CLASSIFICATION OF RESIDENTIAL BUILDINGS AS PER
NATIONAL BUILDING CODE
GROUP ‘A’ - RESIDENTIAL - LODGINGS, DWELLINGS,
DORMITORIES, FLATS,
HOTELS.
A1 - LODGING OR ROOMING HOUSES
A2 -ONE OR TWO FAMILY PRIVATE DWELLING
A3 -DORMITORIES
A4 -APARTMENT HOUSES
A5 -HOTELS
ENTRANCE WIDTH & HEIGHT
CLEARANCE
• EVERY HIGH RISE BUILDING SHOULD HAVE AT LEAST 2
MEANS OF ACCESS, ONE REMOTE TO THE OTHER, OF
MINIMUM WIDTH 4.5M. WITH HEIGHT CLEARANCE OF
5M. THIS MINIMUM WIDTH IS ESSENTIAL TO FACILITATE
FREE MOVEMENT OF FIRE UNITS.
4.5m
plan
SETBACK OR OPEN SPACES
1/3 of total
Height of
building Up to
30m
high
6m
FOR FREE MOVEMENT OF FIRE VEHICLE
CAR PARKING IN SETBACK / OPEN SPACES
• IF THE SETBACK AREA / OPEN SPACES IS MORE THEN 12
METER, THE PROVISION FOR CAR PARKING CAN BE DONE
IN THE SETBACK OR OPEN SPACES AT THE PERIPHERY OF
THE COURTYARD LEAVING THE 6 METER MOTOR ABLE
ROAD.
• CAR PARKING SHALL HAVE TO BE DONE AT THE
BASEMENT WITH PROVISION FOR MINIMUM 2
RAMPS ONE REMOTE TO OTHER.
CAR PARKING
6m
motor
able
road If more
than 12m
STAIRCASES
• EVERY HIGH RISE BUILDING HAVE MINIMUM 2 NUMBER OF
STAIRCASES.
• WIDTH OF STAIRCASES VARIES
FROM 1 M. TO 2 M.
• FOR RESIDENTIAL BUILDING WIDTH OF STAIRCASES
SHOULD BE 1 METRE.
• OUT OF 2 STAIRCASES, 1 CAN BE USED AS A FIRE
ESCAPE STAIRCASE.
• WIDTH OF FIRE ESCAPE SHOULD BE MINIMUM 0.75
METER.
• NUMBER OF STAIRCASES SHALL BE GIVEN AS PER THE TRAVEL DISTANCES.
• STAIRCASE SHALL NOT BE EXTENDED TO BASEMENT TO PREVENT SMOKE , HEAT &
GASES. FROM THE BASEMENT SMOKE, HEAT 7 GASES CAN BE TRAVEL TO UPPER
FLOORS.
• ACCESS TO THE BASEMENT FROM THE GROUND SHOULD BE THROUGH A SEPARATE
STAIRCASE, WHICH IS NOT CONNECTED TO MAIN STAIRCASE
• STAIRCASE SHALL BE OF ENCLOSED TYPE TO PREVENT ENTRY OF SMOKE & FIRE
TO THE STAIRCASE & VICE VERSA.
• SPIRAL STAIRCASE SHALL BE PROVIDED UP TO 9 METRE. HEIGHT.
• EXTERNAL STAIRCASE NORMALLY SHALL NOT BE ALLOWED.
STAIRCASES
RAMPS
• RAMPS SHALL COMPLY WITH ALL THE APPLICABLE REQUIREMENTS FOR STAIRWAYS
REGARDING ENCLOSURE, CAPACITY AND LIMITING DIMENSIONS EXCEPT WHERE
SPECIFIED FOR SPECIAL USES AND OCCUPANCIES
• THE SLOPE OF A RAMP SHALL NOT EXCEED 1 IN 10. IN CERTAIN CASES STEEPER SLOPES
MAY BE PERMITTED BUT IN NO CASE GREATER THAN 1 IN 8
• RAMPS SHALL BE SURFACED WITH NON SLIPPING MATERIAL
LIFTS
• MINIMUM 1 LIFT CAPABLE OF CARRYING MINIMUM 8 PERSONS WEIGHING 545 KGS.
