ARS
Access Rail System
• The Access Rail System ________________________________________ 1
• Types of Rail ________________________________________________ 2
• System Benefits _____________________________________________ 4
• Installation __________________________________________________ 5
• ARS VS. BMU _______________________________________________ 9
• Certification and Warranty ______________________________________ 12
• Case Studies ________________________________________________15
Index
• Designed for use as an adjustable anchorage point for
Suspension /rope access for External /internal
maintenance on buildings + Fall Arrest
• Aesthetic, un-obtrusive solution for access and
maintenance
• Provides total flexibility and freedom of movement at
height
• Engineered to work in extreme environmental
conditions.
• Certified under EN795.2012 + CEN/TS 16415 for
single and multiple users
• Requires minimal maintenance
1
The Access Rail System
R27 Access Rail
27 mm size (Width)
Breaking Load 22 KN
Human Suspension & Fall Arrest
R27 - Single Rail, 1 Double Car 1 person (max 136kg)
R27 Single Rail, 2 Double Cars 2 people, one (max
136kg) per double car
Material Lifting
R27 - Single car - In accordance with LOLER (FOS 4:1)
Capable of lifting 500kg of materials
2
Module : R27
Types Of Access Rail
R32 Access Rail
32 mm size (Width)
Breaking Load 40 KN
Human Suspension & Fall Arrest
R32 - Single Rail, 2 Double Cars 2 people, one (max
136kg) per double car
R32 system is rated to maximum load of 300kg to
enable a 3 person rescue situation
Material Lifting
R32 - Single car - In accordance with LOLER (FOS 4:1)
Capable of lifting 750kg of materials
3
Module : R32
Types Of Access Rail
• Elegant and flexible system
• Can be installed on any Building /Structure/Towers
• Provides freedom of movement at height
• Lightweight
• Safe
• Has no visual impact on Buildings
4
System Benefits
A B
5
Installation
Used as Suspension/Rope Access for Facade maintenance Installed on wooden ceiling for Human/Load suspension
DC
6
Installation
Installed on Curtain Walls Installed on Aluminum Curtain Wall Profile
FE
7
Installation
Industrial : Iron Griders, Cranes Installed on Tile Effect Panels
G H
8
Installation
Tile Effect Panels Installed Sandwich Panels
BMU/Cradle Access Rail
Operational Cost Operational Cost
High cost of yearly maintenance.
High cost of Spare Parts.
3rd party inspection required on quarterly basis.
Minimal maintenance required.
No spare Parts required.
Pull test required once on yearly basis.
Appearance Appearance
The heavy metal and equipment can cause disturbance
and alter the view especially in projects like hotels,
hospitals, VIP residents.…
Cradle storage at sidewalks when not in use.
Low profile
No appearance on building
Does not affect aesthetics and external view
No storage required at all.
9
ARS vs. BMU
BMU/Cradle Access Rail
Time Factor /Efficiency Time Factor /Efficiency
Slow process of cleaning/maintenance.
BMU or Cradle can only accommodate 2 technicians
at a time with a maximum range of 3 meters in one
drop.
Can work with wind speed up to 18km/h
3 technicians required for a single drop.
High risk of mechanical breakdown
Decreases cleaning/maintenance time up to 80% of
the BMU time.
The ARS can accommodate as many technicians as
required around the structure with no range limit.
Can work with wind speed up to 25km/h
1 technician required for the same drop.
No mechanical breakdown.
10
ARS vs. BMU
BMU/Cradle Access Rail
Environmental Environmental
Requires electricity
High Carbon footprint
Does not require electricity.
Low carbon footprint
Lifting Lifting
Limited to weight and dimensions
Can not reach all areas.
Can be adapted for various weights and sizes
Can lift materials up to 750kg/car, This figure
can go up depending on number of cars used.
Very flexible and can reach all difficult areas.
11
ARS vs. BMU
• CE certified and tested under EN795.2012 Type B/D
• EN795:2012 Ensures consistent performance of anchor devices across Europe
• The Access Rail system is Certified by a Notified Body *, and exceeds the requirements of
EN795:2012 and CEN/TS 16415
