Pump Jack Scaffolding
August 2015
Subchapter 4. Construction Safety Orders
Article 22. Scaffolds--Various Types
§1655. Pump Jack Scaffolds.
(a) Pump jack scaffolds shall:
(1) Be limited to a maximum working load of 500 pounds; and
(2) Have a Safety Factor of at least four times the maximum intended load.
(3) The manufactured components shall not be loaded in excess of the
manufacturer's recommended limits. (See Plate B-33, Appendix)
(b) Pump jack brackets, braces, and accessories shall be fabricated from metal plates
and angles. Each pump jack bracket shall have two positive gripping mechanisms to
prevent any failure or slippage.
Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety
Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17
(c) The platform bracket shall be fully decked and the planking secured. Planking, or
equivalent, shall conform with Section 1637.
(1) When wood scaffold planks are used as platforms, poles used for pump jacks
shall not be spaced more than 10 feet center to center. When fabricated
platforms are used that fully comply with all other provisions of this Order, pole
spacing may exceed 10 feet center to center.
(2) Poles shall not exceed 30 feet in height.
(3) Poles shall be secured to the work wall by rigid triangular bracing, or
equivalent, at the bottom, top, and other points as necessary, to provide a
maximum vertical spacing of not more than 10 feet between braces. Each brace
shall be capable of supporting a minimum of 225 pounds tension or compression.
(4) For the pump jack bracket to pass bracing already installed, an extra brace
shall be used approximately 4 feet above the one to be passed until the original
brace is reinstalled.
(d) All poles shall bear on mud sill or other adequate firm foundations.
(e) Pole lumber shall be two 2 x 4's, of Douglas fir, or equivalent, straight-grained, clear,
free of cross-grain, shakes, large loose or dead knots, and other defects which might
impair strength.
(f) When poles are constructed of two continuous lengths, they shall be 2 x 4's, spiked
together with the seam parallel to the bracket, and with 10d common nails, no more
than 12 inches center to center, staggered uniformly from opposite outside edges.
(g) If 2 x 4's are spliced to make up the pole, the splices shall be so constructed as to
develop the full strength of the member.
(h) Not more than two employees shall be permitted at one time upon a pump jack
scaffold between any two supports.
Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety
Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17
(i) Pump jacks scaffolds shall be provided with standard guardrails as described in
Article 16 but no guardrail is required when safety belts with lanyards are provided for
and used by employees.
(j) When a work bench is used at an approximate height of 42 inches, the top guardrail
may be eliminated, if the work bench is fully decked, the planking secured, and is
capable of withstanding 200 pounds load in any direction.
(k) Employees shall not be permitted to use a work bench as a scaffold platform.
NOTE: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor
Code.
HISTORY
1. New section filed 11-14-75; effective thirtieth day thereafter (Register 75, No. 46).
2. Amendment filed 7-24-87; operative 8-23-87 (Register 87, No. 33).
Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety
Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17
EMPLOYEE TRAINING AND INSTRUCTION RECORD
Subject: Pump Jack Scaffolding
Location:
Instructor’s name & Signature: _______
Date of Session: / / Time Started : am / pm Time Finished : am / pm
Please print your name and job title. Then sign your name.
ATTENDEES:
Print Name Job Title Signature

More Related Content

What's hot

TW-02 (150x25mm) outdoor wpc decking
TW-02 (150x25mm) outdoor wpc deckingTW-02 (150x25mm) outdoor wpc decking
TW-02 (150x25mm) outdoor wpc decking威 小
 
Type csd Forklift Tipping Bins
Type csd Forklift Tipping BinsType csd Forklift Tipping Bins
Type csd Forklift Tipping BinsJessica Chen
 
WPC outdoor solid decking floor 134x24mm
WPC outdoor solid decking floor 134x24mmWPC outdoor solid decking floor 134x24mm
WPC outdoor solid decking floor 134x24mm威 小
 
Cell fender
Cell fender Cell fender
Cell fender beast0004
 
Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Rafi Tchopourian
 
2021 A FRAME | AARDWOLF INDUSTRIES LLC
2021  A FRAME | AARDWOLF INDUSTRIES LLC2021  A FRAME | AARDWOLF INDUSTRIES LLC
2021 A FRAME | AARDWOLF INDUSTRIES LLCAarwolf Industries LLC
 
Forming Devise
Forming Devise Forming Devise
Forming Devise Huron1313
 
Load Extender Guide R0
Load Extender Guide R0Load Extender Guide R0
Load Extender Guide R0Joe Botelho
 
False carriage guide_r0
False carriage guide_r0False carriage guide_r0
False carriage guide_r0Joe Botelho
 
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question PaperAr803 Architectural Structure Question Paper
Ar803 Architectural Structure Question PaperVishvendu pandey
 
TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1
TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1
TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1frictionhinges
 
Cutting Edges - Loader Edges
Cutting Edges - Loader EdgesCutting Edges - Loader Edges
Cutting Edges - Loader Edgesconversion2015
 
Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...
Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...
Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...cirwindgroup
 
57623_HFS_SaleSheet_PR
57623_HFS_SaleSheet_PR57623_HFS_SaleSheet_PR
57623_HFS_SaleSheet_PRMark Spelder
 

What's hot (15)

TW-02 (150x25mm) outdoor wpc decking
TW-02 (150x25mm) outdoor wpc deckingTW-02 (150x25mm) outdoor wpc decking
TW-02 (150x25mm) outdoor wpc decking
 
Type csd Forklift Tipping Bins
Type csd Forklift Tipping BinsType csd Forklift Tipping Bins
Type csd Forklift Tipping Bins
 
WPC outdoor solid decking floor 134x24mm
WPC outdoor solid decking floor 134x24mmWPC outdoor solid decking floor 134x24mm
WPC outdoor solid decking floor 134x24mm
 
Cell fender
Cell fender Cell fender
Cell fender
 
Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support Coates Hire Structural Propping & Support
Coates Hire Structural Propping & Support
 
2021 A FRAME | AARDWOLF INDUSTRIES LLC
2021  A FRAME | AARDWOLF INDUSTRIES LLC2021  A FRAME | AARDWOLF INDUSTRIES LLC
2021 A FRAME | AARDWOLF INDUSTRIES LLC
 
Forming Devise
Forming Devise Forming Devise
Forming Devise
 
Steel Spill Containment Pallets
Steel Spill Containment PalletsSteel Spill Containment Pallets
Steel Spill Containment Pallets
 
Load Extender Guide R0
Load Extender Guide R0Load Extender Guide R0
Load Extender Guide R0
 
False carriage guide_r0
False carriage guide_r0False carriage guide_r0
False carriage guide_r0
 
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question PaperAr803 Architectural Structure Question Paper
Ar803 Architectural Structure Question Paper
 
TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1
TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1
TorqMaster Friction Hinge - Zc 250-cf-101-friction-hinge-data-sheet-1
 
Cutting Edges - Loader Edges
Cutting Edges - Loader EdgesCutting Edges - Loader Edges
Cutting Edges - Loader Edges
 
Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...
Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...
Cirwind Group – Circular Looms Machine Exporter, Tarpaulins, Cement Bags / Ju...
 
57623_HFS_SaleSheet_PR
57623_HFS_SaleSheet_PR57623_HFS_SaleSheet_PR
57623_HFS_SaleSheet_PR
 

Viewers also liked

resume Ali Valimohammadi(N41)
resume Ali Valimohammadi(N41)resume Ali Valimohammadi(N41)
resume Ali Valimohammadi(N41)Ali Valimohammadi
 
Plantilla Fase 2 - Ensamble y Mantenimiento de Computadores
Plantilla Fase 2 - Ensamble y Mantenimiento de ComputadoresPlantilla Fase 2 - Ensamble y Mantenimiento de Computadores
Plantilla Fase 2 - Ensamble y Mantenimiento de Computadoresjuan carlos arrieta
 
Тиждень безпеки руху ЗОШ№19
Тиждень безпеки руху ЗОШ№19Тиждень безпеки руху ЗОШ№19
Тиждень безпеки руху ЗОШ№19Tatyana Novomlinets
 
Paul Stead AX7 Programme Manager 4.4
Paul Stead AX7 Programme Manager 4.4Paul Stead AX7 Programme Manager 4.4
Paul Stead AX7 Programme Manager 4.4Paul Kirk Stead
 
flujo de efectivo . rosannys torrealba
flujo de efectivo . rosannys torrealba flujo de efectivo . rosannys torrealba
flujo de efectivo . rosannys torrealba rosannys0902
 
Italy on the Social Web
Italy on the Social WebItaly on the Social Web
Italy on the Social Webron mader
 
Future on Water: IoT Infiltration into Water Management Solutions
Future on Water: IoT Infiltration into Water Management SolutionsFuture on Water: IoT Infiltration into Water Management Solutions
Future on Water: IoT Infiltration into Water Management SolutionsMark Benson
 
Russia on the Social Web
Russia on the Social WebRussia on the Social Web
Russia on the Social Webron mader
 

Viewers also liked (10)

День учителя 2016
День учителя 2016 День учителя 2016
День учителя 2016
 
resume Ali Valimohammadi(N41)
resume Ali Valimohammadi(N41)resume Ali Valimohammadi(N41)
resume Ali Valimohammadi(N41)
 
Login email
Login emailLogin email
Login email
 
Plantilla Fase 2 - Ensamble y Mantenimiento de Computadores
Plantilla Fase 2 - Ensamble y Mantenimiento de ComputadoresPlantilla Fase 2 - Ensamble y Mantenimiento de Computadores
Plantilla Fase 2 - Ensamble y Mantenimiento de Computadores
 
Тиждень безпеки руху ЗОШ№19
Тиждень безпеки руху ЗОШ№19Тиждень безпеки руху ЗОШ№19
Тиждень безпеки руху ЗОШ№19
 
Paul Stead AX7 Programme Manager 4.4
Paul Stead AX7 Programme Manager 4.4Paul Stead AX7 Programme Manager 4.4
Paul Stead AX7 Programme Manager 4.4
 
flujo de efectivo . rosannys torrealba
flujo de efectivo . rosannys torrealba flujo de efectivo . rosannys torrealba
flujo de efectivo . rosannys torrealba
 
Italy on the Social Web
Italy on the Social WebItaly on the Social Web
Italy on the Social Web
 
Future on Water: IoT Infiltration into Water Management Solutions
Future on Water: IoT Infiltration into Water Management SolutionsFuture on Water: IoT Infiltration into Water Management Solutions
Future on Water: IoT Infiltration into Water Management Solutions
 
Russia on the Social Web
Russia on the Social WebRussia on the Social Web
Russia on the Social Web
 

Similar to 21 Pump Jack Scaffolding

PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfssuseref23d3
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5FFSafety
 
Comparison of en 12079 & dnv 2.7 1
Comparison of en 12079 & dnv 2.7 1Comparison of en 12079 & dnv 2.7 1
Comparison of en 12079 & dnv 2.7 1Dai Hung
 
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Patrice Adjei
 
Scaffolding
ScaffoldingScaffolding
ScaffoldingFFSafety
 
Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)Tim Yao
 
Escalator replacement specifications rev 2 consolidated comments
Escalator replacement specifications   rev 2 consolidated commentsEscalator replacement specifications   rev 2 consolidated comments
Escalator replacement specifications rev 2 consolidated commentsgulilero
 
Osha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographicOsha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographicJames Rhoad
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...nasina balasubrahmayam
 
Ash and lacy sa spacer support system a4 12pp v1 hi
Ash and lacy sa spacer support system a4 12pp v1 hiAsh and lacy sa spacer support system a4 12pp v1 hi
Ash and lacy sa spacer support system a4 12pp v1 hiVaughn Botha
 
publication_1580218342.pdf
publication_1580218342.pdfpublication_1580218342.pdf
publication_1580218342.pdfPradeepPokhrel5
 
SafeProCatalogV21162014
SafeProCatalogV21162014SafeProCatalogV21162014
SafeProCatalogV21162014Hannah Bryan
 
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hoseEagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hoseJGB Enterprises, Inc.
 

Similar to 21 Pump Jack Scaffolding (20)

23 Eave Barriers
23 Eave Barriers23 Eave Barriers
23 Eave Barriers
 
26 metal scaffolds
26 metal scaffolds26 metal scaffolds
26 metal scaffolds
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5
 
Comparison of en 12079 & dnv 2.7 1
Comparison of en 12079 & dnv 2.7 1Comparison of en 12079 & dnv 2.7 1
Comparison of en 12079 & dnv 2.7 1
 
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
 
is.3938.1983.pdf
is.3938.1983.pdfis.3938.1983.pdf
is.3938.1983.pdf
 
C.3.7 ladders
C.3.7 laddersC.3.7 ladders
C.3.7 ladders
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Pilework
PileworkPilework
Pilework
 
Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)Vf19 plusspc rev3(3)
Vf19 plusspc rev3(3)
 
Escalator replacement specifications rev 2 consolidated comments
Escalator replacement specifications   rev 2 consolidated commentsEscalator replacement specifications   rev 2 consolidated comments
Escalator replacement specifications rev 2 consolidated comments
 
401
401401
401
 
Osha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographicOsha top-5-scaffolding-violations-infographic
Osha top-5-scaffolding-violations-infographic
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
 
Ash and lacy sa spacer support system a4 12pp v1 hi
Ash and lacy sa spacer support system a4 12pp v1 hiAsh and lacy sa spacer support system a4 12pp v1 hi
Ash and lacy sa spacer support system a4 12pp v1 hi
 
publication_1580218342.pdf
publication_1580218342.pdfpublication_1580218342.pdf
publication_1580218342.pdf
 
SafeProCatalogV21162014
SafeProCatalogV21162014SafeProCatalogV21162014
SafeProCatalogV21162014
 
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hoseEagle Composite Hose - Petroleum Hose - Fluid Transfer hose
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
 

More from Cervelliere Limited

More from Cervelliere Limited (15)

Catalog 04-01-2020
Catalog 04-01-2020Catalog 04-01-2020
Catalog 04-01-2020
 
Revolutionary sandless sandbags flyer
Revolutionary sandless sandbags flyerRevolutionary sandless sandbags flyer
Revolutionary sandless sandbags flyer
 
5 gallon spill kit oil only
5 gallon spill kit oil only5 gallon spill kit oil only
5 gallon spill kit oil only
 
36 elevating employees
36 elevating employees36 elevating employees
36 elevating employees
 
05 heat illness
05 heat illness05 heat illness
05 heat illness
 
30 Roof Hazards
30 Roof Hazards30 Roof Hazards
30 Roof Hazards
 
29 first aid
29 first aid29 first aid
29 first aid
 
Excavation and trenching
Excavation and trenchingExcavation and trenching
Excavation and trenching
 
22 electrical safety
22 electrical safety22 electrical safety
22 electrical safety
 
Cal/OSHA Criminal Investigation of Worker’s Death Results in Prison
Cal/OSHA Criminal Investigation of Worker’s Death Results in PrisonCal/OSHA Criminal Investigation of Worker’s Death Results in Prison
Cal/OSHA Criminal Investigation of Worker’s Death Results in Prison
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
 
11 falls leading cause of death
11 falls leading cause of death11 falls leading cause of death
11 falls leading cause of death
 
08 silica dust
08 silica dust08 silica dust
08 silica dust
 
25 Wood Dust.
25 Wood Dust.25 Wood Dust.
25 Wood Dust.
 
How to prep for and handle an osha inspection
How to prep for and handle an osha inspectionHow to prep for and handle an osha inspection
How to prep for and handle an osha inspection
 

Recently uploaded

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 

Recently uploaded (20)

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 

21 Pump Jack Scaffolding

  • 1. Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17 Pump Jack Scaffolding August 2015 Subchapter 4. Construction Safety Orders Article 22. Scaffolds--Various Types §1655. Pump Jack Scaffolds. (a) Pump jack scaffolds shall: (1) Be limited to a maximum working load of 500 pounds; and (2) Have a Safety Factor of at least four times the maximum intended load. (3) The manufactured components shall not be loaded in excess of the manufacturer's recommended limits. (See Plate B-33, Appendix) (b) Pump jack brackets, braces, and accessories shall be fabricated from metal plates and angles. Each pump jack bracket shall have two positive gripping mechanisms to prevent any failure or slippage.
  • 2. Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17 (c) The platform bracket shall be fully decked and the planking secured. