SlideShare a Scribd company logo
1 of 20
Download to read offline
Page 1 of 17 
 
C.V. 
Personal Data
Full Name Osama Hassan Anwar
Date of birth 14/10/1978
Marital Status Married
Profession Civil Engineer
Current Position Project Technical Manager
Nationality Egyptian
Languages Arabic (native tongue), English, French & Deutch
Years of experience +14 Years
Contact No. Mob. UAE : (+971)50-311 28 53
: (+971) 55 – 450 9 430
Tel. Home : (+20 40) 2550 901
Email oshassan@hotmail.com
osamanwar78@gmail.com
Education and 
professional 
qualifications 
Bachelor of Science Degree in Civil Engineering
Tanta University, Tanta, Egypt 
Major  Civil Engineering 
Year Of Graduation  Year 2000 
Grade  Good (72%) 
4th
 yr. Project title     Repair the Structural Element by Steel strips
Grade                        Excellent 
NEBOSH  Passed With Credit 
Master Log Certificate No. : 
00182214/490371 
IGC1/00182214/486659 
IGC2/00182214/487701 
IGC3/00182214/488798  
Key Experience  - Project Management for Water Pipeline’ Projects.
- OHSE Aspects for Construction of Water Pipeline Projects
- Procurement & Logistic Management for Local & Oversees major
Lead items
QA/QC Factory & Site inspection for DI Pipes/Fittings, CS
Pipes/Fittings, Valves, Dismantling Joint
Construction of Ductile Iron Main Pipeline and related mechanical
Page 2 of 17 
 
& civil works
Construction & Welding of Carbon Steel Pipes & Fittings and
related mechanical & civil works
Coating of Carbon Steel pipes & Fittings
  Commissioning of Water Pipeline
  Co-ordination between Water pipeline Project disciplines ( Civil,
Mechanical, Electrical, ICT….etc)
  Planning & Scheduling
  Tendering & Cost Estimation
 
 
Professional Courses / 
Trainings Attended 
Laying & testing of Fiber Optic Cable – ITS Contracting technologies –
UAE – Febraury 2015
- Familiarization & Training Cathodic Protection System – BSSTech –
UAE – November 2014
- Application of Epoxy Painting by M/s Jotun - 2014
- Working Safely in Confined Space Training – Merdif Security & Safety
Consultants - UAE - 2013
- Rigging Training – Merdif Security & Safety Consultants - UAE - 2013
- Scaffolding Training ( OSHA) – - Merdif Security & Safety Consultants
- UAE - 2013
- Principal for Food Safety - Merdif Security & Safety Consultants - UAE
- 2013
-Application of Heat Shrinkage Sleeve for CS Pipes – TUV-Nord – UAE
December 2012
- Fire Fighting – by M/s ILF Consulting Engineer– UAE - 2011
- First Aid – by M/s ILF Consulting Engineer– UAE - 2011
- Fire Fighting – Emirates Safety Centre – UAE - 2006
First Aide – Emirates Safety Centre – UAE- 2006
- Estimation of the Construction Projects – Egypt – May 2005
Principals for Management of Construction Projects. January 2005
Dewatering systems – Egypt – January 2006
-Claims & Arbitration along with FIDIC contracts (FIDIC 4th Edition) –
May 2004.
Contractor’s Engineer – Egypt – May 2003
Languages  Arabic: Native Language
English: Excellent
French: Fair
German : Beginner
 
Driving License  UAE's Valid Driving License 
Egypt's Valid Driving License
Page 3 of 17 
 
 
Computer Skills  MS Excel
Outlook
MS Word
MS Power Point
MS Project
AutoCAD
Primavera
Adobe Acrobat
Major Factory Inspection Attended 
Europe  A- Ductile Iron Pipes & Fittings – M/s Saint Gobain PAM- (France)
B- Butterfly Valves with Pneumatic Actuators & Air Compressor – M/s MIV
and Atlas Copco – ( Croatia)
UAE  A- Inspection on External Coating 3 LPE coating system at Brederow SHAW –
Ras AL Khaimah.
B- Inspection on DI manhole cover for chamber slabs – DUCAST – Dubai -
UAE
C- Inspection on Aluminium accessories including Painting & load test –
Granada Metal Casting – Mussaffa – Abu Dhabi - UAE
D- Inspection on DI manhole cover for chamber slabs – Abu Dhabi Carnation
Metal Industrial Est. – Abu Dhabi - UAE
E- Inspection on Fabrication of Carbon Steel Fittings at AL Jaber Precision
Establishment – Mussafah – Abu Dhabi - UAE
F- Attending the Concrete Trail mix preparation and Testing at M/s Trans gulf
– Mussafah - Abu Dhabi - UAE
G- Attending the Concrete Trail mix preparation and Testing at M/s TREMIX –
AL Ain City - Abu Dhabi - UAE
H- Attending the Concrete Trail mix preparation and Testing at M/s Quick-Mix
Ready Mix Concrete– Western Region- Abu Dhabi - UAE
I- Inspection on the Pre-cast Element ( cover slabs, RC pits, posts,…etc) at
M/s AL Fara’a – Mussafah – Abu Dhabi- UAE
Egypt  A- DI Pipes & Fittings at Nasr Casting Company – Cairo – Egypt
B- Valves Factory of Al Nasr Casting Company – Alexandria - Egypt
C- DI Pipes & Fitting manufactured by M/s Buders ( Germany) at local agent
premises – Cairo - Egypt
D- Miser El Hegaz, - uPVC pipes – 10th October City - Egypt
E- AL Khalygia – uPVC pipes – 10th October City - Egypt
 
Page 4 of 17 
 
 
Summary Work Experience 
From  To  Compa
ny 
Name 
Country/ 
Location 
Project/Duty  Budget 
US$ 
Position 
August 
2014 
Today  SEDE  UAE/Abu 
Dhabi 
ADDC Contract No. D‐101712 
“Construction of New DN900 
Primary Main from Al Falah to 
East Baniyas Along Graveyard 
Road “ 
25,000 US$  Project 
Technical 
Manager 
February 
2014 
June 
2014 
SEDE  UAE/Abu 
Dhabi 
TRANSCO EPC Tender No. N-
12192 “ Water Transmission
Scheme From Mirfa To Madinat
Zayed, Liwa And Presidential
Palace In Qusahwira of 125 KM
CS & DI Pipelines and related
Electrical, Instrument, Control and
Hypo Chlorination System.”
95,000 US$  Team Leader
May2012  August 
2014 
SEDE  UAE/Abu 
Dhabi  
( Western 
Region) 
TRANSCO EPC Contract N‐11900
“DN 1000 CS water Pipeline From 
Mezerah PS to Jabana” 
29,000 US$  Project 
Technical 
Manager 
January 
2014 
April 
2014 
SEDE    TRANSCO EPC Tender N‐11900 “ 
DN 1000 CS Pipeline from 
Mezeraih to Jabana” 
25,000 US$  Sr 
Estimator/Te
chnical 
Evaluation 
October 
2009 
May 
2012 
SEDE  UAE/Al Ain TRANSCO EPC Contract N‐4381A‐
VO2 “DN 1600 DI water Pipeline 
From Kharyr to Um Ghafa” 
55,000 US$  Chief 
Technical 
Engineer 
August 
2009 
June 
2010 
SEDE  UAE  TRANSCO EPC Tender No. G-
5809 “Strategic Water Storage /
Recovery Project in LIWA”
550,000 US$  Sr Estimator
June 2009  October 
2009 
Mouktar 
Ibrahim 
Egypt/Cairo 
HQ 
Claim Adjustor for sub‐contractors ‐‐‐ Sr. Engineer
  A
pril 2006 
June 
2009 
SEDE UAE/Abu 
Dhabi 
TRANSCO EPC Contract No. N‐
4277 “ Taweelah – Unit III – Umm 
Al Nar  
210,000 US$  Technical & 
Procurement 
Engineer –
Site Offices 
January 
2005 
April 
2006 
Moukhtar 
Ibrahim 
Egypt  Kfw - Germany/NPOWASD -
Egypt - Sanitary Sewage Project
for 15 Village at Kafer El Sheikh
Government Potable Water
Network (Contract No.1)
15,000 US$  Technical 
Engineer 
April 2001  April 
2006 
Moukhtar 
Ibrahim 
Egypt  Kfw - Germany/NPOWASD –
Egypt “Rehabilitation for Kafr El
Sheikh Government Potable Water
Network -Contracts K 18 A & B”
20,000 US$  Technical 
Engineer 
August 
2000 
April 
2001 
Al 
Qadysiah 
Consultan
cy 
Egypt/Tanta Construction of 4 Nos. Residential
Buildings in Tanta City
‐‐ Site Engineer
 
Page 5 of 17 
 
 
Detailed Work Experience. (Projects’ Construction) 
From 01st
 August 2014 up to date  
Project  :  Contract No. D-101712
Construction of New DN900 Primary Main from Al Falah to
East Baniyas Along Graveyard Road
Location  :  Emirate of Abu Dhabi – United Arab Emirates
Client  :  Abu Dhabi Distribution Company (ADDC)
Consultant  :  Italconsult
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu
Dhabi U.A.E
Project Budget  :  106,554,382.99 AED ( 29,000,000 US $)
Position  :  Project Technical Manager ( Main Contractor)
Project Scope  : 
    1- Construction of approximately 30.0 km of DN 900 mm D.I.
pipeline, from Al Falah to East Baniyas along Graveyard
Road, to supply water to Al Falah Community and South
Shamkha Development.
   
