TRAINING REPORT
On
A PROJECT ON RESIDENTIAL BUILDING
OF
PUBLIC WORK DEPARTMENT
Submitted for partial fulfilment of Awards of
BACHELOR OF TECHNOLOGY
IN
CIVIL ENGINEERING
2016-2017
BY
PRADEEP YADAV
(1342100038)
SURYA SCHOOL OF PLANNING ENGINEERING AND
MANAGEMENT,
Lucknow
Affiliated to
Dr. A.P.J. Abdul Kalam Technical University,Lucknow
DEPARTMENT OF CIVIL ENGINEERING, SSPEM
ACKNOWLEDGEMENT
We express our sincere thanks to MR. S K Yadav, Head of
Civil Engineering department Surya SchoolOf Planning Engineering and
Management, Lucknow, for
his guidance and care taken by him in helping us to complete the work
successfully.
In our training period, we had to take the help and Guideline of a Respected
Person, who deserve our greatest gratitude. The completion of this training
gives us much pleasure. We would like to show our gratitude to Mr. Amarkant
Sir for giving us a good guideline for training throughout numerous
consultation. We would also like to expand our deepest gratitude to all those
who have indirectly guided us in summer training.
Many people, especially our team members itself, have made valuable comment
suggestion on this proposal which gave us an inspiration to improve our
training. We thank all the people for their help directly and indirectly to
complete our trainning.
(SIGNATURE)
DECLARATION
In the city Chandauli the detailed work related to broadening and making rigid
of the Chandauli-Sakaldiha Road way is built up in the no.(1) 8/1/16 to avoid
the conjunction on Chandauli-Sakaldiha Road in date 18/7/2017, from built up
residential building completely under taken by public work department .
We declare that this written submission represents our ideas in our own words
and where others’ ideas or words have been included, we have adequately cited
and referenced the original sources. We also declared that we have adhered to
all principles of academic honesty and integrity and have not misrepresented or
fabricated or falsified any idea/data/fact/source in my submission. We
understand that any violation of the above will cause for disciplinary action by
the institute and can also evoke penal action from the sources which have not
been properly cited or from whom proper permission has not been taken when
needed.
Pradeep Yadav
SPECIFICATION
All the works shall be carried out as per P.W.D/M.O.R.T and H.IRC detailed
specifications and as per latest instructions received from engineer in chief
U.P.P.W.D., Chandauli.
INTRODUCTION
 Complete the project in the specified time horizon and allocated cost.
 Deliver value to the customers by providing excellent customer support.
As well as we know that P.W.D is the another construction of all construction it
will stand after 150 years in the Indian culture to make the faboralors structure ,
and they will develop in accordance of engineer and architecture .Building are
an integral part of the houses system. A efficient in order to maximize
economic and social benefits. They play a significant role in achieving national
development and contributing to the overall performance . So people will love
the their leader and obey the laws of our country Surya School Of Planning
Engineering and Management.
 The basics needs of human existences are food ,clothin’s & shelter . From
times times immemorial man has been making efforts in improving their
standard of living. The point of his efforts has been to provide an economic
