Optimization Between
Cost Reduction & Vendor Selection
in SCM
Presented by : Prashant Rajpoot
Date: Jan 28, 2019
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
INDEX
 OBJECTIVE
 INDIAN POWER SECTOR
 ABOUT L&T-MHPS BOILERS PVT LTD
 SUPPLY CHAIN MANAGEMENT
 CHALLENGES FACED
 STRATEGY TO COUNTER
 IMPLEMENTATION PLAN
 RECOMMENDATIONS
 WORK IN PROGRESS
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
OBJECTIVE
 LMB’s Goal of right pricing strategy & reduction in delivery
schedule in todays competitive scenario .
 Focus on supply chain in business processes :
 Better cost saving.
 Developing optimized ordering strategy for packages.
 Developing module for evaluating vendors & right vendor
selection
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
INDIAN POWER SECTOR
196,097
24,867
837
45,487
6,780
70,648
Fuel wise (MW)
Coal Gas
Oil Hydro
Nuclear Renewable energy
0.3%
8.1%
14.1%
61.4%
1.9%
14.1%
(Source: CEA)
Oct. 30, 2018
Capacity Addition Projections (figures in MW)
5 year Plan Planned Thru Coal
11th (2007-2012) 68,869 46,635
12th (2012-2017) 76,000 63,000
13th (2017-2022) 93,400 63,400
Report of The Working Groupon Power for 11th & 12th five year plans.
Existing Capacity : 344,716 MW
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
LMBMHPS
L&T-MHPS Boilers Pvt. Ltd.
L&T
51% 49%
Larsen &
Toubro,
India
Mitsubishi
Hitachi Power
System, Japan
L&T-MHPS
Boilers, India
Incorporation
L&T-MHPS Boilers was
incorporated on
April 18, 2007
(20 Years Term)
Scope
Complete Technology
Transfer of Supercritical
Boilers
Product Range
Supercritical Boilers of
500 MW and above
including Pulverizer
Jaypee
Nigrie
2x660
MW
Maha
Genco
Koradi
3x660
MW
Nabha
Power
Rajpur
a
2x700
MW
RRVUN
L.
Chhabr
a
2x660
MW
MPPG
CL
Khand
wa
2X660
MW
NTPC,
Tanda
2X660
MW
NTPC
Khargo
ne
2X660
MW
NUPPL
Ghatam
pur
3x660
MW
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
L&T-MHPS Boilers Pvt. Ltd.
Signed with
MHPS for Boilers
Term
20 years
Exclusive
In India
Non Exclusive
Outside India
License and Technical
Assistance Agreement
For doing business outside
India
LMB requires prior written consent of
MHPS
Upon MHPS request, LMB can sell its
products to MHPS
Manufacturing Facility at Hazira, Gujarat
Product Range
Boiler & Auxiliaries Package Pressure Part Windbox Pulverisers
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
L&T-MHPS
Boilers Process
Flow
Site
Engineering
SUPPLY CHAIN MANAGEMENT
Standard Urgent
Requirement
Project Based
Requirement
To manage
inventory &
Effective
Deployment
Combination of
methods &
sources to take
decision
InternalFocusExternalFocus
Short Term Long Term
PURCHASING PROCUREMENT
LOGISTICS & IM STRATEGIC
SOURCING
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
CHALLENGES FACED
1. Savings Achieved
2. Transparency in
finalization
3. Vendors are
evaluated yearly &
based on performance,
future ordering is
decided
1. Prone to Cartelization
2. More prone to
delivery failure
3. Ordering only on
basis on L1 philosophy
1. Revisiting Evaluation
philosophy
2. Developing Strategic
thinking
1. Savings might not be
achieved
2. Lead time for
finalization of package
may increase
STRENGTHS WEAKNESSES
OPPURTUNITIES THREATS
Case Example
Vendor : Passive Infra
2010 : Introduction of Vendor in LMB
2012 : Most preferred Vendor
2013 : Executed 3600 MT on time &
Order booking of 2600 till 2016
2016 : 1000 MT backlog
WHAT WENT WRONG
?
SWOT of Current Ordering Process
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
STRATEGY for Opportunities
Analytical Hierarchy Process (AHP)
Decomposing Decision problem into a
hierarchy
Vendor
Selection
Criteria
Cost
Fixed
Variable
Quality
Product
Manufacturi
ng
Delivery
Timeliness
Lead Time
Location
Reliability
Responsive
ness
Facility &
Capacity
Financial
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
Delivery Performance Rating
Existing Process Revised Process
Delivery performance
Ratings (DPR)
QTY Supplied within CDD
QTY Supplied After CDD x
0.5
V : Values In INR