2- Construction of approximately 1.4 km of DN 600 mm D.I.
pipeline for the water supply to Al Shamkha Housing
Development (Phase 1).
   
3- Construction of three (5) DN 600 mm pipe connections
including DN 500 mm Area Metering Units, between the
DN 900 mm pipeline and existing DN 600 mm pressure
mains along Graveyard Road & Al Shamkha Housing
Development.
Duties/Responsibilities/Tasks    - Liaise with Client and Consultant for all construction,
Technical and contractual affairs.
    - Liaise with concerned authorities for issuance of required
permits ( Municipality, TRANSCO, ADDC, ADNOC…etc)
    - Plan, review and co-ordinate design and construction activities
to ensure compliance with Project specification and legal
requirements.
    Provide a technical support for all Project team for ensuring
compliance of the project as per schedule within budget quality
standards
    Ensure contract performance and safety measures are met
    Contribute in preparing of the Tie Of Extension ( EOT)
    Reviewing the progress Monthly, weekly and daily reports.
    Evaluate to project construction to ensure compliance with
project and authorities standards.
    Preparing the internal minute of meetings and following up the
targets and responsibilities
    Dealing with AD Department of Transport ( DoT) regarding
issue the related Permit To Work
    Managing the major sub-contractors within the Project for the
major items:
A- Non Destructive Road Crossing ( NDRC)
B- Geotechnical Survey Specialist
Page 6 of 17 
 
C- TPIA’s for site tests.
D- Asphalt works.
    Participate on Task Risk Assessment to critical and hazardous
task, identifying issues and developing corrective action plans to
ensure compliance with applicable EHS and local regulations
    Identification of construction safety hazards and preparation of
corrective measures
    Preparing the Welding Procedure, review with Owner/Engineer
and conduct the qualification tests.
    Reviewing and contributing of design of the Pipeline Plan and
Profile Drawing ( PAD).
    Preparing/reviewing the engineering document for Project
discipline activities :-
A- Earthwork.
B- Concrete Operation.
C- DI Pipeline Installation
D- Hydro-testing of the pipeline.
E- Filling, Flushing & Disinfection.
    Co-ordination between Project designs team and Owner/
consultant for the design items and ensure compliance with
Project/International Standards.
    Commissioning Engineer to implement and follow-up
commissioning team at site for pre-
commissioning/commissioning, initial operation and trail
operation activates at site and prepare the related procedure and
reports and issuance for the relevant certificates for each sub-
system/system of the project
A- Mechanical Completion Certificate (MCC)
B- Filling, Flushing and disinfection of the Pipeline.
C- Ready for Commission Certificate ( RFC)
D- Ready for Start-up Certificate ( RFSU)
E- Provisional Acceptance Certificate ( PAC).
F- Final Acceptance Certificate ( FAC)
 
From 02nd May 2012 up to date 
Project  :  EPC Contract No. N-11900
DN 1000 Carbon Steel Water Pipeline From Mezeraih Pumping
Station to Janaba for Shah Gas Plant.
Location  :  Emirate of Abu Dhabi – United Arab Emirates
Client  :  Abu Dhabi Transmission & Dispatch Company (TRANSCO)
Consultant  :  Tebodin Middle East Ltd
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu
Dhabi U.A.E
Project Budget  :  94,000,000 AED ( 25,000,000 US $)
Position  :  Project Technical Manager – Site Offices ( Main Contractor)
Project Scope  : 
    1- Supply, construction and commissioning of the DN 1000 mm
( 40”) Carbon Steel water Pipeline 37 KM
    2- Construction of Road Crossing by NDRC method
    3- Construction of Road Crossing by open cut method
    4- Construction of Line Valves Chamber, Washout Chambers,
Page 7 of 17 
 
Air Release valve chambers
    5- Provision for Tie in connection.
    6- Supply, Lay and commissioning of Fiber Optic Cables 2 x
144 Fibers)
Duties/Responsibilities/Tasks    - Liaise with Client and Consultant for all construction,
Technical and contractual affairs.
    - Liaise with concerned authorities for issuance of required
permits ( Municipality, TRANSCO, ADDC, ADNOC…etc)
    - Plan, review and co-ordinate design and construction
operations ensure compliance with design drawings and
specifications.
    Provide a technical support for the Project Manager and all
Project team for ensuring complying of the project as per
schedule within budget, in accordance with quality standards
    Ensure contract performance and safety measures are met
    Contribute in preparing of the overall time schedule of the
Project detailing from Level 1, 2 and 3 & give a detail
breakdown for each stage.
    Reviewing the progress Monthly, weekly and daily reports.
    Evaluate to project construction to ensure compliance with
project and authorities standards.
    Preparing the internal minute of meetings and following up the
targets and responsibilities
    Managing the Procurement Process of the major lead items of
the Project, including :-
a- Preparation of initial agreement during Tender stage
b- Preparation of detailed Contract agreement with the
supplies/manufacturer with respect to the local and
international standards/rules ( e.g. UAE Lows,
Incoterms…etc).
c- Ensuring the compliance of Project/International
standards for the ordered material.
d- Following up/attending and coordinating the Factory
Test at manufacturers/suppliers premises in conjunction
with Owner/Engineer and TPIA representatives
e- Following up the shipping of material to destination and
dealing with forwarders, shipping agent &
transportation agents.
    Managing the major sub-contractors within the Project for the
major items:
A- Non Destructive Road Crossing ( NDRC)
B- Geotechnical Survey Specialist
C- Welding sub-contractor.
D- NDT testing laboratory at site.
E- TPIA’s for site test.
F- TPIA’s for overseas inspection at manufacturers
premises
G- Cement Mortar Lining applicator.
H- Fiber Optic cable Works
I- Cathodic Protection works
J- Asphalt works.
    Participate on Task Risk Assessment to critical and hazardous
task, identifying issues and developing corrective action plans to
ensure compliance with applicable EHS and local regulations
Page 8 of 17 
 
    Identification of construction safety hazards and preparation of
corrective measures
    Preparing the Welding Procedure, review with Owner/Engineer
and conduct the qualification tests.
    Reviewing and contributing of design of the Pipeline Plan and
Profile Drawing ( PAD).
    Preparing/reviewing the engineering document for Project
discipline activities :-
A- Earthwork.
B- Concrete Operation.
C- DI Pipeline Installation
D- CS Pipe welding
E- Fabrication of CS fittings at work shop.
F- Hydro-testing of the pipeline.
G- Filling, Flushing & Disinfection.
    Co-ordination between Project designs team and Owner/
consultant for the design items and ensure compliance with
Project/International Standards.
    Commissioning Engineer to implement and follow-up
commissioning team at site for pre-
commissioning/commissioning, initial operation and trail
operation activates at site and prepare the related procedure and
reports and issuance for the relevant certificates for each sub-
system/system of the project
A- Mechanical Completion Certificate (MCC)
B- Filling, Flushing and disinfection of the Pipeline.
C- Ready for Commission Certificate ( RFC)
D- Ready for Start-up Certificate ( RFSU)
E- Provisional Acceptance Certificate ( PAC).
F- Final Acceptance Certificate ( FAC)
    Review the financial/Planning aspect of the project with the
Planning Team with the presented Cash Flow along the Time
life of the Project.
    Preparing the Project Record Book, Final Account and Close
Out Report for the Project and reviewing with Owner/Engineer.
    Involved in Wastage Management System for Project Waste
Management with respect applicable lows/rules in Emirates of
Abu Dhabi.
 
From 28th
 September 2009 to 02nd
 May 2012 (contractually till 02 May 2014 & Part time for Hand 
Over till to date). 
Project  :  EPC Contract No. N-4381A- VO2 ( Lot – C)
Al Ain Water Distribution Network
Location  :  Emirate of Abu Dhabi – United Arab Emirates
Client  :  Abu Dhabi Transmission & Dispatch Company (TRANSCO)
Consultant  :  ILF Consulting Engineers
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu
Dhabi U.A.E
Project Budget  :  198,953,604.45 AED ( 55,000,000 US $)
Position  :  Chief Technical Engineer – Site Offices ( Main Contractor)
Project Scope  : 
Page 9 of 17 
 
    Supply and Installation of one (1) single line D.I. pipes DN 1600
pipeline from Khreyr to Umm Ghaffa to transfer water from the
Start Point of P2O near Khreyr to end-point of P2R at Umm
Ghaffa Floating Reservoir Station
    Construct the related chambers along the Pipeline route (Line
Valve, Washout & Air Release Valve Chambers).
    Construct the Road Crossings whether by Open Cut method or
by Non Disruptive Road Crossing (NDRC) for the roads
intersect with the DN 1600 Pipeline.
    Construct of 3 Tie in / Tap off Stations ( Tap-Off station at
Khreyr RP 19, Tap-Off station at Mezyad RP 20 and Tie-n
station RP 21 at Al Dhaher PS RP 21).
    Supply and installation of all E&I/C work including of Fiber
Optic Cable along the pipeline route for a distance of
approximately 17.00 km complete with repeater stations to
facilitate data and voice communication
Duties/Responsibilities/Tasks    - Liaise with Client and Consultant for all construction and
contractual affairs.
    - Liaise with concerned local authorities for issuance of required
permits ( Municipality, TRANSCO, ADDC, ADNOC…etc)
    - Plan, review and co-ordinate design and construction
operations ensure compliance with design drawings and
specifications.
    Provide a technical support for the Project Manager and all
Project team for ensuring complying of the project as per
schedule within budget, in accordance with quality standards
    Ensure contract performance and safety measures are met
    Contribute in preparing of the overall time schedule of the
Project detailing from Level 1, 2 and 3 & give a detail
breakdown for each stage.
    Reviewing the progress Monthly, weekly and daily reports.
    Evaluate to project construction to ensure compliance with
project and authorities standards.
    Preparing the internal minute of meetings and following up the
targets and responsibilities
    Managing the Procurement of the main lead item of the Project,
including :-
A- Preparation of initial agreement during Tender stage
B- Preparation of detailed Contract agreement with the
supplies/manufacturer with respect to the local and
international standards/rules ( e.g. UAE Lows,
Incoterms…etc).
C- Ensuring the compliance of Project/International
standards for the ordered material.
D- Following up/attending and coordinating the Factory
Test at manufacturers/suppliers premises in conjunction
with Owner/Engineer and TPIA representatives
E- Following up the shipping of material to destination and
dealing with forwarders, shipping agent &
transportation agents.
    Managing the sub-contractors within the Project for the major
items:
A- Non Destructive Road Crossing ( NDRC)
B- Geotechnical Survey Specialist
Page 10 of 17 
 
