Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Cbn sep8 brownfields workshop final

491 views

Published on

September 9, 2014. ONEIA Excess Soil Session - Presentation Lisa Prime Waterfront Toronto

Published in: Environment
  • Be the first to comment

  • Be the first to like this

Cbn sep8 brownfields workshop final

  1. 1. Implementing Brownfields Lisa Prime Director Environment and Innovation
  2. 2. We’re engaged in one of the most significant city building projects in the world.
  3. 3. Our business model
  4. 4. Master planner and developer
  5. 5. Creating quality of place
  6. 6. Responsible revitalization
  7. 7. Design Excellence Innovative Integrated Systems Green Buildings Sustainable Transport Intelligent Communities Infrastructure Parks and Habitat Creation Moving Beyond Principles to Performance
  8. 8. Minimum Green Building Requirements and Tracking System Version 1 2006, Version 2 February 2014 Minimum performance measures for development: energy, water, waste, transportation, materials, design + progress tracking including soil management plan activities for contaminated soils
  9. 9. • LEED Gold certified buildings • building targeting LEED Gold certification awaiting review with the Canada Green Building Council • buildings under construction targeting LEED Gold certification • buildings under design targeting LEED Gold certification 2 1 10 4 LEED certified buildings
  10. 10. Waste&Diversion&Rates&(construc1on,& demoli1on,&and&excava1on)&in&%& Bayside Queen's Quay Sherbourne Common York Quay George Brown College Waste Diversion 65 100 97 97 89 99 West Don Lands
  11. 11. • 40,000$new$residences,$$ • 40,000$new$jobs,$and$$ • 300$hectares$of$public$parks$ Revitalizing brownfields
  12. 12. Land risk assessed, 43.5 Land not yet assessed, 9.8$ Land assessed but not yet implemented 17.3$ Land assessed and met property specific standards (remediation not required), Brownfield approvals (ha)
  13. 13. Soil Recycling Facility Established in July 2010 Use technology to treat contaminated soil and turn it in to a resource Cost Benefit Analysis Completed Technology Research Sharing, others such as Kingston, Cambridge Model for brownfields stakeholders
  14. 14. Building future-ready infrastructure
  15. 15. The Port Lands
  16. 16. Port Lands Future Communities
  17. 17. www.waterfrontoronto.ca Follow us on Twitter: @WaterfrontTO Lisa Prime Director Environment and Innovation

×