Total Quantity Supplied
Calculation of MF NO of days delay
% age
completion
balance
compared to
total supply
<30 <60 <90 <120
<25 0.94 0.86 0.78 0.70
26-50 0.90 0.82 0.74 0.66
51-75 0.86 0.78 0.70 0.62
DPR 1 =V(0-29) x MF1 + V(30-59) x MF2 + V(60-89) x MF3 + -------
DPR % = (DPR 1 + Sum Of Invoice within CDD) / Total Invoice Value
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
Quality Performance Rating
Existing Process Revised Process
Quality performance
Ratings (QPR)
• A formula governed by
Non Conformity Report
(NCR)
• Not Covering criticality
of NCR
• Not Covering Subjective
aspects
QPR %
70 % x Analytical
Aspect
30 % x Subjective
Aspect
• A multiplication factor governed by criticality of NCR
• For Subjective aspect, a rating is given on a scale of 100
based on 20 questions .
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
Vendor Rating
Existing Process Revised Process
Vendor Rating %
50 % x DPR
50 % x QPR
Vendor Rating % 40 % x DPR 40 % x QPR
20 % x Reliability Factor
• Vendor After Sale services, Effectiveness to follow LMB
procedures, Detention Charges frequency, Financial
Reconciliations
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
Financial Health
7 WONDERS OF FINANCE Z Score 1.2X1 1.4X2 3.3X3 0.6X4 1.0X5
Five Performance Ratios Combined into One Score
X1 = Working Capital / Total Assets
X2 = Retained Earnings / Total Assets
X3 = EBIT / Total Assets
X4 = Market value of Equity / Book value of Total Liabilities
X5 = Sales / Total Assets
SAFE ZONE GREY ZONE DISTRESS
ZONE
3.0 1.8
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
COST Portion
Fixed Variable
Cost provided by vendor
after final negotiation
Modes of Negotiation
1) Direct Negotiation
2) Reverse Auction
Cost of SCM Intervention Cost of Quality Intervention
Expected QC Man-days
PER Day Cost
Factor based on QPR
Expected SCM Man-days
PER Day Cost
Factor based on DPR
Values In INR
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
% Contribution
By Value =
2.41%
By No of Pkg =
13.95 %
% Contribution
By Value =
33.12%
By No of Pkg =
16.28%% Contribution
By Value =
16.50 %
By No of Pkg =
55.23 %
% Contribution
By Value
= 47.96 %
By No of Pkg =
14.53 %
StandardItem
NonStandard
Item
Less Critical Very Critical
IMPLEMENTATION
Total Packages in Boiler - 172 Nos
Total Value – 820 Cr.
Packages were divided into 04 Categories
based on Criticality & Category of Item.
CategoryOfItem
Criticality of Item
• Quadrant II & IV – Major Focus
• Best practices to be followed
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
% Contribution
By Value =
2.41%
By No of Pkg =
13.95 %
% Contribution
By Value =
33.12%
By No of Pkg =
16.28%% Contribution
By Value =
16.50 %
By No of Pkg =
55.23 %
% Contribution
By Value
= 47.96 %
By No of Pkg =
14.53 %
StandardItem
NonStandard
Item
Less Critical Very Critical
IMPLEMENTATION
CategoryOfItem
Criticality of Item
17%
21%
16%
23%
23%
Percentage Satisfaction
Availability of
channels/forums/opportunities
Response from LMB to the ideas
communicated by you
Approachability to LMB divisions
Quality improvement initiative
Proactiveness of LMB in reaching
out with performance
improvement ideas
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
Recommendations
Continuous study and review of historic data for better order finalization accuracy.
Performance evaluation by identified individual & availability of value on server for buyer’s
further usage.
Streamlining Comparison Sheet to make it more amenable for evaluation
Development of common platform accessible to vendors for credentials input & vendor
registration.
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019
Work in Progress
• Online modules for models under approval.
• Incorporation of variable cost component in comparison sheet
• Testing of prototype for online vendor registration module.
• Approval of Standard Operating Procedures for DPR & Vendor
Ratings.
“Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019

