5 Operation
_______________________________________________________________
________________________________________________________________
___________________________________________________Operation
______________________________________________________________
BI636364 REV 00 5.3
Operation
This chapter contains important information on the operation and
maintenance of the system, an overview of the electrical, hydraulic, and
mechanical components, how to adjust the system, and instructions on
the replacement of wear parts.
Read this chapter carefully and thoroughly paying particular attention to
the safety instructions in Chapter 2, “Your safety”.
How to operate the conveyor system
DANGER!
Incorrect operation endangers yourself and others! Incorrect op-
eration of the system can be the cause of very serious accidents!
Operate the unit only when you have been sufficiently trained on
the system and have read and understood this operating manual.
Should anything be unclear, please contact your immediate super-
visor.
Who is allowed to operate the conveyor system?
The conveyor system is only allowed to be operated by persons with
adequate knowledge of the complete system.
This also includes:
■ what safety devices are installed on the system,
■ where these safety devices are located, and
■ how these safety devices are to be operated.
When can conveying be started?
Operation must not be started until the safe condition and proper func-
tion of the complete system has been checked and the daily mainte-
nance operations have been carried out.
Operation____________________________________________________
________________________________________________________________
5.4 BC 200 OMM
Controls and indicators
Drive VFD operator’s station
The Drive controls for the system are located on the VFD cabinet. The
Drive operator’s station (Fig. 9) consists of the following controls and
indicators:
Emergency Stop
Power Disconnect
ACS 800 DTC control
Fig. 9: Drive VFD operator’s station
ACS 800 DTC
programmable
controller
Drive E Stop
Power Disconnect
ACS 800 DTC Programmable controller
NOTICE!
Before preforming any maintenance or service on the drive sys-
tem. The power disconnect must be locked out in accordance with
mine, local and regional rules and laws.
The power disconnect is located to the right of the ACS 800 display and
must be activated in order for the system to function.
Belt conveyor start up sequences vary greatly due to mine conditions,
follow mine supplied sequence for safe startup and shut down.
___________________________________________________Operation
______________________________________________________________
BI636364 REV 00 5.5
This programmable controller (fig:10)has an extensive operations man-
ual covering all features, programing and safety protocols please refer
to vendor manual package and locate the “ACS800 –Firmware Manu-
al—ACS800 Standard Control Program 7.x”
The E STOP (Fig. 10) is used to break the control circuit in emergency
situations. Striking the E Stop with a small amount of force will actuate
the E STOP: all Drive system functions are shutdown immediately.
The system fire suppression system for the belt conveyor is provided
by the mine and follows all applicable mine, local and regional safety,
actuation and resetting rules and laws.
WARNING!
The fire suppression actuator is actuated, the system must be
completely reset before initiating a start sequence on the belt con-
veyor system.
IMPORTANT!
PLC Programing for the drive and feeder systems was completed
by mine personnel. There is no further information available on
parameters or operational settings. All questions and concerns
must be directed to the mine foreman.
E Stop
Fig. 10: ACS 800 Programmable controller
fire suppression
Operation____________________________________________________
________________________________________________________________
5.6 BC 200 OMM
Fig. 11: Controls and indicators
Transformer
Profibus DP
RPBA-01
ACS 800
Main Module
Breakers
Operation____________________________________________________
________________________________________________________________
5.7 BC 200 OMM
Winch operator’s station
The Winch operator’s station (Fig. 14) is located near the winch take up
system. The winch operator’s station consists of the following controls
and indicators:
Touch Screen Display
Power Disconnect
ACS 800 Programmable Controller
E Stop
Fig. 12: Winch operator’s station
E STOP
Touch
Screen
Display
Power
Disconnect
ACS 800
Programmable
Controller
___________________________________________________Operation
______________________________________________________________
BI636364 REV 00 5.8
Winch operator’s station (Internal View)
The winch operator’s station consists internal view shows:
Network Switch
120V Receptacle
Communication Modules
Circuit Breakers
ACS 800 Controller
Profibus DP RPBA-01
Transformers
Fig. 13: Winch Operators Station
Communication
Modules
Profibus DP
RPBA-01
120 V
ACS 800
Controller
Circuit
Breakers
Transformers
Network
Switch
___________________________________________________Operation
______________________________________________________________
BI636364 REV 00 5.9
Starting procedure
After reading the previous descriptions and locating each control and
completing the hands on operator training the operator is ready to oper-
ate the conveyor system. An experienced operator should monitor a
new operator’s indoctrination to the starting procedure.
WARNING!
The system should not be started if it’s core temperature is below
30° Fahrenheit. If the system is started at extremely low tempera-
tures pump and pump motor failure could occur.
IMPORTANT!
Before start-up, check that daily maintenance has been performed
on the system.
WARNING!
Before start-up, check the conveyor for any foreign material or
objects and that all other personnel are within a safe distance of
the system.
Shutdown procedure
The best method for of shutting down the conveyor system is as de-
scribed in operator training.
 Allow the system to run until the belt is empty. Continue to run the
system until all material that has been carried back into the return
line has been cleaned out.
IMPORTANT!
If material is very wet or sticky, it is recommended that the return
line be flushed with water and the conveyor be allowed to run and
clean out the return line before shutting the system down.
_____________________________________________Electrical system
______________________________________________________________
BI636364 REV 00 5.10
Electrical system
The following pages contain a brief description of the major electrical
components and assemblies that are on the conveyor system.
The system receives electrical power through a heavy-duty cable. Be
sure that the box connector is correctly identified and is securely con-
nected; also check that the cable entrance is in good mechanical condi-
tion. Walk along the cable from the power center to the conveyor sys-
