Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Fission Uranium Corporate Presentation

186 views

Published on

Fission Uranium's latest corporate presentation, featuring information on the company's award-winning team and PLS project, as well as the uranium sector and nuclear industry.

Published in: Investor Relations
  • Be the first to comment

  • Be the first to like this

Fission Uranium Corporate Presentation

  1. 1. 1FissionUranium.com PLS: Athabasca’s Shallow Depth, Highly Awarded Uranium Project Exploration Project of the Year The BMO 28th Global Metals & Mining Conference February 24 - 27, 2019
  2. 2. TSX: FCU OTCQX: FCUUF Disclaimer The following information may contain forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. All historical resource estimates were completed prior to the implementation of NI 43- 101 and the Company has not done the work necessary to verify the classification of the resource or reserve, they should not be relied upon or considered a defined resource according to NI 43-101; Except for those properties where NI 43-101 have been completed. The technical information in this corporate presentation has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43- 101 and reviewed on behalf of the company by Ross McElroy, P.Geol. President and COO for Fission Uranium Corp., a qualified person. The updated Mineral Resources as reported February 20, 2018 are as reported from data up to Jan 04, 2018 and are reported within a preliminary open pit design at a cut- off grade of 0.15% U3O8 and 0.3% for resources outside the pit that are potentially mined by underground methods. The R1620E, R840W and R1515W zones are evaluated as underground at this time. 2
  3. 3. TSX: FCU OTCQX: FCUUF Certain of the technical information contained herein is derived from the September 15,2015 report entitled “Technical Report on the Preliminary Economic Assessment of the Patterson Lake South Property, Northern Saskatchewan, Canada” (the “PEA”) – a copy of which is filed on the Company’s profile on SEDAR at www.sedar.com. Readers should be aware that the PEA is preliminary in nature, that it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. The PEA considers the PLS project as a stand-alone mine and mill operation, which includes development and extraction of the R00E and R780E zones (Triple R deposit) and that the PEA study is based on a number of qualifications and assumptions including the following (all values in C$ unless otherwise noted): Mineral Resources are reported within the preliminary pit design at a pit discard cut-off grade of 0.20% U3O8 and outside the design at an underground cut-off grade of 0.25% U3O8 based on a long-term price of US$65 per lb U3O8 and PEA cost estimates. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability Physicals: • Three years of pre-production and 14 year mine life, processing nominally 1,000 tonnes per day (350,000 tonnes per year) • Total Tonnes Processed: 4.8 million tonnes at 1.00% U3O8 average grade; open pit mining of 1.56 million tonnes at 2.21% U3O8 • Underground mining of 3.25 million tonnes at 0.42% U3O8 • Process recovery of 95%, supported by metallurgical testwork • Production of 100.8 million lbs U3O8; an average of 13 million lbs U3O8 per year for 6 years, followed by an average of 3 million lbs U3O8 per year for 8 years Revenue: • Long term uranium price of US$65 / lb U3O8 • Exchange rate of 0.85 US$ / C$1.00 • Gross revenue of $7.71 billion, less Saskatchewan gross revenue royalties of $556 million • Less product transportation charges of $34 million • Net revenue of $7.12 billion Operating Costs • Average OPEX of $16.50/lb (US$14.02/lb) U3O8 over the life of mine • Unit Operating Costs of $346 per tonne processed. Combined Mining $154 per tonne processed • Processing: $114 per tonne processed • Surface and G&A: $78 per tonne processed • Operating cash flow of $5.45 billion Capital Costs • Pre-Production capital costs of $1.1 billion • Open pit mining $363 million (includes dyke, slurry wall, and overburden removal) • Process plant $198 million • Infrastructure $117 million • Indirects $209 million • Contingency $208 million • Sustaining capital costs of $189 million (includes completion of overburden stripping, all underground mine capital costs, and tailings dam lifts) • Reclamation and closure cost of $50 million • Cash flow from operations of $4.12 billion 3 Technical Information