• CEN TS 16415 deals with multi-users anchor devices and stated that Multi-user devices must
now be tested to simulate a minimum of 2 users falling simultaneously.
12
Certification
• TERM
• 10 years component anti-corrosion warranty
• 3 years installation Warranty
• COVERAGE
• Manufacture warrants that each ARS product, when properly used and maintained, will be
free from defects in material and workmanship from the date of receipt
• NOT COVERED
• Damages or expenses relating to defects caused by misuse, abuse, failure to install, use,
maintain or store the ARS product as specified in manual.
13
Rail Warranty
• Created under Health and Safety at Work etc Act 1974
• Introduced to bring UK in line with European Directives , in particular AUWED (Amended Use of Work equipment
Directive 1995)
• Came into force 1998
• Purpose being to reduce the risk of injury from lifting equipment used at work
• Areas covered include:-
 Requirement for lifting equipment to be strong and stable enough for safe use
 To be marked to indicate safe working loads
 Ensuring any equipment is positioned and installed so as to minimise risks;
 Equipment is used safely ensuring that work is planned, organised and performed by a competent person
 And equipment is subject to ongoing thorough examination and where appropriate by competent people.
14
LOLER(Lifting Operations and Lifting Equipment Regulations
- Dubai Mall Metro Link Bridge
• Task - Solution to enable the customer to access the metro link on a regular basis.
• Solution - R27 track with double attachment point,
• Benefits to customer
• Able to maintain all external glass without the need to build temporary structures
over the tanks
15
Case Study # 1
- Access Rail system installed in atrium of large commercial multinational building
• Market : Working at height.
• Company : Omicron industry Austria
• Task - Ability to carry out cleaning and maintenance work; whilst being able
to navigate around obstacles.
• Solution - Fix Access Rail directly to wooden beams on the atrium, with long
screw fixings every 30 cm.
• Benefits to customer
• Aesthetic, un-obtrusive solution for access and maintenance
• No requirement for building maintenance units.
• Not affect functionality or appearance of building
16
Case Study # 2
- Access Rail used for maintenance/glass cleaning on La Rinascente building
• Market: Architecture.
• Location: Milan, Italy.
• Company: La Rinascente, a luxury shopping center in the heart of Milan.
• Task - Method for maintenance/glass-cleaning on the La Rinascente building
• Solution - A special blue/grey rail was fixed every 10 cm with screws directly into
the aluminium profile.
• Benefits to customer
• Practically invisible solution, providing the aesthetically pleasing look the customer
required
• Safety solution for all operators
• 100mm fastenings would distribute the load, preserving the aluminum
structure and keeping operators safe in the case of a fall
17
Case Study # 3
- Overhead Crane
Task - JS Fraser required an internal access system in order to meet
working at height requirements on the advice of their internal health &
safety advisor
Solution - track was fitted to the underside of the crane girder with M8
fixings at 100mm intervals. A MR Car acts as a mobile anchor point,
either fixed in place with the pinstop toggle, or moved under load to the
working location.
Benefits to customer
Operators are able to work at height safely
Working practices comply with their internal health and safety advise
18
Case Study # 4
- Facility Management and Maintenance
• Task - The design of the building precluded the use of traditional BMU’s (cradles for upkeep &
cleaning) Acescott Canada Waters
• Solution - A portable davit system was designed to be used in conjunction with the
PowerSeat to fulfil the clients maintenance needs.
• Benefits to customer
• Cost savings gained of approx £100k per building.
19
Case Study # 5
For more info contact us at :
• T + 971 4 425 6060
• F + 971 4 457 9158
Location :
Al Quoz Industrial No 4
Commercial Warehouse #6
P.O. Box: 487109, Dubai, UAE
www.vertico-x.com
22

