Spectra Solar Park Ltd
Sungrow Power (Singapore) PTE Ltd
GIS Inspection Report
Date : 21-January-2023
GIS Name / Fedeer Name : ITC-1 GIS/A01
SL No. Checking iteam Conditions Result Remark
1 GIS Panel Working
2 DC Panel Working
3 UPS MK box Working
4 GIS Inverter Condition Working
5 UPS Battery Working
6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone
7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
8 Breaker Operation (Count) - 127
9 Com 100 Communication Working
10 Sungrow Logger 3000 Working
11 Temperature Controller Healthy 24℃
Compartment
Tempurature
>25℃ start
Exhust fan
12 Temperature Probe Working
13 Exhaust Fan Working
14 Indoor Light 2 set (4 Nos) Good
15 Emergency Light 1 set (2 nos) Good
16 Grounding Good
17 Over all physical Good
Inspected by DPM PM CE
Imamul Haque
Jenarul Islam
Spectra Solar Park Ltd
Sungrow Power (Singapore) PTE Ltd
GIS Inspection Report
Date : 21-January-2023
GIS Name / Fedeer Name : ITC-2 GIS/A02
SL No. Checking iteam Conditions Result Remark
1 GIS Panel Working
2 DC Panel Working
3 UPS MK box Working
4 GIS Inverter Condition Working
5 UPS Battery Working
6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone
7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
8 Breaker Operation (Count) - 111
9 Com 100 Communication Working
10 Sungrow Logger 3000 Working
11 Temperature Controller Healthy 24.6℃
Compartment
Tempurature
>25℃ start
Exhust fan
12 Temperature Probe Working
13 Exhaust Fan Working
14 Indoor Light 2 set (4 Nos) Good
15 Emergency Light 1 set (2 nos) Good
16 Grounding Good
17 Over all physical Good
Inspected by DPM PM CE
Imamul Haque
Jenarul Islam
Spectra Solar Park Ltd
Sungrow Power (Singapore) PTE Ltd
GIS Inspection Report
Date : 21-January-2023
GIS Name / Fedeer Name : ITC-3 GIS/A03
SL No. Checking iteam Conditions Result Remark
1 GIS Panel Working
2 DC Panel Working
3 UPS MK box Working
4 GIS Inverter Condition Working
5 UPS Battery Working
6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone
7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
8 Breaker Operation (Count) - 91
9 Com 100 Communication Working
10 Sungrow Logger 3000 Working
11 Temperature Controller Healthy 23.9℃
Compartment
Tempurature
>25℃ start
Exhust fan
12 Temperature Probe Working
13 Exhaust Fan Working 2 nos
14 Indoor Light 2 set (4 Nos) Good
15 Emergency Light 1 set (2 nos) working 1 nos light damage
16 Grounding Good
17 Over all physical Good
Inspected by DPM PM CE
Imamul Haque
Jenarul Islam
Spectra Solar Park Ltd
Sungrow Power (Singapore) PTE Ltd
GIS Inspection Report
Date : 21-January-2023
GIS Name / Fedeer Name : ITC-4 GIS/A18
SL No. Checking iteam Conditions Result Remark
1 GIS Panel Working
2 DC Panel Working
3 UPS MK box Working
4 GIS Inverter Condition Working
5 UPS Battery Working
6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone
7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
8 Breaker Operation (Count) - 117
9 Com 100 Communication Working
10 Sungrow Logger 3000 Working
Data addition
work on going
11 Temperature Controller Working 25.6℃
Compartment
Tempurature
>25℃ start
Exhust fan
12 Temperature Probe Working
13 Exhaust Fan Working
14 Indoor Light 2 set (4 Nos) Good
15 Emergency Light 1 set (2 nos) Working 2 nos light damage
16 Grounding Good
17 Over all physical Good
Inspected by DPM PM CE
Imamul Haque
Jenarul Islam
Spectra Solar Park Ltd
Sungrow Power (Singapore) PTE Ltd
GIS Inspection Report
Date : 21-January-2023
GIS Name / Fedeer Name : ITC-5 GIS/A17
SL No. Checking iteam Conditions Result Remark
1 GIS Panel Working
2 DC Panel Working
3 UPS MK box Working
4 GIS Inverter Condition Working
5 UPS Battery Working
6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone
7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
8 Breaker Operation (Count) - 108
9 Com 100 Communication Working
10 Sungrow Logger 3000 Working
11 Temperature Controller Working 24.5℃
Compartment
Tempurature
>25℃ start
Exhust fan
12 Temperature Probe Working
13 Exhaust Fan Working 2 nos
14 Indoor Light 2 set (4 Nos) Good
15 Emergency Light 1 set (2 nos) Good
16 Grounding Good
17 Over all physical Good
Inspected by DPM PM CE
Imamul Haque
Jenarul Islam
Spectra Solar Park Ltd
Sungrow Power (Singapore) PTE Ltd
GIS Inspection Report
Date : 21-January-2023
GIS Name / Fedeer Name : ITC-6 GIS/A16
SL No. Checking iteam Conditions Result Remark
1 GIS Panel Working
2 DC Panel Working
3 UPS MK box Working
4 GIS Inverter Condition Working
5 UPS Battery Working
6 Gas Pressure BP1 (Breaker chambe Damage Faulty
7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
8 Breaker Operation (Count) - 139
9 Com 100 Communication Working
10 Sungrow Logger 3000 Working
11 Temperature Controller Working 24.5℃
Compartment
Tempurature
>25℃ start
Exhust fan
12 Temperature Probe Working
13 Exhaust Fan Working 2 nos
14 Indoor Light 2 set (4 Nos) Good
15 Emergency Light 1 set (2 nos) Good
16 Grounding Good
17 Over all physical Good
Inspected by DPM PM CE
Imamul Haque
Jenarul Islam