More Related Content

Similar to Optimization between better vendor selection & cost reduction

4029 5504 02_strategy_and_performance_measure
4029 5504 02_strategy_and_performance_measure4029 5504 02_strategy_and_performance_measure
4029 5504 02_strategy_and_performance_measure
Vijayendra Gupta
 
Analysis of Optimum Bid and Contractor’s Effort in Obtaining Profit
Analysis of Optimum Bid and Contractor’s Effort in Obtaining ProfitAnalysis of Optimum Bid and Contractor’s Effort in Obtaining Profit
Analysis of Optimum Bid and Contractor’s Effort in Obtaining Profit
AI Publications
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
RAVI PAL SINGH
 
1. Profile Presentation - CostICon
1. Profile Presentation - CostICon1. Profile Presentation - CostICon
1. Profile Presentation - CostICon
Suyash Shah
 
SC Cost optimization
SC Cost optimizationSC Cost optimization
SC Cost optimization
Julia Runow
 

Similar to Optimization between better vendor selection & cost reduction (20)

PfH Live 2016 Rising to the challenge - Steve Malone
PfH Live 2016 Rising to the challenge - Steve MalonePfH Live 2016 Rising to the challenge - Steve Malone
PfH Live 2016 Rising to the challenge - Steve Malone
 
MAGO THERMAL PVT.pptx
MAGO THERMAL PVT.pptxMAGO THERMAL PVT.pptx
MAGO THERMAL PVT.pptx
 
Nihit - Ctran Consulting project proposal
Nihit - Ctran Consulting project proposalNihit - Ctran Consulting project proposal
Nihit - Ctran Consulting project proposal
 
4029 5504 02_strategy_and_performance_measure
4029 5504 02_strategy_and_performance_measure4029 5504 02_strategy_and_performance_measure
4029 5504 02_strategy_and_performance_measure
 
Breedon Aggregates
Breedon AggregatesBreedon Aggregates
Breedon Aggregates
 
Analysis of Optimum Bid and Contractor’s Effort in Obtaining Profit
Analysis of Optimum Bid and Contractor’s Effort in Obtaining ProfitAnalysis of Optimum Bid and Contractor’s Effort in Obtaining Profit
Analysis of Optimum Bid and Contractor’s Effort in Obtaining Profit
 
4 city-gas-distribution
4 city-gas-distribution4 city-gas-distribution
4 city-gas-distribution
 
Service marketing o&m service
Service marketing o&m serviceService marketing o&m service
Service marketing o&m service
 
Workshop slides review of the effectiveness of the wem and egrc regulatory ...
Workshop slides   review of the effectiveness of the wem and egrc regulatory ...Workshop slides   review of the effectiveness of the wem and egrc regulatory ...
Workshop slides review of the effectiveness of the wem and egrc regulatory ...
 
Machine teaching webinar
Machine teaching webinarMachine teaching webinar
Machine teaching webinar
 
Evaluation of United Power Generation & Development – Financial & Strategic ...
Evaluation of United Power Generation & Development  – Financial & Strategic ...Evaluation of United Power Generation & Development  – Financial & Strategic ...
Evaluation of United Power Generation & Development – Financial & Strategic ...
 
Evaluation of United Power – Financial and Strategic Perspective
Evaluation of United Power  – Financial and Strategic PerspectiveEvaluation of United Power  – Financial and Strategic Perspective
Evaluation of United Power – Financial and Strategic Perspective
 
How to Value Digitalization
How to Value DigitalizationHow to Value Digitalization
How to Value Digitalization
 
Resource consumption accounting
Resource consumption accountingResource consumption accounting
Resource consumption accounting
 
P&amp;G
P&amp;GP&amp;G
P&amp;G
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
 
Supplier Relationship & Performance Management
Supplier Relationship & Performance ManagementSupplier Relationship & Performance Management
Supplier Relationship & Performance Management
 
1. Profile Presentation - CostICon
1. Profile Presentation - CostICon1. Profile Presentation - CostICon
1. Profile Presentation - CostICon
 
Ongc Marketing LPG on Study on household cooking fuel usage and willingness t...
Ongc Marketing LPG on Study on household cooking fuel usage and willingness t...Ongc Marketing LPG on Study on household cooking fuel usage and willingness t...
Ongc Marketing LPG on Study on household cooking fuel usage and willingness t...
 
