Depth Load Rating Premier P3030 300 x 300 150 B125 Premier P3045 300 x 450 150 B125 Premier P4545 450 x 450 150 B125 Premier P4560 450 x 600 150 B125 Premier P6060 600 x 600 150 B125 Premier P4590 450 x 900 150 B125 Premier P6090 600 x 900 150 B125 All dimensions in mm. Clear Opening measurements are width x length. The Premier Duct Access Chambers Range 04/1600 Premier Duct Access Chambers plastech plastic systems for industry
  • 2. Pre-Formed base units Contractor Benefits The benefits to the contractor are: • Robust Design • Speed and ease of installation • Light weight sections • 150mm deep sections for greater flexibility and less waste • Pre-Trepanned guide holes for easy access • Interlocking sections • Pre-Formed base units • Cost competitive against traditional products • Can be installed with or without concrete surround benefits premier Premier Duct Access Chamber Plastech is proud to introduce the Premier Duct Access Chamber. Although it is aimed primarily at the Street Lighting and Traffic Signals industries, it is suitable for most applications where a duct access chamber is required. The robust design means that the boxes are not prone to deformation whilst being backfilled with concrete, unlike some other systems on the market, giving the contractor and client peace of mind. PlastechLimited,ParkIndustrialEstate,LiverpoolRoad,Ashton-in-Makerfield,WiganWN40YU Tel:01942717110Fax:01942717115Email:info@plastech-stakka.co.ukWebsite:www.plastech-stakka.co.uk. plastech plasticsystemsforindustry RecommendedInstallationGuide The‘Premier’Chambershouldbebeddedonabaseof100mmthickC20drymixconcreteandthebasebe chamferedtoobtainanaturalsoakawayoutlet.Alternativelyusea‘Premier’pre-formedbasesetinno-finessemi porousconcretemix. Thesidescanbebackfilledwithdugmaterial,granularmaterialorconcrete. Specification Theductinspectionchambershallbemanufacturedfrom32mmthick,highdensitypolyethyleneandhavea smoothinnerwallwithreinforcingribsontheexternalwallforextrarigidity. Theyshallbecapableofwithstandinga12.5tonnewheelload,withouttheneedforstructuralconcretesurround. Theyshallbemanufacturedfromseparate,interlockingsectionsandhavethecapabilitytobeassembledor disassembledonsitewithouttheneedforsawingorspecialistequipment. Theyshallcomecompletewithpre-formedknockoutsectionstoaccommodateductsizesof50mm,66mmand 110mmoutsidediameters. Thechambersshallbesuppliedwithapre-formedGRPbaseunitforeaseandspeedofinstallationwhichshouldbe beddedinano-fines,semiporous,concretemixtoallowanygroundwatertoflowaway. Thechambersshallbesuppliedwitha150mmlong,pre-formedraisingpinwhererequired,toenablethe contractortoliftandtilttheframeasrequired. Thesectionsshallbe150mmoveralldepthandbesuppliedwithalocatingflangetothetopsectionforeaseof assemblyandshallbeavailableinarangeofstandardsizes,asfollows. Othersizescanbemanufacturedatshortnotice. Theductinspectionchamberlidshallbemanufacturedfromhighstrength,polyestercompositematerialandshall conformtoBSEN124,12.5tonnewheelloading. Thelidshalllocateintoa2.5mmthick,lockable,galvanisedframe,witha100mminternalflangewhichallowsfor liftandtiltadjustmentanda70mmexternalflangetothetopsection. ModelNumberClearOpeningSectionDepthLoadRating PremierP3030300x300150B125 PremierP3045300x450150B125 PremierP4545450x450150B125 PremierP4560450x600150B125 PremierP6060600x600150B125 PremierP4590450x900150B125 PremierP6090600x900150B125 Alldimensionsinmm.ClearOpeningmeasurementsarewidthxlength. ThePremierDuctAccessChambersRange 04/1600 PremierDuctAccessChambers plastech plasticsystemsforindustry
  • 3. Pre-Formed base units Contractor Benefits The benefits to the contractor are: • Robust Design • Speed and ease of installation • Light weight sections • 150mm deep sections for greater flexibility and less waste • Pre-Trepanned guide holes for easy access • Interlocking sections • Pre-Formed base units • Cost competitive against traditional products • Can be installed with or without concrete surround benefits premier Premier Duct Access Chamber Plastech is proud to introduce the Premier Duct Access Chamber. Although it is aimed primarily at the Street Lighting and Traffic Signals industries, it is suitable for most applications where a duct access chamber is required. The robust design means that the boxes are not prone to deformation whilst being backfilled with concrete, unlike some other systems on the market, giving the contractor and client peace of mind. PlastechLimited,ParkIndustrialEstate,LiverpoolRoad,Ashton-in-Makerfield,WiganWN40YU Tel:01942717110Fax:01942717115Email:info@plastech-stakka.co.ukWebsite:www.plastech-stakka.co.uk. plastech plasticsystemsforindustry RecommendedInstallationGuide The‘Premier’Chambershouldbebeddedonabaseof100mmthickC20drymixconcreteandthebasebe chamferedtoobtainanaturalsoakawayoutlet.Alternativelyusea‘Premier’pre-formedbasesetinno-finessemi porousconcretemix. Thesidescanbebackfilledwithdugmaterial,granularmaterialorconcrete. Specification Theductinspectionchambershallbemanufacturedfrom32mmthick,highdensitypolyethyleneandhavea