  4. 4. Electricity Demand +150% by 2035 Reactor Builds at 25 year high More reactors operating in 2018 than in any other time in history More Japanese reactors coming online due to strong regulator support Middle East (home of Big Oil) aggressively securing nuclear energy supply USA: +28 EUROPE: +35 INDIA: +28 RUSSIA: +22 CHINA: +136 E. ASIA: +10 SAUDI ARABIA: +16 UAE: +10 452Current Reactors Operation 55Under Construction 151Planned 355Proposed TSX: FCU OTCQX: FCUUF 4
  5. 5. TSX: FCU OTCQX: FCUUF Growing Electrical Demands and Nuclear Solutions Electricity demand growing at rapid pace and increasingly integrated into daily life As demand for electricity increases, demand for clean energy is paramount EV’s entering the marketplace by major automobile manufactures Bitcoin POW mechanism annual electric consumption same as Switzerland Small Modular Reactors (SMR’s) – implementation is a game changer Moving Forward 5 Source: World Nuclear News 5
  6. 6. TSX: FCU OTCQX: FCUUF Moving Forward 6 Small Modular Reactors (SMR’s) Small Modular Reactors (SMR’s) – Game changing technology Assembly line construction will standardize build and reduce construction risk and decrease cost (analogous to Ford’s Model T) Shorter construction time (3 years as opposed to 10 years) Transport modular components reduces major transport requirements Small footprint allows smaller safety zones around reactors Incremental power thus suitable for more countries, more locations Source: World Nuclear News 6
  7. 7. TSX: FCU OTCQX: FCUUF Plans For New Reactors Worldwide 7 Source: https://pris.iaea.org/pris/ 452 Nuclear power reactors in operation 55 Nuclear power reactors under construction 151 Nuclear power reactors planned 335 Nuclear power reactors proposed Reactors: Uranium Requirements & Future Nuclear Power Source: WNA October 2018
  8. 8. TSX: FCU OTCQX: FCUUF CGN, Fission’s Strategic Partner 19 operating reactors* Important domestic and global builder of reactors (23 new reactors under construction world wide)* Owns 19.9% of Fission Offtake agreement - 20% of annual uranium production from PLS; option to purchase additional 15% 8 China’s Strong Nuclear Buildout 240 China’s Reactor Construction Boom 2030 Estimate 150 reactors in operation* 50 under construction*33 Beijing, China: Air Quality Red Alert *CGN Personal communication
  9. 9. TSX: FCU OTCQX: FCUUF Japanese Recovery Continuing 9 “Our resource-poor country cannot do without nuclear power to secure the stability of energy supply while considering what makes economic sense and the issue of climate change,” Shinzo Abe, re-elected Prime Minister of Japan Oct. 2107 2010 2016 2030 Nuclear 25% 2% 20-22% 8 reactors have currently restarted 17 reactors currently in the process of restart approval 2 reactors under construction 9 new reactors planned 3 new reactors proposed
  10. 10. TSX: FCU OTCQX: FCUUF Supply Side Vulnerable to Geopolitical Instabilities 10 Kazakhstan (to reduce planned uranium production by 20%) Other Countries Australia Canada (indefinite suspensions at McArthur River and Key Lake operations) Africa Nearly 60% of primary supply comes from politically unstable countries Saskatchewan, Canada: Ranked #1 mining investment jurisdiction in 2017 by Fraser Institute Increased share of global production from 17% to 22% in 2016 14.1% 39% 22% 10.2% 7.9% Politically unstable Permitting issues Stable & supportive 13.8% Russia & E. Europe All figures from Uranium Investing News (based on World Nuclear Association country reports)
  11. 11. TSX: FCU OTCQX: FCUUF Global Uranium Production Declining 11 Substantial cuts to production in Kazakhstan, Canada, US, Niger and Namibia Production Peaked in 2016 and has being dropping since 2018 Projected shortfall ~57 MM lbs. Data courtesy of UxC – 2018 Q2 Uranium Market Outlook & -3.4 MM lbs Kazakh June 2018 Prod Cut
  12. 12. TSX: FCU OTCQX: FCUUF 12 1B lbs U3O8 Uncovered in Next 8 Years and Supply Still Being Cut Low U3O8 price impacts low cost producers Kazakhstan production cut by 20% over three years starting in 2018 Production indefinitely suspended at McArthur River & Key Lake Canadian operations shut down at Rabbit Lk and Eagle Pt Production cuts at Cigar Lk Utilities are increasingly uncovered Source: UxC 0 50 100 150 200 250 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Uncovered US Utilities Uncovered Non-Us Utilities Covered U3O8 M lb