and efficient shelter . The possessionof shelter besides being a basic, gives a
feeling of security, responsibility and shown the social status of man .
 A peaceful environment .
 Safety from all natural source & climate conditions.
 General facilities for community of his residential area .
CONCEPT
Project (Residential building)
1.ACKNOWLEDGEMENT
2. DECLARATION
3. SPECIFICATION
4. INTRODUCTION
5. CLASSIFICATIONOF BUILDINGS BASED ON OCCUPANCY
6. PROJECT DRAWING
7. ARRANGEMENT OF ROOM
8. RESPONSIBILITY AND OBJECTIVE OF THE PROJECT
9. DESIGN OF SLAB
10. CONCRETING
11. SITE SAFETY
12. EXPERIENCE
PROJECT DRAWING
RESPONSIBILITY AND OBJECTIVE OF THE PROJECT
The whole construction work shall be carried out as per PUBLIC WORK
DEPARTMENT /M.O.R.T. and H./I.R.C. and all the construction work related
to this project controlled by these government organisation .DESIGN OF
SLAB
Slabs are to be designed under limit state method by reference of IS 456-2000
 When the slab are supported in two way direction it acts as two way
supported slab.
 A two way slab is economical compared to one way slab.
SLAB DESIGN:
Fck=20 N/mm2 Fy=415 N/mm2
SPAN
i. Shorter span :- Lx=9.8m
Longer span :-Ly=14.62m
ii. Check Ly/Ly=14.62/9.8 =1.4<2
Hence the slab has to be designed as “two way slab”
iii. Providing over all depth of slab as ,150mm
eff. depth =depth -20-diameter/2
=120-20-10/2
=125mm
iv. Condition:- supported on four sides.
v. Lode calculation:-
Dead load =25x0.15x1 =3.75 KN/m
Live lode =2x1 =2.0KN/m
Floor finish =1x1 =1.0KN/m
=6.75KN/m
Bending moment:-
(+)B.M. at mid span in sorter direction
Mx(+)=ax(+)wlx2
=0.049x6x9.8^2
=28.235Kn-m
Factored B.M =28.235x1.5
= 42.353Kn-m
SPACING AND DIAMETER:-
Provide 8mm dia bar at 210mm spacing
(-ve)B.M. at continuous edge in shorter direction.
Mx(-)=ax(-)wlx2
= 0.062x6x(9.8)^2
=36.386Kn-m
Factored B.M. =36.386x1.554.579Kn-m
(+)B.M.at mid spane in longer direction .
My(+)=ay(+)wlx2
=0.035x6x(9.8)^2
=20.168Kn-m
Factored B.M. =20.168x1.5
=30.252Kn-m
Check for depth:-
Permissible depth =100mm
Mu. Lim. = 0.36*Xumax/d(1-0.42Xumax/d)fck*bd^2
42.35x10^6=0.36*Xumax/d(1-0.42x0.48)15x10000d^2
d=33.6015<100mm
Hence ok.
CONCRETING
1 Plain cement concrement 1:3:6 nominal mix in foundation with crushed
aggregate 40 mm nominal size mechanically mixed placed in foundation and
compacted by vibration including curing for 28 days as per month as per IS
code 456-2000 .
2 plane/reinforced cement concrete M-20 in open foundation complete as per
drawing and technical specification as per IS code 45-2000.
3 construction of footpath over RCC slab 100 mm thick ,over laid with pre-cast
concrete tiles in cement mortar 1:3 as per IS code 456-2000.
Hand mixing Concrete
SITE SAFETY
 All visiotors and deliveries must to the site office.
 Safety helmets must be worn on this site.
 Safety footware must be worn on this site.
 High visibility garments must be worn on this site.
 Unauthorised entry to this site is strictly forbidden.
 No smoking on this site.
EXPERIENCE
This is very wonderful experiance . I felt very comfortable with engineers and
labours at Chandauli. The engineers detected to us sincerely all things and at
governing .They easely solve it with in simple words .there are also available
the primary medical treatment at the site in the condition for any injuries and it
is one of the most best condition at the site .
THANK YOU
Sadab AHMAD