tem and check the condition of the cable. Give special attention to
points most apt to cause damage, such as corners, intersections, and
where cable may be run over by moving equipment. Never use a cable
with exposed wires or splices which heat up or spark under load.
WARNING!
This section is intended only to familiarize the user with the major
electrical components of the conveyor system. All electrical
maintenance should be performed only by a qualified electrician
with the knowledge of the function of the components involved.
WARNING!
Before removing the cover from the starter enclosure and attempt-
ing any maintenance or troubleshooting on the system, the main
power must be disconnected and locked and tagged out at the
main power center.
Fig. 14: Major electrical component locator
Drive VFD Incoming Power Connection
Take Up VFD Incoming Power Connection
Electrical system _____________________________________________
________________________________________________________________
5.11 BC 200 OMM
Drive panel - front side
The Drive panel (Fig. 15) is accessed by opening the door on the en-
closure. Located on the Drive panel are: ACS 800 controller, relays,
transformers, circuit breakers and the main disconnect.
Fig. 15: Drive panel (front side) and main circuit breaker
Main Disconnect Main Disconnect is the main power control for the drive system. The
control knob on the front of the enclosure panel is used to control the
disconnect when the enclosure door is closed
When looking directly at the main disconnect, when the shaft “T” han-
dle is horizontal the power is ON. When the main disconnect “T” han-
dle is vertical the power is OFF .
10A
Breaker
Control Relays
Profibus communication adaptor
Main fuses
DIN
Terminal
blocks
Heavy Duty
Bus chopperTransformer
Regulated
Power supply
Main
Disconnect
20A
Breaker
_____________________________________________Electrical system
______________________________________________________________
BI636364 REV 00 5.12
Drive panel - front side
The Take up Panel (Fig. 16) is accessed by opening the doors on the
enclosure. Located on the Take Up panel are: ACS 800 controller, re-
lays, transformers, circuit breakers and the main disconnect.
Fig. 16: Take Up panel
(inside view)
Main Disconnect
Main Disconnect is the main power control for the drive system. The
control knob on the front of the enclosure panel is used to control the
disconnect when the enclosure door is closed
When looking directly at the main disconnect, when the shaft “T” han-
dle is horizontal the power is ON. When the main disconnect “T” han-
dle is vertical the power is OFF .
Control Relays
Profibus
communication adaptor
Main fuses
DIN
Terminal
blocks
Heavy Duty
Bus chopper
Transformer
Regulated
Power supply
Main
Disconnect
Breakers
Configurable
Input/ Output
Communication Module
____________________________________________ Hydraulic system
______________________________________________________________
BI636364 REV 00 5.13
Hydraulic system
The following pages contain a brief description of the hydraulic compo-
nents and assemblies that are on the conveyor system.
The Manual hydraulic system for this system has been designed to pro-
vide manual hydraulic power for the Feeder Take up
WARNING!
This section is intended only to familiarize the user with the hy-
draulic components of the conveyor system. All hydraulic mainte-
nance should be performed only by a qualified technician with the
knowledge of the function of the components involved.
WARNING!
Never disconnect a hydraulic hose if the circuit is pressurized or if
there is a load on the circuit. If a hose is disconnected while the
circuit is pressurized or a load is on the circuit, the load will fall
causing damage to the system or serious injury or death to you or
other workers.
Fig. 17: Hydraulic component locator conveyor system
Feeder
Manual
Hydraulic
Take Up
Hydraulic system _____________________________________________
________________________________________________________________
5.14 BC 200 OMM
Major hydraulic components
The hand pump is located on the side of the take up section of the sys-
tem, and is used to manually extend and retract the take up cylinders.
The hydraulic cylinders are located on the feeder take up system.
Each cylinder is individually controlled by the 4 way valve on the hand
pump.
WARNING!
Do not replace the take up hydraulic cylinders with different style
cylinders or the system may fall. The system could be damaged
or you or other personnel could be seriously injured or killed by
the failing system.
Take up hydraulic cylinders
take up hand pump
____________________________________________ Hydraulic system
______________________________________________________________
BI636364 REV 00 5.15
Fig. 18: Hydraulic schematic
Hydraulic
Cylinder
Hydraulic
Cylinder
Cylinder
fittings
Cylinder
fittings
Hydraulic
lines
Pump
fittings
Selector
Valve
Manual
Pump
Mechanical assemblies ________________________________________
________________________________________________________________
5.16 BC 200 OMM
Feeder power unit
The feeder power unit drives Feeder(s) (Fig. 19). It consists of a 55KW
electric motor coupled to a gearbox via fluid coupling. The power unit
has been assembled as a unit and can be removed as a unit or as indi-
vidual components (see Replacement of wear parts section of this
chapter).
Fig. 19: Feeder power unit main components
Motor (125 HP)
Connecting tube
Gearbox
Rigid Coupling
Fluid Coupling
_______________________________________ Mechanical assemblies
______________________________________________________________
BI636364 REV 00 5.17
Motor Cooling Fan
Winch Drum gearbox
Coupling Guard
Flex Coupling
Motor
Drum Guard
Brake
Winch power unit assembly
The Winch power unit (Fig. 20) is assembled so that it can be installed
and removed as separate assemblies.
Fig. 20: Winch power unit assembly
Mechanical assemblies ________________________________________
________________________________________________________________
5.18 BC 200 OMMConveyor chain not shown
Drive power unit
The drive power unit (Fig. 21) drives the belt. It consists of a 150 HP
electric motor coupled to a reducer. The power unit has been assem-
bled as a unit and can be removed as a unit or as individual compo-
nents (see Replacement of wear parts section of this chapter).
Fig. 21: feeder power unit
Motor (125 HP)
Connecting tube
Gearbox
Rigid Coupling
Fluid Coupling
_______________________________________ Mechanical assemblies
______________________________________________________________
BI636364 REV 00 5.19
Take Up Assembly
The Take Up assembly (Fig. 22) attaches to the end of the Feeder sys-
tem frame. It consists of a return belt pulley, pillow block bearing and
take up cylinders. The belt runs around the belt pulley and over the
impact bed.
The take up cylinders are used to tension the belt to correct for misa-