SHALL BE PROVIDED FOR EVERY HIGH RISE BUILDING.
• LANDING DOORS OF LIFTS SHALL OPEN TO VENTILATED LOBBY & SHALL HAVE A
FIRE
RESISTANCE OF 1 HOUR.
• 1 LIFT SHALL BE DESIGNED AS A “FIRE LIFT”
• “FIREMAN SWITCH” SHALL BE PROVIDED FOR EACH LIFT.
• LIFTS SHALL NOT BE USED AS MEANS OF EVACUATION.
• COLLAPSIBLE GATES SHALL NOT BE PROVIDED FOR THE LIFT.
• IF MORE THAN 1 LIFTS ARE INSTALLED THE PARTITION WALL SHOULD BE OF MINIMUM
2 HOURS FIRE RESISTANCE
THE REFUGE AREA
• FOR FLOORS ABOVE 24M & UP TO 39M ONE REFUGE
AREA ON THE FLOOR IMMEDIATELY
ABOVE 24M.
• FOR FLOORS ABOVE 39M ONE REFUGE AREA
ON THE FLOOR IMMEDIATELY ABOVE 39M & SO
ON AFTER 15M REFUGE AREA SHALL BE PROVIDED.
EMERGENCY AND ESCAPE LIGHTING
• EMERGENCY LIGHTING SHALL BE POWERED FROM A SOURCE INDEPENDENT OF THAT
SUPPLYING THE NORMAL LIGHTING
• ESCAPE LIGHTING SHALL BE CAPABLE OF:
- INDICATING CLEARLY AND UNAMBIGUOUSLY THE ESCAPE ROUTS.
- PROVIDING ADEQUATE ILLUMINATION AND ILLUMINATION ALONG SUCH
ROUTS TO ALLOW SAFE MOVEMENT
- ENSURING THAT THE FIRE ALARM CALL POINTS AND FIRE FIGHTING
EQUIPMENT PROVIDED ALONG ESCAPE ROUTES CAN BE READILY LOCATED
• HORIZONTAL LUMINANCE AT THE FLOOR LEVEL ON CENTRELINE OF ESCAPE ROUT
SHALL NOT BE LESS THAN 10 LUX
• EMERGENCY LIGHTING SYSTEM SHALL BE CAPABLE OF CONTINUE OPERATION FOR
MINIMUM DURATION OF 1 HR 30 MINS
SERVICE DUCTS
• THE SERVICES DUCTS, IF PROVIDED, SHOULD HAVE TO BE ENCLOSED BY WALLS OF AT
LEAST 2 HOUR FIRE RESISTANCE & SHOULD HAVE TO BE SEALED AT EVERY ALTERNATE
FLOOR WITH NON-COMBUSTIBLE MATERIALS HAVING AT LEAST
2 HOUR FIRE RESISTANCE.
• THE SEALING AT FLOOR LEVEL IS TO PREVENT TRAVEL OF SMOKE & FIRE TO THE UPPER
FLOORS THROUGH THE DUCTS.
BUILT IN FIRE
FIGHTING SYSTEM
WET RISER CUM DOWN COMMER SYSTEM
• WET RISER : IT IS A VERTICAL PIPELINE (DIA. DEPENDS ON THE FLOOR AREA OF
THE BUILDING) CONNECTED TO A BOTTOM TANK(UNDERGROUND
WATER TANK).
• DOWN - : IT IS A VERTICAL PIPELINE (DIA. DEPENDS ON THE FLOOR AREA OF
COMMER THE BUILDING) CONNECTED TO A OVERHEAD TANK .
• HYDRANT :IT IS A HORIZONTAL PIPE LINE WITH OUTLET OF 63 MM. DIA
CONNECTED TO UNDERGROUND WATER TANK.
• DRY RISER :IT IS A VERTICAL PIPE WHICH IS ALWAYS KEPT DRY TO AVOID
THE FREEZING OF WATER.
WET RISER
• WET RISER CUM DOWN COMMER OR ONLY DOWN
COMMER SYSTEM SHALL BE PROVIDED FOR RESIDENTIAL
BUILDING.
• DIAMETER OF RISER WILL BE 150MM FOR ALL THE
BUILDINGS.