C- TPIA’s for site test.
D- TPIA’s for overseas inspection at manufacturers
premises
E- Cement Mortar Lining applicator.
F- Fiber Optic cable Works
G- Asphalt works.
    Participate on Task Risk Assessment to critical and hazardous
task, identifying issues and developing corrective action plans to
ensure compliance with applicable EHS and local regulations
    Identification of construction safety hazards and preparation of
corrective measures
    Reviewing and contributing of design of the Pipeline Plan and
Profile Drawing ( PAD).
    Preparing/reviewing the engineering document for Project
discipline activities :-
A- Earthwork.
B- Concrete Operation.
C- DI Pipeline Installation.
D- Particular Procedures for Major shut down on the
existing lines
E- Hydro-testing of the pipeline.
F- Filling, Flushing & Disinfection.
    Commissioning Engineer to implement and follow-up
commissioning team at site for pre-
commissioning/commissioning, initial operation and trail
operation activates at site and prepare the related procedure and
reports and issuance for the relevant certificates for each sub-
system/system of the project
A- Mechanical Completion Certificate (MCC)
B- Filling, Flushing and disinfection of the Pipeline.
C- Ready for Commission Certificate ( RFC)
D- Ready for Start-up Certificate ( RFSU)
E- Provisional Acceptance Certificate ( PAC).
F- Final Acceptance Certificate ( FAC)
    Review the financial/Planning aspect of the project with the
Planning Team with the presented Cash Flow along the Time
life of the Project.
    Contribute in preparing the Project Record Book for the Project
and reviewing with Owner/Engineer
 
From July 2009 to September 2009 
Company  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu
Dhabi - UAE
Position : Sr Estimator
Duties/Responsibilities/Tasks
Review the Claims have been submitted from sub-contractors
against the company.
Investigate the disputes initiated between the sub-contractors
and the company.
Contributed in initiation of the Price List for the sub-contractors
with respect to Clients (s) price lists.
Page 11 of 17 
 
Negotiations and discussions with the suppliers/manufacturers
of pipes, fitting and construction materials.
Contribute in Estimating of EPC Tender No. G-5809 (
TRANSCO) for Strategic Water Storage / Recovery Project in
LIWA, which consists of the followings:-
- Location 1 :- Back up Power Station and Service Centre
- Location 2 :- Existing Storage Tanks
- Location 3 :- Recharge / Recovery Scheme Pilot Plant
- Location 4 :- Recharge / Recovery Schemes A,B,C
- Location 5 :- Pumping Station Madinat Zayed
- Location 6 :- Intermediate Pumping Station 2 – IPS2
- Location 7 :- Intermediate Pumping Station 1 – IPS1
- Location 8 :- Pumping Station Al Mirfa
- Location 9 :- Pumping Station Al Mirfa New
- Location 10 :- Transmission Mains (DN 1200 and DN
900).
- Location 11 :- Back up Power Station Mussafah
- Major Trade 1 :- Recovery well and monitoring well ( well
construction )
- Major Trade 2 :- Medium Voltage System
- Major Trade 3 :- SCADA System, Process Control and
Instrumentation
The main Task/duties were as followings:-:
- Calculate/Review the quantities of Reinforced Concrete
structures.
- Preliminary Design for the Piping system between the
buildings of the 11th locations.
- Co-ordination with the In house design staff for RC
buildings and pipeline chambers
- Calculate/Review the quantities for the internal piping
systems in the locations.
- Prepare the technical/financial terms included in the
inquiries for relevant suppliers/manufacturers.
- Review the quotations from the suppliers/manufacturers
and establish the comparison status
- Establish the breakdown for the LUM SUM items for
the piping works inside the locations.
- Study the rate of production for labors and equipment’s
related the activities for supply/installation/erection of
piping system.
- Establish breakdown for the earthwork activities for the
DN 1200 pipeline and 2xDN900 pipeline (Excavation,
backfilling, bund construction….etc)
From April 2006 to June 2009
Project : EPC Contract No. N-4277
Tawelah – Unit III – Umm Al Nar Water Transmission Scheme (
Lot 1 & 2)
Location  :  Emirate of Abu Dhabi – United Arab Emirates 
Client  :  Abu Dhabi Transmission & Dispatch Company (TRANSCO) 
Consultant  :  Tebodin Middle East
Page 12 of 17 
 
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu Dhabi U.A.E
Project Budget  :  760,000,00.00 AED ( 206,500,000 US $) 
Position  :  Sr. Technical Engineer – Site Offices ( Main Contractor) 
Project Scope  :   
    Supply and Laying of DI Pipeline 60 km length DN 1600mm from 
Taweelah station to Umm Al Nar junction. 
    Supply & ‐ Laying the fibre optic cable from Taweelah 
station to Umm Al Nar junction 
    Construct the related chambers along the Pipeline route (Line 
Valve, Washout & Air Release Valve Chambers). 
    Construct the Road Crossings whether by Open Cut method or 
by Non Disruptive Road Crossing (NDRC) for the roads intersect 
with the DN 1600 Pipeline. 
    Replace of 5 km twin water DI pipeline DN 1200mm instead of 
CS exiting line. 
    Laying of 3.5 km DI pipeline DN 1200 to Yas Island. Including the 
marine crossing under water Chaneel to supply the water for 
Yas Island 
    Laying of 3.5 km of the 33 kv cable from Unit III complex to Al 
Bahyia sub station. 
    Pump station Buildings (Pump hall, Sub‐station, Hypo‐
chlorination & Fire 
Duties/Responsibilities/Tasks    Preparing the documents for obtaining approval from Abu Dhabi 
Municipality (Road Section) regarding the Non Disruptive Road 
Crossings (NDRC) and Directional Drilling (HDPE). 
    Preparing/Reviewing the assessment for the quantities of 
required materials (Concrete works, piping works…….etc) 
    Ensure contract performance and safety measures are met 
    Contribute in preparing of the overall time schedule of the 
Project detailing from Level 1, 2 and 3 & give a detail breakdown 
for each stage.  
    Reviewing the progress Monthly, weekly and daily reports. 
    Key contact Person for the Procurement of the main lead item 
of the Project, including :‐ 
A‐ Ensuring the compliance of Project/International 
standards for the ordered material. 
B‐ Following up/attending and coordinating the Factory 
Test at manufacturers/suppliers premises in conjunction 
with Owner/Engineer and TPIA representatives 
C‐ Following up the shipping of material to destination and 
dealing with forwarders, shipping agent & 
transportation agents. 
   
    Follow-up the sub-contractors within the Project for the major
items:
A- Non Destructive Road Crossing ( NDRC)
B- Geotechnical Survey Specialist
C- TPIA’s for site test.
D- TPIA’s for overseas inspection at manufacturers
premises
E- Sub-contractor for Marine Channel Crossing ( Drill-Tec/
Page 13 of 17 
 
NSCC JV)
F- Fiber Optic cable Works
G- Asphalt works.
    Key contact person for procurement of the major imported
materials: DI Pipes and Fittings from M/S SG PAM (France), DI
Fittings from M/s DUKER (Germany), Valves from M/s MIV
(Croatia), Dismantling Joints/Couplings from Helden ( UK)
including all inquiries, technical discussions, delivery schedules
and correspondences
    Competent Peron authorized from Abu Dhabi Transmission &
Dispatch Company ( TRANCO) to issue the safety permit in
accordance to TRANSCO’ SSRs. “Permit TO Work (PTW) for
Civil works and works near 33 kv cables”
    Authorized person for GASCO authorization to work (ATW).
    Prepare the technical submittal for materials for the Pipeline
rated material, reply on comments with respect to applicable
Project/International Standards
    Preparing the KKS numbering system for the pipeline works
from Taweelah- to Umm Al Nar.
    Preparing the engineering document for Project discipline
activities :-
A- Earthwork.
B- Concrete Operation.
C- DI Pipeline Installation.
D- Particular procedures for protection of existing utilites
intersect with pipeline route.
E- Hydro-testing of the pipeline.
F- Filling, Flushing & Disinfection.
    Dealing with the insurance companies regarding the technical
points and preparing the financial claims.
    Contribute in and co-ordinate with the sub-contractor (M/s
NSCC/DrillTec JV) for the Marine works to cross the Yas Island
channel as followings:
- The Carbon steel Pipes DN 1200 procurements,
- Welding Procedure process /NDT testing,
- Prepare/Discuss the procedures for the pneumatic test
and hydrostatic test for the CS pipes.
- Drilling and reaming stages.
- Pulling of the CS pipes under the channel.
    Assistant Commissioning Engineer to implement and one of the
commissioning team at site for pre-
commissioning/commissioning, initial operation and trail
operation activates at site and contribute in preparing the related
procedure and reports and issuance for the relevant certificates
for each sub-system/system of the project
A- Mechanical Completion Certificate (MCC)
B- Filling, Flushing and disinfection of the Pipeline.
C- Ready for Commission Certificate ( RFC)
D- Ready for Start-up Certificate ( RFSU)
E- Provisional Acceptance Certificate ( PAC).
F- Final Acceptance Certificate ( FAC)
    Review the financial/Planning aspect of the project with the
Planning Team with the presented Cash Flow along the Time life
of the Project.
Page 14 of 17 
 
