Outline
• Brief Introduction to PetroTeach
• Biography of Distinguished Instructors Jerry Rusnak
• Webinar Presentation (45 - 60 min.)
• Course Agenda on “Casing and Cementing”
• Q&A (15 - 20 min.)
Introduction to PetroTeach
www.petro-teach.com
Reservoir............ 3
 Providing 150 training courses
 About 50 Distinguished Lecturers
 Online, Public and In-house Courses
 Download Our Catalogue !
 Follow us on Social Media!
4
Tuesday 1th – 16:00 GMT
Nightmare of Hydrate Blockage
Professor Bahman Tohidi
Wednesday 9th – 16:00 GMT
Seismic Reservoir Characterization
Dr. Andrew Ross
Thursday 10th – 16:00 GMT
Hydraulic Fracturing
Jerry Rusnak
Monday 14th – 17:00 GMT
3D Printing: The Future of Geology
Dr. Franek Hasiuk and Dr. Sergey Ishutov
Free Webinars in September
Monday 21th – 17:00 GMT
Elements of Fiscal Regimes and Impact on
E&P Economics and Take Statistics
Professor Wumi Illedare
Thursday 3th – 16:00 GMT
Advanced Petrophysics
Mostafa Haggag
5
Wednesday 7th – 16:00 GMT
Classic Measurement vs. Image Processing
Professor Reza Azin
Thursday 1th – 16:00 GMT
Casing and Cementing
Jerry Rusnak
Wednesday 14th – 16:00 GMT
Advanced Analysis of Carbonate System
Professor Maria Mutti
Monday 21th – 16:00 GMT
SAGD And Solvent-SAGD Design And Analysis
Dr. Mazda Irani
Free Webinars in October
Jerry Rusnak
PetroTeach
Distingushed Instructor
• Jerry Rusnak holds a Bachelor of Science degree in Ocean Engineering
from Florida Atlantic University.
• He has more than 40 years of oilfield experience. He has worked in all
phases of the industry including service, supply, operations, and
academia.
• He began his career as a Wireline field engineer. Then he worked for an
Independent Exploration and Production Company as a field engineer,
managing wellsite drilling, completion, and workover operations.
• Moving up he became the company’s Drilling and Completion Manager
in charge of multiple simultaneous drilling and completion operations
across US.
• He is an active member and past section president of the Society of
Petroleum Engineers (SPE), and holds or is eligible to hold most major
certifications required for wellsite work both onshore and offshore.
Casing and Cementing
Webinar
Jerry Rusnak
Instructor
CSG_CMT_WEB 7
Course Objectives
• What does the EIC need to know in order to properly Case and
Cement a well?
• The API standards for casing
• The number of casing strings required
• The setting depth (casing point) of each string
• The borehole (bit) size for each string
• The strength and metallurgy required for each string
• The primary cement job design for each string
• How to evaluate a primary cement job
• How to remediate an unsuccessful primary cement job
CSG_CMT_WEB 8
API Casing Standards
• Size (OD) 4 ½” – 36”
• Weight (lbs/ft) determines ID & wall thickness
• Grade (Letter & Number) determines metallurgy & YS (ksi)
• Length Range
• Range 1 (R-1): 16 – 25 ft
• Range 2 (R-2): 25 – 34 ft
• Range 3 (R-3): > 34 ft
• Type of connection
• STC-8RND
• LTC-8RND
• BTC
CSG_CMT_WEB 9
Connections
• Pressure seal can be interference between the threads or metal to
metal.
• The connection strength will normally be different than the pipe body
strength.
CSG_CMT_WEB 10
How Many Strings of Casing will you run?
11CSG_CMT_WEB
Purpose of Casing Strings
• Conductor – The casing string that is put into the well first.
• On land wells, to prevent the sides of the hole from caving
into the wellbore.
• This casing, sometimes called drive pipe, is generally a
short length and is sometimes driven into the ground.
• It is run because the shallow section of most wells
onshore is drilled in unconsolidated sediment or soil
rather than consolidated strata typically encountered
deeper.
• Offshore, the drive pipe or structural casing may be
installed prior to the conductor for similar reasons.
CSG_CMT_WEB 12
Purpose of Casing Strings
• Surface – Minimum depth often determined by Gov’t
regulations.
•Cover/protect freshwater zones.
•Cemented from total depth (TD) to surface.
•Must support the weight of all other casing strings.
•Fracture pressure (Pf)at shoe must exceed max
reservoir pressure (Pp) expected before next string
is run.
•The blowout preventer (BOP) is initially made up to
the surface casing head.
CSG_CMT_WEB 13
Purpose of Casing Strings
• Intermediate (I/M) – Optional but normally run if mud
weight (MW) required to overbalance Pp will exceed Pf below
previously run string.
• Sometimes used to isolate “troublesome” zones
encountered while drilling - Lost Circ, Differential sticking,
Sloughing shale, etc…
• TOC not normally to surface but often overlaps previous
casing.
CSG_CMT_WEB 14
Purpose of Casing Strings
• Production – The innermost casing run in the well.
•Size will be determined by production tubing size
requirement.
•This will determine size of all the other csg strings.
•Normally cemented across all zones capable of