SC Cost optimization
SC Cost optimizationSC Cost optimization
SC Cost optimization
 

Recently uploaded

Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 

Recently uploaded (20)

A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
Global Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfGlobal Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdf
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
Powers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdfPowers and Functions of CPCB - The Water Act 1974.pdf
Powers and Functions of CPCB - The Water Act 1974.pdf
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE Ventures
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 

Optimization between better vendor selection & cost reduction

  • 1. Optimization Between Cost Reduction & Vendor Selection in SCM Presented by : Prashant Rajpoot Date: Jan 28, 2019
  • 2. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 INDEX  OBJECTIVE  INDIAN POWER SECTOR  ABOUT L&T-MHPS BOILERS PVT LTD  SUPPLY CHAIN MANAGEMENT  CHALLENGES FACED  STRATEGY TO COUNTER  IMPLEMENTATION PLAN  RECOMMENDATIONS  WORK IN PROGRESS
  • 3. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 OBJECTIVE  LMB’s Goal of right pricing strategy & reduction in delivery schedule in todays competitive scenario .  Focus on supply chain in business processes :  Better cost saving.  Developing optimized ordering strategy for packages.  Developing module for evaluating vendors & right vendor selection
  • 4. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 INDIAN POWER SECTOR 196,097 24,867 837 45,487 6,780 70,648 Fuel wise (MW) Coal Gas Oil Hydro Nuclear Renewable energy 0.3% 8.1% 14.1% 61.4% 1.9% 14.1% (Source: CEA) Oct. 30, 2018 Capacity Addition Projections (figures in MW) 5 year Plan Planned Thru Coal 11th (2007-2012) 68,869 46,635 12th (2012-2017) 76,000 63,000 13th (2017-2022) 93,400 63,400 Report of The Working Groupon Power for 11th & 12th five year plans. Existing Capacity : 344,716 MW
  • 5. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 LMBMHPS L&T-MHPS Boilers Pvt. Ltd. L&T 51% 49% Larsen & Toubro, India Mitsubishi Hitachi Power System, Japan L&T-MHPS Boilers, India Incorporation L&T-MHPS Boilers was incorporated on April 18, 2007 (20 Years Term) Scope Complete Technology Transfer of Supercritical Boilers Product Range Supercritical Boilers of 500 MW and above including Pulverizer Jaypee Nigrie 2x660 MW Maha Genco Koradi 3x660 MW Nabha Power Rajpur a 2x700 MW RRVUN L. Chhabr a 2x660 MW MPPG CL Khand wa 2X660 MW NTPC, Tanda 2X660 MW NTPC Khargo ne 2X660 MW NUPPL Ghatam pur 3x660 MW
  • 6. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 L&T-MHPS Boilers Pvt. Ltd. Signed with MHPS for Boilers Term 20 years Exclusive In India Non Exclusive Outside India License and Technical Assistance Agreement For doing business outside India LMB requires prior written consent of MHPS Upon MHPS request, LMB can sell its products to MHPS Manufacturing Facility at Hazira, Gujarat Product Range Boiler & Auxiliaries Package Pressure Part Windbox Pulverisers
  • 7. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 L&T-MHPS Boilers Process Flow Site Engineering SUPPLY CHAIN MANAGEMENT Standard Urgent Requirement Project Based Requirement To manage inventory & Effective Deployment Combination of methods & sources to take decision InternalFocusExternalFocus Short Term Long Term PURCHASING PROCUREMENT LOGISTICS & IM STRATEGIC SOURCING
  • 8. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 CHALLENGES FACED 1. Savings Achieved 2. Transparency in finalization 3. Vendors are evaluated yearly & based on performance, future ordering is decided 1. Prone to Cartelization 2. More prone to delivery failure 3. Ordering only on basis on L1 philosophy 1. Revisiting Evaluation philosophy 2. Developing Strategic thinking 1. Savings might not be achieved 2. Lead time for finalization of package may increase STRENGTHS WEAKNESSES OPPURTUNITIES THREATS Case Example Vendor : Passive Infra 2010 : Introduction of Vendor in LMB 2012 : Most preferred Vendor 2013 : Executed 3600 MT on time & Order booking of 2600 till 2016 2016 : 1000 MT backlog WHAT WENT WRONG ? SWOT of Current Ordering Process
  • 9. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 STRATEGY for Opportunities Analytical Hierarchy Process (AHP) Decomposing Decision problem into a hierarchy Vendor Selection Criteria Cost Fixed Variable Quality Product Manufacturi ng Delivery Timeliness Lead Time Location Reliability Responsive ness Facility & Capacity Financial
