Costs, benefits and transport decisions
o Cost-benefit analysis (CBA) is the main framework used for the
assessment of socio-economic benefits of investment, especially in
North America and Europe since the 1990s
o The theoretical foundation of CBA lies in the Pareto Improvement
principle and social welfare maximisation
o In practice, CBA involves assessing all costs and benefits and
evaluating the aggregate impact on welfare in monetary terms;
different from profitability/financial viability of the project.
o Today, both transport policies and projects require an impact
assessment, the main component of which is CBA
Why is cost-benefit analysis important?
o Socio-economic assessments are crucial to understand whether:
• A project is viable or should be rejected
• Different project elements are appropriately selected
• A project is of high or low priority within an overall program
• The timing of the project is correct
o To allow proper comparison of options, an objective, uniform
framework is important
o Ultimately CBA is about ensuring value for money and efficiency
of public spending
o Important guiding principles in the presence of competing
demands for funds and limited public budgets
CBA in practice
Key components:
• A time horizon or planning period (T), usually expressed as a number of years;
• Estimated costs (C) over that period (including operating and capital costs and
possibly social costs);
• Estimated benefits (B) over that period (expressed in terms of monetary benefits
for operators, users and society as a whole);
• A discount rate (r) to convert future values to present day values representing
the opportunity cost of investment
Example 1 / CBA in the UK transport
“business case”
o UK example - all major transport project proposals need to show
business case with 5 components:
1. Fit with overall policy objectives – strategic case
2. Value for money - economic case
3. Commercially viability - commercial case
4. Financially affordability - financial case
5. Achievability - management case
CBA is done here
Effects on welfare
and economy
Other resource benefits from:
• More productive jobs
• Increased labour supply
• Induced property development
• Increased competition
Investment in transport
Average
travel
time
Transport
improvements
$ cost Reliability Comfort Resilience Access
Direct resource benefits
• Travel time savings (wage benefit)
• Fuel and operating cost savings
• Agglomeration benefits
Welfare benefits
• Leisure/commute time savings
• Reliability benefits
• Comfort benefits
• Safety benefits (life and injury)
• Environmental benefits
Location changes:
• Housing
• Business activities
• Jobs and commutes
Flow-on and final
effects on economy
Business
&
freight
Leisure
Travel to
work
Transport users
affected
Major effects in CBAKey: Minor effects in CBA Effects (usually) not captured in CBA
Transmitted economic effects
• Employment
• Output / GDP
• Productivity and wages
• Profits
• Land and property value/rents
Standard CBA scope
Market imperfections
CBA applied to policy measures
o CBA should enter the policy-making process as part of RIA
o Quantitative assessments of impacts give policy makers clear, like-for-
like comparisons of different options – including no intervention
o But CBA is just one of the impact assessment tools available (also BEA,
CEA, MCA) and should only be used when some conditions are met…
CBA
CBA – a word of caution
Important factors to consider for effective CBA in transport:
1. Good data availability covering the period before the intervention to minimise
measurement problems
2. Sophisticated enough methods to forecast and evaluate future costs and
benefits, including non-market valuation
3. Total/net welfare benefits ignore distributional effects; additional analysis may
be needed including how to compensate losers
4. Mismatch between what CBA measures (social welfare) and national political
priorities (economic effects)
5. Limited coverage, when important impacts cannot be monetised and risk being
ignored in the final decision
Example 2 / Japanese rail privatisation ex-
post assessment
o Ex-post impact assessment (2005) of rail privatisation (1987)
o Based on 2000 data for the Tokyo Metropolitan Area and
comparing consumer and producer surplus under private rail
with a baseline scenario of continued public ownership
o Selection of year and geographic location to maximise
availability of data from different sources
o Assumptions of status quo: efficiency, pricing, quality…
o Results: privatisation had been the appropriate policy choice
and total welfare benefits were 251 billion Yen in Case 1, and
in 80.6 billion Yen in Case 2.
Concluding remarks
o Better decisions on both transport policies and projects
require an impact assessment, the main component of which
is CBA
o Quantification of costs and benefits, where possible, adds
elements of objectivity and comparability to the assessment
of options
o To get CBA right:
• Data
• Skills
• Experience
o Learning process that is strengthened by ex-post validation
over time