More Related Content

Viewers also liked

El sonido
El sonidoEl sonido
El sonidojames0x
 
UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014
UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014
UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014Carla Sofia Oliveira Silva
 
Diferencias ente los wikis y blogs
Diferencias ente los wikis y blogsDiferencias ente los wikis y blogs
Diferencias ente los wikis y blogsjames0x
 
Himalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-SystemHimalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-SystemFang Sam
 
Ольга Чередова
Ольга ЧередоваОльга Чередова
Ольга Чередоваbduomsk
 
Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...
Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...
Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...Digital Queensland
 
Stakeholder involvement in ux research
Stakeholder involvement in ux researchStakeholder involvement in ux research
Stakeholder involvement in ux researchHester Bruikman
 
minor project report on design of residential building
minor project report on design of residential buildingminor project report on design of residential building
minor project report on design of residential buildingtushar garg
 
Planning Analysis Designing and Estimation of Residential Building
Planning Analysis Designing and Estimation of Residential BuildingPlanning Analysis Designing and Estimation of Residential Building
Planning Analysis Designing and Estimation of Residential BuildingMohamed Peer Thavood
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of buildingKrishnagnr
 
Analysis and Design of Structural Components of a Ten Storied RCC Residential...
Analysis and Design of Structural Components of a Ten Storied RCC Residential...Analysis and Design of Structural Components of a Ten Storied RCC Residential...
Analysis and Design of Structural Components of a Ten Storied RCC Residential...Shariful Haque Robin
 
Ppt of mini project.
Ppt of mini project.Ppt of mini project.
Ppt of mini project.saikiran_gone
 

Viewers also liked (17)

Practica slideshare
Practica slidesharePractica slideshare
Practica slideshare
 
El sonido
El sonidoEl sonido
El sonido
 
UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014
UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014
UNIVERSIDADE E MERCADO DE TRABALHO - comunicação escrita - Set 2014
 
Diferencias ente los wikis y blogs
Diferencias ente los wikis y blogsDiferencias ente los wikis y blogs
Diferencias ente los wikis y blogs
 
Himalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-SystemHimalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-System
 
Ольга Чередова
Ольга ЧередоваОльга Чередова
Ольга Чередова
 
Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...
Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...
Partners in Technology (PiT) - Department of Housing and Public Works - 23 Oc...
 
Stakeholder involvement in ux research
Stakeholder involvement in ux researchStakeholder involvement in ux research
Stakeholder involvement in ux research
 
multi storey buidling
multi storey buidlingmulti storey buidling
multi storey buidling
 
minor project report on design of residential building
minor project report on design of residential buildingminor project report on design of residential building
minor project report on design of residential building
 
Planning Analysis Designing and Estimation of Residential Building
Planning Analysis Designing and Estimation of Residential BuildingPlanning Analysis Designing and Estimation of Residential Building
Planning Analysis Designing and Estimation of Residential Building
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of building
 
Analysis and Design of Structural Components of a Ten Storied RCC Residential...
Analysis and Design of Structural Components of a Ten Storied RCC Residential...Analysis and Design of Structural Components of a Ten Storied RCC Residential...
Analysis and Design of Structural Components of a Ten Storied RCC Residential...
 
Complete-Mini-Project-Report
Complete-Mini-Project-ReportComplete-Mini-Project-Report
Complete-Mini-Project-Report
 
Ppt of mini project.
Ppt of mini project.Ppt of mini project.
Ppt of mini project.
 
Mini project ppt
Mini project pptMini project ppt
Mini project ppt
 
Mini project complete
Mini project completeMini project complete
Mini project complete
 

Similar to Sadab AHMAD

Project report on design &amp; execution of a theatre and arts complex
Project report on design &amp; execution of a theatre and arts complexProject report on design &amp; execution of a theatre and arts complex
Project report on design &amp; execution of a theatre and arts complexService_supportAssignment
 
Design engineering 2A report
Design engineering 2A reportDesign engineering 2A report
Design engineering 2A reporttirath prajapati
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential buildingK.MAHESH KUMAR
 
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECTL&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECTDeepak Kumar
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 
Site visit report
Site visit reportSite visit report
Site visit reportEyelynLee
 
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Muhammad Haziq Azhar Mat Nazri
 
Internship report 2015 (1)
Internship report 2015 (1)Internship report 2015 (1)
Internship report 2015 (1)Navneet Kumar
 
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...Jasmine Dixon
 
To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...Peachy Essay
 
Chaff cutter nx model project cttc bhubaneswar
Chaff cutter nx model project cttc bhubaneswarChaff cutter nx model project cttc bhubaneswar
Chaff cutter nx model project cttc bhubaneswarSrikanta Kumar Nayak
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecturebiruktigistu1
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING Vikas Sukhwal
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for collegeindrajeet kumar
 

Similar to Sadab AHMAD (20)

Project report on design &amp; execution of a theatre and arts complex
Project report on design &amp; execution of a theatre and arts complexProject report on design &amp; execution of a theatre and arts complex
Project report on design &amp; execution of a theatre and arts complex
 
Design engineering 2A report
Design engineering 2A reportDesign engineering 2A report
Design engineering 2A report
 
Final Project
Final ProjectFinal Project
Final Project
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential building
 
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECTL&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
L&T B&F IC SUMMER INTERNSHIP REPORT BIHAR MUSEUM PROJECT
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Profile, F E S Int.
Profile, F E S Int.Profile, F E S Int.
Profile, F E S Int.
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
Floor and Wall Finishes Case Study, Educity Sports Complex (Running Track and...
 