producing fluids and/or to be used for injection.
CSG_CMT_WEB 15
Casing shoe depths and the number of
strings
•In conventional drilling operations, the
setting depths are determined principally
by the mud weight (ppg) and the fracture
gradient (psi/ft) at all depths (TVD) in the
well.
•Following determination of the setting
depths, drill bit and casing sizes, of
individual casing strings must be
determined.
16 CSG_CMT_WEB
What determines the setting depth (casing
point) of each string?
CSG_CMT_WEB 17
What determines the setting depth (casing
point) of each string?
CSG_CMT_WEB 18
19
Casing size Vs. Bit size
CSG_CMT_WEB
20
2 7/8” production tubing
5 ½” production casing
CSG_CMT_WEB
How to purchase the casing strings?
• Size – Weight – Grade – Range – Connection
• Number of joints for each string (allowance for thread loss)
• Logistics from factory to wellsite
• Particularly important for offshore
• Order the required accessories (matching size & connections)
• Float Equipment
• Centralizers
• Scratchers
• Stage tool
• Wellhead equipment
CSG_CMT_WEB 21
What are the different Well Conditions to
consider when designing the casing string(s)?
• Installation Conditions
• Axial Stresses – Weight, shock loads, over pull, etc…
• Pressure forces – Burst, Collapse
• Bending stresses if directional or “crooked” wellbore
• Cementing Conditions
• How will forces change while conditioning mud and pumping
cement – rotation & reciprocation
• Set Cement Conditions
• How will forces change after cement has “set”
CSG_CMT_WEB 22
What are the different Well Conditions to
consider when designing the casing string(s)?
• Completion Forces
•Is a major stimulation (acid or frac job) planned?
•Pressure Forces
•Temperature forces
• Production forces
•Tubing and packer forces
•Pressure depletion
•Temperature forces
CSG_CMT_WEB 23
Computer Design
• Run a Finite Element Analysis (FEA) for each of these
conditions.
• Determine the maximum stress on the casing and where it
will occur.
• Select pipe grade (YS) based on maximum stress.
• Select pipe grade (metallurgy) based on Corrosion, H2S,
etc…
• Select pipe weight (wall thickness) based on wear if
drilling inside casing will be done.
• Select design safety factor (SF) based on experience.
CSG_CMT_WEB 24
Casing Design Software
CDEx - A Better and Simple Way to Casing
Design (2:17)
• https://youtu.be/GlpPoMBqrfM
25
CSG_CMT_WEB
Where will I put centralizers?
• Design/placement critical for good primary cement
job.
• Proper “stand off” critical for mud removal/cement
coverage.
• Most computer programs will “optimize” centralizer
placement.
CSG_CMT_WEB 26
After Casing installation we are ready to
perform Primary Cement Job.
• Design cement job based on.
•Drilling mud removal.
•Pore pressure & Frac pressure (well control).
•TOC required.
•Strength of cement required.
CSG_CMT_WEB 27
Considerations while pumping Cement job
• Cementing
Equipment
• Cementing head
• Wiper plugs
• Scratchers
• Centralizers
• Float collar
• Float shoe
28CSG_CMT_WEB
Considerations while pumping Cement job
• Need to “condition” drilling mud prior to pumping
cement system.
• Need to consider “Rheology” of drilling mud, chemical
wash, spacer fluids and cement.
• Need to ensure compatibility of all fluids as some
contamination is unavoidable.
CSG_CMT_WEB 29
Major Cement Slurry Properties
•Water/Cement Ratios (gal/sk)
•Slurry Density (ppg)
•Fluid-Loss Control (ml/30s)
•Thickening Time (minutes)
•Slurry Rheology (µ, Yp, Nre)
30CSG_CMT_WEB
Cement Additives
•Accelerators
•Retarders
•Fluid Loss Additives
•Dispersants
•Extenders
•Weighting Agents
•Lost Circulation Materials
•Special Additives
31CSG_CMT_WEB
Rheology
•The study of flow and deformation of
fluids
•In well cementing, rheology affects:
•Cement slurry mixability and
pumpability
•Cement coverage (mud displacement)
•Friction pressure estimation (ECD)
•HHP requirements (P x Q)
32CSG_CMT_WEB
Flow Rate and Deformation
33CSG_CMT_WEB
Reynolds Number
•Prediction of type of flow pattern (plug,
laminar or turbulent) is defined as the
Reynolds Number
•Nre = ρvD/μ (Dimensionless)
•ρ = fluid density (lb/ft3 or kg/m3)
•v = average velocity (ft/s or m/s)
•D = diameter (ft or m)
•μ = fluid viscosity (lb/ft s or Pa s)
34CSG_CMT_WEB
Critical Reynolds Number
•NRe = ρvDe/μe > 3000 is often used to
determine the flowrate required to
achieve turbulent flow in the annulus.
•Empirical evidence shows that the best
regime for displacing mud in the annulus
is turbulent flow.
•Experience recommends a minimum
pump rate of 8 BPM.
35CSG_CMT_WEB
Rheology
• In the lab we can use
instruments to
measure shear stress
(Ꚍ) and shear rate (ꙋ)
of a fluid.
• A plot of this data will
give us an estimate of
the fluid viscosity
under pumping
conditions.
36CSG_CMT_WEB
Rheology
• A plot of this data will
give us an estimate of
the Yield Point of the