smoothinnerwallwithreinforcingribsontheexternalwallforextrarigidity. Theyshallbecapableofwithstandinga12.5tonnewheelload,withouttheneedforstructuralconcretesurround. Theyshallbemanufacturedfromseparate,interlockingsectionsandhavethecapabilitytobeassembledor disassembledonsitewithouttheneedforsawingorspecialistequipment. Theyshallcomecompletewithpre-formedknockoutsectionstoaccommodateductsizesof50mm,66mmand 110mmoutsidediameters. Thechambersshallbesuppliedwithapre-formedGRPbaseunitforeaseandspeedofinstallationwhichshouldbe beddedinano-fines,semiporous,concretemixtoallowanygroundwatertoflowaway. Thechambersshallbesuppliedwitha150mmlong,pre-formedraisingpinwhererequired,toenablethe contractortoliftandtilttheframeasrequired. Thesectionsshallbe150mmoveralldepthandbesuppliedwithalocatingflangetothetopsectionforeaseof assemblyandshallbeavailableinarangeofstandardsizes,asfollows. Othersizescanbemanufacturedatshortnotice. Theductinspectionchamberlidshallbemanufacturedfromhighstrength,polyestercompositematerialandshall conformtoBSEN124,12.5tonnewheelloading. Thelidshalllocateintoa2.5mmthick,lockable,galvanisedframe,witha100mminternalflangewhichallowsfor liftandtiltadjustmentanda70mmexternalflangetothetopsection. ModelNumberClearOpeningSectionDepthLoadRating PremierP3030300x300150B125 PremierP3045300x450150B125 PremierP4545450x450150B125 PremierP4560450x600150B125 PremierP6060600x600150B125 PremierP4590450x900150B125 PremierP6090600x900150B125 Alldimensionsinmm.ClearOpeningmeasurementsarewidthxlength. ThePremierDuctAccessChambersRange 04/1600 PremierDuctAccessChambers plastech plasticsystemsforindustry
  • 4. Pre-Formedbaseunits ContractorBenefits Thebenefitstothecontractorare: •RobustDesign •Speedandeaseofinstallation •Lightweightsections •150mmdeepsectionsforgreaterflexibilityandlesswaste •Pre-Trepannedguideholesforeasyaccess •Interlockingsections •Pre-Formedbaseunits •Costcompetitiveagainsttraditionalproducts •Canbeinstalledwithorwithoutconcretesurround benefits premier PremierDuctAccessChamber PlastechisproudtointroducethePremierDuctAccessChamber. AlthoughitisaimedprimarilyattheStreetLightingandTrafficSignals industries,itissuitableformostapplicationswhereaductaccesschamber isrequired. Therobustdesignmeansthattheboxesarenotpronetodeformationwhilst beingbackfilledwithconcrete,unlikesomeothersystemsonthemarket, givingthecontractorandclientpeaceofmind. Plastech Limited, Park Industrial Estate, Liverpool Road, Ashton-in-Makerfield, Wigan WN4 0YU Tel: 01942 717110 Fax: 01942 717115 Email: info@plastech-stakka.co.uk Website: www.plastech-stakka.co.uk. plastech plastic systems for industry Recommended Installation Guide The ‘Premier’ Chamber should be bedded on a base of 100mm thick C20 drymix concrete and the base be chamfered to obtain a natural soakaway outlet. Alternatively use a ‘Premier’ pre-formed base set in no-fines semi porous concrete mix. The sides can be backfilled with dug material, granular material or concrete. Specification The duct inspection chamber shall be manufactured from 32mm thick, high density polyethylene and have a smooth inner wall with reinforcing ribs on the external wall for extra rigidity. They shall be capable of withstanding a 12.5 tonne wheel load, without the need for structural concrete surround. They shall be manufactured from separate, interlocking sections and have the capability to be assembled or disassembled on site without the need for sawing or specialist equipment. They shall come complete with pre-formed knock out sections to accommodate duct sizes of 50mm, 66mm and 110mm outside diameters. The chambers shall be supplied with a pre-formed GRP base unit for ease and speed of installation which should be bedded in a no-fines, semi porous, concrete mix to allow any ground water to flow away. The chambers shall be supplied with a 150mm long, pre-formed raising pin where required, to enable the contractor to lift and tilt the frame as required. The sections shall be 150mm overall depth and be supplied with a locating flange to the top section for ease of assembly and shall be available in a range of standard sizes, as follows. Other sizes can be manufactured at short notice. The duct inspection chamber lid shall be manufactured from high strength, polyester composite material and shall conform to BSEN 124, 12.5 tonne wheel loading. The lid shall locate into a 2.5mm thick, lockable, galvanised frame, with a 100mm internal flange which allows for lift and tilt adjustment and a 70mm external flange to the top section. Model Number Clear Opening Section Depth Load Rating Premier P3030 300 x 300 150 B125 Premier P3045 300 x 450 150 B125 Premier P4545 450 x 450 150 B125 Premier P4560 450 x 600 150 B125 Premier P6060 600 x 600 150 B125 Premier P4590 450 x 900 150 B125 Premier P6090 600 x 900 150 B125 All dimensions in mm. Clear Opening measurements are width x length. The Premier Duct Access Chambers Range 04/1600 Premier Duct Access Chambers plastech plastic systems for industry