SlideShare a Scribd company logo
1 of 26
Investor
Presentation
FEBRUARY 2017
Certain statements in this presentation may constitute "forward-looking" statements which involve known and unknown
risks, uncertainties and other factors which may cause the actual results, performance or achievements of Potash Ridge
Corporation (the "Corporation"), or industry results, to be materially different from any future results, performance or
achievements expressed or implied by such forward-looking statements. When used in this presentation, such statements
use such words as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate" and other
similar terminology. These statements reflect the Corporation's current expectations regarding future events and operating
performance and speak only as of the date of this presentation. Forward-looking statements involve significant risks and
uncertainties, which include, but are not limited to the factors discussed under “A Cautionary Note Regarding Forward
Looking Statements” and "Risk Factors" in the Corporation’s Annual Information Form dated March 28, 2016, and should
not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether or
not such results will be achieved. Although the forward-looking statements contained in this presentation are based upon
what management of the Corporation believes are reasonable assumptions, the Corporation cannot assure
investors that actual results will be consistent with these forward-looking statements. These forward-
looking statements are made as of the date of this presentation and are expressly qualified in their
entirety by this cautionary statement. Subject to applicable securities laws, the Corporation assumes
no obligation to update or revise them to reflect new events or circumstances.
FORWARD LOOKING STATEMENTS
2
ABOUT US
3TSX:PRK
Potash Ridge is a near term
producer of potassium sulphate
(SOP) fertilizer using two
different processes; one in Utah
and one in Quebec.
OUR VISION IS TO BECOME THE SOP MARKET LEADER IN NORTH AMERICA
4
• Become lowest cost
North American SOP
producer
• Become first producer
using Mannheim
process in North
America
• Acquired in 2015
• 40,000 tpy of SOP
• CDN$50 million capex
• 30% after tax IRR
• Proven process
• Production targeted in H1 2018
• Scalable
• Potential for $14m in average
annual cash flows
• NPV (after tax 10%) $82 million
• Original SOP project
• 230,000 tpy of SOP
• US $458 million capex
• 20.1% after tax IRR
• Lowest cost producer in North
America (US$ 172/ton)
• Major permits and water rights
secured; infrastructure nearby
• Potential for US$100M in
average annual cash flow
• NPV (after tax 10%) $482 million
Strategy Valleyfield
(Quebec)
Blawn
Mountain
(Utah)
TSX:PRK
Potassium
Sulphate
(SOP)
• Low-chloride fertilizer required for
fruits, vegetables, nuts
• Domestic selling price 3x potash
(“MOP”)
• Global consumption ~7 million
tonnes per year (“tpy”)
• Demand potential is 10 million tpy
• 400k t current production in North
America versus projected demand
of 1M t demand
• One other North American
producer
• Qualifies as “organic”
Potassium Sulphate (SOP)
Low chloride, high sulphur – providing benefits to crops not available
with MOP
Global potential market demand of 10 million tpy
Capacity growth limited in current North American process
US$630/tonne in North America
Improves yield, taste, appearance and shelf life
Significant benefits for fruits, vegetables, nuts, tobacco
POTASSIUM SULPHATE: Two Macronutrients in One
ALUNITE
CRUSHING & GRINDING
CALCINATION
WATER LEACH
In fertilizers, there are 6 macro nutrients required for a plant’s life cycle. No substitutes
SO2 ACID PLANT SUPHURIC ACID
TSX:PRK
Nitrogen
Phosphate
Potassium Magnesium
Calcium
Sulphur
Potassium Chloride (MOP)
Contains chloride – detrimental to plants and soil
Global market 55 million tpy
Market is in over supply, with idle capacity and multiple projects in
pipeline
US$150/tonne in North America
Chloride can leach into groundwater or build-up in arid soil conditions,
impacting yields and crop quality
Primarily for corn and grain crops that can withstand chloride 5
POTASSIUM APPLICATION IMPROVES YIELD AND QUALITY – IMPACT ON TOMATOES
6Universityof Florida:Comparisonof Potassium Sources and Rates For TomatoProduction in Florida
100lb/acre 200lb/acre 300lb/acre
POTASSIUM SULPHATE ELIMINATES CHLORIDE DAMAGE
7
Clemson University, The Australian and NewZealand Field
Guide to Diseases, Pests and Disorders of Grapes
Peach and grape leaves suffering salt (chloride) damage
SOP: A top performing commodity in last 5 years
SOP: SUPERIOR PRODUCT WITH ATTRACTIVE MARKET DYNAMICS
1 Compass Minerals Q3 2016 Report, 2 Potash Corp Q3 2016 Report
SERVING AN UNDERSERVED MARKET
8
MOP2
SOP1
$US/ton
-
200.0
400.0
600.0
800.0
1,000.0
1,200.0
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
SOP price influenced by high-value
crop economics not MOP price
SOURCES OF POTASSIUM SULPHATE
SOP
CHEMICAL REACTION: Mannheim Process
50% of all SOP produced uses Mannheim Process
Used in Asia, Middle East and Europe
Soluble and granular form
SOP
EVAPORATION: Salt Lake
Finite resource
Found in USA, Chile, China, Europe
Granular form
9TSX:PRK
SOP
MINERAL PROCESSING: Alunite
Proven process
Soluble and granular form
POTASH RIDGE’S TWO SOP PROJECTS
BLAWN MOUNTAIN (Utah)
VALLEYFIELD FERTILIZER CORP. (Quebec)
SOP CONSUMPTION MATCHES LOCAL AVAILABLE PRODUCTION
10Green Markets, Northern Shoreline, company reports
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
North A. South A. Europe Asia Middle East
North America is Underserved
Current Production Existing Consumption Estimated Demand
000’s tonnes
TWO PROJECTS STRATEGICALLY LOCATED TO SERVE SOP-DEMANDING CROPS
Valleyfield
Blawn Mountain
Almonds
Grapes
Apples
Lettuce
Citrus
Vegetables
Potatoes
Tobacco
11
Valleyfield Project
Quebec
TSX:PRK
VALLEYFIELD PROJECT (QUEBEC)
13
Low capex with fixed price contract (CAD$50 million)
Short build time: 9-12 months
40,000 tpy of SOP (scalable)
Other locations in North America being for expansion opportunities
Utilities and logistics infrastructure well-established
Technology and commercial relationships create barrier to entry
Land use approved by local city council – enthusiastic government
support
Long term offtake for hydrochloric acid by product secured
Long term supply of sulphuric acid secured
Phase 1 - Economic Summary (CDN$)
Initial capital cost $50.0 million
IRR (unlevered after tax) 30%
NPV (after tax at 10%) $82.0 million
SOP price/tonne $820
Opex/tonne 3701
Margin/tonne $450
TSX:PRK
(1) Net of acid credit.
Located in industrial area near Montreal, Quebec
Property secured in industrial zone
Strong local support
Rail access at site
Port within 2 km, allowing access into key U.S. markets
Within 5 km of sulphuric acid supplier
Located near hydrochloric acid customers
Quebec Government highly supportive of new
investments that create employment (including