fluid under pumping
conditions.
• YP is the shear stress
at zero shear rate.
• It is a measure of the
amount of pressure
applied to the fluid
before it will move.
37CSG_CMT_WEB
Rheology
• The YP is a
measurement of a
fluids ability to
suspend solids.
• Lower the YP of the
mud as low as
practically possible
prior to pumping
cement job, but only
after the hole is
clean.
38CSG_CMT_WEB
Job Execution
•For successful job execution the Wellsite
Manager and the Cementing Crew
Wellsite Supervisor need to be involved in
the job planning.
•Communication is the key to a successful
job.
39CSG_CMT_WEB
Cement Job Evaluation
•Comparison of calculated job design
parameters with actual parameters
recorded during job execution.
•This includes pump rate, pump pressure
and slurry/liquid density at a minimum.
•Collect and preserve cement samples
collected during job.
•Do not remove free water from samples.
40CSG_CMT_WEB
Final Circulating Pressure (FCP)
41CSG_CMT_WEB
Volumes of cementing fluids pumped?
•Spacer and/or pre-flush fluids, and
cement slurries (lead and Tail) should
be as per the well specific cement
program
•Inventory all materials before and
after job (cement, additives, water).
42CSG_CMT_WEB
Flowline Returns During Job
•What was the flow rate of the flowline
returns compared to the pump rate?
•Were there any losses of returns during
the cement job?
•Where/When during job did these losses
occur?
•What was the density or change in
density of the fluid returns?
43CSG_CMT_WEB
44
• Was the top plug Bumped?
• How did the actual displacement volume compare to
the calculated volume?
CSG_CMT_WEB
Did the float equipment work?
•Check float equipment as described in the
cementing job procedure.
•If the float equipment “leaks” shut the
well in at the surface (cementing head)
and wait till it sets to bleed of pump
pressure.
45CSG_CMT_WEB
CBL/VDL/GR/CCL
46CSG_CMT_WEB
If Primary Cement Job is “unsuccessful” how
do you plan Remedial cement job?
• High Pressure Squeeze – BHP > Pf
• Low Pressure Squeeze – BHP < Pf
• Re-cement above TOC of Primary Job
CSG_CMT_WEB 47
Radial-cement evaluation
48CSG_CMT_WEB
Setting Cement Plugs
• If Well is not salvageable because of failure of cement
job than the final cement job performed might be to
Set Cement Plug(s) & Abandon Well.
• You do not want to be the EIC of that!
49CSG_CMT_WEB
Casing and Cementing (online)
26 - 30 Oct. 2020
25 – 29 Jan. 2021
Register@petro-teach.com
• The course will introduce casing and cement job processes including design and related
calculations. Casing handling equipment and running procedures are covered. Cementing
surface equipment considerations are included. The course will include practical exercises and
evaluation of knowledge gained. Cementing materials and additives and their effects on cement
rheology will be explained. The course will provide examples of primary, remedial, plug back
and abandonment cementing designs. Cement job evaluation using job data, pressure testing
and wireline logs will be used.
• The learning objectives of the top-most level content of the course
are:
 To obtain a working knowledge of casing design
 To obtain a working knowledge of cementing procedures
 To learn the practical application of different types of cement
 To learn how to use additives to produce specific cement properties
 To learn the equipment, tools and techniques involved in casing and cementing a well
 To learn how to evaluate the success or failure of a cement job
Course price (Euro):
• Normal registration:1490+VAT
• 20% DISCOUNT for PhD students, Group (≥ 3 person) and early bird registrants (1 week before)
50CSG_CMT_WEB
Thank You
Any Questions ?
52
Legal Disclaimer, General Access Terms & Conditions
This material and the information contained in it are directed to or intended for general education
propose. The information presented on this material is collected, maintained and provided purely
for the convenience of the reader. We have made every attempt to ensure that the information
contained in this material has been obtained from reliable sources and PetroTeach is not
responsible for any errors, decisions or omissions of the information. The information on this
material has been incorporated in good faith and it is only for the general education and training
purpose. It should not be relied upon for any specific purpose and no representation or warranty is
given for its accuracy or completeness.
By accessing this material, you agree that PetroTeach will not be liable for any loss incurred due
to the use of the information and the material contained.
The copyright for this material is solely belongs to the PetroTeach and Its Instructors.
Any access to it by the general public does not imply free license to any company/organization to
use it for any commercial education and projects unless it is inquired permission from PetroTeach.