• FOR EACH 1000M2 FLOOR AREA OR IT’S PART ONE RISER
SHALL BE PROVIDED.
• AT EVERY LANDING TWIN OUTLET EACH OF 63MM DIA.
SHALL BE PROVIDED (ONE SHOULD BE CONNECTED TO
HOSE REEL & ANOTHER SHOULD BE TO HOSE & BRANCH).
WET RISER
• LENGTH OF HOSE SHOULD BE SHALL THAT IT SHOULD
REACH AT THE LAST POINT OF FLOOR AREA.
• MINIMUM TWO COURTYARD HYDRANTS SHALL BE
PROVIDED (COURTYARD HYDRANT WILL BE AN EXTENSION
TO RISER).
• HOSE REEL HOSE OF 12MM DIA. SHALL BE PROVIDED
FROM LANDING VALVE TO WET-RISER AT EACH FLOOR.
• A SEPARATE FIRE SERVICE INLET SHALL BE PROVIDED AT
THE GROUND FLOOR.
• LOCATION OF WET-RISER SHALL BE PREFERABLE AS NEAR
TO STAIRCASE.
WATER TANK
• UNDERGROUND WATER STORAGE TANK VARIES FROM 50,000 LITRES. TO250,000
LITRES. DEPENDING ON THE TYPE & OCCUPANCY OF THE BUILDINGS.
• THE CAPACITY OF TERRACE LEVEL WATER STORAGE TANK VARIES FROM 10,000 LITRES.
TO 20,000 LITRES. DEPENDING ON THE TYPE & OCCUPANCY OF THE BUILDING.
• FIRE WATER TANK IS SEPARATE OF OTHER WATER STORAGE TANKS OF BUILDING
Under ground
Water storage
tank
Terrace level
tank
FIRE ALARM SYSTEM
• DEPENDING ON THE OCCUPANCY, M.O.E.F.A.
SYSTEM OR AUTOMATIC OPERATED SYSTEM SHALL
BE PROVIDED IN THE BUILDING.
• EVERY BUILDING MORE THAN 15M IN HEIGHT
SHALL PROVIDE BOTH I.E. M.O.E.F.A &
A.F.A.
Manually operated Electrical fire alarm
system
Automatic Fire Alarm system
FIRE DETECTION SYSTEM
• DIFFERENT TYPES OF DETECTORS ARE PROVIDED AS PER THE
RISK INVOLVED IN THE AREA.
• ZONES ARE MADE AS PER THE RISK OR AS PER THE FLOOR.
2WAY COMMUNICATION SYSTEM TO BE PROVIDED WHICH
WILL HELP TO CONTACT FROM GROUND FLOOR TO SPECIFIC
FLOOR OR VICE-VERSA.
• MIKE ON EVERY FLOOR HAS TO BE PROVIDED
• ON MIKE INSTRUCTIONS CAN BE GIVEN AS PER SITUATION.
MANUAL CALL POINTS, AUTOMATIC DETECTOR & PUBLIC
ADDRESS SYSTEM SHALL BE INTERLINKED.
• DETECTORS SHALL BE INSTALLED AS PER IS 2189/ 1988.
SPRINKLER SYSTEM
• SPRINKLER SYSTEM IS A MUST FOR BASEMENT PARKING &
OTHER RISK AREAS WHERE LARGE QUANTITIES OF COMBUSTIBLE
MATERIALS ARE STORED.
• EACH SPRINKLER SHOULD COVER 6.96M2 AREA
• NORMALLY A SEPARATE SPRINKLER SHOULD BE PROVIDED FOR
A SEPARATE CAR.
• SPRINKLERS MAY CONNECT TO MAIN WATER TANK & PUMP,
BUT CAPACITY OF THE TANK & PUMP SHALL BE INCREASED IN
THAT PROPORTIONATE.
• THE CAPACITY OF WATER TANK SHALL BE CALCULATED ON THE
BASIS OF SPRINKLERS
MINIMUM REQUIREMENTS FOR FIRE
FIGHTING SYSTEM
THANK YOU !