providing financial support)
14
VALLEYFIELD: STRATEGICALLY LOCATED
TSX:PRK
PROVEN MANNHEIM PROCESS
Converts MOP to SOP
Proven production process
(150 year history),
with numerous operating
facilities in Europe and China
(50% of current SOP
production is from Mannheim)
High quality, consistent
production process
Scale allows for construction
time of 12-months
Migao Corp. (long-term SOP
producer) engaged to provide
procurement and technical
services
POTASSIUM
CHLORIDE
SULPHURIC
ACID
HEAT
MANNHEIM
FURNACE
POTASSIUM
SULPHATE
(SOP)
HYDRO-
CHLORIC ACID
(HCl)
TSX:PRK 15
Raw Material Finished Products2-Stage Process
550oC
.84t
.56t
1.0t
1.2t
VALLEYFIELD MILESTONES
1
Engineering
 Preliminary engineering
completed Q1 2017
Phase I near completion
 Partnered with Migao
Corp. to leverage 20-year
Mannheim experience
Expected to proceed with
execution in Q1, 2017
2
Permitting
Applications being
submitted Q1 2017
 City has passed
resolution for use
of land
3
Commercial
Arrangements
Negotiating long
term supply of MOP
 Long term supply
of sulphuric acid
secured
 Lock in natural
gas contract
 HCl offtake with
Jones Hamilton
secured
4
SOP Offtake
Negotiating long term
offtake agreements
Direct sales to local
growers
5
Financing
Debt and Equity
negotiations ongoing
at Valleyfield level
Quebec & Federal
government financial
programs available
6
Construction
Milestones
Break ground Q2 2017
Complete construction
Q1 2018
Ramp up to full
production H1 2018
16TSX:PRK
Blawn Mountain Project
Utah
TSX:PRK
BLAWN MOUNTAIN PROJECT (UTAH)
18
Will be lowest cost producer in north America
45+ years proven + probable reserves
Initial production rate of 255,000 tons per year
Can expand to 645,000 tons per year
All infrastructure within 30 miles
Processing technology optimized by Potash Ridge over last 3 years
Commercial arrangements well advanced
Permits and water rights secured
Offtake for sulphuric acid byproduct secured
Upside potential through monetization of tailings rich in alumina
PFS Economic Summary (US$)
Initial capital cost $458 million
IRR (unlevered after tax) 20.1%
NPV (after tax at 10%) $482 million
SOP price/ton $673
Opex/ton(1) $172
Margin/ton $501
(1) Net of acid credit and excluding royalties.
TSX:PRK
BLAWN MOUNTAIN PROJECT (UTAH)
19
• Drilling work to date has established 45+
years of reserves
• Over 100 years of potential potash
production
• Ranked #2 state for business and top 10
mining jurisdiction globally(1)
• 100% state-owned land
• Strong state government and local support
• All necessary infrastructure nearby
(1) Forbes Magazine, 2015 Ranking and Fraser Institute, 2015
1
2
3
54
1 Area 2 Mining Zone 2 Processing Plant Location 3 Access Road 4 Area 1 Mining Zone 5 Ore Test Pit
TSX:PRK
PERMITTING ESSENTIALLY COMPLETED
The following table identifies the major permits and approvals that the Corporation
has or still needs to obtain prior to construction:
20
PERMIT/APPROVAL ISSUING AGENCY COMPLETED
Exploration Permit Utah Division of Oil, Gas and Mining October, 2011
US Army Corps of Engineers
Jurisdictional Waters Concurrence
US Army Corps of Engineers March, 2014
Groundwater Permits Utah Division of Water Quality July, 2014
Large Mine Operation Approval Utah Division of Oil, Gas and Mining August, 2014
Air Quality Emission Standard Utah Division of Air Quality
Air Quality Emission Standard requires the engineering to be partially completed before the
application is filed. It is technically not a permit, but more an agreed upon emission target that the
Project must be designed to meet.
TSX:PRK
INDUSTRY PROVEN FLOWSHEET
ALUNITE
CRUSHING & GRINDING
CALCINATION
WATER LEACH
ALUMINA RICH TAILINGS
SO2
SOP SOLUTION
ACID PLANT
CRYSTALLIZING DRYING,
COMPACTING & SIZING
SUPHURIC ACID
SOP
21
• Existing plant in Azerbaijan currently mothballed (Ganja Refinery)
• Flowsheet similar to commercial-scale production processes historically used
in US and Australia
• Extensive test work optimizes proven technology of SOP process
• Planned additional test work will include bulk samples at equipment vendor
facilities – will result in vendors providing production guarantees
TSX:PRK
• PFS economics exclude revenue from alumina rich material
BLAWN MOUNTAIN DEVELOPMENT TIMELINE
Late 1970’s
$25 million
invested
developing
Project
April 2012
Initial resource
estimate
August 2014
Large Mine
Operating Permit
issued
December 2012
IPO $80M
market cap
March 2014
US ACOE confirms
no US federal permits
required; exploration
lease converted to
mining lease
July 2014
Groundwater
Discharge Permit
issued
December 2013
Prefeasibility
Study established 40
years of reserves
November 2012
Preliminary
Economic
Assessment
2011
Project Acquired
October 2014
Entered into offtake
and marketing
arrangement for by-
product sulphuric acid
22TSX:PRK
January 2017
Updated PFS
issued showing
reduced capex
and maintaining
strong economics
BLAWN MOUNTAIN MILESTONES
1
Maintain Value Created
to Date While Raising
Pre-Construction Capital
 Mining lease modified
in June 2015 to defer
lease payments
 Permits remain intact
 Commercial arrangements
already negotiated for
support infrastructure
remain in place
2
Evaluated Reduced
Scale Alternative
 Completed updated PFS
in Q1 2017
Next step to obtain EPC
quote
3
Offtake
 MOU signed for sale
of by-product
sulphuric acid
In discussions
with potential offtake
of SOP partners
Ongoing discussions
with potential partners
to assess the upside for
the alumina
4
Financing
Strong interest in
construction financing –
continue dialogue with
potential financiers
23TSX:PRK
GUY BENTINCK
President & Chief Executive Officer
• Chartered Professional Accountant
• 20 years mining/resource experience
• Sherritt CFO and SVP Capital Projects
EXPERIENCED AND PROVEN MANAGEMENT
ROSS PHILLIPS
Chief Operating Officer &
Chief Financial Officer
• MA (Econ)/MBA/CFA/CPA
• 15 years experience in large
resource and energy sector projects
• Sherritt, Capital Power
JAY HUSSEY
President, Valleyfield Fertilizer
& VP Corporate Finance
• 20 years capital markets consulting
• 9 years SOP operational experience with
Migao Corporation (TSX-listed, China-based,
Mannheim SOP producer)
OVER 55YEARS
COMBINED
EXPERIENCE
24TSX:PRK
CAPITAL STRUCTURE
126.4M
Total Common
Shares Outstanding
10.6M
Stock Options
25.2M
Warrants
162.2M
Total Fully
Diluted Shares
25TSX:PRK
Date/Price Price
Proceeds
$mm
February 2011 $0.05 $1.1
August 2011 $0.25 5.4
November 2011 $0.25 1.5
December 2011 $0.25 0.5
December 2011 $0.75 10.5
December 2012 $1.00 20.0
November 2015 $0.03 0.6
April 2016 $0.15 1.75
May 2016 $0.25 $1.4
January 2017
Convertible
Debenture
$3.4
Total $46.15
CAPITAL RAISES
As of February 13, 2017
Shares outstanding 126 million
52 week range $0.50 - $0.05
February 13 , 2017
share price
$0.25
Market Cap $31 million
Management and Board 2.2 million shares
MARKET FIGURES
10 King Street East, Suite 300
Toronto, Ontario
416.362.8640
www.potashridge.com