More Related Content

What's hot

AADE-10-DF-HO-05
AADE-10-DF-HO-05AADE-10-DF-HO-05
AADE-10-DF-HO-05Andy Gillikin
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser DesignKon Aguek
 
Halliburton cementing presentation
Halliburton cementing presentationHalliburton cementing presentation
Halliburton cementing presentationBoubenia ali
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 
Mechanical Seal for Pumps by Engr. Muhammad Shahbaz
Mechanical Seal for Pumps by Engr. Muhammad ShahbazMechanical Seal for Pumps by Engr. Muhammad Shahbaz
Mechanical Seal for Pumps by Engr. Muhammad ShahbazEngr. Muhammad Shahbaz
 
Understanding the Function of Radial Lip Shaft Seals
Understanding the Function of Radial Lip Shaft SealsUnderstanding the Function of Radial Lip Shaft Seals
Understanding the Function of Radial Lip Shaft SealsRL Hudson
 

What's hot (8)

Kick t1
Kick t1Kick t1
Kick t1
 
AADE-10-DF-HO-05
AADE-10-DF-HO-05AADE-10-DF-HO-05
AADE-10-DF-HO-05
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser Design
 
Halliburton cementing presentation
Halliburton cementing presentationHalliburton cementing presentation
Halliburton cementing presentation
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Mechanical Seal for Pumps by Engr. Muhammad Shahbaz
Mechanical Seal for Pumps by Engr. Muhammad ShahbazMechanical Seal for Pumps by Engr. Muhammad Shahbaz
Mechanical Seal for Pumps by Engr. Muhammad Shahbaz
 
Mechanical seals
Mechanical sealsMechanical seals
Mechanical seals
 
Understanding the Function of Radial Lip Shaft Seals
Understanding the Function of Radial Lip Shaft SealsUnderstanding the Function of Radial Lip Shaft Seals
Understanding the Function of Radial Lip Shaft Seals
 

Similar to Casing Cement Webinar

Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2Bennet Kuriakose, PhD
 
Shaft sinking operation
Shaft sinking operationShaft sinking operation
Shaft sinking operationSafdar Ali
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Mohamed _el_shora
 
Hydroelasticity_051222.pptx
Hydroelasticity_051222.pptxHydroelasticity_051222.pptx
Hydroelasticity_051222.pptxRohitKumar234819
 
Introduction to mp prathik
Introduction to mp prathikIntroduction to mp prathik
Introduction to mp prathikprathik jain
 
culverts-channeline-international.pptx
culverts-channeline-international.pptxculverts-channeline-international.pptx
culverts-channeline-international.pptxraviyemmadi
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling ProjectAndika Mahardika
 
Raise boring,organisation of shaft sinking,lining
Raise boring,organisation of shaft sinking,liningRaise boring,organisation of shaft sinking,lining
Raise boring,organisation of shaft sinking,liningSafdar Ali
 
Final project ppt
Final project pptFinal project ppt
Final project pptAkhil Vas
 
drillingfluids-171223201136.pptx
drillingfluids-171223201136.pptxdrillingfluids-171223201136.pptx
drillingfluids-171223201136.pptxMuammerAlakary
 
drillingfluids-22.pptx
drillingfluids-22.pptxdrillingfluids-22.pptx
drillingfluids-22.pptxMuammerAlakary
 
RUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHRUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHApoorv Dhawan
 
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTFIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTMUHAMMAD NOMAN KHAN
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluidsAAPG SU SC
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptAndresRios87791
 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxcharantinku6799
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsPath Marketing Inc.
 

Similar to Casing Cement Webinar (20)

Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2
 
Shaft sinking operation
Shaft sinking operationShaft sinking operation
Shaft sinking operation
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016
 
Hydroelasticity_051222.pptx
Hydroelasticity_051222.pptxHydroelasticity_051222.pptx
Hydroelasticity_051222.pptx
 
Introduction to mp prathik
Introduction to mp prathikIntroduction to mp prathik
Introduction to mp prathik
 
culverts-channeline-international.pptx
culverts-channeline-international.pptxculverts-channeline-international.pptx
culverts-channeline-international.pptx
 
Basic soils presentation
Basic soils presentation Basic soils presentation
Basic soils presentation
 
2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
Raise boring,organisation of shaft sinking,lining
Raise boring,organisation of shaft sinking,liningRaise boring,organisation of shaft sinking,lining
Raise boring,organisation of shaft sinking,lining
 
Final project ppt
Final project pptFinal project ppt
Final project ppt
 
drillingfluids-171223201136.pptx
drillingfluids-171223201136.pptxdrillingfluids-171223201136.pptx
drillingfluids-171223201136.pptx
 
drillingfluids-22.pptx
drillingfluids-22.pptxdrillingfluids-22.pptx
drillingfluids-22.pptx
 
RUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHRUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCH
 
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTFIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptx
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 

More from Petro Teach

Webinar investment analysis final
Webinar investment analysis finalWebinar investment analysis final
Webinar investment analysis finalPetro Teach
 
The role of geomodeling in the multi disciplinary team
The role of geomodeling in the multi disciplinary teamThe role of geomodeling in the multi disciplinary team
The role of geomodeling in the multi disciplinary teamPetro Teach
 
Capillarity in Porous Media
Capillarity in Porous MediaCapillarity in Porous Media
Capillarity in Porous MediaPetro Teach
 
Electrofacies a guided machine learning for practice of geomodelling
Electrofacies a guided machine learning for practice of geomodellingElectrofacies a guided machine learning for practice of geomodelling
Electrofacies a guided machine learning for practice of geomodellingPetro Teach
 
Petro teach webinar_21_10_2020_sagd and solvent-sagd design and analysis
Petro teach webinar_21_10_2020_sagd and solvent-sagd design and analysisPetro teach webinar_21_10_2020_sagd and solvent-sagd design and analysis
Petro teach webinar_21_10_2020_sagd and solvent-sagd design and analysisPetro Teach
 
Elements of Fiscal Regimes and Impact on E&P Economics and Take Statistics
Elements of Fiscal Regimes and Impact on E&P Economics and Take StatisticsElements of Fiscal Regimes and Impact on E&P Economics and Take Statistics
Elements of Fiscal Regimes and Impact on E&P Economics and Take StatisticsPetro Teach
 
PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...
PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...
PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...Petro Teach
 
Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...
Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...
Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...Petro Teach
 
Petro Teach Free Webinar on Advanced Petrophysics
Petro Teach Free Webinar on Advanced PetrophysicsPetro Teach Free Webinar on Advanced Petrophysics
Petro Teach Free Webinar on Advanced PetrophysicsPetro Teach
 
PetroTeach Free Webinar on "Nightmare of Gas Hydrate by Professor Bahaman T...
PetroTeach Free Webinar on "Nightmare of Gas Hydrate by  Professor Bahaman  T...PetroTeach Free Webinar on "Nightmare of Gas Hydrate by  Professor Bahaman  T...
PetroTeach Free Webinar on "Nightmare of Gas Hydrate by Professor Bahaman T...Petro Teach
 
PetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir Characterization
PetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir CharacterizationPetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir Characterization
PetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir CharacterizationPetro Teach
 

More from Petro Teach (11)

Webinar investment analysis final
Webinar investment analysis finalWebinar investment analysis final
Webinar investment analysis final
 
The role of geomodeling in the multi disciplinary team
The role of geomodeling in the multi disciplinary teamThe role of geomodeling in the multi disciplinary team
The role of geomodeling in the multi disciplinary team
 
Capillarity in Porous Media
Capillarity in Porous MediaCapillarity in Porous Media
Capillarity in Porous Media
 
Electrofacies a guided machine learning for practice of geomodelling
Electrofacies a guided machine learning for practice of geomodellingElectrofacies a guided machine learning for practice of geomodelling
Electrofacies a guided machine learning for practice of geomodelling
 
Petro teach webinar_21_10_2020_sagd and solvent-sagd design and analysis
Petro teach webinar_21_10_2020_sagd and solvent-sagd design and analysisPetro teach webinar_21_10_2020_sagd and solvent-sagd design and analysis
Petro teach webinar_21_10_2020_sagd and solvent-sagd design and analysis
 
Elements of Fiscal Regimes and Impact on E&P Economics and Take Statistics
Elements of Fiscal Regimes and Impact on E&P Economics and Take StatisticsElements of Fiscal Regimes and Impact on E&P Economics and Take Statistics
Elements of Fiscal Regimes and Impact on E&P Economics and Take Statistics
 
PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...
PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...
PetroTeach Free Webinar on 3D Printing: The Future of Geology by Dr. Franek H...
 
Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...
Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...
Petro Teach Free Webinar on "Rock Physics for Quantitative Seismic Reservoir ...
 
Petro Teach Free Webinar on Advanced Petrophysics
Petro Teach Free Webinar on Advanced PetrophysicsPetro Teach Free Webinar on Advanced Petrophysics
Petro Teach Free Webinar on Advanced Petrophysics
 
PetroTeach Free Webinar on "Nightmare of Gas Hydrate by Professor Bahaman T...
PetroTeach Free Webinar on "Nightmare of Gas Hydrate by  Professor Bahaman  T...PetroTeach Free Webinar on "Nightmare of Gas Hydrate by  Professor Bahaman  T...
PetroTeach Free Webinar on "Nightmare of Gas Hydrate by Professor Bahaman T...
 
PetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir Characterization
PetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir CharacterizationPetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir Characterization
PetroTeach Free Webinar by Dr. Andrew Ross on Seismic Reservoir Characterization
 

Recently uploaded

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)Dr. Mazin Mohamed alkathiri
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 

Recently uploaded (20)

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 

Casing Cement Webinar

  • 1. World Class Training Solutions Casing and Cementing
  • 2. 2 Outline • Brief Introduction to PetroTeach • Biography of Distinguished Instructors Jerry Rusnak • Webinar Presentation (45 - 60 min.) • Course Agenda on “Casing and Cementing” • Q&A (15 - 20 min.)
  • 3. Introduction to PetroTeach www.petro-teach.com Reservoir............ 3  Providing 150 training courses  About 50 Distinguished Lecturers  Online, Public and In-house Courses  Download Our Catalogue !  Follow us on Social Media!
  • 4. 4 Tuesday 1th – 16:00 GMT Nightmare of Hydrate Blockage Professor Bahman Tohidi Wednesday 9th – 16:00 GMT Seismic Reservoir Characterization Dr. Andrew Ross Thursday 10th – 16:00 GMT Hydraulic Fracturing Jerry Rusnak Monday 14th – 17:00 GMT 3D Printing: The Future of Geology Dr. Franek Hasiuk and Dr. Sergey Ishutov Free Webinars in September Monday 21th – 17:00 GMT Elements of Fiscal Regimes and Impact on E&P Economics and Take Statistics Professor Wumi Illedare Thursday 3th – 16:00 GMT Advanced Petrophysics Mostafa Haggag
  • 5. 5 Wednesday 7th – 16:00 GMT Classic Measurement vs. Image Processing Professor Reza Azin Thursday 1th – 16:00 GMT Casing and Cementing Jerry Rusnak Wednesday 14th – 16:00 GMT Advanced Analysis of Carbonate System Professor Maria Mutti Monday 21th – 16:00 GMT SAGD And Solvent-SAGD Design And Analysis Dr. Mazda Irani Free Webinars in October
  • 6. Jerry Rusnak PetroTeach Distingushed Instructor • Jerry Rusnak holds a Bachelor of Science degree in Ocean Engineering from Florida Atlantic University. • He has more than 40 years of oilfield experience. He has worked in all phases of the industry including service, supply, operations, and academia. • He began his career as a Wireline field engineer. Then he worked for an Independent Exploration and Production Company as a field engineer, managing wellsite drilling, completion, and workover operations. • Moving up he became the company’s Drilling and Completion Manager in charge of multiple simultaneous drilling and completion operations across US. • He is an active member and past section president of the Society of Petroleum Engineers (SPE), and holds or is eligible to hold most major certifications required for wellsite work both onshore and offshore.
  • 7. Casing and Cementing Webinar Jerry Rusnak Instructor CSG_CMT_WEB 7
  • 8. Course Objectives • What does the EIC need to know in order to properly Case and Cement a well? • The API standards for casing • The number of casing strings required • The setting depth (casing point) of each string • The borehole (bit) size for each string • The strength and metallurgy required for each string • The primary cement job design for each string • How to evaluate a primary cement job • How to remediate an unsuccessful primary cement job CSG_CMT_WEB 8
  • 9. API Casing Standards • Size (OD) 4 ½” – 36” • Weight (lbs/ft) determines ID & wall thickness • Grade (Letter & Number) determines metallurgy & YS (ksi) • Length Range • Range 1 (R-1): 16 – 25 ft • Range 2 (R-2): 25 – 34 ft • Range 3 (R-3): > 34 ft • Type of connection • STC-8RND • LTC-8RND • BTC CSG_CMT_WEB 9
  • 10. Connections • Pressure seal can be interference between the threads or metal to metal. • The connection strength will normally be different than the pipe body strength. CSG_CMT_WEB 10
  • 11. How Many Strings of Casing will you run? 11CSG_CMT_WEB
  • 12. Purpose of Casing Strings • Conductor – The casing string that is put into the well first. • On land wells, to prevent the sides of the hole from caving into the wellbore. • This casing, sometimes called drive pipe, is generally a short length and is sometimes driven into the ground. • It is run because the shallow section of most wells onshore is drilled in unconsolidated sediment or soil rather than consolidated strata typically encountered deeper. • Offshore, the drive pipe or structural casing may be installed prior to the conductor for similar reasons. CSG_CMT_WEB 12
  • 13. Purpose of Casing Strings • Surface – Minimum depth often determined by Gov’t regulations. •Cover/protect freshwater zones. •Cemented from total depth (TD) to surface. •Must support the weight of all other casing strings. •Fracture pressure (Pf)at shoe must exceed max reservoir pressure (Pp) expected before next string is run. •The blowout preventer (BOP) is initially made up to the surface casing head. CSG_CMT_WEB 13