Rebinding 3 pg
Rebinding 3 pgRebinding 3 pg
Rebinding 3 pg
 
Internship report 2015 (1)
Internship report 2015 (1)Internship report 2015 (1)
Internship report 2015 (1)
 
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
A PROJECT REPORT ON ANALYSIS AND DESIGN OF MULTI STOREY(G 6) RESIDENTIAL BUIL...
 
To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...To develop a statement of work for the designing and fabrication of a solar w...
To develop a statement of work for the designing and fabrication of a solar w...
 
Chaff cutter nx model project cttc bhubaneswar
Chaff cutter nx model project cttc bhubaneswarChaff cutter nx model project cttc bhubaneswar
Chaff cutter nx model project cttc bhubaneswar
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecture
 
Project report
Project reportProject report
Project report
 
PM
PMPM
PM
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for college
 

Sadab AHMAD

  • 1. TRAINING REPORT On A PROJECT ON RESIDENTIAL BUILDING OF PUBLIC WORK DEPARTMENT Submitted for partial fulfilment of Awards of BACHELOR OF TECHNOLOGY IN CIVIL ENGINEERING 2016-2017 BY PRADEEP YADAV (1342100038) SURYA SCHOOL OF PLANNING ENGINEERING AND MANAGEMENT, Lucknow Affiliated to Dr. A.P.J. Abdul Kalam Technical University,Lucknow DEPARTMENT OF CIVIL ENGINEERING, SSPEM
  • 2. ACKNOWLEDGEMENT We express our sincere thanks to MR. S K Yadav, Head of Civil Engineering department Surya SchoolOf Planning Engineering and Management, Lucknow, for his guidance and care taken by him in helping us to complete the work successfully. In our training period, we had to take the help and Guideline of a Respected Person, who deserve our greatest gratitude. The completion of this training gives us much pleasure. We would like to show our gratitude to Mr. Amarkant Sir for giving us a good guideline for training throughout numerous consultation. We would also like to expand our deepest gratitude to all those who have indirectly guided us in summer training. Many people, especially our team members itself, have made valuable comment suggestion on this proposal which gave us an inspiration to improve our training. We thank all the people for their help directly and indirectly to complete our trainning. (SIGNATURE)
  • 3. DECLARATION In the city Chandauli the detailed work related to broadening and making rigid of the Chandauli-Sakaldiha Road way is built up in the no.(1) 8/1/16 to avoid the conjunction on Chandauli-Sakaldiha Road in date 18/7/2017, from built up residential building completely under taken by public work department . We declare that this written submission represents our ideas in our own words and where others’ ideas or words have been included, we have adequately cited and referenced the original sources. We also declared that we have adhered to all principles of academic honesty and integrity and have not misrepresented or fabricated or falsified any idea/data/fact/source in my submission. We understand that any violation of the above will cause for disciplinary action by the institute and can also evoke penal action from the sources which have not been properly cited or from whom proper permission has not been taken when needed. Pradeep Yadav
  • 4. SPECIFICATION All the works shall be carried out as per P.W.D/M.O.R.T and H.IRC detailed specifications and as per latest instructions received from engineer in chief U.P.P.W.D., Chandauli.
  • 5.