    Review and contribute in preparing the as built drawings and
discussion with Owner/Consultant for comments and finalize the
final revision.
    Contribute in preparing the Project Record Book for the Project
and reviewing with Owner/Engineer
 
From January 2005 to April 2006 
Project  :  Sanitary Sewage Project for 15 Village at Kafer El Sheikh
Government Potable Water Network (Contract No.1)
Location  :  Kafer El Sheikh Government - Egypt
Client  :  National organization for Potable Water and Sanitary Drainage-
Ministry of Housing ( Egypt)– Sponsored by the German Bank
(KFW) - Germany
Consultant  :  Gitec – Dorch - Utilities Joint Venture
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES SEDE – Moukhtar
Ibrahim) – Egypt.
Project Budget  :  10,000,000 US $
Position  :  Technical Engineer – Site Offices ( Main Contractor)
Project Scope  : 
    - Constriction of 15 Nos. water treatment plant
    - Construction of 30 Nos. pumping stations
    - Laying of the force mains pipeline ( 20 km DI pipes DN
400 : 600 mm)
Duties/Responsibilities/Tasks   
    -Preparing/Reviewing the Profile & Alignment Drawings (PAD)
for all piping works in the project.
    -Assessment/Review the quantities of required materials
(Concrete works, piping works…….etc)
    - Preparing the monthly progress invoices.
    - Preparing/Reviewing the technical submittals.
    - Estimation for new items providing a detailed study for
Owner/Consultants
    - Prepare/Review the Work shop drawings.
    - Review the as built drawings.
    - Monitor the internal inventory system.
    - Attending the co-ordination meeting with Ministerial
committee for discussion and resolving the contractual
and financial issues.
 
From January 2005 to April 2006 ( Part Time) 
Project  :  Al Hafer Shehab El Din & AL Nor Booster Station in Kafr El
Shiekh Governorate
Location  :  Kafer El Sheikh Government - Egypt
Client  :  Ministry of Irrigation and Water Resources .
Consultant  :  ETECTO Consultancy Services
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES SEDE – Moukhtar
Ibrahim) – Egypt.
Page 15 of 17 
 
Project Budget  :  10,000,000 US $
Position  :  Senior Technical Office Engineer ( Main Contractor)
Project Scope  : 
    - Constriction Booster Station on Al Hafeer Shhab El Din
drain.
    - Constriction Booster Station on Al Nor irrigation canal.
Duties/Responsibilities/Tasks   
    - Pre - award activities (liaising with vendors, prepare
estimates for items, discuss the construction proposals).
    - Preparing Preliminary Time Schedule
    - Negotiation and award of contract documentation
    - Preparing/Reviewing the technical submittals.
    - Preparing documents for extension of time
    - Reviewing, verify design/construction drawings in line
with contract specifications and local requirements
    - Co-ordination for Geotechnical/Topographical Survey
works at site
 
From April 2001 to April 2006 
Project  :  Rehabilitation for Kafr El Sheikh Government Potable Water
Network (Contracts K 18 A & B)
Location  :  Kafer El Sheikh Government - Egypt
Client  :  National organization for Potable Water and Sanitary Drainage “
NOPWASD”- Ministry of Housing ( Egypt)– Sponsored by the
German Bank (KFW) - Germany
Consultant  :  CES – SEBA – Sanis Joint Venture
Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES SEDE – Moukhtar
Ibrahim) – Egypt.
Project Budget  :  20,000,000 US $
Position  :  Technical Engineer – Site Offices ( Main Contractor)
Project Scope  : 
    Laying about 80 km DI Pipelines about 50 km (DN 100 : 600
mm).
    Laying about 680 km uPVC pipes (DN 100: 300 mm).
    Construction of 12,000 Nos. house connections and laying
Polyethylene pipes ( 500 km)
    Construction of 182 nos. under road/railways pipes (by Non
disruptive method and open cut method
Duties/Responsibilities/Tasks   
    -Preparing/Reviewing the Profile & Alignment Drawings (PAD)
for all piping works in the project.
    -Assessment/Review the quantities of required materials
(Concrete works, piping works…….etc)
    - Preparing the monthly progress invoices.
    - Preparing/Reviewing the technical submittals.
    - Assessment for the quantities of required materials
(Concrete works, piping works…….etc)
    - Estimation for new items providing a detailed study for
Owner/Consultants
    - Key Contact Person with the suppliers/manufacturers of
Page 16 of 17 
 
the major imported materials; SG Pam (FRANCE),
Erhard (GRMANY), HAWLE (AUSTERIA), BEDRUS
(GRMANY), Viking Johnson (UK)
    - Key Contact Person with the suppliers/manufacturer of
the major local materials; uPVC manufactures (Miser El
Hegaz, AL Khalygia……etc), DI pipes fittings and
valves manufacturers (Al Naser casting Company)
    - Preparing Claims documents for extension for time and
related financial impact cooperated with the claims
consultant (Prof Dr. Sherief Al Hagan – American
University in Cairo).
    - Team leader for repairing the free issue materials
supplied by the client (Pipes, Fittings, Saddles,
Valves…..etc).
    - Prepare/Review the Work shop drawings.
    - Review the as built drawings.
    - Monitor the internal inventory system.
    - Attending the co-ordination meeting with Ministerial
committee for discussion and resolving the contractual
and financial issues.
 
From August 2000 to April 2001 
Project  :  Construction of 4 Nos. Residential Buildings in Tanta City
Location  :  Al Gharbia Government – Tanta City - Egypt
Client  :  Ministry of Electricity – Egypt Government
Consultant  :  AL Qadesya for Consultancy Services – Egypt.
Main Contractor  :  AL Hamed Contracting Co.
Project Budget  :  1,000,000 US $
Position  :  Site Engineer - Consultant
Project Scope  : 
    Construction of 4 Nos. Residential Buildings/ 20 floor for each -
Tanta City
Duties/Responsibilities/Tasks   
    - Inspection for steel reinforcement as per approved
drawings and specifications.
    - Inspection for Concrete works during placing as per
approved drawings and specifications
    - Quality Control records for concrete works
 
Tendering/Estimating experience 
- Team Leader for Estimation of TRANSCO EPC Tender No. N-12192 for Water Transmission
Scheme From Mirfa To Madinat Zayed, Liwa And Presidential Palace In Qusahwira of 50
KM of Carbon Steel Pipes 48”, 40”, 36 “ & 32” and 74 KM DI Pipeline DN 600 and related
Electrical, Instrument, Control and Hypo Chlorination System.
- Contribute in Tendering Stage of TRANSCO Tender No. N-11900 for water Pipeline from
Muzerah Pump Station to Jabana for Shah Gas Plant DN 1000 Carbon Steel Pipeline for
Technical evaluation during Tender stage for all materials, Budget Amount around
25,500,000 US $ ( Abu Dhabi –UAE – 2012)
Page 17 of 17 
 
- Contribute in Tender Stage of Al Ain Water Network (Tender No. N 6821) –The Client is
Abu Dhabi Transmission & Dispatch Co "TRANSCO" with approx. budgeted amount
250,000,000.00 US$. The tender Consists of :- (Abu Dhabi – UAE- April, May 2009)
- DI Pipes Dia 1600, 1200, 1000, 800, 600
- NDRC works.
- 5 x 10 MIG RC tanks with all complementary structures
- Contributed in Tender Stage of The family Court Building in Kafr El Sheikh Governorate (
Egypt – 2005) – with budgeted amount 25,000,000 Egyptian pounds.
- Contributed in Tender Stage of Al Hafer Shehab AL Din Booster Station in Kafer El Sheikh
Government (Eqypt – 2004) – with budgeted amount 20,000,000 Egyptian pounds. Preparing
the technical and financial offers
- Contributed in Tender Stage of Al Nor Booster Station in Kafer El Sheikh Governorate
(Eqypt - 2003) – with budgeted amount 6,000,000 Egyptian pounds. Preparing the technical
and financial offers.
Osama CV 2015 - Copy
Osama CV 2015 - Copy
Osama CV 2015 - Copy

More Related Content

What's hot (19)

عبدالسلام_original
عبدالسلام_originalعبدالسلام_original
عبدالسلام_original
 
LEE CV
LEE CVLEE CV
LEE CV
 
Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01Erik Groot CV Updated Aug 2015 rev 01
Erik Groot CV Updated Aug 2015 rev 01
 
omar-cv-1 QC
omar-cv-1 QComar-cv-1 QC
omar-cv-1 QC
 
mahmoud cv
mahmoud cv mahmoud cv
mahmoud cv
 
CV ahmed12
CV ahmed12CV ahmed12
CV ahmed12
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
CV - Florin Tuluc 2
CV - Florin Tuluc 2CV - Florin Tuluc 2
CV - Florin Tuluc 2
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
aslam Doc. controller cv.doc
aslam Doc. controller cv.docaslam Doc. controller cv.doc
aslam Doc. controller cv.doc
 
