Parag Kapile fx7378
MRP DSS PROJECT
In this project I am playing the role of a production planner of the "GREEK MANUFACTURING
COMPANY" and developing a decision support system. I am managing two products Alpha
and Beta for which orders are placed by me in variable quantity throughout the week. These
Alpha and Beta are made up of comma, Delta, Epsilon, Fi and gamma. Some of these products
are produced within company and some are being purchased from outside. In carrying out
production the parts are routed through passing machines kappa, Mu, phi, rho and sigma
within the company, where processing time is spent.
The production planning is done on weekly basis. At the beginning of the week, inventories
are checked and orders are released both within company and to the vendors. Through last
week processing of the orders takes places. As customers’ orders arrive, they filled from
inventory on hand. Orders are may be filled partially if there is in sufficient on hand inventory
for the whole order. Unfilled orders are placed on file and filled when the product is available
they will be repeated week after week which will be simulated with help of Excel sheet.
1) Highest profit made while playing in the ad-hoc manner at the end of week 32 is: -
$732238.75
2) Playing game on re-order point basis, the main idea of reorder point is to set minimum
level of inventory. Now will choose our own order sizes. We will try different ROP and order
sizes.
Item Re-order point Order Size
Alpha 300 2000
Beta 350 2500
Comma 400 2000
Delta 150 600
Epsilon 400 700
Fi 400 800
Gamma 350 750
The maximum profit achieved by using re-order point is this $52739.25
Parag Kapile fx7378
3) We play the game by using DSS. To play game we need to do forecasting of both Alpha
and Beta
We used forecast formula Y= mX+c to calculate forecast up to 32 week. Now we will fill
forecasted values into MPS schedule of MRP worksheets by using VLOOKUP function from
excel used forecast data into MPS Table. Linked all inventory and other values from main
menu to MPS table. Then we did MRP explosion by using lot to lot policy and with lead time
of one week.
The Maximum Profit achieved by using DSS is $ 954420.75 of 32 week.
Parag Kapile fx7378

More Related Content

Viewers also liked

GSS capabilities
GSS capabilitiesGSS capabilities
GSS capabilities
Lisa A. F
 
KyleBates - Letter of Recommendation
KyleBates - Letter of RecommendationKyleBates - Letter of Recommendation
KyleBates - Letter of Recommendation
Kyle Bates
 
Vivir plenamente
Vivir plenamenteVivir plenamente
Vivir plenamente
Alain Ruiz
 
Les capteurs de l'Internet des Objets, par Jean-Samuel Chenard
Les capteurs de l'Internet des Objets, par Jean-Samuel ChenardLes capteurs de l'Internet des Objets, par Jean-Samuel Chenard
Les capteurs de l'Internet des Objets, par Jean-Samuel Chenard
CleverToday
 
Apostila processamento de cereais
Apostila processamento de cereaisApostila processamento de cereais
Apostila processamento de cereais
Eli Lima
 

Viewers also liked (13)

GSS capabilities
GSS capabilitiesGSS capabilities
GSS capabilities
 
KyleBates - Letter of Recommendation
KyleBates - Letter of RecommendationKyleBates - Letter of Recommendation
KyleBates - Letter of Recommendation
 
Future Earth 8 June 2016
Future Earth 8 June 2016Future Earth 8 June 2016
Future Earth 8 June 2016
 
Materials Testing 2
Materials Testing 2Materials Testing 2
Materials Testing 2
 
Vivir plenamente
Vivir plenamenteVivir plenamente
Vivir plenamente
 
Les capteurs de l'Internet des Objets, par Jean-Samuel Chenard
Les capteurs de l'Internet des Objets, par Jean-Samuel ChenardLes capteurs de l'Internet des Objets, par Jean-Samuel Chenard
Les capteurs de l'Internet des Objets, par Jean-Samuel Chenard
 
The solar system
The solar systemThe solar system
The solar system
 
MWEB
MWEB MWEB
MWEB
 
5 Slide Challange
5 Slide Challange5 Slide Challange
5 Slide Challange
 
ROBOTS
ROBOTSROBOTS
ROBOTS
 
Solar system
Solar systemSolar system
Solar system
 
Apostila processamento de cereais
Apostila processamento de cereaisApostila processamento de cereais
Apostila processamento de cereais
 
Preparo da Cana-de-açúcar
Preparo da Cana-de-açúcarPreparo da Cana-de-açúcar
Preparo da Cana-de-açúcar
 

Similar to report kapile_fx7378

Paul Gosney CV - Senior Developer
Paul Gosney CV - Senior DeveloperPaul Gosney CV - Senior Developer
Paul Gosney CV - Senior Developer
Paul Gosney
 