More Related Content

Similar to Fire legislation - architecture legislation

Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsMohamed Anas
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitalsKomal Gupta
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyVishwas Sahni
 
VARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOWVARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOWRIDDHESH VARIK
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxNehaRanade2
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Anil Kumar R
 
Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital manjul gambhir
 
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYBUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYAgrima Garg
 
Acoustics noise reduction
Acoustics noise reductionAcoustics noise reduction
Acoustics noise reductionAbhishek kumar
 
Building vertival transport.pdf
Building vertival transport.pdfBuilding vertival transport.pdf
Building vertival transport.pdfMohsinAhmed969174
 

Similar to Fire legislation - architecture legislation (20)

Dry riser system
Dry riser systemDry riser system
Dry riser system
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Blasting
BlastingBlasting
Blasting
 
Insulators.pdf
Insulators.pdfInsulators.pdf
Insulators.pdf
 
Build services
Build servicesBuild services
Build services
 
Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise Buildings
 
Placing Reference.pdf
Placing Reference.pdfPlacing Reference.pdf
Placing Reference.pdf
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitals
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
VARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOWVARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOW
 
GROUP 4 LITERATURE.pptx
GROUP 4 LITERATURE.pptxGROUP 4 LITERATURE.pptx
GROUP 4 LITERATURE.pptx
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptx
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016
 
Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital
 
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYBUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
 
Acoustics noise reduction
Acoustics noise reductionAcoustics noise reduction
Acoustics noise reduction
 
2. Hydrant System.pdf
2. Hydrant System.pdf2. Hydrant System.pdf
2. Hydrant System.pdf
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
MEP- Building services
MEP- Building servicesMEP- Building services
MEP- Building services
 
Building vertival transport.pdf
Building vertival transport.pdfBuilding vertival transport.pdf
Building vertival transport.pdf
 

More from Ar. Prerna Chouhan

Conservation of Phillaur Haveli
Conservation of Phillaur Haveli Conservation of Phillaur Haveli
Conservation of Phillaur Haveli Ar. Prerna Chouhan
 
Essay on Culture by Ar. Prerna Chouhan
Essay on Culture by Ar. Prerna Chouhan Essay on Culture by Ar. Prerna Chouhan
Essay on Culture by Ar. Prerna Chouhan Ar. Prerna Chouhan
 
RESEARCH PAPER : DR BIRAJA SANKAR GUHA
RESEARCH PAPER : DR BIRAJA SANKAR GUHARESEARCH PAPER : DR BIRAJA SANKAR GUHA
RESEARCH PAPER : DR BIRAJA SANKAR GUHAAr. Prerna Chouhan
 
Green mobility - Cycle friendly cities
Green mobility - Cycle friendly citiesGreen mobility - Cycle friendly cities
Green mobility - Cycle friendly citiesAr. Prerna Chouhan
 
ARCHITECT ALVAR AALTO - ARCHITECT
ARCHITECT ALVAR AALTO - ARCHITECT ARCHITECT ALVAR AALTO - ARCHITECT
ARCHITECT ALVAR AALTO - ARCHITECT Ar. Prerna Chouhan
 
Library Interior Design - case study - Beant Singh Memorial Library
Library Interior Design - case study - Beant Singh Memorial Library Library Interior Design - case study - Beant Singh Memorial Library
Library Interior Design - case study - Beant Singh Memorial Library Ar. Prerna Chouhan
 
Persian Garden - landscape architecture
Persian Garden - landscape architecture Persian Garden - landscape architecture
Persian Garden - landscape architecture Ar. Prerna Chouhan
 
Kenzo Tange - receiptant of Pritzker Architecture Award
Kenzo Tange - receiptant of Pritzker Architecture AwardKenzo Tange - receiptant of Pritzker Architecture Award
Kenzo Tange - receiptant of Pritzker Architecture AwardAr. Prerna Chouhan
 
Himachal Pradesh - Vernacular architecture
Himachal Pradesh -  Vernacular architecture Himachal Pradesh -  Vernacular architecture
Himachal Pradesh - Vernacular architecture Ar. Prerna Chouhan
 
Hospital services (library & case study)
Hospital services (library & case study)  Hospital services (library & case study)
Hospital services (library & case study) Ar. Prerna Chouhan
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyAr. Prerna Chouhan
 
Slums - origin, growth, problems & solutions - B.ARCH STUDY REPORT
Slums  - origin, growth, problems & solutions - B.ARCH STUDY REPORT Slums  - origin, growth, problems & solutions - B.ARCH STUDY REPORT
Slums - origin, growth, problems & solutions - B.ARCH STUDY REPORT Ar. Prerna Chouhan
 