  13. 13. • Utilities buy high and sell low • Lack of long-term contracting leaves utilities exposed • For contracting to return, prices will have to rise • The longer the wait, the stronger the upwards pressure on pricing Source: UxC, Uranium Market Outlook, Q4 2016 U3O8 Purchases (Mlbs) Pressure is Growing for Return to Contracting 0 20 40 60 80 100 120 140 160 0 50 100 150 200 250 300 350 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 U3O8Millionlbs YEAR U3O8US$/lp Spot Term Reactor Consumption Spot Price TSX: FCU OTCQX: FCUUF 13
  14. 14. TSX: FCU OTCQX: FCUUF 14 Stage Set for Higher Uranium Prices Source: Data from the Ux Consulting Company, LLC http://www.uxc.com/, Haywood Securities Cameco CEO, Tim Gitzel, says today Cameco can buy uranium on the market cheaper than they can produce it, which is what they plan to do. “…we’re going to reduce supply and we’re going to add to the demand by going out to buy so that will bring better times sooner rather than just continuing to produce into the market.” Interview with Tim Gitzel and Country 600 CJWW / Saskatoon, SK, CA November 8, 2017 – Cameco to suspend production from McArthur and Key Lake. July 25, 2018 – extends suspension for an indeterminate duration - will purchase uranium to meet delivery commitments. UxC BAP TTM Chart
  15. 15. TSX: FCU OTCQX: FCUUF Building Shareholder Value Since 1996 Fission Energy Corp (‘07) JV KEPCO (Korea) ($44M) J-Zone Discovery & Sale to Denison ($85M) Strathmore Minerals Corp (‘96) 1996 – U3O8 spot at $7/lb $2M Mkt Cap to > $457M (‘07) JV Sumitomo (Japan) ($50M) Fission Uranium Corp (‘13) Takeover of Alpha Minerals Triple R 43-101 Resource 87.76M Indicated / 52.85M Inferred PEA – OPEX $14.02/lb US CGN (Chinese Utility) buys 19.99% ($82M) Fission 3.0 Spin-Out 15 Fission 3.0 Corp (‘13) Project Generator with several high- potential projects: drilling-boulders- geochem-geophysics-showings Rhyolite to spend C$22M to earn-in 80% of Macusani Assets Energy Fuels Acquires Strathmore in 2013
  16. 16. TSX: FCU OTCQX: FCUUF 16 Award Winning Project and Team Dev Randhawa • Ross McElroy Mining Person/s of the Year, 2013
  17. 17. TSX: FCU OTCQX: FCUUF 17 Major Exploration Success and Strong Prospects New Discoveries: Still Early Days Large, High Grade, Shallow, Open Pit Resource Backed by PEA Leading Jurisdiction
  18. 18. TSX: FCU OTCQX: FCUUF ENVIRONMENT • Political stability • Pro-mining • Permitting INFRASTRUCTURE • Mills nearby • Power Grid • Highways & Air EXPERIENCE • 60+ years of mining • Supplies 22% of the world’s uranium % U3O8 Athabasca: The Premier High-Grade Uranium District 18
  19. 19. TSX: FCU OTCQX: FCUUF Canada’s Athabasca Basin District 19
  20. 20. TSX: FCU OTCQX: FCUUF 100 200 300 400 500 600 700 800 900 Exploration “Sweet-Spot” Low Hanging Fruit Picked First Cluff Lake Key Lake Triple R (FCU) McClean Lake Midwest Roughrider Phoenix Cigar Lake McArthur River Millennium Arrow Shea Creek Mined Out In production Undeveloped Discoveries McClean Lake Mine, Saskatchewan, Canada 20
  21. 21. TSX: FCU OTCQX: FCUUF 21 PLS: Triple R Deposit & New Zones “Total E-W strike length is now well beyond that of even Cigar Lake (1.95 km) or McArthur River (1.70 km) – such a lateral extent to us underlines the magnitude of the strength of the mineralizing system at PLS.” Raymond James
  22. 22. TSX: FCU OTCQX: FCUUF 22 Triple R Deposit – 3.2km Mineralized Trend Triple R Deposit – Economic U3O8 Resources(1) Indicated 87.8M lbs at 1.82% U3O8 Inferred 52.9M lbs at 1.80% U3O8 (1) Please see legal disclaimer on slides 2 and 3 of this presentation W E
  23. 23. TSX: FCU OTCQX: FCUUF 23 2019 Winter Drill Program – proposed area of work
  24. 24. TSX: FCU OTCQX: FCUUF R780E Resource Expansion Drill Holes 24
  25. 25. TSX: FCU OTCQX: FCUUF Progressing Triple R Towards Production 25 Q1, 2018 Resource Update Zone Expansion Q3, 2018 Summer PFS Work Early 2019 Complete PFS 2020 FS Complete Submit EA R780E R00E Triple R Deposit – Resource Estimate (1) (2018 Update based on drilling to end of 2017) Indicated 87.8M lbs at 1.82% U3O8 Inferred 52.9M lbs at 1.80% U3O8 (1) Please see legal disclaimer on slides 2 and 3 of this presentation