  • 6. INTRODUCTION  Complete the project in the specified time horizon and allocated cost.  Deliver value to the customers by providing excellent customer support. As well as we know that P.W.D is the another construction of all construction it will stand after 150 years in the Indian culture to make the faboralors structure , and they will develop in accordance of engineer and architecture .Building are an integral part of the houses system. A efficient in order to maximize economic and social benefits. They play a significant role in achieving national development and contributing to the overall performance . So people will love the their leader and obey the laws of our country Surya School Of Planning Engineering and Management.  The basics needs of human existences are food ,clothin’s & shelter . From times times immemorial man has been making efforts in improving their standard of living. The point of his efforts has been to provide an economic and efficient shelter . The possessionof shelter besides being a basic, gives a feeling of security, responsibility and shown the social status of man .  A peaceful environment .  Safety from all natural source & climate conditions.  General facilities for community of his residential area .
  • 7. CONCEPT Project (Residential building) 1.ACKNOWLEDGEMENT 2. DECLARATION 3. SPECIFICATION 4. INTRODUCTION 5. CLASSIFICATIONOF BUILDINGS BASED ON OCCUPANCY 6. PROJECT DRAWING 7. ARRANGEMENT OF ROOM 8. RESPONSIBILITY AND OBJECTIVE OF THE PROJECT 9. DESIGN OF SLAB 10. CONCRETING 11. SITE SAFETY 12. EXPERIENCE
  • 8. PROJECT DRAWING RESPONSIBILITY AND OBJECTIVE OF THE PROJECT The whole construction work shall be carried out as per PUBLIC WORK DEPARTMENT /M.O.R.T. and H./I.R.C. and all the construction work related to this project controlled by these government organisation .DESIGN OF SLAB Slabs are to be designed under limit state method by reference of IS 456-2000  When the slab are supported in two way direction it acts as two way supported slab.  A two way slab is economical compared to one way slab.
  • 9. SLAB DESIGN: Fck=20 N/mm2 Fy=415 N/mm2 SPAN i. Shorter span :- Lx=9.8m Longer span :-Ly=14.62m ii. Check Ly/Ly=14.62/9.8 =1.4<2 Hence the slab has to be designed as “two way slab” iii. Providing over all depth of slab as ,150mm eff. depth =depth -20-diameter/2 =120-20-10/2 =125mm iv. Condition:- supported on four sides. v. Lode calculation:- Dead load =25x0.15x1 =3.75 KN/m Live lode =2x1 =2.0KN/m Floor finish =1x1 =1.0KN/m =6.75KN/m Bending moment:- (+)B.M. at mid span in sorter direction Mx(+)=ax(+)wlx2 =0.049x6x9.8^2 =28.235Kn-m Factored B.M =28.235x1.5 = 42.353Kn-m
  • 10. SPACING AND DIAMETER:- Provide 8mm dia bar at 210mm spacing (-ve)B.M. at continuous edge in shorter direction. Mx(-)=ax(-)wlx2 = 0.062x6x(9.8)^2 =36.386Kn-m Factored B.M. =36.386x1.554.579Kn-m (+)B.M.at mid spane in longer direction . My(+)=ay(+)wlx2 =0.035x6x(9.8)^2 =20.168Kn-m Factored B.M. =20.168x1.5 =30.252Kn-m Check for depth:- Permissible depth =100mm Mu. Lim. = 0.36*Xumax/d(1-0.42Xumax/d)fck*bd^2 42.35x10^6=0.36*Xumax/d(1-0.42x0.48)15x10000d^2 d=33.6015<100mm Hence ok.
  • 11. CONCRETING 1 Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 28 days as per month as per IS code 456-2000 . 2 plane/reinforced cement concrete M-20 in open foundation complete as per drawing and technical specification as per IS code 45-2000. 3 construction of footpath over RCC slab 100 mm thick ,over laid with pre-cast concrete tiles in cement mortar 1:3 as per IS code 456-2000. Hand mixing Concrete
  • 12. SITE SAFETY  All visiotors and deliveries must to the site office.  Safety helmets must be worn on this site.  Safety footware must be worn on this site.  High visibility garments must be worn on this site.  Unauthorised entry to this site is strictly forbidden.  No smoking on this site. EXPERIENCE This is very wonderful experiance . I felt very comfortable with engineers and labours at Chandauli. The engineers detected to us sincerely all things and at governing .They easely solve it with in simple words .there are also available the primary medical treatment at the site in the condition for any injuries and it is one of the most best condition at the site .