More Related Content

What's hot

Hydraulic Dock Levelers
Hydraulic Dock LevelersHydraulic Dock Levelers
Hydraulic Dock LevelersNikhil Tyagi
 
Irish Constuction Industry Magazine_Sept_2008_Cost Model_Lifts
Irish Constuction Industry Magazine_Sept_2008_Cost Model_LiftsIrish Constuction Industry Magazine_Sept_2008_Cost Model_Lifts
Irish Constuction Industry Magazine_Sept_2008_Cost Model_LiftsDavid Hughes
 
(Revised) Safety and Enviromental Impact Reduction Through Equipment Design
(Revised) Safety and Enviromental Impact Reduction Through Equipment Design(Revised) Safety and Enviromental Impact Reduction Through Equipment Design
(Revised) Safety and Enviromental Impact Reduction Through Equipment DesignSteve Lehmer - EMS
 
BEST workshop Industrial Visit Report
BEST workshop Industrial Visit ReportBEST workshop Industrial Visit Report
BEST workshop Industrial Visit ReportArshad Habib Khan
 
Internship report [AW]
Internship report [AW]Internship report [AW]
Internship report [AW]Aaditya Wahi
 
VINAYAK ENGINEERING CORPORATION
VINAYAK ENGINEERING CORPORATIONVINAYAK ENGINEERING CORPORATION
VINAYAK ENGINEERING CORPORATIONNinadWebTech
 
Altra: Manufacturing Market Applications & Innovations
Altra: Manufacturing Market Applications & InnovationsAltra: Manufacturing Market Applications & Innovations
Altra: Manufacturing Market Applications & InnovationsAltra Industrial Motion
 
Lift: Common faults found during inspections
Lift: Common faults found during inspectionsLift: Common faults found during inspections
Lift: Common faults found during inspectionsGhazali Embi
 
Maintenance facilities for surface mine operations
Maintenance facilities for surface mine operationsMaintenance facilities for surface mine operations
Maintenance facilities for surface mine operationsCharles Jojo Besitan
 
Bomag bw 177 d 4 single drum rollers service repair manual
Bomag bw 177 d 4 single drum rollers service repair manualBomag bw 177 d 4 single drum rollers service repair manual
Bomag bw 177 d 4 single drum rollers service repair manualfjsqazkekdmme
 
Car Park Barrier
Car Park BarrierCar Park Barrier
Car Park Barrierproektasis
 

What's hot (14)

Hydraulic Dock Levelers
Hydraulic Dock LevelersHydraulic Dock Levelers
Hydraulic Dock Levelers
 
Irish Constuction Industry Magazine_Sept_2008_Cost Model_Lifts
Irish Constuction Industry Magazine_Sept_2008_Cost Model_LiftsIrish Constuction Industry Magazine_Sept_2008_Cost Model_Lifts
Irish Constuction Industry Magazine_Sept_2008_Cost Model_Lifts
 
(Revised) Safety and Enviromental Impact Reduction Through Equipment Design
(Revised) Safety and Enviromental Impact Reduction Through Equipment Design(Revised) Safety and Enviromental Impact Reduction Through Equipment Design
(Revised) Safety and Enviromental Impact Reduction Through Equipment Design
 
BEST workshop Industrial Visit Report
BEST workshop Industrial Visit ReportBEST workshop Industrial Visit Report
BEST workshop Industrial Visit Report
 
Weigbridge Manufacturers
Weigbridge ManufacturersWeigbridge Manufacturers
Weigbridge Manufacturers
 
Internship report [AW]
Internship report [AW]Internship report [AW]
Internship report [AW]
 
VINAYAK ENGINEERING CORPORATION
VINAYAK ENGINEERING CORPORATIONVINAYAK ENGINEERING CORPORATION
VINAYAK ENGINEERING CORPORATION
 
Altra: Manufacturing Market Applications & Innovations
Altra: Manufacturing Market Applications & InnovationsAltra: Manufacturing Market Applications & Innovations
Altra: Manufacturing Market Applications & Innovations
 
Lift: Common faults found during inspections
Lift: Common faults found during inspectionsLift: Common faults found during inspections
Lift: Common faults found during inspections
 
Maintenance facilities for surface mine operations
Maintenance facilities for surface mine operationsMaintenance facilities for surface mine operations
Maintenance facilities for surface mine operations
 
Resume1
Resume1Resume1
Resume1
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Bomag bw 177 d 4 single drum rollers service repair manual
Bomag bw 177 d 4 single drum rollers service repair manualBomag bw 177 d 4 single drum rollers service repair manual
Bomag bw 177 d 4 single drum rollers service repair manual
 
Car Park Barrier
Car Park BarrierCar Park Barrier
Car Park Barrier
 

Viewers also liked (15)

Nbmar10
Nbmar10Nbmar10
Nbmar10
 
QUT_Hockey_14_Results Database
QUT_Hockey_14_Results DatabaseQUT_Hockey_14_Results Database
QUT_Hockey_14_Results Database
 
E commerce Introduction
E commerce IntroductionE commerce Introduction
E commerce Introduction
 
Web design company sydney
Web design company sydneyWeb design company sydney
Web design company sydney
 
Certification
CertificationCertification
Certification
 
Actividad de aprendisaje 20_JAPS
Actividad de aprendisaje 20_JAPSActividad de aprendisaje 20_JAPS
Actividad de aprendisaje 20_JAPS
 
Main points -Patrick Moynihan, The Negro Family (1965)
Main points -Patrick Moynihan, The Negro Family (1965) Main points -Patrick Moynihan, The Negro Family (1965)
Main points -Patrick Moynihan, The Negro Family (1965)
 
Apresentação Institucional
Apresentação InstitucionalApresentação Institucional
Apresentação Institucional
 
Delitos informaticos
Delitos informaticosDelitos informaticos
Delitos informaticos
 
Laura Deleruyelle: Insulin and Sugar
Laura Deleruyelle: Insulin and SugarLaura Deleruyelle: Insulin and Sugar
Laura Deleruyelle: Insulin and Sugar
 
Проверь свое здоровье
Проверь свое здоровьеПроверь свое здоровье
Проверь свое здоровье
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
La Dictadura de Primo de Rivera y la caída de la Monarquía
La Dictadura de Primo de Rivera y la caída de la MonarquíaLa Dictadura de Primo de Rivera y la caída de la Monarquía
La Dictadura de Primo de Rivera y la caída de la Monarquía
 
Prioritizing for Profit from AgilePalooza
Prioritizing for Profit from AgilePaloozaPrioritizing for Profit from AgilePalooza
Prioritizing for Profit from AgilePalooza
 

Similar to VX - ARS

Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr TRABALHO VERTICAL
 
Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...Ivan Shalaevskiy
 
Energizing a sustainable rail industry
Energizing a sustainable rail industryEnergizing a sustainable rail industry
Energizing a sustainable rail industryEaton Electrical
 
140428 SIBS Presentation
140428 SIBS Presentation140428 SIBS Presentation
140428 SIBS PresentationMike Fallows
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction BrochureRICHARD GORDON
 
Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...NSW Environment and Planning
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATIONSilvia Iovu
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringFred Strijbos
 
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...IRJET Journal
 
Construction using Precast technology
Construction using Precast technologyConstruction using Precast technology
Construction using Precast technologyShubham Arora
 
Magaziner VNA Truck
Magaziner VNA TruckMagaziner VNA Truck
Magaziner VNA Truckpishondavid
 
Vice Cum Bender Machine
Vice Cum Bender MachineVice Cum Bender Machine
Vice Cum Bender MachineIRJET Journal
 
Shandwood Brochure
Shandwood  BrochureShandwood  Brochure
Shandwood BrochureRoy Catto
 
DesignProjectPPT_optimized.pptx
DesignProjectPPT_optimized.pptxDesignProjectPPT_optimized.pptx
DesignProjectPPT_optimized.pptxPeriShrihar
 
Intelligent engineering to maximize productivity and reduce maintenance
Intelligent engineering to maximize productivity and reduce maintenanceIntelligent engineering to maximize productivity and reduce maintenance
Intelligent engineering to maximize productivity and reduce maintenanceX-tec Ag
 
PVH_CorpPresentation_Nov_v1
PVH_CorpPresentation_Nov_v1PVH_CorpPresentation_Nov_v1
PVH_CorpPresentation_Nov_v1Gregory Lukens
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvikCem Sayar
 
JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)Vin Lee
 
IRJET- Design and Analysis of Scissor Lifiting Mechanism
IRJET-  	  Design and Analysis of Scissor Lifiting MechanismIRJET-  	  Design and Analysis of Scissor Lifiting Mechanism
IRJET- Design and Analysis of Scissor Lifiting MechanismIRJET Journal
 

Similar to VX - ARS (20)

Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr
 
Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...Manufacturing process organization of attached implements and towed vehicles ...
Manufacturing process organization of attached implements and towed vehicles ...
 
Energizing a sustainable rail industry
Energizing a sustainable rail industryEnergizing a sustainable rail industry
Energizing a sustainable rail industry
 
140428 SIBS Presentation
140428 SIBS Presentation140428 SIBS Presentation
140428 SIBS Presentation
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
 
Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATION
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_Engineering
 
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
 
Construction using Precast technology
Construction using Precast technologyConstruction using Precast technology
Construction using Precast technology
 
Magaziner VNA Truck
Magaziner VNA TruckMagaziner VNA Truck
Magaziner VNA Truck
 
Vice Cum Bender Machine
Vice Cum Bender MachineVice Cum Bender Machine
Vice Cum Bender Machine
 
Shandwood Brochure
Shandwood  BrochureShandwood  Brochure
Shandwood Brochure
 
DesignProjectPPT_optimized.pptx
DesignProjectPPT_optimized.pptxDesignProjectPPT_optimized.pptx
DesignProjectPPT_optimized.pptx
 
Portfolio_03
Portfolio_03Portfolio_03
Portfolio_03
 
Intelligent engineering to maximize productivity and reduce maintenance
Intelligent engineering to maximize productivity and reduce maintenanceIntelligent engineering to maximize productivity and reduce maintenance
Intelligent engineering to maximize productivity and reduce maintenance
 
PVH_CorpPresentation_Nov_v1
PVH_CorpPresentation_Nov_v1PVH_CorpPresentation_Nov_v1
PVH_CorpPresentation_Nov_v1
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvik
 
JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)
 
IRJET- Design and Analysis of Scissor Lifiting Mechanism
IRJET-  	  Design and Analysis of Scissor Lifiting MechanismIRJET-  	  Design and Analysis of Scissor Lifiting Mechanism
IRJET- Design and Analysis of Scissor Lifiting Mechanism
 

VX - ARS

  • 2. • The Access Rail System ________________________________________ 1 • Types of Rail ________________________________________________ 2 • System Benefits _____________________________________________ 4 • Installation __________________________________________________ 5 • ARS VS. BMU _______________________________________________ 9 • Certification and Warranty ______________________________________ 12 • Case Studies ________________________________________________15 Index
  • 3. • Designed for use as an adjustable anchorage point for Suspension /rope access for External /internal maintenance on buildings + Fall Arrest • Aesthetic, un-obtrusive solution for access and maintenance • Provides total flexibility and freedom of movement at height • Engineered to work in extreme environmental conditions. • Certified under EN795.2012 + CEN/TS 16415 for single and multiple users • Requires minimal maintenance 1 The Access Rail System
  • 4. R27 Access Rail 27 mm size (Width) Breaking Load 22 KN Human Suspension & Fall Arrest R27 - Single Rail, 1 Double Car 1 person (max 136kg) R27 Single Rail, 2 Double Cars 2 people, one (max 136kg) per double car Material Lifting R27 - Single car - In accordance with LOLER (FOS 4:1) Capable of lifting 500kg of materials 2 Module : R27 Types Of Access Rail
  • 5. R32 Access Rail 32 mm size (Width) Breaking Load 40 KN Human Suspension & Fall Arrest R32 - Single Rail, 2 Double Cars 2 people, one (max 136kg) per double car R32 system is rated to maximum load of 300kg to enable a 3 person rescue situation Material Lifting R32 - Single car - In accordance with LOLER (FOS 4:1) Capable of lifting 750kg of materials 3 Module : R32 Types Of Access Rail
  • 6. • Elegant and flexible system • Can be installed on any Building /Structure/Towers • Provides freedom of movement at height • Lightweight • Safe • Has no visual impact on Buildings 4 System Benefits
  • 7. A B 5 Installation Used as Suspension/Rope Access for Facade maintenance Installed on wooden ceiling for Human/Load suspension
  • 8. DC 6 Installation Installed on Curtain Walls Installed on Aluminum Curtain Wall Profile
  • 9. FE 7 Installation Industrial : Iron Griders, Cranes Installed on Tile Effect Panels
  • 10. G H 8 Installation Tile Effect Panels Installed Sandwich Panels
  • 11. BMU/Cradle Access Rail Operational Cost Operational Cost High cost of yearly maintenance. High cost of Spare Parts. 3rd party inspection required on quarterly basis. Minimal maintenance required. No spare Parts required. Pull test required once on yearly basis. Appearance Appearance The heavy metal and equipment can cause disturbance and alter the view especially in projects like hotels, hospitals, VIP residents.… Cradle storage at sidewalks when not in use. Low profile No appearance on building Does not affect aesthetics and external view No storage required at all. 9 ARS vs. BMU
  • 12. BMU/Cradle Access Rail Time Factor /Efficiency Time Factor /Efficiency Slow process of cleaning/maintenance. BMU or Cradle can only accommodate 2 technicians at a time with a maximum range of 3 meters in one drop. Can work with wind speed up to 18km/h 3 technicians required for a single drop. High risk of mechanical breakdown Decreases cleaning/maintenance time up to 80% of the BMU time. The ARS can accommodate as many technicians as required around the structure with no range limit. Can work with wind speed up to 25km/h 1 technician required for the same drop. No mechanical breakdown. 10 ARS vs. BMU
  • 13. BMU/Cradle Access Rail Environmental Environmental Requires electricity High Carbon footprint Does not require electricity. Low carbon footprint Lifting Lifting Limited to weight and dimensions Can not reach all areas. Can be adapted for various weights and sizes Can lift materials up to 750kg/car, This figure can go up depending on number of cars used. Very flexible and can reach all difficult areas. 11 ARS vs. BMU
  • 14. • CE certified and tested under EN795.2012 Type B/D • EN795:2012 Ensures consistent performance of anchor devices across Europe • The Access Rail system is Certified by a Notified Body *, and exceeds the requirements of EN795:2012 and CEN/TS 16415 • CEN TS 16415 deals with multi-users anchor devices and stated that Multi-user devices must now be tested to simulate a minimum of 2 users falling simultaneously. 12 Certification
  • 15. • TERM • 10 years component anti-corrosion warranty • 3 years installation Warranty • COVERAGE • Manufacture warrants that each ARS product, when properly used and maintained, will be free from defects in material and workmanship from the date of receipt • NOT COVERED • Damages or expenses relating to defects caused by misuse, abuse, failure to install, use, maintain or store the ARS product as specified in manual. 13 Rail Warranty
  • 16. • Created under Health and Safety at Work etc Act 1974 • Introduced to bring UK in line with European Directives , in particular AUWED (Amended Use of Work equipment Directive 1995) • Came into force 1998 • Purpose being to reduce the risk of injury from lifting equipment used at work • Areas covered include:-  Requirement for lifting equipment to be strong and stable enough for safe use  To be marked to indicate safe working loads  Ensuring any equipment is positioned and installed so as to minimise risks;  Equipment is used safely ensuring that work is planned, organised and performed by a competent person  And equipment is subject to ongoing thorough examination and where appropriate by competent people. 14 LOLER(Lifting Operations and Lifting Equipment Regulations
  • 17. - Dubai Mall Metro Link Bridge • Task - Solution to enable the customer to access the metro link on a regular basis. • Solution - R27 track with double attachment point, • Benefits to customer • Able to maintain all external glass without the need to build temporary structures over the tanks 15 Case Study # 1
  • 18. - Access Rail system installed in atrium of large commercial multinational building • Market : Working at height. • Company : Omicron industry Austria • Task - Ability to carry out cleaning and maintenance work; whilst being able to navigate around obstacles. • Solution - Fix Access Rail directly to wooden beams on the atrium, with long screw fixings every 30 cm. • Benefits to customer • Aesthetic, un-obtrusive solution for access and maintenance • No requirement for building maintenance units. • Not affect functionality or appearance of building 16 Case Study # 2
  • 19. - Access Rail used for maintenance/glass cleaning on La Rinascente building • Market: Architecture. • Location: Milan, Italy. • Company: La Rinascente, a luxury shopping center in the heart of Milan. • Task - Method for maintenance/glass-cleaning on the La Rinascente building • Solution - A special blue/grey rail was fixed every 10 cm with screws directly into the aluminium profile. • Benefits to customer • Practically invisible solution, providing the aesthetically pleasing look the customer required • Safety solution for all operators • 100mm fastenings would distribute the load, preserving the aluminum structure and keeping operators safe in the case of a fall 17 Case Study # 3
  • 20. - Overhead Crane Task - JS Fraser required an internal access system in order to meet working at height requirements on the advice of their internal health & safety advisor Solution - track was fitted to the underside of the crane girder with M8 fixings at 100mm intervals. A MR Car acts as a mobile anchor point, either fixed in place with the pinstop toggle, or moved under load to the working location. Benefits to customer Operators are able to work at height safely Working practices comply with their internal health and safety advise 18 Case Study # 4
  • 21. - Facility Management and Maintenance • Task - The design of the building precluded the use of traditional BMU’s (cradles for upkeep & cleaning) Acescott Canada Waters • Solution - A portable davit system was designed to be used in conjunction with the PowerSeat to fulfil the clients maintenance needs. • Benefits to customer • Cost savings gained of approx £100k per building. 19 Case Study # 5
  • 22. For more info contact us at : • T + 971 4 425 6060 • F + 971 4 457 9158 Location : Al Quoz Industrial No 4 Commercial Warehouse #6 P.O. Box: 487109, Dubai, UAE www.vertico-x.com 22