Institutional Campus - Library Study & Case Study (Panjab University Punjab ...
Institutional Campus - Library Study  & Case Study (Panjab University Punjab ...Institutional Campus - Library Study  & Case Study (Panjab University Punjab ...
Institutional Campus - Library Study & Case Study (Panjab University Punjab ...Ar. Prerna Chouhan
 
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, MohaliCASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, MohaliAr. Prerna Chouhan
 
HOTEL DESIGN CASE STUDY - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARH
HOTEL DESIGN CASE STUDY  - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARHHOTEL DESIGN CASE STUDY  - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARH
HOTEL DESIGN CASE STUDY - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARHAr. Prerna Chouhan
 

More from Ar. Prerna Chouhan (20)

Conservation of Phillaur Haveli
Conservation of Phillaur Haveli Conservation of Phillaur Haveli
Conservation of Phillaur Haveli
 
Essay on Culture by Ar. Prerna Chouhan
Essay on Culture by Ar. Prerna Chouhan Essay on Culture by Ar. Prerna Chouhan
Essay on Culture by Ar. Prerna Chouhan
 
RESEARCH PAPER : DR BIRAJA SANKAR GUHA
RESEARCH PAPER : DR BIRAJA SANKAR GUHARESEARCH PAPER : DR BIRAJA SANKAR GUHA
RESEARCH PAPER : DR BIRAJA SANKAR GUHA
 
Indus valley civilisation
Indus valley civilisationIndus valley civilisation
Indus valley civilisation
 
Traffic control devices
Traffic control devicesTraffic control devices
Traffic control devices
 
Green mobility - Cycle friendly cities
Green mobility - Cycle friendly citiesGreen mobility - Cycle friendly cities
Green mobility - Cycle friendly cities
 
ARCHITECT ALVAR AALTO - ARCHITECT
ARCHITECT ALVAR AALTO - ARCHITECT ARCHITECT ALVAR AALTO - ARCHITECT
ARCHITECT ALVAR AALTO - ARCHITECT
 
Library Interior Design - case study - Beant Singh Memorial Library
Library Interior Design - case study - Beant Singh Memorial Library Library Interior Design - case study - Beant Singh Memorial Library
Library Interior Design - case study - Beant Singh Memorial Library
 
STRUCTURE DESIGN REPORT
STRUCTURE  DESIGN REPORT STRUCTURE  DESIGN REPORT
STRUCTURE DESIGN REPORT
 
Persian Garden - landscape architecture
Persian Garden - landscape architecture Persian Garden - landscape architecture
Persian Garden - landscape architecture
 
Kenzo Tange - receiptant of Pritzker Architecture Award
Kenzo Tange - receiptant of Pritzker Architecture AwardKenzo Tange - receiptant of Pritzker Architecture Award
Kenzo Tange - receiptant of Pritzker Architecture Award
 
Himachal Pradesh - Vernacular architecture
Himachal Pradesh -  Vernacular architecture Himachal Pradesh -  Vernacular architecture
Himachal Pradesh - Vernacular architecture
 
group housing - Library study
group housing - Library studygroup housing - Library study
group housing - Library study
 
URBAN DESIGN - LONDON
URBAN DESIGN - LONDON URBAN DESIGN - LONDON
URBAN DESIGN - LONDON
 
Hospital services (library & case study)
Hospital services (library & case study)  Hospital services (library & case study)
Hospital services (library & case study)
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
 
Slums - origin, growth, problems & solutions - B.ARCH STUDY REPORT
Slums  - origin, growth, problems & solutions - B.ARCH STUDY REPORT Slums  - origin, growth, problems & solutions - B.ARCH STUDY REPORT
Slums - origin, growth, problems & solutions - B.ARCH STUDY REPORT
 
Institutional Campus - Library Study & Case Study (Panjab University Punjab ...
Institutional Campus - Library Study  & Case Study (Panjab University Punjab ...Institutional Campus - Library Study  & Case Study (Panjab University Punjab ...
Institutional Campus - Library Study & Case Study (Panjab University Punjab ...
 