More Related Content

What's hot

January 2015 - Presentation
January 2015 - PresentationJanuary 2015 - Presentation
January 2015 - PresentationPotashRidge
 
Presentation march 2014
Presentation   march 2014Presentation   march 2014
Presentation march 2014PotashRidge
 
Presentation sep 2013
Presentation   sep 2013Presentation   sep 2013
Presentation sep 2013PotashRidge
 
Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009Savanna Energy Services Corp.
 
Royal Helium Ltd. - Corporate Presentation July 2021
Royal Helium Ltd. - Corporate Presentation July 2021Royal Helium Ltd. - Corporate Presentation July 2021
Royal Helium Ltd. - Corporate Presentation July 2021Adnet Communications
 
Presentation may
Presentation  mayPresentation  may
Presentation mayPotashRidge
 
Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen_AAB
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentationSagegold
 
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALNemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALVictor Cantore
 
Potash ridge april 2016
Potash ridge april 2016Potash ridge april 2016
Potash ridge april 2016PotashRidge
 
Potash ridge august 2015
Potash ridge august 2015 Potash ridge august 2015
Potash ridge august 2015 PotashRidge
 
2014 website tj annual meeting final nov 14 2014
2014 website tj annual meeting final nov 14 20142014 website tj annual meeting final nov 14 2014
2014 website tj annual meeting final nov 14 2014RoyalGold
 
Cypress Development Clayton Valley Lithium Project Presentation
Cypress Development Clayton Valley Lithium Project PresentationCypress Development Clayton Valley Lithium Project Presentation
Cypress Development Clayton Valley Lithium Project PresentationCypress Development Corp.
 
American Lithium Investor Presentation: Exploration and development of lithiu...
American Lithium Investor Presentation: Exploration and development of lithiu...American Lithium Investor Presentation: Exploration and development of lithiu...
American Lithium Investor Presentation: Exploration and development of lithiu...American Lithium Corp
 
Royal gold slides final october 30 2014
Royal gold slides   final october 30 2014Royal gold slides   final october 30 2014
Royal gold slides final october 30 2014RoyalGold
 
Clayton Valley Lithium Project, Nevada Presentation
Clayton Valley Lithium Project, Nevada PresentationClayton Valley Lithium Project, Nevada Presentation
Clayton Valley Lithium Project, Nevada PresentationCypress Development Corp.
 