  • 14. Purpose of Casing Strings • Intermediate (I/M) – Optional but normally run if mud weight (MW) required to overbalance Pp will exceed Pf below previously run string. • Sometimes used to isolate “troublesome” zones encountered while drilling - Lost Circ, Differential sticking, Sloughing shale, etc… • TOC not normally to surface but often overlaps previous casing. CSG_CMT_WEB 14
  • 15. Purpose of Casing Strings • Production – The innermost casing run in the well. •Size will be determined by production tubing size requirement. •This will determine size of all the other csg strings. •Normally cemented across all zones capable of producing fluids and/or to be used for injection. CSG_CMT_WEB 15
  • 16. Casing shoe depths and the number of strings •In conventional drilling operations, the setting depths are determined principally by the mud weight (ppg) and the fracture gradient (psi/ft) at all depths (TVD) in the well. •Following determination of the setting depths, drill bit and casing sizes, of individual casing strings must be determined. 16 CSG_CMT_WEB
  • 17. What determines the setting depth (casing point) of each string? CSG_CMT_WEB 17
  • 18. What determines the setting depth (casing point) of each string? CSG_CMT_WEB 18
  • 19. 19 Casing size Vs. Bit size CSG_CMT_WEB
  • 20. 20 2 7/8” production tubing 5 ½” production casing CSG_CMT_WEB
  • 21. How to purchase the casing strings? • Size – Weight – Grade – Range – Connection • Number of joints for each string (allowance for thread loss) • Logistics from factory to wellsite • Particularly important for offshore • Order the required accessories (matching size & connections) • Float Equipment • Centralizers • Scratchers • Stage tool • Wellhead equipment CSG_CMT_WEB 21
  • 22. What are the different Well Conditions to consider when designing the casing string(s)? • Installation Conditions • Axial Stresses – Weight, shock loads, over pull, etc… • Pressure forces – Burst, Collapse • Bending stresses if directional or “crooked” wellbore • Cementing Conditions • How will forces change while conditioning mud and pumping cement – rotation & reciprocation • Set Cement Conditions • How will forces change after cement has “set” CSG_CMT_WEB 22
  • 23. What are the different Well Conditions to consider when designing the casing string(s)? • Completion Forces •Is a major stimulation (acid or frac job) planned? •Pressure Forces •Temperature forces • Production forces •Tubing and packer forces •Pressure depletion •Temperature forces CSG_CMT_WEB 23
  • 24. Computer Design • Run a Finite Element Analysis (FEA) for each of these conditions. • Determine the maximum stress on the casing and where it will occur. • Select pipe grade (YS) based on maximum stress. • Select pipe grade (metallurgy) based on Corrosion, H2S, etc… • Select pipe weight (wall thickness) based on wear if drilling inside casing will be done. • Select design safety factor (SF) based on experience. CSG_CMT_WEB 24
  • 25. Casing Design Software CDEx - A Better and Simple Way to Casing Design (2:17) • https://youtu.be/GlpPoMBqrfM 25 CSG_CMT_WEB
  • 26. Where will I put centralizers? • Design/placement critical for good primary cement job. • Proper “stand off” critical for mud removal/cement coverage. • Most computer programs will “optimize” centralizer placement. CSG_CMT_WEB 26
  • 27. After Casing installation we are ready to perform Primary Cement Job. • Design cement job based on. •Drilling mud removal. •Pore pressure & Frac pressure (well control). •TOC required. •Strength of cement required. CSG_CMT_WEB 27
  • 28. Considerations while pumping Cement job • Cementing Equipment • Cementing head • Wiper plugs • Scratchers • Centralizers • Float collar • Float shoe 28CSG_CMT_WEB
  • 29. Considerations while pumping Cement job • Need to “condition” drilling mud prior to pumping cement system. • Need to consider “Rheology” of drilling mud, chemical wash, spacer fluids and cement. • Need to ensure compatibility of all fluids as some contamination is unavoidable. CSG_CMT_WEB 29
  • 30. Major Cement Slurry Properties •Water/Cement Ratios (gal/sk) •Slurry Density (ppg) •Fluid-Loss Control (ml/30s) •Thickening Time (minutes) •Slurry Rheology (Âľ, Yp, Nre) 30CSG_CMT_WEB
  • 31. Cement Additives •Accelerators •Retarders •Fluid Loss Additives •Dispersants •Extenders •Weighting Agents •Lost Circulation Materials •Special Additives 31CSG_CMT_WEB
  • 32. Rheology •The study of flow and deformation of fluids •In well cementing, rheology affects: •Cement slurry mixability and pumpability •Cement coverage (mud displacement) •Friction pressure estimation (ECD) •HHP requirements (P x Q) 32CSG_CMT_WEB
  • 33. Flow Rate and Deformation 33CSG_CMT_WEB
  • 34. Reynolds Number •Prediction of type of flow pattern (plug, laminar or turbulent) is defined as the Reynolds Number •Nre = ρvD/Îź (Dimensionless) •ρ = fluid density (lb/ft3 or kg/m3) •v = average velocity (ft/s or m/s) •D = diameter (ft or m) •μ = fluid viscosity (lb/ft s or Pa s) 34CSG_CMT_WEB
  • 35. Critical Reynolds Number •NRe = ρvDe/Îźe > 3000 is often used to determine the flowrate required to achieve turbulent flow in the annulus. •Empirical evidence shows that the best regime for displacing mud in the annulus is turbulent flow. •Experience recommends a minimum pump rate of 8 BPM. 35CSG_CMT_WEB