More Related Content

Similar to GIS Inspection Report (January 2023).pdf

Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013
SULTAN ZAFAR
 

Similar to GIS Inspection Report (January 2023).pdf (7)

Hgu process startup requirement ta18
Hgu process   startup requirement ta18Hgu process   startup requirement ta18
Hgu process startup requirement ta18
 
anti islanding technology(passive)
anti islanding technology(passive)anti islanding technology(passive)
anti islanding technology(passive)
 
Abnormality report of TG-2 SCCT Diode failure on overcurrent.pdf
Abnormality report of TG-2 SCCT Diode failure on overcurrent.pdfAbnormality report of TG-2 SCCT Diode failure on overcurrent.pdf
Abnormality report of TG-2 SCCT Diode failure on overcurrent.pdf
 
Calibration of Geomagnetic and Soil Temperatur Sensor for Earthquake Early Wa...
Calibration of Geomagnetic and Soil Temperatur Sensor for Earthquake Early Wa...Calibration of Geomagnetic and Soil Temperatur Sensor for Earthquake Early Wa...
Calibration of Geomagnetic and Soil Temperatur Sensor for Earthquake Early Wa...
 
Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013
 
Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013
 
Due Diligence TEM 220201.pptx
Due Diligence TEM 220201.pptxDue Diligence TEM 220201.pptx
Due Diligence TEM 220201.pptx
 

Recently uploaded

TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc
 
CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
Wonjun Hwang
 

Recently uploaded (20)

AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptxCyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cf
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
How to Check GPS Location with a Live Tracker in Pakistan
How to Check GPS Location with a Live Tracker in PakistanHow to Check GPS Location with a Live Tracker in Pakistan
How to Check GPS Location with a Live Tracker in Pakistan
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 
Top 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTop 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development Companies
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
 