What's hot (20)

January 2015 - Presentation
January 2015 - PresentationJanuary 2015 - Presentation
January 2015 - Presentation
 
Presentation march 2014
Presentation   march 2014Presentation   march 2014
Presentation march 2014
 
Presentation sep 2013
Presentation   sep 2013Presentation   sep 2013
Presentation sep 2013
 
Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009
 
Royal Helium Ltd. - Corporate Presentation July 2021
Royal Helium Ltd. - Corporate Presentation July 2021Royal Helium Ltd. - Corporate Presentation July 2021
Royal Helium Ltd. - Corporate Presentation July 2021
 
Presentation may
Presentation  mayPresentation  may
Presentation may
 
Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016 Aberdeen International Corporate Presentation July 2016
Aberdeen International Corporate Presentation July 2016
 
Cypress Development Corporate Presentation
Cypress Development Corporate PresentationCypress Development Corporate Presentation
Cypress Development Corporate Presentation
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentation
 
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALNemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
 
Potash ridge april 2016
Potash ridge april 2016Potash ridge april 2016
Potash ridge april 2016
 
Potash ridge august 2015
Potash ridge august 2015 Potash ridge august 2015
Potash ridge august 2015
 
2014 website tj annual meeting final nov 14 2014
2014 website tj annual meeting final nov 14 20142014 website tj annual meeting final nov 14 2014
2014 website tj annual meeting final nov 14 2014
 
Cypress Development Corporate Presentation
Cypress Development Corporate Presentation Cypress Development Corporate Presentation
Cypress Development Corporate Presentation
 
Cypress Development Clayton Valley Lithium Project Presentation
Cypress Development Clayton Valley Lithium Project PresentationCypress Development Clayton Valley Lithium Project Presentation
Cypress Development Clayton Valley Lithium Project Presentation
 
Great Quest PEA Presentation
Great Quest PEA PresentationGreat Quest PEA Presentation
Great Quest PEA Presentation
 
American Lithium Investor Presentation: Exploration and development of lithiu...
American Lithium Investor Presentation: Exploration and development of lithiu...American Lithium Investor Presentation: Exploration and development of lithiu...
American Lithium Investor Presentation: Exploration and development of lithiu...
 
Royal gold slides final october 30 2014
Royal gold slides   final october 30 2014Royal gold slides   final october 30 2014
Royal gold slides final october 30 2014
 
Clayton Valley Lithium Project, Nevada, USA
Clayton Valley Lithium Project, Nevada, USAClayton Valley Lithium Project, Nevada, USA
Clayton Valley Lithium Project, Nevada, USA
 
Clayton Valley Lithium Project, Nevada Presentation
Clayton Valley Lithium Project, Nevada PresentationClayton Valley Lithium Project, Nevada Presentation
Clayton Valley Lithium Project, Nevada Presentation
 

Viewers also liked

Ir q3 2016_january17
Ir q3 2016_january17Ir q3 2016_january17
Ir q3 2016_january17qrhc
 
Summer Infant (SUMR) Investor Presentation - Feb 2017
Summer Infant (SUMR) Investor Presentation - Feb 2017Summer Infant (SUMR) Investor Presentation - Feb 2017
Summer Infant (SUMR) Investor Presentation - Feb 2017summerinfant
 
November 2016 Investor Presentation
November 2016 Investor PresentationNovember 2016 Investor Presentation
November 2016 Investor PresentationSunocoLP
 
4 q full year 2016 final
4 q full year 2016 final4 q full year 2016 final
4 q full year 2016 finalMetaldyne
 
01 mar-17 rdc investor-presentation - final
01 mar-17 rdc investor-presentation - final01 mar-17 rdc investor-presentation - final
01 mar-17 rdc investor-presentation - finalRowanCompanies
 
Psx 2017 baml conference presentation final for posting
Psx 2017 baml conference presentation final for postingPsx 2017 baml conference presentation final for posting
Psx 2017 baml conference presentation final for postinginvestor_phillips66
 
Potash ridge investor presentation may 30 2016 cmpr
Potash ridge investor presentation may 30 2016 cmprPotash ridge investor presentation may 30 2016 cmpr
Potash ridge investor presentation may 30 2016 cmprPotashRidge
 
Potash ridge april 2016 web
Potash ridge april 2016 webPotash ridge april 2016 web
Potash ridge april 2016 webPotashRidge
 
Power point referente a manuales administrativos hecho por luis caldera 26082282
Power point referente a manuales administrativos hecho por luis caldera 26082282Power point referente a manuales administrativos hecho por luis caldera 26082282
Power point referente a manuales administrativos hecho por luis caldera 26082282Luis Caldera
 
Decreto número 0147 del 27 de febrero de 2017
Decreto número 0147 del 27 de febrero de 2017Decreto número 0147 del 27 de febrero de 2017
Decreto número 0147 del 27 de febrero de 2017Jhon Mario
 
Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...
Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...
Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...Andrew Michael Martin
 
Republica bolivariana-de-venezuela
Republica bolivariana-de-venezuelaRepublica bolivariana-de-venezuela
Republica bolivariana-de-venezuelaEva Mora
 
Briefing on the situation in the south east of ukraine
Briefing on the situation in the south east of ukraineBriefing on the situation in the south east of ukraine
Briefing on the situation in the south east of ukraineembassyofukraine
 
Organizaciones tradicionales vs actuales
Organizaciones tradicionales vs actualesOrganizaciones tradicionales vs actuales
Organizaciones tradicionales vs actualesJonalex Melendez
 
Tarea para el sábado 4 de marzo
Tarea para el sábado 4 de marzoTarea para el sábado 4 de marzo
Tarea para el sábado 4 de marzoAlejandro Blnn
 