First of all, I like you to notice that I have set Starting WIP .docx
First of all, I like you to notice that I have set Starting WIP .docxFirst of all, I like you to notice that I have set Starting WIP .docx
First of all, I like you to notice that I have set Starting WIP .docx
voversbyobersby
 
Use Machine Learning to Get the Most out of Your Big Data Clusters
Use Machine Learning to Get the Most out of Your Big Data ClustersUse Machine Learning to Get the Most out of Your Big Data Clusters
Use Machine Learning to Get the Most out of Your Big Data Clusters
Databricks
 
Week 2 iLab TCO 2 — Given a simple problem, design a solutio.docx
Week 2 iLab TCO 2 — Given a simple problem, design a solutio.docxWeek 2 iLab TCO 2 — Given a simple problem, design a solutio.docx
Week 2 iLab TCO 2 — Given a simple problem, design a solutio.docx
melbruce90096
 
asgmt01.classpathasgmt01.project asgmt01 .docx
asgmt01.classpathasgmt01.project  asgmt01  .docxasgmt01.classpathasgmt01.project  asgmt01  .docx
asgmt01.classpathasgmt01.project asgmt01 .docx
fredharris32
 
Rick Watkins Power Point presentation
Rick Watkins Power Point presentationRick Watkins Power Point presentation
Rick Watkins Power Point presentation
rickwatkins
 
Paul Gosney CV - Senior Systems Analyst
Paul Gosney CV - Senior Systems AnalystPaul Gosney CV - Senior Systems Analyst
Paul Gosney CV - Senior Systems Analyst
Paul Gosney
 
Rick Watkins Power Point Presentation on Automation efficiencies
Rick Watkins Power Point Presentation on Automation efficienciesRick Watkins Power Point Presentation on Automation efficiencies
Rick Watkins Power Point Presentation on Automation efficiencies
rickwatkins
 
Power Point Presentation
Power Point PresentationPower Point Presentation
Power Point Presentation
rickwatkins
 

Similar to report kapile_fx7378 (20)

Paul Gosney CV - Senior Developer
Paul Gosney CV - Senior DeveloperPaul Gosney CV - Senior Developer
Paul Gosney CV - Senior Developer
 
Software Sizing
Software SizingSoftware Sizing
Software Sizing
 
First of all, I like you to notice that I have set Starting WIP .docx
First of all, I like you to notice that I have set Starting WIP .docxFirst of all, I like you to notice that I have set Starting WIP .docx
First of all, I like you to notice that I have set Starting WIP .docx
 
Use Machine Learning to Get the Most out of Your Big Data Clusters
Use Machine Learning to Get the Most out of Your Big Data ClustersUse Machine Learning to Get the Most out of Your Big Data Clusters
Use Machine Learning to Get the Most out of Your Big Data Clusters
 
MLProjectReport
MLProjectReportMLProjectReport
MLProjectReport
 
resum
resumresum
resum
 
Week 2 iLab TCO 2 — Given a simple problem, design a solutio.docx
Week 2 iLab TCO 2 — Given a simple problem, design a solutio.docxWeek 2 iLab TCO 2 — Given a simple problem, design a solutio.docx
Week 2 iLab TCO 2 — Given a simple problem, design a solutio.docx
 
asgmt01.classpathasgmt01.project asgmt01 .docx
asgmt01.classpathasgmt01.project  asgmt01  .docxasgmt01.classpathasgmt01.project  asgmt01  .docx
asgmt01.classpathasgmt01.project asgmt01 .docx
 
Deploying Data Science for Distribution of The New York Times - Anne Bauer
Deploying Data Science for Distribution of The New York Times - Anne BauerDeploying Data Science for Distribution of The New York Times - Anne Bauer
Deploying Data Science for Distribution of The New York Times - Anne Bauer
 
QAD solution (ENG)
QAD solution (ENG)QAD solution (ENG)
QAD solution (ENG)
 
Samplepc (3)
Samplepc (3)Samplepc (3)
Samplepc (3)
 
Rick Watkins Power Point presentation
Rick Watkins Power Point presentationRick Watkins Power Point presentation
Rick Watkins Power Point presentation
 
From 6 hours to 1 minute... in 2 days! How we managed to stream our (long) Ha...
From 6 hours to 1 minute... in 2 days! How we managed to stream our (long) Ha...From 6 hours to 1 minute... in 2 days! How we managed to stream our (long) Ha...
From 6 hours to 1 minute... in 2 days! How we managed to stream our (long) Ha...
 