lignment between the belt and the conveyor system.
The take up assembly, when attached to the conveyor system, pro-
vides a means for quickly tensioning the belt.
Fig. 22: Take up assembly
Take up cylinder
Pillow block bearing
Belt pulley
Mechanical assemblies ________________________________________
________________________________________________________________
5.20 BC 200 OMM
Carriage assembly
The carriage assembly (Fig. 23) attaches to the storage unit of the con-
veyor system. It consists of pulley carriage and pulley.
The carriage assembly is used to tension the belt during system
advancement and retreat.
Fig. 23: carriage assembly
Upper belt
spreader cylinder
Pillow Block Bearing
Winch Connection
Carriage Pulley Greasing Manifold
V-Groove Tracking wheel Assembly
Pulley Carriage Frame
________________________________________________ Maintenance
______________________________________________________________
BI636364 REV 00 5.21
Instructions on the maintenance
Maintenance at regular intervals increases the operational safety and
prolongs the service life of the system. In particular, observe the safety
instructions in chapter 2 “Your safety”.
Important notes
Please observe the following:
■ In order to avoid individual components not being serviced or being
only inadequately serviced during maintenance work on the system
as a whole, we recommend that a general maintenance plan be
drawn up. You can, for example, draw up a checklist using this
operation manual and the manuals of the other components.
■ Inadequate maintenance can result in system damage which leads
to considerable costs.
■ Use only suitable and approved tools for maintenance work.
■ Use only original Caterpillar spare parts when replacing
components.
■ All electrical work must be supervised and inspected by a certified
electrician.
■ Anyone performing maintenance on this equipment must be trained
to operate it and be familiar with this Caterpillar guide.
Before maintenance
Please observe the following:
■ Disconnect the electrical power. The circuit breaker must be in the
“OFF” position and the power should be disconnected at the main
power source. Follow all Federal and mine safety regulations for
lockout/tagout procedures.
WARNING!
Before performing maintenance on the system, the circuit breaker
must be in the “OFF” position and the power should be discon-
nected at the main power source. Follow all Federal and mine
safety regulations for lockout/tagout procedures. Electrical shock
and accidental system movement can cause serious injuries or
even death to you or the maintenance person.
■ Test the controls to ensure that the unit will not move.
WARNING!
Do not move any hydraulic control lever unless you are certain
that everyone is completely clear of any system movement. Acci-
dental system movement can cause serious injuries or even death
to you or the maintenance person.
Maintenance _________________________________________________
________________________________________________________________
5.22 BC 200 OMM
■ Do not perform maintenance on a hydraulic cylinder while there is a
load resting on the hydraulic cylinder. Loads must be securely
blocked if maintenance is to be performed with a load on the
hydraulic cylinder. Follow all Federal and mine safety standards for
blocking the load.
WARNING!
Never disconnect a hydraulic hose if the circuit is pressurized or if
there is a load on the circuit. If a hose is disconnected while the
circuit is pressurized or a load is on the circuit, the load may fall,
causing damage to the system or serious injury or death to you or
other workers. Always block or place a mechanical lock on the
load. Follow all Federal and mine safety standards for blocking
the load.
WARNING!
You could be seriously injured or even killed by falling loads. Ob-
serve the safe working load limits of lifting or blocking devices
and keep a safe distance from suspended loads.
■ Do not perform maintenance in a congested area. This could
endanger the maintenance person or others in the vicinity.
■ Whenever a potential problem is uncovered during a periodic
maintenance check, it is imperative that it be corrected immediately
by a qualified maintenance technician.
■ Cleanliness can not be overemphasized as the essential ingredient
of a good maintenance program. System should be kept as free as
possible of dirt and debris which could impede performance or
infiltrate systems and cause premature wear or failure.
Maintenance _________________________________________________
________________________________________________________________
5.23 BC 200 OMM
Lubrication and inspection
Maintenance includes:
■ lubrication of the system in accordance with the lubrication
schedule.
■ inspection of the system for faults and proper function.
■ inspection of wear parts.
Lubrication
IMPORTANT!
The is equipped with lubrication manifolds on the system.
The manifolds (Fig. 24) are located through out the conveyor system.
This allows the following to be easily lubricated from a central point; he
pulley bearings, and idler bearings.
Fig:24 grease manifold
lubrication manifold
Grease Manifold
Maintenance _________________________________________________
________________________________________________________________
5.24 BC 200 OMM
Inspection of the conveyor system
CAUTION!
During inspection, report any damage, missing parts or other
faults to your immediate supervisor.
Prior to each shift the following points should be inspected:
 Clean and remove any foreign material from the operator’s station.
 Inspect all electrical cables, conduits, hydraulic hoses, fittings and
warning devices for signs of wear or damage.
 Visually inspect the condition and readability of all tags, labels and
reflectors.
 Check the “STOP” button (s) for correct operation.
 Check oil level in all reducers.
 Inspect the condition of all electrical and hydraulic components.
 Check for proper conveyor belt tensioning.
 Lubricate per the lubrication schedule.
 Check power input cable to power source insuring that the voltage
and breaker settings are correct.
 Check that all covers are installed and secure.
 Check the tightness of all connecting elements.
________________________________________________ Maintenance
______________________________________________________________
BI636364 REV 00 5.25
Inspection of wear parts on the conveyor
In order to be able to determine in good time when a repair shift has to
be scheduled, and to avoid damage to other components, it is essential
to inspect all the following wear parts as to their degree of wear:
■ the conveyor tail pulley
■ the idler rollers
■ the return rollers
■ the belt wipers
■ the belt cleaners
■ the plugged chute sensor
Inspection of fire suppression system on the conveyor
system
To provide maximum assurance that your fire suppression system will
operate effectively and safely, the system should be inspected weekly,
in accordance with mine safety procedures.