  • 10. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 Delivery Performance Rating Existing Process Revised Process Delivery performance Ratings (DPR) QTY Supplied within CDD QTY Supplied After CDD x 0.5 V : Values In INR Total Quantity Supplied Calculation of MF NO of days delay % age completion balance compared to total supply <30 <60 <90 <120 <25 0.94 0.86 0.78 0.70 26-50 0.90 0.82 0.74 0.66 51-75 0.86 0.78 0.70 0.62 DPR 1 =V(0-29) x MF1 + V(30-59) x MF2 + V(60-89) x MF3 + ------- DPR % = (DPR 1 + Sum Of Invoice within CDD) / Total Invoice Value
  • 11. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 Quality Performance Rating Existing Process Revised Process Quality performance Ratings (QPR) • A formula governed by Non Conformity Report (NCR) • Not Covering criticality of NCR • Not Covering Subjective aspects QPR % 70 % x Analytical Aspect 30 % x Subjective Aspect • A multiplication factor governed by criticality of NCR • For Subjective aspect, a rating is given on a scale of 100 based on 20 questions .
  • 12. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 Vendor Rating Existing Process Revised Process Vendor Rating % 50 % x DPR 50 % x QPR Vendor Rating % 40 % x DPR 40 % x QPR 20 % x Reliability Factor • Vendor After Sale services, Effectiveness to follow LMB procedures, Detention Charges frequency, Financial Reconciliations
  • 13. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 Financial Health 7 WONDERS OF FINANCE Z Score 1.2X1 1.4X2 3.3X3 0.6X4 1.0X5 Five Performance Ratios Combined into One Score X1 = Working Capital / Total Assets X2 = Retained Earnings / Total Assets X3 = EBIT / Total Assets X4 = Market value of Equity / Book value of Total Liabilities X5 = Sales / Total Assets SAFE ZONE GREY ZONE DISTRESS ZONE 3.0 1.8
  • 14. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 COST Portion Fixed Variable Cost provided by vendor after final negotiation Modes of Negotiation 1) Direct Negotiation 2) Reverse Auction Cost of SCM Intervention Cost of Quality Intervention Expected QC Man-days PER Day Cost Factor based on QPR Expected SCM Man-days PER Day Cost Factor based on DPR Values In INR
  • 15. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 % Contribution By Value = 2.41% By No of Pkg = 13.95 % % Contribution By Value = 33.12% By No of Pkg = 16.28%% Contribution By Value = 16.50 % By No of Pkg = 55.23 % % Contribution By Value = 47.96 % By No of Pkg = 14.53 % StandardItem NonStandard Item Less Critical Very Critical IMPLEMENTATION Total Packages in Boiler - 172 Nos Total Value – 820 Cr. Packages were divided into 04 Categories based on Criticality & Category of Item. CategoryOfItem Criticality of Item • Quadrant II & IV – Major Focus • Best practices to be followed
  • 16. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 % Contribution By Value = 2.41% By No of Pkg = 13.95 % % Contribution By Value = 33.12% By No of Pkg = 16.28%% Contribution By Value = 16.50 % By No of Pkg = 55.23 % % Contribution By Value = 47.96 % By No of Pkg = 14.53 % StandardItem NonStandard Item Less Critical Very Critical IMPLEMENTATION CategoryOfItem Criticality of Item 17% 21% 16% 23% 23% Percentage Satisfaction Availability of channels/forums/opportunities Response from LMB to the ideas communicated by you Approachability to LMB divisions Quality improvement initiative Proactiveness of LMB in reaching out with performance improvement ideas
  • 17. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 Recommendations Continuous study and review of historic data for better order finalization accuracy. Performance evaluation by identified individual & availability of value on server for buyer’s further usage. Streamlining Comparison Sheet to make it more amenable for evaluation Development of common platform accessible to vendors for credentials input & vendor registration.
  • 18. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019 Work in Progress • Online modules for models under approval. • Incorporation of variable cost component in comparison sheet • Testing of prototype for online vendor registration module. • Approval of Standard Operating Procedures for DPR & Vendor Ratings.
  • 19. “Vendor Management & Cost Optimization for L&T‐MHPS Boilers Private Limited” Presented by : Prashant Rajpoot Jan 28, 2019

Editor's Notes

  1. Add five year plan projections. Add NEP data for coal fired power plant.
  2. of more easily comprehended criteria & Sub - Criteria