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, MohaliCASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
 
HOTEL DESIGN CASE STUDY - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARH
HOTEL DESIGN CASE STUDY  - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARHHOTEL DESIGN CASE STUDY  - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARH
HOTEL DESIGN CASE STUDY - ALTIUS HOTEL & MOUNTVIEW HOTEL CHANDIGARH
 

Recently uploaded

MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 

Recently uploaded (20)

MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 

Fire legislation - architecture legislation

  • 1. SUBMITTED BY AMIT JHAKAD (14010) MANSI PUSHPAKAR (14034) PRERNA CHOUHAN (14044) SAHIL (14048)
  • 2. CLASSIFICATION OF RESIDENTIAL BUILDINGS AS PER NATIONAL BUILDING CODE GROUP ‘A’ - RESIDENTIAL - LODGINGS, DWELLINGS, DORMITORIES, FLATS, HOTELS. A1 - LODGING OR ROOMING HOUSES A2 -ONE OR TWO FAMILY PRIVATE DWELLING A3 -DORMITORIES A4 -APARTMENT HOUSES A5 -HOTELS
  • 3. ENTRANCE WIDTH & HEIGHT CLEARANCE • EVERY HIGH RISE BUILDING SHOULD HAVE AT LEAST 2 MEANS OF ACCESS, ONE REMOTE TO THE OTHER, OF MINIMUM WIDTH 4.5M. WITH HEIGHT CLEARANCE OF 5M. THIS MINIMUM WIDTH IS ESSENTIAL TO FACILITATE FREE MOVEMENT OF FIRE UNITS. 4.5m plan
  • 4. SETBACK OR OPEN SPACES 1/3 of total Height of building Up to 30m high 6m FOR FREE MOVEMENT OF FIRE VEHICLE
  • 5. CAR PARKING IN SETBACK / OPEN SPACES • IF THE SETBACK AREA / OPEN SPACES IS MORE THEN 12 METER, THE PROVISION FOR CAR PARKING CAN BE DONE IN THE SETBACK OR OPEN SPACES AT THE PERIPHERY OF THE COURTYARD LEAVING THE 6 METER MOTOR ABLE ROAD. • CAR PARKING SHALL HAVE TO BE DONE AT THE BASEMENT WITH PROVISION FOR MINIMUM 2 RAMPS ONE REMOTE TO OTHER. CAR PARKING 6m motor able road If more than 12m
  • 6. STAIRCASES • EVERY HIGH RISE BUILDING HAVE MINIMUM 2 NUMBER OF STAIRCASES. • WIDTH OF STAIRCASES VARIES FROM 1 M. TO 2 M. • FOR RESIDENTIAL BUILDING WIDTH OF STAIRCASES SHOULD BE 1 METRE. • OUT OF 2 STAIRCASES, 1 CAN BE USED AS A FIRE ESCAPE STAIRCASE. • WIDTH OF FIRE ESCAPE SHOULD BE MINIMUM 0.75 METER.
  • 7. • NUMBER OF STAIRCASES SHALL BE GIVEN AS PER THE TRAVEL DISTANCES. • STAIRCASE SHALL NOT BE EXTENDED TO BASEMENT TO PREVENT SMOKE , HEAT & GASES. FROM THE BASEMENT SMOKE, HEAT 7 GASES CAN BE TRAVEL TO UPPER FLOORS. • ACCESS TO THE BASEMENT FROM THE GROUND SHOULD BE THROUGH A SEPARATE STAIRCASE, WHICH IS NOT CONNECTED TO MAIN STAIRCASE • STAIRCASE SHALL BE OF ENCLOSED TYPE TO PREVENT ENTRY OF SMOKE & FIRE TO THE STAIRCASE & VICE VERSA. • SPIRAL STAIRCASE SHALL BE PROVIDED UP TO 9 METRE. HEIGHT. • EXTERNAL STAIRCASE NORMALLY SHALL NOT BE ALLOWED. STAIRCASES
  • 8. RAMPS • RAMPS SHALL COMPLY WITH ALL THE APPLICABLE REQUIREMENTS FOR STAIRWAYS REGARDING ENCLOSURE, CAPACITY AND LIMITING DIMENSIONS EXCEPT WHERE SPECIFIED FOR SPECIAL USES AND OCCUPANCIES • THE SLOPE OF A RAMP SHALL NOT EXCEED 1 IN 10. IN CERTAIN CASES STEEPER SLOPES MAY BE PERMITTED BUT IN NO CASE GREATER THAN 1 IN 8 • RAMPS SHALL BE SURFACED WITH NON SLIPPING MATERIAL
  • 9. LIFTS • MINIMUM 1 LIFT CAPABLE OF CARRYING MINIMUM 8 PERSONS WEIGHING 545 KGS. SHALL BE PROVIDED FOR EVERY HIGH RISE BUILDING. • LANDING DOORS OF LIFTS SHALL OPEN TO VENTILATED LOBBY & SHALL HAVE A FIRE RESISTANCE OF 1 HOUR. • 1 LIFT SHALL BE DESIGNED AS A “FIRE LIFT” • “FIREMAN SWITCH” SHALL BE PROVIDED FOR EACH LIFT. • LIFTS SHALL NOT BE USED AS MEANS OF EVACUATION. • COLLAPSIBLE GATES SHALL NOT BE PROVIDED FOR THE LIFT. • IF MORE THAN 1 LIFTS ARE INSTALLED THE PARTITION WALL SHOULD BE OF MINIMUM 2 HOURS FIRE RESISTANCE
  • 10. THE REFUGE AREA • FOR FLOORS ABOVE 24M & UP TO 39M ONE REFUGE AREA ON THE FLOOR IMMEDIATELY ABOVE 24M. • FOR FLOORS ABOVE 39M ONE REFUGE AREA ON THE FLOOR IMMEDIATELY ABOVE 39M & SO ON AFTER 15M REFUGE AREA SHALL BE PROVIDED.
  • 11. EMERGENCY AND ESCAPE LIGHTING • EMERGENCY LIGHTING SHALL BE POWERED FROM A SOURCE INDEPENDENT OF THAT SUPPLYING THE NORMAL LIGHTING • ESCAPE LIGHTING SHALL BE CAPABLE OF: - INDICATING CLEARLY AND UNAMBIGUOUSLY THE ESCAPE ROUTS. - PROVIDING ADEQUATE ILLUMINATION AND ILLUMINATION ALONG SUCH ROUTS TO ALLOW SAFE MOVEMENT - ENSURING THAT THE FIRE ALARM CALL POINTS AND FIRE FIGHTING EQUIPMENT PROVIDED ALONG ESCAPE ROUTES CAN BE READILY LOCATED • HORIZONTAL LUMINANCE AT THE FLOOR LEVEL ON CENTRELINE OF ESCAPE ROUT SHALL NOT BE LESS THAN 10 LUX • EMERGENCY LIGHTING SYSTEM SHALL BE CAPABLE OF CONTINUE OPERATION FOR MINIMUM DURATION OF 1 HR 30 MINS
  • 12. SERVICE DUCTS • THE SERVICES DUCTS, IF PROVIDED, SHOULD HAVE TO BE ENCLOSED BY WALLS OF AT LEAST 2 HOUR FIRE RESISTANCE & SHOULD HAVE TO BE SEALED AT EVERY ALTERNATE FLOOR WITH NON-COMBUSTIBLE MATERIALS HAVING AT LEAST 2 HOUR FIRE RESISTANCE. • THE SEALING AT FLOOR LEVEL IS TO PREVENT TRAVEL OF SMOKE & FIRE TO THE UPPER FLOORS THROUGH THE DUCTS.
  • 14. WET RISER CUM DOWN COMMER SYSTEM • WET RISER : IT IS A VERTICAL PIPELINE (DIA. DEPENDS ON THE FLOOR AREA OF THE BUILDING) CONNECTED TO A BOTTOM TANK(UNDERGROUND WATER TANK). • DOWN - : IT IS A VERTICAL PIPELINE (DIA. DEPENDS ON THE FLOOR AREA OF COMMER THE BUILDING) CONNECTED TO A OVERHEAD TANK . • HYDRANT :IT IS A HORIZONTAL PIPE LINE WITH OUTLET OF 63 MM. DIA CONNECTED TO UNDERGROUND WATER TANK. • DRY RISER :IT IS A VERTICAL PIPE WHICH IS ALWAYS KEPT DRY TO AVOID THE FREEZING OF WATER.