More Related Content

What's hot

Role of transportation in Development
Role of transportation in DevelopmentRole of transportation in Development
Role of transportation in Development
Malvika Jaishal
 
Role of infrastructure
Role of infrastructureRole of infrastructure
Role of infrastructure
mohishukla
 
Transport problems in urban india
Transport problems in urban indiaTransport problems in urban india
Transport problems in urban india
Neha Budhiraja
 

What's hot (20)

Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Presentation transport economics 17_may2106
Presentation transport economics 17_may2106Presentation transport economics 17_may2106
Presentation transport economics 17_may2106
 
Transportation
TransportationTransportation
Transportation
 
Transportation planning
Transportation planningTransportation planning
Transportation planning
 
04 transport modelling
04 transport modelling04 transport modelling
04 transport modelling
 
Container terminals (1)
Container terminals (1)Container terminals (1)
Container terminals (1)
 
Transportation problem with relevance to indian cities
Transportation problem with relevance to indian citiesTransportation problem with relevance to indian cities
Transportation problem with relevance to indian cities
 
Sustainable Transportation
Sustainable TransportationSustainable Transportation
Sustainable Transportation
 
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport Policy
 
Role of transportation in Development
Role of transportation in DevelopmentRole of transportation in Development
Role of transportation in Development
 
Transportation problems
Transportation problemsTransportation problems
Transportation problems
 
Role of infrastructure
Role of infrastructureRole of infrastructure
Role of infrastructure
 
TRANSPORT SUPPLY AND DEMAND
TRANSPORT SUPPLY AND DEMANDTRANSPORT SUPPLY AND DEMAND
TRANSPORT SUPPLY AND DEMAND
 
Trip generation
Trip generationTrip generation
Trip generation
 
Land-use transport planning
Land-use transport planning Land-use transport planning
Land-use transport planning
 
Methods of route assignment
Methods of route assignmentMethods of route assignment
Methods of route assignment
 
Urban traffic problems and solutions
Urban traffic problems and solutionsUrban traffic problems and solutions
Urban traffic problems and solutions
 
Multi-modal and Inter-modal transportation planning
Multi-modal and Inter-modal transportation planningMulti-modal and Inter-modal transportation planning
Multi-modal and Inter-modal transportation planning
 
Transport problems in urban india
Transport problems in urban indiaTransport problems in urban india
Transport problems in urban india
 

Similar to Cost-benefit analysis in the transport sector

Cost benefit analysis in policy making ta 181113
Cost benefit analysis in policy making ta 181113Cost benefit analysis in policy making ta 181113
Cost benefit analysis in policy making ta 181113
Tera Allas
 
Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...
Institute for Transport Studies (ITS)
 
Clear Air Zones – What are Local Authorities Proposing? - Nigel Bellamy
Clear Air Zones – What are Local Authorities Proposing? - Nigel BellamyClear Air Zones – What are Local Authorities Proposing? - Nigel Bellamy
Clear Air Zones – What are Local Authorities Proposing? - Nigel Bellamy
IES / IAQM
 
Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...
Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...
Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...
Green Field consulting & development (GFD)
 
Econ evaluation guidelines
Econ evaluation guidelinesEcon evaluation guidelines
Econ evaluation guidelines
Adili Zella
 

Similar to Cost-benefit analysis in the transport sector (20)

Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...
 
Cost benefit analysis in policy making ta 181113
Cost benefit analysis in policy making ta 181113Cost benefit analysis in policy making ta 181113
Cost benefit analysis in policy making ta 181113
 
Planning transport for future city regions – do we have the tools we need?
Planning transport for future city regions – do we have the tools we need?Planning transport for future city regions – do we have the tools we need?
Planning transport for future city regions – do we have the tools we need?
 