Big Data Berlin - Criteo
Big Data Berlin - CriteoBig Data Berlin - Criteo
Big Data Berlin - Criteo
 
The power of combining Planning and Simulation on SAC
The power of combining Planning and Simulation on SACThe power of combining Planning and Simulation on SAC
The power of combining Planning and Simulation on SAC
 
Software Project Cost Estimation
Software Project Cost EstimationSoftware Project Cost Estimation
Software Project Cost Estimation
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Paul Gosney CV - Senior Systems Analyst
Paul Gosney CV - Senior Systems AnalystPaul Gosney CV - Senior Systems Analyst
Paul Gosney CV - Senior Systems Analyst
 
Rick Watkins Power Point Presentation on Automation efficiencies
Rick Watkins Power Point Presentation on Automation efficienciesRick Watkins Power Point Presentation on Automation efficiencies
Rick Watkins Power Point Presentation on Automation efficiencies
 
Power Point Presentation
Power Point PresentationPower Point Presentation
Power Point Presentation
 

More from Parag Kapile

IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8
Parag Kapile
 
Lean Back Offices Project
Lean Back Offices ProjectLean Back Offices Project
Lean Back Offices Project
Parag Kapile
 
Project Presentation_fx7378_fy6055
Project Presentation_fx7378_fy6055Project Presentation_fx7378_fy6055
Project Presentation_fx7378_fy6055
Parag Kapile
 
GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378
Parag Kapile
 
Individual Project
Individual ProjectIndividual Project
Individual Project
Parag Kapile
 
Optimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state pptOptimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state ppt
Parag Kapile
 
design n testing of tool used in press shop
design n testing of tool used in press shopdesign n testing of tool used in press shop
design n testing of tool used in press shop
Parag Kapile
 

More from Parag Kapile (7)

IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8
 
Lean Back Offices Project
Lean Back Offices ProjectLean Back Offices Project
Lean Back Offices Project
 
Project Presentation_fx7378_fy6055
Project Presentation_fx7378_fy6055Project Presentation_fx7378_fy6055
Project Presentation_fx7378_fy6055
 
GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378GROUP PROJECT REPORT_FY6055_FX7378
GROUP PROJECT REPORT_FY6055_FX7378
 
Individual Project
Individual ProjectIndividual Project
Individual Project
 
Optimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state pptOptimization of International student expenses at Wayne state ppt
Optimization of International student expenses at Wayne state ppt
 
design n testing of tool used in press shop
design n testing of tool used in press shopdesign n testing of tool used in press shop
design n testing of tool used in press shop
 

report kapile_fx7378

  • 1. Parag Kapile fx7378 MRP DSS PROJECT In this project I am playing the role of a production planner of the "GREEK MANUFACTURING COMPANY" and developing a decision support system. I am managing two products Alpha and Beta for which orders are placed by me in variable quantity throughout the week. These Alpha and Beta are made up of comma, Delta, Epsilon, Fi and gamma. Some of these products are produced within company and some are being purchased from outside. In carrying out production the parts are routed through passing machines kappa, Mu, phi, rho and sigma within the company, where processing time is spent. The production planning is done on weekly basis. At the beginning of the week, inventories are checked and orders are released both within company and to the vendors. Through last week processing of the orders takes places. As customers’ orders arrive, they filled from inventory on hand. Orders are may be filled partially if there is in sufficient on hand inventory for the whole order. Unfilled orders are placed on file and filled when the product is available they will be repeated week after week which will be simulated with help of Excel sheet. 1) Highest profit made while playing in the ad-hoc manner at the end of week 32 is: - $732238.75 2) Playing game on re-order point basis, the main idea of reorder point is to set minimum level of inventory. Now will choose our own order sizes. We will try different ROP and order sizes. Item Re-order point Order Size Alpha 300 2000 Beta 350 2500 Comma 400 2000 Delta 150 600 Epsilon 400 700 Fi 400 800 Gamma 350 750 The maximum profit achieved by using re-order point is this $52739.25
  • 2. Parag Kapile fx7378 3) We play the game by using DSS. To play game we need to do forecasting of both Alpha and Beta We used forecast formula Y= mX+c to calculate forecast up to 32 week. Now we will fill forecasted values into MPS schedule of MRP worksheets by using VLOOKUP function from excel used forecast data into MPS Table. Linked all inventory and other values from main menu to MPS table. Then we did MRP explosion by using lot to lot policy and with lead time of one week. The Maximum Profit achieved by using DSS is $ 954420.75 of 32 week.