  • 15. WET RISER • WET RISER CUM DOWN COMMER OR ONLY DOWN COMMER SYSTEM SHALL BE PROVIDED FOR RESIDENTIAL BUILDING. • DIAMETER OF RISER WILL BE 150MM FOR ALL THE BUILDINGS. • FOR EACH 1000M2 FLOOR AREA OR IT’S PART ONE RISER SHALL BE PROVIDED. • AT EVERY LANDING TWIN OUTLET EACH OF 63MM DIA. SHALL BE PROVIDED (ONE SHOULD BE CONNECTED TO HOSE REEL & ANOTHER SHOULD BE TO HOSE & BRANCH).
  • 16. WET RISER • LENGTH OF HOSE SHOULD BE SHALL THAT IT SHOULD REACH AT THE LAST POINT OF FLOOR AREA. • MINIMUM TWO COURTYARD HYDRANTS SHALL BE PROVIDED (COURTYARD HYDRANT WILL BE AN EXTENSION TO RISER). • HOSE REEL HOSE OF 12MM DIA. SHALL BE PROVIDED FROM LANDING VALVE TO WET-RISER AT EACH FLOOR. • A SEPARATE FIRE SERVICE INLET SHALL BE PROVIDED AT THE GROUND FLOOR. • LOCATION OF WET-RISER SHALL BE PREFERABLE AS NEAR TO STAIRCASE.
  • 17. WATER TANK • UNDERGROUND WATER STORAGE TANK VARIES FROM 50,000 LITRES. TO250,000 LITRES. DEPENDING ON THE TYPE & OCCUPANCY OF THE BUILDINGS. • THE CAPACITY OF TERRACE LEVEL WATER STORAGE TANK VARIES FROM 10,000 LITRES. TO 20,000 LITRES. DEPENDING ON THE TYPE & OCCUPANCY OF THE BUILDING. • FIRE WATER TANK IS SEPARATE OF OTHER WATER STORAGE TANKS OF BUILDING Under ground Water storage tank Terrace level tank
  • 18. FIRE ALARM SYSTEM • DEPENDING ON THE OCCUPANCY, M.O.E.F.A. SYSTEM OR AUTOMATIC OPERATED SYSTEM SHALL BE PROVIDED IN THE BUILDING. • EVERY BUILDING MORE THAN 15M IN HEIGHT SHALL PROVIDE BOTH I.E. M.O.E.F.A & A.F.A. Manually operated Electrical fire alarm system Automatic Fire Alarm system
  • 19. FIRE DETECTION SYSTEM • DIFFERENT TYPES OF DETECTORS ARE PROVIDED AS PER THE RISK INVOLVED IN THE AREA. • ZONES ARE MADE AS PER THE RISK OR AS PER THE FLOOR. 2WAY COMMUNICATION SYSTEM TO BE PROVIDED WHICH WILL HELP TO CONTACT FROM GROUND FLOOR TO SPECIFIC FLOOR OR VICE-VERSA. • MIKE ON EVERY FLOOR HAS TO BE PROVIDED • ON MIKE INSTRUCTIONS CAN BE GIVEN AS PER SITUATION. MANUAL CALL POINTS, AUTOMATIC DETECTOR & PUBLIC ADDRESS SYSTEM SHALL BE INTERLINKED. • DETECTORS SHALL BE INSTALLED AS PER IS 2189/ 1988.
  • 20. SPRINKLER SYSTEM • SPRINKLER SYSTEM IS A MUST FOR BASEMENT PARKING & OTHER RISK AREAS WHERE LARGE QUANTITIES OF COMBUSTIBLE MATERIALS ARE STORED. • EACH SPRINKLER SHOULD COVER 6.96M2 AREA • NORMALLY A SEPARATE SPRINKLER SHOULD BE PROVIDED FOR A SEPARATE CAR. • SPRINKLERS MAY CONNECT TO MAIN WATER TANK & PUMP, BUT CAPACITY OF THE TANK & PUMP SHALL BE INCREASED IN THAT PROPORTIONATE. • THE CAPACITY OF WATER TANK SHALL BE CALCULATED ON THE BASIS OF SPRINKLERS
  • 21. MINIMUM REQUIREMENTS FOR FIRE FIGHTING SYSTEM