CV
CVCV
CV
 
Ahmed Naeim Kamel CV 5-2-2016
Ahmed Naeim Kamel  CV 5-2-2016Ahmed Naeim Kamel  CV 5-2-2016
Ahmed Naeim Kamel CV 5-2-2016
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015
 
Ahmed Ragab C.V
Ahmed Ragab C.VAhmed Ragab C.V
Ahmed Ragab C.V
 
A.Awad_CV 1016
A.Awad_CV 1016A.Awad_CV 1016
A.Awad_CV 1016
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
Procurement engineer cv
Procurement engineer cv Procurement engineer cv
Procurement engineer cv
 

Similar to Osama CV 2015 - Copy

Mohamed Melouk CV - Septmeber 2016 - MEP
Mohamed Melouk CV - Septmeber 2016 - MEPMohamed Melouk CV - Septmeber 2016 - MEP
Mohamed Melouk CV - Septmeber 2016 - MEPMohamed Melouk
 
Yahia albehairy cv addendum - pdf
Yahia albehairy cv  addendum - pdfYahia albehairy cv  addendum - pdf
Yahia albehairy cv addendum - pdfYahia Albehairy
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFYahia Albehairy
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFYahia Albehairy
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015ahmed elzidy
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CVmuhammad abdullah
 
Ehab C V5(2)
Ehab C V5(2)Ehab C V5(2)
Ehab C V5(2)Ehab RIZK
 
Mina Safwat Mounir Aziz R 2016
Mina Safwat Mounir Aziz  R 2016Mina Safwat Mounir Aziz  R 2016
Mina Safwat Mounir Aziz R 2016TKXE
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01Maged Tadrous
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv pipingMohamedZidan85
 

Similar to Osama CV 2015 - Copy (20)

modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Mohamed Melouk CV - Septmeber 2016 - MEP
Mohamed Melouk CV - Septmeber 2016 - MEPMohamed Melouk CV - Septmeber 2016 - MEP
Mohamed Melouk CV - Septmeber 2016 - MEP
 
Yahia albehairy cv addendum - pdf
Yahia albehairy cv  addendum - pdfYahia albehairy cv  addendum - pdf
Yahia albehairy cv addendum - pdf
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDF
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDF
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Abdelaziz Hamed Cv.pdf
Abdelaziz Hamed Cv.pdfAbdelaziz Hamed Cv.pdf
Abdelaziz Hamed Cv.pdf
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Ehab C V5(2)
Ehab C V5(2)Ehab C V5(2)
Ehab C V5(2)
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
Mina Safwat Mounir Aziz R 2016
Mina Safwat Mounir Aziz  R 2016Mina Safwat Mounir Aziz  R 2016
Mina Safwat Mounir Aziz R 2016
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 

Osama CV 2015 - Copy

  • 1. Page 1 of 17    C.V.  Personal Data Full Name Osama Hassan Anwar Date of birth 14/10/1978 Marital Status Married Profession Civil Engineer Current Position Project Technical Manager Nationality Egyptian Languages Arabic (native tongue), English, French & Deutch Years of experience +14 Years Contact No. Mob. UAE : (+971)50-311 28 53 : (+971) 55 – 450 9 430 Tel. Home : (+20 40) 2550 901 Email oshassan@hotmail.com osamanwar78@gmail.com Education and  professional  qualifications  Bachelor of Science Degree in Civil Engineering Tanta University, Tanta, Egypt  Major  Civil Engineering  Year Of Graduation  Year 2000  Grade  Good (72%)  4th  yr. Project title     Repair the Structural Element by Steel strips Grade                        Excellent  NEBOSH  Passed With Credit  Master Log Certificate No. :  00182214/490371  IGC1/00182214/486659  IGC2/00182214/487701  IGC3/00182214/488798   Key Experience  - Project Management for Water Pipeline’ Projects. - OHSE Aspects for Construction of Water Pipeline Projects - Procurement & Logistic Management for Local & Oversees major Lead items QA/QC Factory & Site inspection for DI Pipes/Fittings, CS Pipes/Fittings, Valves, Dismantling Joint Construction of Ductile Iron Main Pipeline and related mechanical
  • 2. Page 2 of 17    & civil works Construction & Welding of Carbon Steel Pipes & Fittings and related mechanical & civil works Coating of Carbon Steel pipes & Fittings   Commissioning of Water Pipeline   Co-ordination between Water pipeline Project disciplines ( Civil, Mechanical, Electrical, ICT….etc)   Planning & Scheduling   Tendering & Cost Estimation     Professional Courses /  Trainings Attended  Laying & testing of Fiber Optic Cable – ITS Contracting technologies – UAE – Febraury 2015 - Familiarization & Training Cathodic Protection System – BSSTech – UAE – November 2014 - Application of Epoxy Painting by M/s Jotun - 2014 - Working Safely in Confined Space Training – Merdif Security & Safety Consultants - UAE - 2013 - Rigging Training – Merdif Security & Safety Consultants - UAE - 2013 - Scaffolding Training ( OSHA) – - Merdif Security & Safety Consultants - UAE - 2013 - Principal for Food Safety - Merdif Security & Safety Consultants - UAE - 2013 -Application of Heat Shrinkage Sleeve for CS Pipes – TUV-Nord – UAE December 2012 - Fire Fighting – by M/s ILF Consulting Engineer– UAE - 2011 - First Aid – by M/s ILF Consulting Engineer– UAE - 2011 - Fire Fighting – Emirates Safety Centre – UAE - 2006 First Aide – Emirates Safety Centre – UAE- 2006 - Estimation of the Construction Projects – Egypt – May 2005 Principals for Management of Construction Projects. January 2005 Dewatering systems – Egypt – January 2006 -Claims & Arbitration along with FIDIC contracts (FIDIC 4th Edition) – May 2004. Contractor’s Engineer – Egypt – May 2003 Languages  Arabic: Native Language English: Excellent French: Fair German : Beginner   Driving License  UAE's Valid Driving License  Egypt's Valid Driving License
  • 3. Page 3 of 17      Computer Skills  MS Excel Outlook MS Word MS Power Point MS Project AutoCAD Primavera Adobe Acrobat Major Factory Inspection Attended  Europe  A- Ductile Iron Pipes & Fittings – M/s Saint Gobain PAM- (France) B- Butterfly Valves with Pneumatic Actuators & Air Compressor – M/s MIV and Atlas Copco – ( Croatia) UAE  A- Inspection on External Coating 3 LPE coating system at Brederow SHAW – Ras AL Khaimah. B- Inspection on DI manhole cover for chamber slabs – DUCAST – Dubai - UAE C- Inspection on Aluminium accessories including Painting & load test – Granada Metal Casting – Mussaffa – Abu Dhabi - UAE D- Inspection on DI manhole cover for chamber slabs – Abu Dhabi Carnation Metal Industrial Est. – Abu Dhabi - UAE E- Inspection on Fabrication of Carbon Steel Fittings at AL Jaber Precision Establishment – Mussafah – Abu Dhabi - UAE F- Attending the Concrete Trail mix preparation and Testing at M/s Trans gulf – Mussafah - Abu Dhabi - UAE G- Attending the Concrete Trail mix preparation and Testing at M/s TREMIX – AL Ain City - Abu Dhabi - UAE H- Attending the Concrete Trail mix preparation and Testing at M/s Quick-Mix Ready Mix Concrete– Western Region- Abu Dhabi - UAE I- Inspection on the Pre-cast Element ( cover slabs, RC pits, posts,…etc) at M/s AL Fara’a – Mussafah – Abu Dhabi- UAE Egypt  A- DI Pipes & Fittings at Nasr Casting Company – Cairo – Egypt B- Valves Factory of Al Nasr Casting Company – Alexandria - Egypt C- DI Pipes & Fitting manufactured by M/s Buders ( Germany) at local agent premises – Cairo - Egypt D- Miser El Hegaz, - uPVC pipes – 10th October City - Egypt E- AL Khalygia – uPVC pipes – 10th October City - Egypt  
  • 4. Page 4 of 17      Summary Work Experience  From  To  Compa ny  Name  Country/  Location  Project/Duty  Budget  US$  Position  August  2014  Today  SEDE  UAE/Abu  Dhabi  ADDC Contract No. D‐101712  “Construction of New DN900  Primary Main from Al Falah to  East Baniyas Along Graveyard  Road “  25,000 US$  Project  Technical  Manager  February  2014  June  2014  SEDE  UAE/Abu  Dhabi  TRANSCO EPC Tender No. N- 12192 “ Water Transmission Scheme From Mirfa To Madinat Zayed, Liwa And Presidential Palace In Qusahwira of 125 KM CS & DI Pipelines and related Electrical, Instrument, Control and Hypo Chlorination System.” 95,000 US$  Team Leader May2012  August  2014  SEDE  UAE/Abu  Dhabi   ( Western  Region)  TRANSCO EPC Contract N‐11900 “DN 1000 CS water Pipeline From  Mezerah PS to Jabana”  29,000 US$  Project  Technical  Manager  January  2014  April  2014  SEDE    TRANSCO EPC Tender N‐11900 “  DN 1000 CS Pipeline from  Mezeraih to Jabana”  25,000 US$  Sr  Estimator/Te chnical  Evaluation  October  2009  May  2012  SEDE  UAE/Al Ain TRANSCO EPC Contract N‐4381A‐ VO2 “DN 1600 DI water Pipeline  From Kharyr to Um Ghafa”  55,000 US$  Chief  Technical  Engineer  August  2009  June  2010  SEDE  UAE  TRANSCO EPC Tender No. G- 5809 “Strategic Water Storage / Recovery Project in LIWA” 550,000 US$  Sr Estimator June 2009  October  2009  Mouktar  Ibrahim  Egypt/Cairo  HQ  Claim Adjustor for sub‐contractors ‐‐‐ Sr. Engineer   A pril 2006  June  2009  SEDE UAE/Abu  Dhabi  TRANSCO EPC Contract No. N‐ 4277 “ Taweelah – Unit III – Umm  Al Nar   210,000 US$  Technical &  Procurement  Engineer – Site Offices  January  2005  April  2006  Moukhtar  Ibrahim  Egypt  Kfw - Germany/NPOWASD - Egypt - Sanitary Sewage Project for 15 Village at Kafer El Sheikh Government Potable Water Network (Contract No.1) 15,000 US$  Technical  Engineer  April 2001  April  2006  Moukhtar  Ibrahim  Egypt  Kfw - Germany/NPOWASD – Egypt “Rehabilitation for Kafr El Sheikh Government Potable Water Network -Contracts K 18 A & B” 20,000 US$  Technical  Engineer  August  2000  April  2001  Al  Qadysiah  Consultan cy  Egypt/Tanta Construction of 4 Nos. Residential Buildings in Tanta City ‐‐ Site Engineer  
  • 5. Page 5 of 17      Detailed Work Experience. (Projects’ Construction)  From 01st  August 2014 up to date   Project  :  Contract No. D-101712 Construction of New DN900 Primary Main from Al Falah to East Baniyas Along Graveyard Road Location  :  Emirate of Abu Dhabi – United Arab Emirates Client  :  Abu Dhabi Distribution Company (ADDC) Consultant  :  Italconsult Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu Dhabi U.A.E Project Budget  :  106,554,382.99 AED ( 29,000,000 US $) Position  :  Project Technical Manager ( Main Contractor) Project Scope  :      1- Construction of approximately 30.0 km of DN 900 mm D.I. pipeline, from Al Falah to East Baniyas along Graveyard Road, to supply water to Al Falah Community and South Shamkha Development.     2- Construction of approximately 1.4 km of DN 600 mm D.I. pipeline for the water supply to Al Shamkha Housing Development (Phase 1).     3- Construction of three (5) DN 600 mm pipe connections including DN 500 mm Area Metering Units, between the DN 900 mm pipeline and existing DN 600 mm pressure mains along Graveyard Road & Al Shamkha Housing Development. Duties/Responsibilities/Tasks    - Liaise with Client and Consultant for all construction, Technical and contractual affairs.     - Liaise with concerned authorities for issuance of required permits ( Municipality, TRANSCO, ADDC, ADNOC…etc)     - Plan, review and co-ordinate design and construction activities to ensure compliance with Project specification and legal requirements.     Provide a technical support for all Project team for ensuring compliance of the project as per schedule within budget quality standards     Ensure contract performance and safety measures are met     Contribute in preparing of the Tie Of Extension ( EOT)     Reviewing the progress Monthly, weekly and daily reports.     Evaluate to project construction to ensure compliance with project and authorities standards.     Preparing the internal minute of meetings and following up the targets and responsibilities     Dealing with AD Department of Transport ( DoT) regarding issue the related Permit To Work     Managing the major sub-contractors within the Project for the major items: A- Non Destructive Road Crossing ( NDRC) B- Geotechnical Survey Specialist
  • 6. Page 6 of 17    C- TPIA’s for site tests. D- Asphalt works.     Participate on Task Risk Assessment to critical and hazardous task, identifying issues and developing corrective action plans to ensure compliance with applicable EHS and local regulations     Identification of construction safety hazards and preparation of corrective measures     Preparing the Welding Procedure, review with Owner/Engineer and conduct the qualification tests.     Reviewing and contributing of design of the Pipeline Plan and Profile Drawing ( PAD).     Preparing/reviewing the engineering document for Project discipline activities :- A- Earthwork. B- Concrete Operation. C- DI Pipeline Installation D- Hydro-testing of the pipeline. E- Filling, Flushing & Disinfection.     Co-ordination between Project designs team and Owner/ consultant for the design items and ensure compliance with Project/International Standards.     Commissioning Engineer to implement and follow-up commissioning team at site for pre- commissioning/commissioning, initial operation and trail operation activates at site and prepare the related procedure and reports and issuance for the relevant certificates for each sub- system/system of the project A- Mechanical Completion Certificate (MCC) B- Filling, Flushing and disinfection of the Pipeline. C- Ready for Commission Certificate ( RFC) D- Ready for Start-up Certificate ( RFSU) E- Provisional Acceptance Certificate ( PAC). F- Final Acceptance Certificate ( FAC)   From 02nd May 2012 up to date  Project  :  EPC Contract No. N-11900 DN 1000 Carbon Steel Water Pipeline From Mezeraih Pumping Station to Janaba for Shah Gas Plant. Location  :  Emirate of Abu Dhabi – United Arab Emirates Client  :  Abu Dhabi Transmission & Dispatch Company (TRANSCO) Consultant  :  Tebodin Middle East Ltd Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu Dhabi U.A.E Project Budget  :  94,000,000 AED ( 25,000,000 US $) Position  :  Project Technical Manager – Site Offices ( Main Contractor) Project Scope  :      1- Supply, construction and commissioning of the DN 1000 mm ( 40”) Carbon Steel water Pipeline 37 KM     2- Construction of Road Crossing by NDRC method     3- Construction of Road Crossing by open cut method     4- Construction of Line Valves Chamber, Washout Chambers,
  • 7. Page 7 of 17    Air Release valve chambers     5- Provision for Tie in connection.     6- Supply, Lay and commissioning of Fiber Optic Cables 2 x 144 Fibers) Duties/Responsibilities/Tasks    - Liaise with Client and Consultant for all construction, Technical and contractual affairs.     - Liaise with concerned authorities for issuance of required permits ( Municipality, TRANSCO, ADDC, ADNOC…etc)     - Plan, review and co-ordinate design and construction operations ensure compliance with design drawings and specifications.     Provide a technical support for the Project Manager and all Project team for ensuring complying of the project as per schedule within budget, in accordance with quality standards     Ensure contract performance and safety measures are met     Contribute in preparing of the overall time schedule of the Project detailing from Level 1, 2 and 3 & give a detail breakdown for each stage.     Reviewing the progress Monthly, weekly and daily reports.     Evaluate to project construction to ensure compliance with project and authorities standards.     Preparing the internal minute of meetings and following up the targets and responsibilities     Managing the Procurement Process of the major lead items of the Project, including :- a- Preparation of initial agreement during Tender stage b- Preparation of detailed Contract agreement with the supplies/manufacturer with respect to the local and international standards/rules ( e.g. UAE Lows, Incoterms…etc). c- Ensuring the compliance of Project/International standards for the ordered material. d- Following up/attending and coordinating the Factory Test at manufacturers/suppliers premises in conjunction with Owner/Engineer and TPIA representatives e- Following up the shipping of material to destination and dealing with forwarders, shipping agent & transportation agents.     Managing the major sub-contractors within the Project for the major items: A- Non Destructive Road Crossing ( NDRC) B- Geotechnical Survey Specialist C- Welding sub-contractor. D- NDT testing laboratory at site. E- TPIA’s for site test. F- TPIA’s for overseas inspection at manufacturers premises G- Cement Mortar Lining applicator. H- Fiber Optic cable Works I- Cathodic Protection works J- Asphalt works.     Participate on Task Risk Assessment to critical and hazardous task, identifying issues and developing corrective action plans to ensure compliance with applicable EHS and local regulations
  • 8. Page 8 of 17        Identification of construction safety hazards and preparation of corrective measures     Preparing the Welding Procedure, review with Owner/Engineer and conduct the qualification tests.     Reviewing and contributing of design of the Pipeline Plan and Profile Drawing ( PAD).     Preparing/reviewing the engineering document for Project discipline activities :- A- Earthwork. B- Concrete Operation. C- DI Pipeline Installation D- CS Pipe welding E- Fabrication of CS fittings at work shop. F- Hydro-testing of the pipeline. G- Filling, Flushing & Disinfection.     Co-ordination between Project designs team and Owner/ consultant for the design items and ensure compliance with Project/International Standards.     Commissioning Engineer to implement and follow-up commissioning team at site for pre- commissioning/commissioning, initial operation and trail operation activates at site and prepare the related procedure and reports and issuance for the relevant certificates for each sub- system/system of the project A- Mechanical Completion Certificate (MCC) B- Filling, Flushing and disinfection of the Pipeline. C- Ready for Commission Certificate ( RFC) D- Ready for Start-up Certificate ( RFSU) E- Provisional Acceptance Certificate ( PAC). F- Final Acceptance Certificate ( FAC)     Review the financial/Planning aspect of the project with the Planning Team with the presented Cash Flow along the Time life of the Project.     Preparing the Project Record Book, Final Account and Close Out Report for the Project and reviewing with Owner/Engineer.     Involved in Wastage Management System for Project Waste Management with respect applicable lows/rules in Emirates of Abu Dhabi.   From 28th  September 2009 to 02nd  May 2012 (contractually till 02 May 2014 & Part time for Hand  Over till to date).  Project  :  EPC Contract No. N-4381A- VO2 ( Lot – C) Al Ain Water Distribution Network Location  :  Emirate of Abu Dhabi – United Arab Emirates Client  :  Abu Dhabi Transmission & Dispatch Company (TRANSCO) Consultant  :  ILF Consulting Engineers Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu Dhabi U.A.E Project Budget  :  198,953,604.45 AED ( 55,000,000 US $) Position  :  Chief Technical Engineer – Site Offices ( Main Contractor) Project Scope  : 
  • 9. Page 9 of 17        Supply and Installation of one (1) single line D.I. pipes DN 1600 pipeline from Khreyr to Umm Ghaffa to transfer water from the Start Point of P2O near Khreyr to end-point of P2R at Umm Ghaffa Floating Reservoir Station     Construct the related chambers along the Pipeline route (Line Valve, Washout & Air Release Valve Chambers).     Construct the Road Crossings whether by Open Cut method or by Non Disruptive Road Crossing (NDRC) for the roads intersect with the DN 1600 Pipeline.     Construct of 3 Tie in / Tap off Stations ( Tap-Off station at Khreyr RP 19, Tap-Off station at Mezyad RP 20 and Tie-n station RP 21 at Al Dhaher PS RP 21).     Supply and installation of all E&I/C work including of Fiber Optic Cable along the pipeline route for a distance of approximately 17.00 km complete with repeater stations to facilitate data and voice communication Duties/Responsibilities/Tasks    - Liaise with Client and Consultant for all construction and contractual affairs.     - Liaise with concerned local authorities for issuance of required permits ( Municipality, TRANSCO, ADDC, ADNOC…etc)     - Plan, review and co-ordinate design and construction operations ensure compliance with design drawings and specifications.     Provide a technical support for the Project Manager and all Project team for ensuring complying of the project as per schedule within budget, in accordance with quality standards     Ensure contract performance and safety measures are met     Contribute in preparing of the overall time schedule of the Project detailing from Level 1, 2 and 3 & give a detail breakdown for each stage.     Reviewing the progress Monthly, weekly and daily reports.     Evaluate to project construction to ensure compliance with project and authorities standards.     Preparing the internal minute of meetings and following up the targets and responsibilities     Managing the Procurement of the main lead item of the Project, including :- A- Preparation of initial agreement during Tender stage B- Preparation of detailed Contract agreement with the supplies/manufacturer with respect to the local and international standards/rules ( e.g. UAE Lows, Incoterms…etc). C- Ensuring the compliance of Project/International standards for the ordered material. D- Following up/attending and coordinating the Factory Test at manufacturers/suppliers premises in conjunction with Owner/Engineer and TPIA representatives E- Following up the shipping of material to destination and dealing with forwarders, shipping agent & transportation agents.     Managing the sub-contractors within the Project for the major items: A- Non Destructive Road Crossing ( NDRC) B- Geotechnical Survey Specialist
  • 10. Page 10 of 17    C- TPIA’s for site test. D- TPIA’s for overseas inspection at manufacturers premises E- Cement Mortar Lining applicator. F- Fiber Optic cable Works G- Asphalt works.     Participate on Task Risk Assessment to critical and hazardous task, identifying issues and developing corrective action plans to ensure compliance with applicable EHS and local regulations     Identification of construction safety hazards and preparation of corrective measures     Reviewing and contributing of design of the Pipeline Plan and Profile Drawing ( PAD).     Preparing/reviewing the engineering document for Project discipline activities :- A- Earthwork. B- Concrete Operation. C- DI Pipeline Installation. D- Particular Procedures for Major shut down on the existing lines E- Hydro-testing of the pipeline. F- Filling, Flushing & Disinfection.     Commissioning Engineer to implement and follow-up commissioning team at site for pre- commissioning/commissioning, initial operation and trail operation activates at site and prepare the related procedure and reports and issuance for the relevant certificates for each sub- system/system of the project A- Mechanical Completion Certificate (MCC) B- Filling, Flushing and disinfection of the Pipeline. C- Ready for Commission Certificate ( RFC) D- Ready for Start-up Certificate ( RFSU) E- Provisional Acceptance Certificate ( PAC). F- Final Acceptance Certificate ( FAC)     Review the financial/Planning aspect of the project with the Planning Team with the presented Cash Flow along the Time life of the Project.     Contribute in preparing the Project Record Book for the Project and reviewing with Owner/Engineer   From July 2009 to September 2009  Company  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu Dhabi - UAE Position : Sr Estimator Duties/Responsibilities/Tasks Review the Claims have been submitted from sub-contractors against the company. Investigate the disputes initiated between the sub-contractors and the company. Contributed in initiation of the Price List for the sub-contractors with respect to Clients (s) price lists.
  • 11. Page 11 of 17    Negotiations and discussions with the suppliers/manufacturers of pipes, fitting and construction materials. Contribute in Estimating of EPC Tender No. G-5809 ( TRANSCO) for Strategic Water Storage / Recovery Project in LIWA, which consists of the followings:- - Location 1 :- Back up Power Station and Service Centre - Location 2 :- Existing Storage Tanks - Location 3 :- Recharge / Recovery Scheme Pilot Plant - Location 4 :- Recharge / Recovery Schemes A,B,C - Location 5 :- Pumping Station Madinat Zayed - Location 6 :- Intermediate Pumping Station 2 – IPS2 - Location 7 :- Intermediate Pumping Station 1 – IPS1 - Location 8 :- Pumping Station Al Mirfa - Location 9 :- Pumping Station Al Mirfa New - Location 10 :- Transmission Mains (DN 1200 and DN 900). - Location 11 :- Back up Power Station Mussafah - Major Trade 1 :- Recovery well and monitoring well ( well construction ) - Major Trade 2 :- Medium Voltage System - Major Trade 3 :- SCADA System, Process Control and Instrumentation The main Task/duties were as followings:-: - Calculate/Review the quantities of Reinforced Concrete structures. - Preliminary Design for the Piping system between the buildings of the 11th locations. - Co-ordination with the In house design staff for RC buildings and pipeline chambers - Calculate/Review the quantities for the internal piping systems in the locations. - Prepare the technical/financial terms included in the inquiries for relevant suppliers/manufacturers. - Review the quotations from the suppliers/manufacturers and establish the comparison status - Establish the breakdown for the LUM SUM items for the piping works inside the locations. - Study the rate of production for labors and equipment’s related the activities for supply/installation/erection of piping system. - Establish breakdown for the earthwork activities for the DN 1200 pipeline and 2xDN900 pipeline (Excavation, backfilling, bund construction….etc) From April 2006 to June 2009 Project : EPC Contract No. N-4277 Tawelah – Unit III – Umm Al Nar Water Transmission Scheme ( Lot 1 & 2) Location  :  Emirate of Abu Dhabi – United Arab Emirates  Client  :  Abu Dhabi Transmission & Dispatch Company (TRANSCO)  Consultant  :  Tebodin Middle East
  • 12. Page 12 of 17    Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES (SEDE) – Abu Dhabi U.A.E Project Budget  :  760,000,00.00 AED ( 206,500,000 US $)  Position  :  Sr. Technical Engineer – Site Offices ( Main Contractor)  Project Scope  :        Supply and Laying of DI Pipeline 60 km length DN 1600mm from  Taweelah station to Umm Al Nar junction.      Supply & ‐ Laying the fibre optic cable from Taweelah  station to Umm Al Nar junction      Construct the related chambers along the Pipeline route (Line  Valve, Washout & Air Release Valve Chambers).      Construct the Road Crossings whether by Open Cut method or  by Non Disruptive Road Crossing (NDRC) for the roads intersect  with the DN 1600 Pipeline.      Replace of 5 km twin water DI pipeline DN 1200mm instead of  CS exiting line.      Laying of 3.5 km DI pipeline DN 1200 to Yas Island. Including the  marine crossing under water Chaneel to supply the water for  Yas Island      Laying of 3.5 km of the 33 kv cable from Unit III complex to Al  Bahyia sub station.      Pump station Buildings (Pump hall, Sub‐station, Hypo‐ chlorination & Fire  Duties/Responsibilities/Tasks    Preparing the documents for obtaining approval from Abu Dhabi  Municipality (Road Section) regarding the Non Disruptive Road  Crossings (NDRC) and Directional Drilling (HDPE).      Preparing/Reviewing the assessment for the quantities of  required materials (Concrete works, piping works…….etc)      Ensure contract performance and safety measures are met      Contribute in preparing of the overall time schedule of the  Project detailing from Level 1, 2 and 3 & give a detail breakdown  for each stage.       Reviewing the progress Monthly, weekly and daily reports.      Key contact Person for the Procurement of the main lead item  of the Project, including :‐  A‐ Ensuring the compliance of Project/International  standards for the ordered material.  B‐ Following up/attending and coordinating the Factory  Test at manufacturers/suppliers premises in conjunction  with Owner/Engineer and TPIA representatives  C‐ Following up the shipping of material to destination and  dealing with forwarders, shipping agent &  transportation agents.          Follow-up the sub-contractors within the Project for the major items: A- Non Destructive Road Crossing ( NDRC) B- Geotechnical Survey Specialist C- TPIA’s for site test. D- TPIA’s for overseas inspection at manufacturers premises E- Sub-contractor for Marine Channel Crossing ( Drill-Tec/
  • 13. Page 13 of 17    NSCC JV) F- Fiber Optic cable Works G- Asphalt works.     Key contact person for procurement of the major imported materials: DI Pipes and Fittings from M/S SG PAM (France), DI Fittings from M/s DUKER (Germany), Valves from M/s MIV (Croatia), Dismantling Joints/Couplings from Helden ( UK) including all inquiries, technical discussions, delivery schedules and correspondences     Competent Peron authorized from Abu Dhabi Transmission & Dispatch Company ( TRANCO) to issue the safety permit in accordance to TRANSCO’ SSRs. “Permit TO Work (PTW) for Civil works and works near 33 kv cables”     Authorized person for GASCO authorization to work (ATW).     Prepare the technical submittal for materials for the Pipeline rated material, reply on comments with respect to applicable Project/International Standards     Preparing the KKS numbering system for the pipeline works from Taweelah- to Umm Al Nar.     Preparing the engineering document for Project discipline activities :- A- Earthwork. B- Concrete Operation. C- DI Pipeline Installation. D- Particular procedures for protection of existing utilites intersect with pipeline route. E- Hydro-testing of the pipeline. F- Filling, Flushing & Disinfection.     Dealing with the insurance companies regarding the technical points and preparing the financial claims.     Contribute in and co-ordinate with the sub-contractor (M/s NSCC/DrillTec JV) for the Marine works to cross the Yas Island channel as followings: - The Carbon steel Pipes DN 1200 procurements, - Welding Procedure process /NDT testing, - Prepare/Discuss the procedures for the pneumatic test and hydrostatic test for the CS pipes. - Drilling and reaming stages. - Pulling of the CS pipes under the channel.     Assistant Commissioning Engineer to implement and one of the commissioning team at site for pre- commissioning/commissioning, initial operation and trail operation activates at site and contribute in preparing the related procedure and reports and issuance for the relevant certificates for each sub-system/system of the project A- Mechanical Completion Certificate (MCC) B- Filling, Flushing and disinfection of the Pipeline. C- Ready for Commission Certificate ( RFC) D- Ready for Start-up Certificate ( RFSU) E- Provisional Acceptance Certificate ( PAC). F- Final Acceptance Certificate ( FAC)     Review the financial/Planning aspect of the project with the Planning Team with the presented Cash Flow along the Time life of the Project.
  • 14. Page 14 of 17        Review and contribute in preparing the as built drawings and discussion with Owner/Consultant for comments and finalize the final revision.     Contribute in preparing the Project Record Book for the Project and reviewing with Owner/Engineer   From January 2005 to April 2006  Project  :  Sanitary Sewage Project for 15 Village at Kafer El Sheikh Government Potable Water Network (Contract No.1) Location  :  Kafer El Sheikh Government - Egypt Client  :  National organization for Potable Water and Sanitary Drainage- Ministry of Housing ( Egypt)– Sponsored by the German Bank (KFW) - Germany Consultant  :  Gitec – Dorch - Utilities Joint Venture Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES SEDE – Moukhtar Ibrahim) – Egypt. Project Budget  :  10,000,000 US $ Position  :  Technical Engineer – Site Offices ( Main Contractor) Project Scope  :      - Constriction of 15 Nos. water treatment plant     - Construction of 30 Nos. pumping stations     - Laying of the force mains pipeline ( 20 km DI pipes DN 400 : 600 mm) Duties/Responsibilities/Tasks        -Preparing/Reviewing the Profile & Alignment Drawings (PAD) for all piping works in the project.     -Assessment/Review the quantities of required materials (Concrete works, piping works…….etc)     - Preparing the monthly progress invoices.     - Preparing/Reviewing the technical submittals.     - Estimation for new items providing a detailed study for Owner/Consultants     - Prepare/Review the Work shop drawings.     - Review the as built drawings.     - Monitor the internal inventory system.     - Attending the co-ordination meeting with Ministerial committee for discussion and resolving the contractual and financial issues.   From January 2005 to April 2006 ( Part Time)  Project  :  Al Hafer Shehab El Din & AL Nor Booster Station in Kafr El Shiekh Governorate Location  :  Kafer El Sheikh Government - Egypt Client  :  Ministry of Irrigation and Water Resources . Consultant  :  ETECTO Consultancy Services Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES SEDE – Moukhtar Ibrahim) – Egypt.
  • 15. Page 15 of 17    Project Budget  :  10,000,000 US $ Position  :  Senior Technical Office Engineer ( Main Contractor) Project Scope  :      - Constriction Booster Station on Al Hafeer Shhab El Din drain.     - Constriction Booster Station on Al Nor irrigation canal. Duties/Responsibilities/Tasks        - Pre - award activities (liaising with vendors, prepare estimates for items, discuss the construction proposals).     - Preparing Preliminary Time Schedule     - Negotiation and award of contract documentation     - Preparing/Reviewing the technical submittals.     - Preparing documents for extension of time     - Reviewing, verify design/construction drawings in line with contract specifications and local requirements     - Co-ordination for Geotechnical/Topographical Survey works at site   From April 2001 to April 2006  Project  :  Rehabilitation for Kafr El Sheikh Government Potable Water Network (Contracts K 18 A & B) Location  :  Kafer El Sheikh Government - Egypt Client  :  National organization for Potable Water and Sanitary Drainage “ NOPWASD”- Ministry of Housing ( Egypt)– Sponsored by the German Bank (KFW) - Germany Consultant  :  CES – SEBA – Sanis Joint Venture Main Contractor  :  SOCIETE EGYPTIENNE D’ENTREPRISES SEDE – Moukhtar Ibrahim) – Egypt. Project Budget  :  20,000,000 US $ Position  :  Technical Engineer – Site Offices ( Main Contractor) Project Scope  :      Laying about 80 km DI Pipelines about 50 km (DN 100 : 600 mm).     Laying about 680 km uPVC pipes (DN 100: 300 mm).     Construction of 12,000 Nos. house connections and laying Polyethylene pipes ( 500 km)     Construction of 182 nos. under road/railways pipes (by Non disruptive method and open cut method Duties/Responsibilities/Tasks        -Preparing/Reviewing the Profile & Alignment Drawings (PAD) for all piping works in the project.     -Assessment/Review the quantities of required materials (Concrete works, piping works…….etc)     - Preparing the monthly progress invoices.     - Preparing/Reviewing the technical submittals.     - Assessment for the quantities of required materials (Concrete works, piping works…….etc)     - Estimation for new items providing a detailed study for Owner/Consultants     - Key Contact Person with the suppliers/manufacturers of
  • 16. Page 16 of 17    the major imported materials; SG Pam (FRANCE), Erhard (GRMANY), HAWLE (AUSTERIA), BEDRUS (GRMANY), Viking Johnson (UK)     - Key Contact Person with the suppliers/manufacturer of the major local materials; uPVC manufactures (Miser El Hegaz, AL Khalygia……etc), DI pipes fittings and valves manufacturers (Al Naser casting Company)     - Preparing Claims documents for extension for time and related financial impact cooperated with the claims consultant (Prof Dr. Sherief Al Hagan – American University in Cairo).     - Team leader for repairing the free issue materials supplied by the client (Pipes, Fittings, Saddles, Valves…..etc).     - Prepare/Review the Work shop drawings.     - Review the as built drawings.     - Monitor the internal inventory system.     - Attending the co-ordination meeting with Ministerial committee for discussion and resolving the contractual and financial issues.   From August 2000 to April 2001  Project  :  Construction of 4 Nos. Residential Buildings in Tanta City Location  :  Al Gharbia Government – Tanta City - Egypt Client  :  Ministry of Electricity – Egypt Government Consultant  :  AL Qadesya for Consultancy Services – Egypt. Main Contractor  :  AL Hamed Contracting Co. Project Budget  :  1,000,000 US $ Position  :  Site Engineer - Consultant Project Scope  :      Construction of 4 Nos. Residential Buildings/ 20 floor for each - Tanta City Duties/Responsibilities/Tasks        - Inspection for steel reinforcement as per approved drawings and specifications.     - Inspection for Concrete works during placing as per approved drawings and specifications     - Quality Control records for concrete works   Tendering/Estimating experience  - Team Leader for Estimation of TRANSCO EPC Tender No. N-12192 for Water Transmission Scheme From Mirfa To Madinat Zayed, Liwa And Presidential Palace In Qusahwira of 50 KM of Carbon Steel Pipes 48”, 40”, 36 “ & 32” and 74 KM DI Pipeline DN 600 and related Electrical, Instrument, Control and Hypo Chlorination System. - Contribute in Tendering Stage of TRANSCO Tender No. N-11900 for water Pipeline from Muzerah Pump Station to Jabana for Shah Gas Plant DN 1000 Carbon Steel Pipeline for Technical evaluation during Tender stage for all materials, Budget Amount around 25,500,000 US $ ( Abu Dhabi –UAE – 2012)
  • 17. Page 17 of 17    - Contribute in Tender Stage of Al Ain Water Network (Tender No. N 6821) –The Client is Abu Dhabi Transmission & Dispatch Co "TRANSCO" with approx. budgeted amount 250,000,000.00 US$. The tender Consists of :- (Abu Dhabi – UAE- April, May 2009) - DI Pipes Dia 1600, 1200, 1000, 800, 600 - NDRC works. - 5 x 10 MIG RC tanks with all complementary structures - Contributed in Tender Stage of The family Court Building in Kafr El Sheikh Governorate ( Egypt – 2005) – with budgeted amount 25,000,000 Egyptian pounds. - Contributed in Tender Stage of Al Hafer Shehab AL Din Booster Station in Kafer El Sheikh Government (Eqypt – 2004) – with budgeted amount 20,000,000 Egyptian pounds. Preparing the technical and financial offers - Contributed in Tender Stage of Al Nor Booster Station in Kafer El Sheikh Governorate (Eqypt - 2003) – with budgeted amount 6,000,000 Egyptian pounds. Preparing the technical and financial offers.