More Related Content

What's hot

Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualjjfjsekksemm
 
Yale (f807) erp030 th lift truck service repair manual
Yale (f807) erp030 th lift truck service repair manualYale (f807) erp030 th lift truck service repair manual
Yale (f807) erp030 th lift truck service repair manualfjksekmdme
 
Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...
Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...
Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...jfjskekdhnejd
 
Yale a814 erp16 20 aaf lift truck service repair manual
Yale a814 erp16 20 aaf lift truck service repair manualYale a814 erp16 20 aaf lift truck service repair manual
Yale a814 erp16 20 aaf lift truck service repair manualhfjsekekmmd
 
Toyota bt spe120 electric stacker truck service repair manual
Toyota bt spe120 electric stacker truck service repair manualToyota bt spe120 electric stacker truck service repair manual
Toyota bt spe120 electric stacker truck service repair manualudjfjkskekmdm
 
Ba scalance x-200-76
Ba scalance x-200-76Ba scalance x-200-76
Ba scalance x-200-76Jairo Ramos
 
Toyota bt lep340 be electric pallet truck service repair manual
Toyota bt lep340 be electric pallet truck service repair manualToyota bt lep340 be electric pallet truck service repair manual
Toyota bt lep340 be electric pallet truck service repair manualudjjjskekdmdm
 
8w97 Power Distribution Maintenance Manual
8w97 Power Distribution Maintenance Manual8w97 Power Distribution Maintenance Manual
8w97 Power Distribution Maintenance ManualRimsky Cheng
 
Bobcat 963 skid steer loader service repair manual sn 562215001 & above
Bobcat 963 skid steer loader service repair manual sn 562215001 & aboveBobcat 963 skid steer loader service repair manual sn 562215001 & above
Bobcat 963 skid steer loader service repair manual sn 562215001 & abovehfjsejdkemmn
 

What's hot (10)

Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manual
 
Yale (f807) erp030 th lift truck service repair manual
Yale (f807) erp030 th lift truck service repair manualYale (f807) erp030 th lift truck service repair manual
Yale (f807) erp030 th lift truck service repair manual
 
Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...
Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...
Bobcat a300 all wheel steer loader service repair manual sn 521111001 & a...
 
Yale a814 erp16 20 aaf lift truck service repair manual
Yale a814 erp16 20 aaf lift truck service repair manualYale a814 erp16 20 aaf lift truck service repair manual
Yale a814 erp16 20 aaf lift truck service repair manual
 
Toyota bt spe120 electric stacker truck service repair manual
Toyota bt spe120 electric stacker truck service repair manualToyota bt spe120 electric stacker truck service repair manual
Toyota bt spe120 electric stacker truck service repair manual
 
Ba scalance x-200-76
Ba scalance x-200-76Ba scalance x-200-76
Ba scalance x-200-76
 
Toyota bt lep340 be electric pallet truck service repair manual
Toyota bt lep340 be electric pallet truck service repair manualToyota bt lep340 be electric pallet truck service repair manual
Toyota bt lep340 be electric pallet truck service repair manual
 
8w97 Power Distribution Maintenance Manual
8w97 Power Distribution Maintenance Manual8w97 Power Distribution Maintenance Manual
8w97 Power Distribution Maintenance Manual
 
Acs550
Acs550Acs550
Acs550
 
Bobcat 963 skid steer loader service repair manual sn 562215001 & above
Bobcat 963 skid steer loader service repair manual sn 562215001 & aboveBobcat 963 skid steer loader service repair manual sn 562215001 & above
Bobcat 963 skid steer loader service repair manual sn 562215001 & above
 

Similar to Operations and Maintaince Manual Sample

Atv61 programming manual_en_v2
Atv61 programming manual_en_v2Atv61 programming manual_en_v2
Atv61 programming manual_en_v2Toàn Huỳnh
 