Viewers also liked (20)

Ir q3 2016_january17
Ir q3 2016_january17Ir q3 2016_january17
Ir q3 2016_january17
 
Summer Infant (SUMR) Investor Presentation - Feb 2017
Summer Infant (SUMR) Investor Presentation - Feb 2017Summer Infant (SUMR) Investor Presentation - Feb 2017
Summer Infant (SUMR) Investor Presentation - Feb 2017
 
November 2016 Investor Presentation
November 2016 Investor PresentationNovember 2016 Investor Presentation
November 2016 Investor Presentation
 
4 q full year 2016 final
4 q full year 2016 final4 q full year 2016 final
4 q full year 2016 final
 
Q317 Results
Q317 Results Q317 Results
Q317 Results
 
01 mar-17 rdc investor-presentation - final
01 mar-17 rdc investor-presentation - final01 mar-17 rdc investor-presentation - final
01 mar-17 rdc investor-presentation - final
 
Psx 2017 baml conference presentation final for posting
Psx 2017 baml conference presentation final for postingPsx 2017 baml conference presentation final for posting
Psx 2017 baml conference presentation final for posting
 
Potash ridge investor presentation may 30 2016 cmpr
Potash ridge investor presentation may 30 2016 cmprPotash ridge investor presentation may 30 2016 cmpr
Potash ridge investor presentation may 30 2016 cmpr
 
Potash ridge april 2016 web
Potash ridge april 2016 webPotash ridge april 2016 web
Potash ridge april 2016 web
 
Informe
InformeInforme
Informe
 
Power point referente a manuales administrativos hecho por luis caldera 26082282
Power point referente a manuales administrativos hecho por luis caldera 26082282Power point referente a manuales administrativos hecho por luis caldera 26082282
Power point referente a manuales administrativos hecho por luis caldera 26082282
 
Joemorris 2
Joemorris 2Joemorris 2
Joemorris 2
 
Decreto número 0147 del 27 de febrero de 2017
Decreto número 0147 del 27 de febrero de 2017Decreto número 0147 del 27 de febrero de 2017
Decreto número 0147 del 27 de febrero de 2017
 
Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...
Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...
Sierra Manufacturing Introduction Presentation: Special Cutting Tools Fabrica...
 
Republica bolivariana-de-venezuela
Republica bolivariana-de-venezuelaRepublica bolivariana-de-venezuela
Republica bolivariana-de-venezuela
 
Briefing on the situation in the south east of ukraine
Briefing on the situation in the south east of ukraineBriefing on the situation in the south east of ukraine
Briefing on the situation in the south east of ukraine
 
Manual administrativo
Manual administrativoManual administrativo
Manual administrativo
 
Alchol detection
Alchol detectionAlchol detection
Alchol detection
 
Organizaciones tradicionales vs actuales
Organizaciones tradicionales vs actualesOrganizaciones tradicionales vs actuales
Organizaciones tradicionales vs actuales
 
Tarea para el sábado 4 de marzo
Tarea para el sábado 4 de marzoTarea para el sábado 4 de marzo
Tarea para el sábado 4 de marzo
 

Similar to PRK Investor Presentation Highlights SOP Projects

Potash ridge may 1 2017
Potash ridge may 1 2017Potash ridge may 1 2017
Potash ridge may 1 2017PotashRidge
 
Highbank Resources Ltd. (HBK.V) - February 2015 Presentation
Highbank Resources Ltd. (HBK.V) - February 2015 PresentationHighbank Resources Ltd. (HBK.V) - February 2015 Presentation
Highbank Resources Ltd. (HBK.V) - February 2015 PresentationFollow me on Twitter @Stockshaman
 
Ohio River Valley Growth and Development
Ohio River Valley Growth and DevelopmentOhio River Valley Growth and Development
Ohio River Valley Growth and DevelopmentAdvisian
 
12.6 2016 investor presentation
12.6 2016 investor presentation12.6 2016 investor presentation
12.6 2016 investor presentationFalcoCorporate
 
Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019RedChip Companies, Inc.
 
August Investor presentation
August Investor presentationAugust Investor presentation
August Investor presentationFalcoCorporate
 
Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)Adnet Communications
 
Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)Adnet Communications
 
2015 credit-suisse-final v001-h4mb7r
2015 credit-suisse-final v001-h4mb7r2015 credit-suisse-final v001-h4mb7r
2015 credit-suisse-final v001-h4mb7rinvestor_phillips66
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate PresentationDev Randhawa
 
Noble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse PresentationNoble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse PresentationAndy Varoshiotis
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate PresentationDev Randhawa
 
17.7 falco presentation bmo
17.7 falco presentation   bmo17.7 falco presentation   bmo
17.7 falco presentation bmoFalcoCorporate
 
Dgc 16 02_28 - bmo 1x1 presentation
Dgc 16 02_28 - bmo 1x1 presentationDgc 16 02_28 - bmo 1x1 presentation
Dgc 16 02_28 - bmo 1x1 presentationdetour-gold
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLDetourGold
 
20.1 falco presentation may 2017
20.1 falco presentation   may 201720.1 falco presentation   may 2017
20.1 falco presentation may 2017FalcoCorporate
 

Similar to PRK Investor Presentation Highlights SOP Projects (20)

Potash ridge may 1 2017
Potash ridge may 1 2017Potash ridge may 1 2017
Potash ridge may 1 2017
 
Highbank Resources Ltd. (HBK.V) - February 2015 Presentation
Highbank Resources Ltd. (HBK.V) - February 2015 PresentationHighbank Resources Ltd. (HBK.V) - February 2015 Presentation
Highbank Resources Ltd. (HBK.V) - February 2015 Presentation
 