  26. 26. TSX: FCU OTCQX: FCUUF 26 How the Triple R Measures Up: Economics Project OPEX (US$/lb U3O8) Owner/Operator Triple R $14.02 Average OPEX(1) Fission Uranium Kazakhstan Avg (ISL mining) $15.41 (2) Uranium One Cigar Lake, Canada $15.70 (3) Cameco McArthur River, Canada $16.34 (4) Cameco Willow Creek, US (ISL mining) $33.85 (5) Uranium One Average OPEX of US$14.02/lb U3O8 Pre-tax NPV $1.81 bln, post-tax NPV $1.02 bln (10% discount rate) Pre-tax IRR 46.7%, post-tax IRR 34.2% Rapid 1.4 yr pay back (pre-tax), 1.7 yr (post- tax) Pre-tax Net Cash Flow over LOM of $4.12 bln, post-tax $2.53 bln Estimated CAPEX of $1.1 billion (1) Base case using US$65/lb U3O8 and an exchange rate of US$0.85:C$1.00 (2) Uranium One Inc., Audited Annual Consolidated Financial Statements For the years ended December 31, 2014 and 2013 (3) Cigar Lake Project NI 43-101 Technical Report, February 24, 2012 (4) McArthur River Operation NI 43-101 Technical Report, November 2, 2012 (5) Uranium One Inc., Audited Annual Consolidated Financial Statements For the years ended December 31, 2014 and 2013
  27. 27. TSX: FCU OTCQX: FCUUF 27 How the Triple R Measures Up: Size >50% of global uranium supplied by 10 mines Averaging +7M lbs per year, Triple R positioned to be one of the top 5 global producers and the largest open pit production Position Project Location Mining Method 2016 Production (M lbs U3O8) Percent of Total 1 McArthur River Canada UG 18.0 11% 2 Cigar Lake Canada UG 17.3 11% 3 Katco Kazakhstan ISR 10.4 7% 4 Olympic Dam Australia UG 9.6 6% 5 Central Mining District Uzbekistan ISR 6.2 4% 6 Inkai Kazakhstan ISR 5.7 4% 7 Somair Niger OP 5.6 4% 8 Karatau Kazakhstan ISR 5.4 3% 9 Ranger Australia OP 5.2 3% 10 South Inkai Kazakhstan ISR 5.1 3% - Remaining - - 69.2 44% Total 157.7 100% Source: SNL Metals and Mining Triple R
  28. 28. TSX: FCU OTCQX: FCUUF Moving Forward 28 Competitive Advantage • Shallow, High-Grade, Open Pit 2019-2020 Goals • Complete Pre Feasibility Study in early 2019 • Continue towards Feasibility Study Feasibility Study Work • Grow resource by adding Indicated from all zones (13,000m in 40 holes) • Permitting • Geotechnical Drilling / Dyke Berm Design • On-site testing of trench cutter • Further metallurgical on ore / ARD and metal leach on waste • Feasibility level mine design and cost estimation • Detailed project construction plan & schedule
  29. 29. TSX: FCU OTCQX: FCUUF 29 Corporate Information Executive Management Team: Dev Randhawa, MBA — CEO Ross McElroy, P.Geol. — President & COO Advisory Board: Ron Netolitzky Michael Halvorson Mark Wittrup Chief Teddy Clark Board of Directors: Dev Randhawa - Chairman Ross McElroy Frank Estergaard William Marsh Rob Chang Darian Yip Paul Ma Deshao Chen Analyst Coverage Alex Pierce – BMO Capital Markets, London David Talbot — Eight Capital, Toronto Colin Healey — Haywood Securities, Vancouver Heiko Ihle — H. C. Wainwright & Co., New York Tyron Breytenbach — Cormark Securities, Toronto Financial Summary Market Cap: C$ 243 million (as at Feb. 20, 2019) Cash: C$ 19.4 million (as at Jan 31, 2019) Shares outstanding: 486.0 million Options: 30.4 million Fully diluted: 516.4 million (as at Jan 31, 2019)
  30. 30. TSX: FCU OTCQX: FCUUF 30 Dev Randhawa, Chairman & CEO ▪ Fission Energy founding CEO and chairman from 2007 to 2013 leading company to Tier One status ▪ Finance Monthly ‘Dealmaker of the Year 2013’, Northern Miner ‘Person of the Year 2013’ ▪ Founder of Pacific Asia China Energy, sold for $34M Ross McElroy, President and COO ▪ Formerly with Cameco, Areva, BHP Billiton ▪ PDAC 2014 ‘Bill Dennis Award for Exploration Success’, Northern Miner ‘Person of the Year 2013’ ▪ Significant role in 4 major uranium discoveries in Athabasca Basin, incl. Fission’s Waterbury Lake & PLS ▪ Professional geologist of 30+ yrs exp Paul Charlish, CFO, Corporate Secretary ▪ 30 years specialization in the mining sector ▪ Experience in mergers, acquisitions, spin outs and divestments for mining companies, including Fission Energy and Fission Uranium Ray Ashley, VP Exploration ▪ Professional geophysicist with 30+ years ▪ Responsible for PLS field operations ▪ Involved in several important discoveries including a key role in the Ekati diamond mine discovery Fission’s Management Team
  31. 31. TSX: FCU OTCQX: FCUUF Notes 31 _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________
  32. 32. Fission Uranium Corp. Phone: +1 250 868 8140 Toll Free: +1 877 868 8140 (North America) Web: www.fissionuranium.com Investor Relations: Email: ir@fissionuranium.com

×