Cost-Benefit Analysis in Transport - Professor Peter Mackie
Cost-Benefit Analysis in Transport - Professor Peter MackieCost-Benefit Analysis in Transport - Professor Peter Mackie
Cost-Benefit Analysis in Transport - Professor Peter Mackie
 
Financing for Sustainable Low Carbon Transport Systems
Financing for Sustainable Low Carbon Transport SystemsFinancing for Sustainable Low Carbon Transport Systems
Financing for Sustainable Low Carbon Transport Systems
 
Cost benefit analysis in policy making ta 181113
Cost benefit analysis in policy making ta 181113Cost benefit analysis in policy making ta 181113
Cost benefit analysis in policy making ta 181113
 
Co-Benefits of Pro-Climate Transport
Co-Benefits of Pro-Climate TransportCo-Benefits of Pro-Climate Transport
Co-Benefits of Pro-Climate Transport
 
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxPUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
 
Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...
 
Clear Air Zones – What are Local Authorities Proposing? - Nigel Bellamy
Clear Air Zones – What are Local Authorities Proposing? - Nigel BellamyClear Air Zones – What are Local Authorities Proposing? - Nigel Bellamy
Clear Air Zones – What are Local Authorities Proposing? - Nigel Bellamy
 
Economic appraisal under NAPs
Economic appraisal under NAPsEconomic appraisal under NAPs
Economic appraisal under NAPs
 
NAP Training Viet Nam - Session 7 Appraising Adaptation Options
NAP Training Viet Nam - Session 7 Appraising Adaptation OptionsNAP Training Viet Nam - Session 7 Appraising Adaptation Options
NAP Training Viet Nam - Session 7 Appraising Adaptation Options
 
Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)
 
Carbon Market 2.1? Networks and the riddle of fair and ambitious climate coop...
Carbon Market 2.1? Networks and the riddle of fair and ambitious climate coop...Carbon Market 2.1? Networks and the riddle of fair and ambitious climate coop...
Carbon Market 2.1? Networks and the riddle of fair and ambitious climate coop...
 
Investment appraisal-in-the-round: Multi-Criteria Analysis
Investment appraisal-in-the-round: Multi-Criteria AnalysisInvestment appraisal-in-the-round: Multi-Criteria Analysis
Investment appraisal-in-the-round: Multi-Criteria Analysis
 
Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...
Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...
Enhancing Effective Regulation of Water and Energy Infrastructure and Utility...
 
Spending Reviews - Wojciech ZIELINSKI, OECD
Spending Reviews - Wojciech ZIELINSKI, OECDSpending Reviews - Wojciech ZIELINSKI, OECD
Spending Reviews - Wojciech ZIELINSKI, OECD
 
Cba makassar port (english)
Cba makassar port (english)Cba makassar port (english)
Cba makassar port (english)
 
Econ evaluation guidelines
Econ evaluation guidelinesEcon evaluation guidelines
Econ evaluation guidelines
 
Understanding the GDP impact of infrastructure investment - learning from tra...
Understanding the GDP impact of infrastructure investment - learning from tra...Understanding the GDP impact of infrastructure investment - learning from tra...
Understanding the GDP impact of infrastructure investment - learning from tra...
 