Atv71 l programming_manual_en_v1
Atv71 l programming_manual_en_v1Atv71 l programming_manual_en_v1
Atv71 l programming_manual_en_v1Tinh Nguyen Huu
 
Logic gate based automatic water level controller
Logic gate based automatic water level controllerLogic gate based automatic water level controller
Logic gate based automatic water level controllereSAT Publishing House
 
IRJET- PLC based Washing Machine
IRJET- PLC based Washing MachineIRJET- PLC based Washing Machine
IRJET- PLC based Washing MachineIRJET Journal
 
Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualfhsjejkdm
 
Yale (f807) erp035 th lift truck service repair manual
Yale (f807) erp035 th lift truck service repair manualYale (f807) erp035 th lift truck service repair manual
Yale (f807) erp035 th lift truck service repair manualfdhjsekdme
 
Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualfjjsjeskkekem
 
Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualfhjsekfksemert
 
Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...
Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...
Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...Mead O'Brien, Inc.
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker OperationIRJET Journal
 
Atv312 programming manual
Atv312 programming manualAtv312 programming manual
Atv312 programming manualToàn Huỳnh
 
IRJET- Design of Diagnosis Device for Electronic Throttle Body
IRJET-  	  Design of Diagnosis Device for Electronic Throttle BodyIRJET-  	  Design of Diagnosis Device for Electronic Throttle Body
IRJET- Design of Diagnosis Device for Electronic Throttle BodyIRJET Journal
 
Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...
Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...
Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...Edward Setec
 

Similar to Operations and Maintaince Manual Sample (20)

Atv61 programming manual_en_v2
Atv61 programming manual_en_v2Atv61 programming manual_en_v2
Atv61 programming manual_en_v2
 
Atv61 programming manual_en_v2
Atv61 programming manual_en_v2Atv61 programming manual_en_v2
Atv61 programming manual_en_v2
 
SR609C Compact Solar Water Heater Controller
SR609C Compact Solar Water Heater ControllerSR609C Compact Solar Water Heater Controller
SR609C Compact Solar Water Heater Controller
 
Sr609 c+ultisolar new energy co ltd solar pump station solar water heater con...
Sr609 c+ultisolar new energy co ltd solar pump station solar water heater con...Sr609 c+ultisolar new energy co ltd solar pump station solar water heater con...
Sr609 c+ultisolar new energy co ltd solar pump station solar water heater con...
 
Atv71 l programming_manual_en_v1
Atv71 l programming_manual_en_v1Atv71 l programming_manual_en_v1
Atv71 l programming_manual_en_v1
 
Uim48701z r2
Uim48701z r2Uim48701z r2
Uim48701z r2
 
Logic gate based automatic water level controller
Logic gate based automatic water level controllerLogic gate based automatic water level controller
Logic gate based automatic water level controller
 
IRJET- PLC based Washing Machine
IRJET- PLC based Washing MachineIRJET- PLC based Washing Machine
IRJET- PLC based Washing Machine
 
Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manual
 
Yale (f807) erp035 th lift truck service repair manual
Yale (f807) erp035 th lift truck service repair manualYale (f807) erp035 th lift truck service repair manual
Yale (f807) erp035 th lift truck service repair manual
 
Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manual
 
Yale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manualYale (f807) erp040 th lift truck service repair manual
Yale (f807) erp040 th lift truck service repair manual
 
Atv71 programming
Atv71 programmingAtv71 programming
Atv71 programming
 
Atv71 programming
Atv71 programmingAtv71 programming
Atv71 programming
 
Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...
Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...
Intrusive vs. Non-Intrusive Electric Actuators: Which option is right for you...
 
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET -  	  Automated Monitoring Test Rig for Circuit Breaker OperationIRJET -  	  Automated Monitoring Test Rig for Circuit Breaker Operation
IRJET - Automated Monitoring Test Rig for Circuit Breaker Operation
 
Atv312 programming manual
Atv312 programming manualAtv312 programming manual
Atv312 programming manual
 
IRJET- Design of Diagnosis Device for Electronic Throttle Body
IRJET-  	  Design of Diagnosis Device for Electronic Throttle BodyIRJET-  	  Design of Diagnosis Device for Electronic Throttle Body
IRJET- Design of Diagnosis Device for Electronic Throttle Body
 
Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...
Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...
Set48 220 1 klc user manual, High frequency DC 48v to AC 220v inverter for Te...
 
FTSB2011-001
FTSB2011-001FTSB2011-001
FTSB2011-001
 

Operations and Maintaince Manual Sample

  • 3. ___________________________________________________Operation ______________________________________________________________ BI636364 REV 00 5.3 Operation This chapter contains important information on the operation and maintenance of the system, an overview of the electrical, hydraulic, and mechanical components, how to adjust the system, and instructions on the replacement of wear parts. Read this chapter carefully and thoroughly paying particular attention to the safety instructions in Chapter 2, “Your safety”. How to operate the conveyor system DANGER! Incorrect operation endangers yourself and others! Incorrect op- eration of the system can be the cause of very serious accidents! Operate the unit only when you have been sufficiently trained on the system and have read and understood this operating manual. Should anything be unclear, please contact your immediate super- visor. Who is allowed to operate the conveyor system? The conveyor system is only allowed to be operated by persons with adequate knowledge of the complete system. This also includes: ■ what safety devices are installed on the system, ■ where these safety devices are located, and ■ how these safety devices are to be operated. When can conveying be started? Operation must not be started until the safe condition and proper func- tion of the complete system has been checked and the daily mainte- nance operations have been carried out.
  • 4. Operation____________________________________________________ ________________________________________________________________ 5.4 BC 200 OMM Controls and indicators Drive VFD operator’s station The Drive controls for the system are located on the VFD cabinet. The Drive operator’s station (Fig. 9) consists of the following controls and indicators: Emergency Stop Power Disconnect ACS 800 DTC control Fig. 9: Drive VFD operator’s station ACS 800 DTC programmable controller Drive E Stop Power Disconnect ACS 800 DTC Programmable controller NOTICE! Before preforming any maintenance or service on the drive sys- tem. The power disconnect must be locked out in accordance with mine, local and regional rules and laws. The power disconnect is located to the right of the ACS 800 display and must be activated in order for the system to function. Belt conveyor start up sequences vary greatly due to mine conditions, follow mine supplied sequence for safe startup and shut down.
  • 5. ___________________________________________________Operation ______________________________________________________________ BI636364 REV 00 5.5 This programmable controller (fig:10)has an extensive operations man- ual covering all features, programing and safety protocols please refer to vendor manual package and locate the “ACS800 –Firmware Manu- al—ACS800 Standard Control Program 7.x” The E STOP (Fig. 10) is used to break the control circuit in emergency situations. Striking the E Stop with a small amount of force will actuate the E STOP: all Drive system functions are shutdown immediately. The system fire suppression system for the belt conveyor is provided by the mine and follows all applicable mine, local and regional safety, actuation and resetting rules and laws. WARNING! The fire suppression actuator is actuated, the system must be completely reset before initiating a start sequence on the belt con- veyor system. IMPORTANT! PLC Programing for the drive and feeder systems was completed by mine personnel. There is no further information available on parameters or operational settings. All questions and concerns must be directed to the mine foreman. E Stop Fig. 10: ACS 800 Programmable controller fire suppression
  • 6. Operation____________________________________________________ ________________________________________________________________ 5.6 BC 200 OMM Fig. 11: Controls and indicators Transformer Profibus DP RPBA-01 ACS 800 Main Module Breakers
  • 7. Operation____________________________________________________ ________________________________________________________________ 5.7 BC 200 OMM Winch operator’s station The Winch operator’s station (Fig. 14) is located near the winch take up system. The winch operator’s station consists of the following controls and indicators: Touch Screen Display Power Disconnect ACS 800 Programmable Controller E Stop Fig. 12: Winch operator’s station E STOP Touch Screen Display Power Disconnect ACS 800 Programmable Controller
  • 8. ___________________________________________________Operation ______________________________________________________________ BI636364 REV 00 5.8 Winch operator’s station (Internal View) The winch operator’s station consists internal view shows: Network Switch 120V Receptacle Communication Modules Circuit Breakers ACS 800 Controller Profibus DP RPBA-01 Transformers Fig. 13: Winch Operators Station Communication Modules Profibus DP RPBA-01 120 V ACS 800 Controller Circuit Breakers Transformers Network Switch
  • 9. ___________________________________________________Operation ______________________________________________________________ BI636364 REV 00 5.9 Starting procedure After reading the previous descriptions and locating each control and completing the hands on operator training the operator is ready to oper- ate the conveyor system. An experienced operator should monitor a new operator’s indoctrination to the starting procedure. WARNING! The system should not be started if it’s core temperature is below 30° Fahrenheit. If the system is started at extremely low tempera- tures pump and pump motor failure could occur. IMPORTANT! Before start-up, check that daily maintenance has been performed on the system. WARNING! Before start-up, check the conveyor for any foreign material or objects and that all other personnel are within a safe distance of the system. Shutdown procedure The best method for of shutting down the conveyor system is as de- scribed in operator training.  Allow the system to run until the belt is empty. Continue to run the system until all material that has been carried back into the return line has been cleaned out. IMPORTANT! If material is very wet or sticky, it is recommended that the return line be flushed with water and the conveyor be allowed to run and clean out the return line before shutting the system down.
  • 10. _____________________________________________Electrical system ______________________________________________________________ BI636364 REV 00 5.10 Electrical system The following pages contain a brief description of the major electrical components and assemblies that are on the conveyor system. The system receives electrical power through a heavy-duty cable. Be sure that the box connector is correctly identified and is securely con- nected; also check that the cable entrance is in good mechanical condi- tion. Walk along the cable from the power center to the conveyor sys- tem and check the condition of the cable. Give special attention to points most apt to cause damage, such as corners, intersections, and where cable may be run over by moving equipment. Never use a cable with exposed wires or splices which heat up or spark under load. WARNING! This section is intended only to familiarize the user with the major electrical components of the conveyor system. All electrical maintenance should be performed only by a qualified electrician with the knowledge of the function of the components involved. WARNING! Before removing the cover from the starter enclosure and attempt- ing any maintenance or troubleshooting on the system, the main power must be disconnected and locked and tagged out at the main power center. Fig. 14: Major electrical component locator Drive VFD Incoming Power Connection Take Up VFD Incoming Power Connection
  • 11. Electrical system _____________________________________________ ________________________________________________________________ 5.11 BC 200 OMM Drive panel - front side The Drive panel (Fig. 15) is accessed by opening the door on the en- closure. Located on the Drive panel are: ACS 800 controller, relays, transformers, circuit breakers and the main disconnect. Fig. 15: Drive panel (front side) and main circuit breaker Main Disconnect Main Disconnect is the main power control for the drive system. The control knob on the front of the enclosure panel is used to control the disconnect when the enclosure door is closed When looking directly at the main disconnect, when the shaft “T” han- dle is horizontal the power is ON. When the main disconnect “T” han- dle is vertical the power is OFF . 10A Breaker Control Relays Profibus communication adaptor Main fuses DIN Terminal blocks Heavy Duty Bus chopperTransformer Regulated Power supply Main Disconnect 20A Breaker
  • 12. _____________________________________________Electrical system ______________________________________________________________ BI636364 REV 00 5.12 Drive panel - front side The Take up Panel (Fig. 16) is accessed by opening the doors on the enclosure. Located on the Take Up panel are: ACS 800 controller, re- lays, transformers, circuit breakers and the main disconnect. Fig. 16: Take Up panel (inside view) Main Disconnect Main Disconnect is the main power control for the drive system. The control knob on the front of the enclosure panel is used to control the disconnect when the enclosure door is closed When looking directly at the main disconnect, when the shaft “T” han- dle is horizontal the power is ON. When the main disconnect “T” han- dle is vertical the power is OFF . Control Relays Profibus communication adaptor Main fuses DIN Terminal blocks Heavy Duty Bus chopper Transformer Regulated Power supply Main Disconnect Breakers Configurable Input/ Output Communication Module
  • 13. ____________________________________________ Hydraulic system ______________________________________________________________ BI636364 REV 00 5.13 Hydraulic system The following pages contain a brief description of the hydraulic compo- nents and assemblies that are on the conveyor system. The Manual hydraulic system for this system has been designed to pro- vide manual hydraulic power for the Feeder Take up WARNING! This section is intended only to familiarize the user with the hy- draulic components of the conveyor system. All hydraulic mainte- nance should be performed only by a qualified technician with the knowledge of the function of the components involved. WARNING! Never disconnect a hydraulic hose if the circuit is pressurized or if there is a load on the circuit. If a hose is disconnected while the circuit is pressurized or a load is on the circuit, the load will fall causing damage to the system or serious injury or death to you or other workers. Fig. 17: Hydraulic component locator conveyor system Feeder Manual Hydraulic Take Up
  • 14. Hydraulic system _____________________________________________ ________________________________________________________________ 5.14 BC 200 OMM Major hydraulic components The hand pump is located on the side of the take up section of the sys- tem, and is used to manually extend and retract the take up cylinders. The hydraulic cylinders are located on the feeder take up system. Each cylinder is individually controlled by the 4 way valve on the hand pump. WARNING! Do not replace the take up hydraulic cylinders with different style cylinders or the system may fall. The system could be damaged or you or other personnel could be seriously injured or killed by the failing system. Take up hydraulic cylinders take up hand pump
  • 15. ____________________________________________ Hydraulic system ______________________________________________________________ BI636364 REV 00 5.15 Fig. 18: Hydraulic schematic Hydraulic Cylinder Hydraulic Cylinder Cylinder fittings Cylinder fittings Hydraulic lines Pump fittings Selector Valve Manual Pump
  • 16. Mechanical assemblies ________________________________________ ________________________________________________________________ 5.16 BC 200 OMM Feeder power unit The feeder power unit drives Feeder(s) (Fig. 19). It consists of a 55KW electric motor coupled to a gearbox via fluid coupling. The power unit has been assembled as a unit and can be removed as a unit or as indi- vidual components (see Replacement of wear parts section of this chapter). Fig. 19: Feeder power unit main components Motor (125 HP) Connecting tube Gearbox Rigid Coupling Fluid Coupling
  • 17. _______________________________________ Mechanical assemblies ______________________________________________________________ BI636364 REV 00 5.17 Motor Cooling Fan Winch Drum gearbox Coupling Guard Flex Coupling Motor Drum Guard Brake Winch power unit assembly The Winch power unit (Fig. 20) is assembled so that it can be installed and removed as separate assemblies. Fig. 20: Winch power unit assembly
  • 18. Mechanical assemblies ________________________________________ ________________________________________________________________ 5.18 BC 200 OMMConveyor chain not shown Drive power unit The drive power unit (Fig. 21) drives the belt. It consists of a 150 HP electric motor coupled to a reducer. The power unit has been assem- bled as a unit and can be removed as a unit or as individual compo- nents (see Replacement of wear parts section of this chapter). Fig. 21: feeder power unit Motor (125 HP) Connecting tube Gearbox Rigid Coupling Fluid Coupling
  • 19. _______________________________________ Mechanical assemblies ______________________________________________________________ BI636364 REV 00 5.19 Take Up Assembly The Take Up assembly (Fig. 22) attaches to the end of the Feeder sys- tem frame. It consists of a return belt pulley, pillow block bearing and take up cylinders. The belt runs around the belt pulley and over the impact bed. The take up cylinders are used to tension the belt to correct for misa- lignment between the belt and the conveyor system. The take up assembly, when attached to the conveyor system, pro- vides a means for quickly tensioning the belt. Fig. 22: Take up assembly Take up cylinder Pillow block bearing Belt pulley
  • 20. Mechanical assemblies ________________________________________ ________________________________________________________________ 5.20 BC 200 OMM Carriage assembly The carriage assembly (Fig. 23) attaches to the storage unit of the con- veyor system. It consists of pulley carriage and pulley. The carriage assembly is used to tension the belt during system advancement and retreat. Fig. 23: carriage assembly Upper belt spreader cylinder Pillow Block Bearing Winch Connection Carriage Pulley Greasing Manifold V-Groove Tracking wheel Assembly Pulley Carriage Frame
  • 21. ________________________________________________ Maintenance ______________________________________________________________ BI636364 REV 00 5.21 Instructions on the maintenance Maintenance at regular intervals increases the operational safety and prolongs the service life of the system. In particular, observe the safety instructions in chapter 2 “Your safety”. Important notes Please observe the following: ■ In order to avoid individual components not being serviced or being only inadequately serviced during maintenance work on the system as a whole, we recommend that a general maintenance plan be drawn up. You can, for example, draw up a checklist using this operation manual and the manuals of the other components. ■ Inadequate maintenance can result in system damage which leads to considerable costs. ■ Use only suitable and approved tools for maintenance work. ■ Use only original Caterpillar spare parts when replacing components. ■ All electrical work must be supervised and inspected by a certified electrician. ■ Anyone performing maintenance on this equipment must be trained to operate it and be familiar with this Caterpillar guide. Before maintenance Please observe the following: ■ Disconnect the electrical power. The circuit breaker must be in the “OFF” position and the power should be disconnected at the main power source. Follow all Federal and mine safety regulations for lockout/tagout procedures. WARNING! Before performing maintenance on the system, the circuit breaker must be in the “OFF” position and the power should be discon- nected at the main power source. Follow all Federal and mine safety regulations for lockout/tagout procedures. Electrical shock and accidental system movement can cause serious injuries or even death to you or the maintenance person. ■ Test the controls to ensure that the unit will not move. WARNING! Do not move any hydraulic control lever unless you are certain that everyone is completely clear of any system movement. Acci- dental system movement can cause serious injuries or even death to you or the maintenance person.
  • 22. Maintenance _________________________________________________ ________________________________________________________________ 5.22 BC 200 OMM ■ Do not perform maintenance on a hydraulic cylinder while there is a load resting on the hydraulic cylinder. Loads must be securely blocked if maintenance is to be performed with a load on the hydraulic cylinder. Follow all Federal and mine safety standards for blocking the load. WARNING! Never disconnect a hydraulic hose if the circuit is pressurized or if there is a load on the circuit. If a hose is disconnected while the circuit is pressurized or a load is on the circuit, the load may fall, causing damage to the system or serious injury or death to you or other workers. Always block or place a mechanical lock on the load. Follow all Federal and mine safety standards for blocking the load. WARNING! You could be seriously injured or even killed by falling loads. Ob- serve the safe working load limits of lifting or blocking devices and keep a safe distance from suspended loads. ■ Do not perform maintenance in a congested area. This could endanger the maintenance person or others in the vicinity. ■ Whenever a potential problem is uncovered during a periodic maintenance check, it is imperative that it be corrected immediately by a qualified maintenance technician. ■ Cleanliness can not be overemphasized as the essential ingredient of a good maintenance program. System should be kept as free as possible of dirt and debris which could impede performance or infiltrate systems and cause premature wear or failure.
  • 23. Maintenance _________________________________________________ ________________________________________________________________ 5.23 BC 200 OMM Lubrication and inspection Maintenance includes: ■ lubrication of the system in accordance with the lubrication schedule. ■ inspection of the system for faults and proper function. ■ inspection of wear parts. Lubrication IMPORTANT! The is equipped with lubrication manifolds on the system. The manifolds (Fig. 24) are located through out the conveyor system. This allows the following to be easily lubricated from a central point; he pulley bearings, and idler bearings. Fig:24 grease manifold lubrication manifold Grease Manifold
  • 24. Maintenance _________________________________________________ ________________________________________________________________ 5.24 BC 200 OMM Inspection of the conveyor system CAUTION! During inspection, report any damage, missing parts or other faults to your immediate supervisor. Prior to each shift the following points should be inspected:  Clean and remove any foreign material from the operator’s station.  Inspect all electrical cables, conduits, hydraulic hoses, fittings and warning devices for signs of wear or damage.  Visually inspect the condition and readability of all tags, labels and reflectors.  Check the “STOP” button (s) for correct operation.  Check oil level in all reducers.  Inspect the condition of all electrical and hydraulic components.  Check for proper conveyor belt tensioning.  Lubricate per the lubrication schedule.  Check power input cable to power source insuring that the voltage and breaker settings are correct.  Check that all covers are installed and secure.  Check the tightness of all connecting elements.
  • 25. ________________________________________________ Maintenance ______________________________________________________________ BI636364 REV 00 5.25 Inspection of wear parts on the conveyor In order to be able to determine in good time when a repair shift has to be scheduled, and to avoid damage to other components, it is essential to inspect all the following wear parts as to their degree of wear: ■ the conveyor tail pulley ■ the idler rollers ■ the return rollers ■ the belt wipers ■ the belt cleaners ■ the plugged chute sensor Inspection of fire suppression system on the conveyor system To provide maximum assurance that your fire suppression system will operate effectively and safely, the system should be inspected weekly, in accordance with mine safety procedures.