GIS Inspection Report (January 2023).pdf

  • 1. Spectra Solar Park Ltd Sungrow Power (Singapore) PTE Ltd GIS Inspection Report Date : 21-January-2023 GIS Name / Fedeer Name : ITC-1 GIS/A01 SL No. Checking iteam Conditions Result Remark 1 GIS Panel Working 2 DC Panel Working 3 UPS MK box Working 4 GIS Inverter Condition Working 5 UPS Battery Working 6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone 7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone 8 Breaker Operation (Count) - 127 9 Com 100 Communication Working 10 Sungrow Logger 3000 Working 11 Temperature Controller Healthy 24℃ Compartment Tempurature >25℃ start Exhust fan 12 Temperature Probe Working 13 Exhaust Fan Working 14 Indoor Light 2 set (4 Nos) Good 15 Emergency Light 1 set (2 nos) Good 16 Grounding Good 17 Over all physical Good
  • 2. Inspected by DPM PM CE Imamul Haque Jenarul Islam Spectra Solar Park Ltd Sungrow Power (Singapore) PTE Ltd GIS Inspection Report Date : 21-January-2023 GIS Name / Fedeer Name : ITC-2 GIS/A02 SL No. Checking iteam Conditions Result Remark 1 GIS Panel Working 2 DC Panel Working 3 UPS MK box Working 4 GIS Inverter Condition Working 5 UPS Battery Working 6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone 7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone
  • 3. 8 Breaker Operation (Count) - 111 9 Com 100 Communication Working 10 Sungrow Logger 3000 Working 11 Temperature Controller Healthy 24.6℃ Compartment Tempurature >25℃ start Exhust fan 12 Temperature Probe Working 13 Exhaust Fan Working 14 Indoor Light 2 set (4 Nos) Good 15 Emergency Light 1 set (2 nos) Good 16 Grounding Good 17 Over all physical Good Inspected by DPM PM CE Imamul Haque Jenarul Islam
  • 4. Spectra Solar Park Ltd Sungrow Power (Singapore) PTE Ltd GIS Inspection Report Date : 21-January-2023 GIS Name / Fedeer Name : ITC-3 GIS/A03 SL No. Checking iteam Conditions Result Remark 1 GIS Panel Working 2 DC Panel Working 3 UPS MK box Working 4 GIS Inverter Condition Working 5 UPS Battery Working 6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone 7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone 8 Breaker Operation (Count) - 91 9 Com 100 Communication Working 10 Sungrow Logger 3000 Working 11 Temperature Controller Healthy 23.9℃ Compartment Tempurature >25℃ start Exhust fan 12 Temperature Probe Working 13 Exhaust Fan Working 2 nos 14 Indoor Light 2 set (4 Nos) Good 15 Emergency Light 1 set (2 nos) working 1 nos light damage 16 Grounding Good 17 Over all physical Good
  • 5. Inspected by DPM PM CE Imamul Haque Jenarul Islam Spectra Solar Park Ltd Sungrow Power (Singapore) PTE Ltd GIS Inspection Report Date : 21-January-2023 GIS Name / Fedeer Name : ITC-4 GIS/A18 SL No. Checking iteam Conditions Result Remark 1 GIS Panel Working 2 DC Panel Working 3 UPS MK box Working 4 GIS Inverter Condition Working 5 UPS Battery Working 6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone 7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone 8 Breaker Operation (Count) - 117 9 Com 100 Communication Working
  • 6. 10 Sungrow Logger 3000 Working Data addition work on going 11 Temperature Controller Working 25.6℃ Compartment Tempurature >25℃ start Exhust fan 12 Temperature Probe Working 13 Exhaust Fan Working 14 Indoor Light 2 set (4 Nos) Good 15 Emergency Light 1 set (2 nos) Working 2 nos light damage 16 Grounding Good 17 Over all physical Good Inspected by DPM PM CE Imamul Haque Jenarul Islam
  • 7. Spectra Solar Park Ltd Sungrow Power (Singapore) PTE Ltd GIS Inspection Report Date : 21-January-2023 GIS Name / Fedeer Name : ITC-5 GIS/A17 SL No. Checking iteam Conditions Result Remark 1 GIS Panel Working 2 DC Panel Working 3 UPS MK box Working 4 GIS Inverter Condition Working 5 UPS Battery Working 6 Gas Pressure BP1 (Breaker chambe Healthy Green Zone 7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone 8 Breaker Operation (Count) - 108 9 Com 100 Communication Working 10 Sungrow Logger 3000 Working 11 Temperature Controller Working 24.5℃ Compartment Tempurature >25℃ start Exhust fan 12 Temperature Probe Working 13 Exhaust Fan Working 2 nos 14 Indoor Light 2 set (4 Nos) Good 15 Emergency Light 1 set (2 nos) Good 16 Grounding Good 17 Over all physical Good
  • 8. Inspected by DPM PM CE Imamul Haque Jenarul Islam Spectra Solar Park Ltd Sungrow Power (Singapore) PTE Ltd GIS Inspection Report Date : 21-January-2023 GIS Name / Fedeer Name : ITC-6 GIS/A16 SL No. Checking iteam Conditions Result Remark 1 GIS Panel Working 2 DC Panel Working 3 UPS MK box Working 4 GIS Inverter Condition Working 5 UPS Battery Working 6 Gas Pressure BP1 (Breaker chambe Damage Faulty 7 Gas Pressure BP2 (Busbar chamber Healthy Green Zone 8 Breaker Operation (Count) - 139 9 Com 100 Communication Working
  • 9. 10 Sungrow Logger 3000 Working 11 Temperature Controller Working 24.5℃ Compartment Tempurature >25℃ start Exhust fan 12 Temperature Probe Working 13 Exhaust Fan Working 2 nos 14 Indoor Light 2 set (4 Nos) Good 15 Emergency Light 1 set (2 nos) Good 16 Grounding Good 17 Over all physical Good Inspected by DPM PM CE Imamul Haque Jenarul Islam