Ohio River Valley Growth and Development
Ohio River Valley Growth and DevelopmentOhio River Valley Growth and Development
Ohio River Valley Growth and Development
 
12.6 2016 investor presentation
12.6 2016 investor presentation12.6 2016 investor presentation
12.6 2016 investor presentation
 
SQM Corporate Presentation September 2014
SQM Corporate Presentation September 2014SQM Corporate Presentation September 2014
SQM Corporate Presentation September 2014
 
Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019Piedmont Lithium Corporate Presentation May 2019
Piedmont Lithium Corporate Presentation May 2019
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
August Investor presentation
August Investor presentationAugust Investor presentation
August Investor presentation
 
Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)Gq corporate-presentation-(25 march2014)
Gq corporate-presentation-(25 march2014)
 
2015 credit-suisse-final v001-h4mb7r
2015 credit-suisse-final v001-h4mb7r2015 credit-suisse-final v001-h4mb7r
2015 credit-suisse-final v001-h4mb7r
 
Sqm corp pres 07oct14_website
Sqm corp pres 07oct14_websiteSqm corp pres 07oct14_website
Sqm corp pres 07oct14_website
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate Presentation
 
Noble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse PresentationNoble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse Presentation
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate Presentation
 
17.7 falco presentation bmo
17.7 falco presentation   bmo17.7 falco presentation   bmo
17.7 falco presentation bmo
 
Dgc 16 02_28 - bmo 1x1 presentation
Dgc 16 02_28 - bmo 1x1 presentationDgc 16 02_28 - bmo 1x1 presentation
Dgc 16 02_28 - bmo 1x1 presentation
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FL
 
20.1 falco presentation may 2017
20.1 falco presentation   may 201720.1 falco presentation   may 2017
20.1 falco presentation may 2017
 

More from PotashRidge

April 2015 - Presentation
April 2015 - PresentationApril 2015 - Presentation
April 2015 - PresentationPotashRidge
 
February 2013 - Presentation
February 2013 - PresentationFebruary 2013 - Presentation
February 2013 - PresentationPotashRidge
 
Presentation feb12013
Presentation feb12013Presentation feb12013
Presentation feb12013PotashRidge
 
January 2013 - Presentation
January 2013 - PresentationJanuary 2013 - Presentation
January 2013 - PresentationPotashRidge
 
January 2013 - Presentation
January 2013 - PresentationJanuary 2013 - Presentation
January 2013 - PresentationPotashRidge
 
December 2012 - Presentation
December 2012 - PresentationDecember 2012 - Presentation
December 2012 - PresentationPotashRidge
 

More from PotashRidge (6)

April 2015 - Presentation
April 2015 - PresentationApril 2015 - Presentation
April 2015 - Presentation
 
February 2013 - Presentation
February 2013 - PresentationFebruary 2013 - Presentation
February 2013 - Presentation
 
Presentation feb12013
Presentation feb12013Presentation feb12013
Presentation feb12013
 
January 2013 - Presentation
January 2013 - PresentationJanuary 2013 - Presentation
January 2013 - Presentation
 
January 2013 - Presentation
January 2013 - PresentationJanuary 2013 - Presentation
January 2013 - Presentation
 
December 2012 - Presentation
December 2012 - PresentationDecember 2012 - Presentation
December 2012 - Presentation
 

Recently uploaded

Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 

Recently uploaded (20)

Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 

PRK Investor Presentation Highlights SOP Projects

  • 2. Certain statements in this presentation may constitute "forward-looking" statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Potash Ridge Corporation (the "Corporation"), or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. When used in this presentation, such statements use such words as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate" and other similar terminology. These statements reflect the Corporation's current expectations regarding future events and operating performance and speak only as of the date of this presentation. Forward-looking statements involve significant risks and uncertainties, which include, but are not limited to the factors discussed under “A Cautionary Note Regarding Forward Looking Statements” and "Risk Factors" in the Corporation’s Annual Information Form dated March 28, 2016, and should not be read as guarantees of future performance or results, and will not necessarily be accurate indications of whether or not such results will be achieved. Although the forward-looking statements contained in this presentation are based upon what management of the Corporation believes are reasonable assumptions, the Corporation cannot assure investors that actual results will be consistent with these forward-looking statements. These forward- looking statements are made as of the date of this presentation and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the Corporation assumes no obligation to update or revise them to reflect new events or circumstances. FORWARD LOOKING STATEMENTS 2
  • 3. ABOUT US 3TSX:PRK Potash Ridge is a near term producer of potassium sulphate (SOP) fertilizer using two different processes; one in Utah and one in Quebec.
  • 4. OUR VISION IS TO BECOME THE SOP MARKET LEADER IN NORTH AMERICA 4 • Become lowest cost North American SOP producer • Become first producer using Mannheim process in North America • Acquired in 2015 • 40,000 tpy of SOP • CDN$50 million capex • 30% after tax IRR • Proven process • Production targeted in H1 2018 • Scalable • Potential for $14m in average annual cash flows • NPV (after tax 10%) $82 million • Original SOP project • 230,000 tpy of SOP • US $458 million capex • 20.1% after tax IRR • Lowest cost producer in North America (US$ 172/ton) • Major permits and water rights secured; infrastructure nearby • Potential for US$100M in average annual cash flow • NPV (after tax 10%) $482 million Strategy Valleyfield (Quebec) Blawn Mountain (Utah) TSX:PRK Potassium Sulphate (SOP) • Low-chloride fertilizer required for fruits, vegetables, nuts • Domestic selling price 3x potash (“MOP”) • Global consumption ~7 million tonnes per year (“tpy”) • Demand potential is 10 million tpy • 400k t current production in North America versus projected demand of 1M t demand • One other North American producer • Qualifies as “organic”
  • 5. Potassium Sulphate (SOP) Low chloride, high sulphur – providing benefits to crops not available with MOP Global potential market demand of 10 million tpy Capacity growth limited in current North American process US$630/tonne in North America Improves yield, taste, appearance and shelf life Significant benefits for fruits, vegetables, nuts, tobacco POTASSIUM SULPHATE: Two Macronutrients in One ALUNITE CRUSHING & GRINDING CALCINATION WATER LEACH In fertilizers, there are 6 macro nutrients required for a plant’s life cycle. No substitutes SO2 ACID PLANT SUPHURIC ACID TSX:PRK Nitrogen Phosphate Potassium Magnesium Calcium Sulphur Potassium Chloride (MOP) Contains chloride – detrimental to plants and soil Global market 55 million tpy Market is in over supply, with idle capacity and multiple projects in pipeline US$150/tonne in North America Chloride can leach into groundwater or build-up in arid soil conditions, impacting yields and crop quality Primarily for corn and grain crops that can withstand chloride 5
  • 6. POTASSIUM APPLICATION IMPROVES YIELD AND QUALITY – IMPACT ON TOMATOES 6Universityof Florida:Comparisonof Potassium Sources and Rates For TomatoProduction in Florida 100lb/acre 200lb/acre 300lb/acre
  • 7. POTASSIUM SULPHATE ELIMINATES CHLORIDE DAMAGE 7 Clemson University, The Australian and NewZealand Field Guide to Diseases, Pests and Disorders of Grapes Peach and grape leaves suffering salt (chloride) damage
  • 8. SOP: A top performing commodity in last 5 years SOP: SUPERIOR PRODUCT WITH ATTRACTIVE MARKET DYNAMICS 1 Compass Minerals Q3 2016 Report, 2 Potash Corp Q3 2016 Report SERVING AN UNDERSERVED MARKET 8 MOP2 SOP1 $US/ton - 200.0 400.0 600.0 800.0 1,000.0 1,200.0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 SOP price influenced by high-value crop economics not MOP price
  • 9. SOURCES OF POTASSIUM SULPHATE SOP CHEMICAL REACTION: Mannheim Process 50% of all SOP produced uses Mannheim Process Used in Asia, Middle East and Europe Soluble and granular form SOP EVAPORATION: Salt Lake Finite resource Found in USA, Chile, China, Europe Granular form 9TSX:PRK SOP MINERAL PROCESSING: Alunite Proven process Soluble and granular form POTASH RIDGE’S TWO SOP PROJECTS BLAWN MOUNTAIN (Utah) VALLEYFIELD FERTILIZER CORP. (Quebec)
  • 10. SOP CONSUMPTION MATCHES LOCAL AVAILABLE PRODUCTION 10Green Markets, Northern Shoreline, company reports 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 North A. South A. Europe Asia Middle East North America is Underserved Current Production Existing Consumption Estimated Demand 000’s tonnes
  • 11. TWO PROJECTS STRATEGICALLY LOCATED TO SERVE SOP-DEMANDING CROPS Valleyfield Blawn Mountain Almonds Grapes Apples Lettuce Citrus Vegetables Potatoes Tobacco 11
  • 13. VALLEYFIELD PROJECT (QUEBEC) 13 Low capex with fixed price contract (CAD$50 million) Short build time: 9-12 months 40,000 tpy of SOP (scalable) Other locations in North America being for expansion opportunities Utilities and logistics infrastructure well-established Technology and commercial relationships create barrier to entry Land use approved by local city council – enthusiastic government support Long term offtake for hydrochloric acid by product secured Long term supply of sulphuric acid secured Phase 1 - Economic Summary (CDN$) Initial capital cost $50.0 million IRR (unlevered after tax) 30% NPV (after tax at 10%) $82.0 million SOP price/tonne $820 Opex/tonne 3701 Margin/tonne $450 TSX:PRK (1) Net of acid credit.
  • 14. Located in industrial area near Montreal, Quebec Property secured in industrial zone Strong local support Rail access at site Port within 2 km, allowing access into key U.S. markets Within 5 km of sulphuric acid supplier Located near hydrochloric acid customers Quebec Government highly supportive of new investments that create employment (including providing financial support) 14 VALLEYFIELD: STRATEGICALLY LOCATED TSX:PRK