  • 36. Rheology • In the lab we can use instruments to measure shear stress (Ꚍ) and shear rate (ꙋ) of a fluid. • A plot of this data will give us an estimate of the fluid viscosity under pumping conditions. 36CSG_CMT_WEB
  • 37. Rheology • A plot of this data will give us an estimate of the Yield Point of the fluid under pumping conditions. • YP is the shear stress at zero shear rate. • It is a measure of the amount of pressure applied to the fluid before it will move. 37CSG_CMT_WEB
  • 38. Rheology • The YP is a measurement of a fluids ability to suspend solids. • Lower the YP of the mud as low as practically possible prior to pumping cement job, but only after the hole is clean. 38CSG_CMT_WEB
  • 39. Job Execution •For successful job execution the Wellsite Manager and the Cementing Crew Wellsite Supervisor need to be involved in the job planning. •Communication is the key to a successful job. 39CSG_CMT_WEB
  • 40. Cement Job Evaluation •Comparison of calculated job design parameters with actual parameters recorded during job execution. •This includes pump rate, pump pressure and slurry/liquid density at a minimum. •Collect and preserve cement samples collected during job. •Do not remove free water from samples. 40CSG_CMT_WEB
  • 41. Final Circulating Pressure (FCP) 41CSG_CMT_WEB
  • 42. Volumes of cementing fluids pumped? •Spacer and/or pre-flush fluids, and cement slurries (lead and Tail) should be as per the well specific cement program •Inventory all materials before and after job (cement, additives, water). 42CSG_CMT_WEB
  • 43. Flowline Returns During Job •What was the flow rate of the flowline returns compared to the pump rate? •Were there any losses of returns during the cement job? •Where/When during job did these losses occur? •What was the density or change in density of the fluid returns? 43CSG_CMT_WEB
  • 44. 44 • Was the top plug Bumped? • How did the actual displacement volume compare to the calculated volume? CSG_CMT_WEB
  • 45. Did the float equipment work? •Check float equipment as described in the cementing job procedure. •If the float equipment “leaks” shut the well in at the surface (cementing head) and wait till it sets to bleed of pump pressure. 45CSG_CMT_WEB
  • 47. If Primary Cement Job is “unsuccessful” how do you plan Remedial cement job? • High Pressure Squeeze – BHP > Pf • Low Pressure Squeeze – BHP < Pf • Re-cement above TOC of Primary Job CSG_CMT_WEB 47
  • 49. Setting Cement Plugs • If Well is not salvageable because of failure of cement job than the final cement job performed might be to Set Cement Plug(s) & Abandon Well. • You do not want to be the EIC of that! 49CSG_CMT_WEB
  • 50. Casing and Cementing (online) 26 - 30 Oct. 2020 25 – 29 Jan. 2021 Register@petro-teach.com • The course will introduce casing and cement job processes including design and related calculations. Casing handling equipment and running procedures are covered. Cementing surface equipment considerations are included. The course will include practical exercises and evaluation of knowledge gained. Cementing materials and additives and their effects on cement rheology will be explained. The course will provide examples of primary, remedial, plug back and abandonment cementing designs. Cement job evaluation using job data, pressure testing and wireline logs will be used. • The learning objectives of the top-most level content of the course are:  To obtain a working knowledge of casing design  To obtain a working knowledge of cementing procedures  To learn the practical application of different types of cement  To learn how to use additives to produce specific cement properties  To learn the equipment, tools and techniques involved in casing and cementing a well  To learn how to evaluate the success or failure of a cement job Course price (Euro): • Normal registration:1490+VAT • 20% DISCOUNT for PhD students, Group (≥ 3 person) and early bird registrants (1 week before) 50CSG_CMT_WEB
  • 52. 52 Legal Disclaimer, General Access Terms & Conditions This material and the information contained in it are directed to or intended for general education propose. The information presented on this material is collected, maintained and provided purely for the convenience of the reader. We have made every attempt to ensure that the information contained in this material has been obtained from reliable sources and PetroTeach is not responsible for any errors, decisions or omissions of the information. The information on this material has been incorporated in good faith and it is only for the general education and training purpose. It should not be relied upon for any specific purpose and no representation or warranty is given for its accuracy or completeness. By accessing this material, you agree that PetroTeach will not be liable for any loss incurred due to the use of the information and the material contained. The copyright for this material is solely belongs to the PetroTeach and Its Instructors. Any access to it by the general public does not imply free license to any company/organization to use it for any commercial education and projects unless it is inquired permission from PetroTeach.