More from OECD Governance

More from OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 

Recently uploaded

VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Recently uploaded (20)

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 

Cost-benefit analysis in the transport sector

  • 1. COST BENEFIT ANALYSIS IN THE TRANSPORT SECTOR Lorenzo Casullo - Economist and Policy Analyst International Transport Forum at the OECD Lima, February 2017
  • 2. Costs, benefits and transport decisions o Cost-benefit analysis (CBA) is the main framework used for the assessment of socio-economic benefits of investment, especially in North America and Europe since the 1990s o The theoretical foundation of CBA lies in the Pareto Improvement principle and social welfare maximisation o In practice, CBA involves assessing all costs and benefits and evaluating the aggregate impact on welfare in monetary terms; different from profitability/financial viability of the project. o Today, both transport policies and projects require an impact assessment, the main component of which is CBA
  • 3. Why is cost-benefit analysis important? o Socio-economic assessments are crucial to understand whether: • A project is viable or should be rejected • Different project elements are appropriately selected • A project is of high or low priority within an overall program • The timing of the project is correct o To allow proper comparison of options, an objective, uniform framework is important o Ultimately CBA is about ensuring value for money and efficiency of public spending o Important guiding principles in the presence of competing demands for funds and limited public budgets
  • 4. CBA in practice Key components: • A time horizon or planning period (T), usually expressed as a number of years; • Estimated costs (C) over that period (including operating and capital costs and possibly social costs); • Estimated benefits (B) over that period (expressed in terms of monetary benefits for operators, users and society as a whole); • A discount rate (r) to convert future values to present day values representing the opportunity cost of investment
  • 5. Example 1 / CBA in the UK transport “business case” o UK example - all major transport project proposals need to show business case with 5 components: 1. Fit with overall policy objectives – strategic case 2. Value for money - economic case 3. Commercially viability - commercial case 4. Financially affordability - financial case 5. Achievability - management case CBA is done here
  • 6. Effects on welfare and economy Other resource benefits from: • More productive jobs • Increased labour supply • Induced property development • Increased competition Investment in transport Average travel time Transport improvements $ cost Reliability Comfort Resilience Access Direct resource benefits • Travel time savings (wage benefit) • Fuel and operating cost savings • Agglomeration benefits Welfare benefits • Leisure/commute time savings • Reliability benefits • Comfort benefits • Safety benefits (life and injury) • Environmental benefits Location changes: • Housing • Business activities • Jobs and commutes Flow-on and final effects on economy Business & freight Leisure Travel to work Transport users affected Major effects in CBAKey: Minor effects in CBA Effects (usually) not captured in CBA Transmitted economic effects • Employment • Output / GDP • Productivity and wages • Profits • Land and property value/rents Standard CBA scope Market imperfections
  • 7. CBA applied to policy measures o CBA should enter the policy-making process as part of RIA o Quantitative assessments of impacts give policy makers clear, like-for- like comparisons of different options – including no intervention o But CBA is just one of the impact assessment tools available (also BEA, CEA, MCA) and should only be used when some conditions are met… CBA
  • 8. CBA – a word of caution Important factors to consider for effective CBA in transport: 1. Good data availability covering the period before the intervention to minimise measurement problems 2. Sophisticated enough methods to forecast and evaluate future costs and benefits, including non-market valuation 3. Total/net welfare benefits ignore distributional effects; additional analysis may be needed including how to compensate losers 4. Mismatch between what CBA measures (social welfare) and national political priorities (economic effects) 5. Limited coverage, when important impacts cannot be monetised and risk being ignored in the final decision
  • 9. Example 2 / Japanese rail privatisation ex- post assessment o Ex-post impact assessment (2005) of rail privatisation (1987) o Based on 2000 data for the Tokyo Metropolitan Area and comparing consumer and producer surplus under private rail with a baseline scenario of continued public ownership o Selection of year and geographic location to maximise availability of data from different sources o Assumptions of status quo: efficiency, pricing, quality… o Results: privatisation had been the appropriate policy choice and total welfare benefits were 251 billion Yen in Case 1, and in 80.6 billion Yen in Case 2.
  • 10. Concluding remarks o Better decisions on both transport policies and projects require an impact assessment, the main component of which is CBA o Quantification of costs and benefits, where possible, adds elements of objectivity and comparability to the assessment of options o To get CBA right: • Data • Skills • Experience o Learning process that is strengthened by ex-post validation over time