  • 15. PROVEN MANNHEIM PROCESS Converts MOP to SOP Proven production process (150 year history), with numerous operating facilities in Europe and China (50% of current SOP production is from Mannheim) High quality, consistent production process Scale allows for construction time of 12-months Migao Corp. (long-term SOP producer) engaged to provide procurement and technical services POTASSIUM CHLORIDE SULPHURIC ACID HEAT MANNHEIM FURNACE POTASSIUM SULPHATE (SOP) HYDRO- CHLORIC ACID (HCl) TSX:PRK 15 Raw Material Finished Products2-Stage Process 550oC .84t .56t 1.0t 1.2t
  • 16. VALLEYFIELD MILESTONES 1 Engineering  Preliminary engineering completed Q1 2017 Phase I near completion  Partnered with Migao Corp. to leverage 20-year Mannheim experience Expected to proceed with execution in Q1, 2017 2 Permitting Applications being submitted Q1 2017  City has passed resolution for use of land 3 Commercial Arrangements Negotiating long term supply of MOP  Long term supply of sulphuric acid secured  Lock in natural gas contract  HCl offtake with Jones Hamilton secured 4 SOP Offtake Negotiating long term offtake agreements Direct sales to local growers 5 Financing Debt and Equity negotiations ongoing at Valleyfield level Quebec & Federal government financial programs available 6 Construction Milestones Break ground Q2 2017 Complete construction Q1 2018 Ramp up to full production H1 2018 16TSX:PRK
  • 18. BLAWN MOUNTAIN PROJECT (UTAH) 18 Will be lowest cost producer in north America 45+ years proven + probable reserves Initial production rate of 255,000 tons per year Can expand to 645,000 tons per year All infrastructure within 30 miles Processing technology optimized by Potash Ridge over last 3 years Commercial arrangements well advanced Permits and water rights secured Offtake for sulphuric acid byproduct secured Upside potential through monetization of tailings rich in alumina PFS Economic Summary (US$) Initial capital cost $458 million IRR (unlevered after tax) 20.1% NPV (after tax at 10%) $482 million SOP price/ton $673 Opex/ton(1) $172 Margin/ton $501 (1) Net of acid credit and excluding royalties. TSX:PRK
  • 19. BLAWN MOUNTAIN PROJECT (UTAH) 19 • Drilling work to date has established 45+ years of reserves • Over 100 years of potential potash production • Ranked #2 state for business and top 10 mining jurisdiction globally(1) • 100% state-owned land • Strong state government and local support • All necessary infrastructure nearby (1) Forbes Magazine, 2015 Ranking and Fraser Institute, 2015 1 2 3 54 1 Area 2 Mining Zone 2 Processing Plant Location 3 Access Road 4 Area 1 Mining Zone 5 Ore Test Pit TSX:PRK
  • 20. PERMITTING ESSENTIALLY COMPLETED The following table identifies the major permits and approvals that the Corporation has or still needs to obtain prior to construction: 20 PERMIT/APPROVAL ISSUING AGENCY COMPLETED Exploration Permit Utah Division of Oil, Gas and Mining October, 2011 US Army Corps of Engineers Jurisdictional Waters Concurrence US Army Corps of Engineers March, 2014 Groundwater Permits Utah Division of Water Quality July, 2014 Large Mine Operation Approval Utah Division of Oil, Gas and Mining August, 2014 Air Quality Emission Standard Utah Division of Air Quality Air Quality Emission Standard requires the engineering to be partially completed before the application is filed. It is technically not a permit, but more an agreed upon emission target that the Project must be designed to meet. TSX:PRK
  • 21. INDUSTRY PROVEN FLOWSHEET ALUNITE CRUSHING & GRINDING CALCINATION WATER LEACH ALUMINA RICH TAILINGS SO2 SOP SOLUTION ACID PLANT CRYSTALLIZING DRYING, COMPACTING & SIZING SUPHURIC ACID SOP 21 • Existing plant in Azerbaijan currently mothballed (Ganja Refinery) • Flowsheet similar to commercial-scale production processes historically used in US and Australia • Extensive test work optimizes proven technology of SOP process • Planned additional test work will include bulk samples at equipment vendor facilities – will result in vendors providing production guarantees TSX:PRK • PFS economics exclude revenue from alumina rich material
  • 22. BLAWN MOUNTAIN DEVELOPMENT TIMELINE Late 1970’s $25 million invested developing Project April 2012 Initial resource estimate August 2014 Large Mine Operating Permit issued December 2012 IPO $80M market cap March 2014 US ACOE confirms no US federal permits required; exploration lease converted to mining lease July 2014 Groundwater Discharge Permit issued December 2013 Prefeasibility Study established 40 years of reserves November 2012 Preliminary Economic Assessment 2011 Project Acquired October 2014 Entered into offtake and marketing arrangement for by- product sulphuric acid 22TSX:PRK January 2017 Updated PFS issued showing reduced capex and maintaining strong economics
  • 23. BLAWN MOUNTAIN MILESTONES 1 Maintain Value Created to Date While Raising Pre-Construction Capital  Mining lease modified in June 2015 to defer lease payments  Permits remain intact  Commercial arrangements already negotiated for support infrastructure remain in place 2 Evaluated Reduced Scale Alternative  Completed updated PFS in Q1 2017 Next step to obtain EPC quote 3 Offtake  MOU signed for sale of by-product sulphuric acid In discussions with potential offtake of SOP partners Ongoing discussions with potential partners to assess the upside for the alumina 4 Financing Strong interest in construction financing – continue dialogue with potential financiers 23TSX:PRK
  • 24. GUY BENTINCK President & Chief Executive Officer • Chartered Professional Accountant • 20 years mining/resource experience • Sherritt CFO and SVP Capital Projects EXPERIENCED AND PROVEN MANAGEMENT ROSS PHILLIPS Chief Operating Officer & Chief Financial Officer • MA (Econ)/MBA/CFA/CPA • 15 years experience in large resource and energy sector projects • Sherritt, Capital Power JAY HUSSEY President, Valleyfield Fertilizer & VP Corporate Finance • 20 years capital markets consulting • 9 years SOP operational experience with Migao Corporation (TSX-listed, China-based, Mannheim SOP producer) OVER 55YEARS COMBINED EXPERIENCE 24TSX:PRK
  • 25. CAPITAL STRUCTURE 126.4M Total Common Shares Outstanding 10.6M Stock Options 25.2M Warrants 162.2M Total Fully Diluted Shares 25TSX:PRK Date/Price Price Proceeds $mm February 2011 $0.05 $1.1 August 2011 $0.25 5.4 November 2011 $0.25 1.5 December 2011 $0.25 0.5 December 2011 $0.75 10.5 December 2012 $1.00 20.0 November 2015 $0.03 0.6 April 2016 $0.15 1.75 May 2016 $0.25 $1.4 January 2017 Convertible Debenture $3.4 Total $46.15 CAPITAL RAISES As of February 13, 2017 Shares outstanding 126 million 52 week range $0.50 - $0.05 February 13 , 2017 share price $0.25 Market Cap $31 million Management and Board 2.2 million shares MARKET FIGURES
  • 26. 10 King Street East, Suite 300 Toronto, Ontario 416.362.8640 www.potashridge.com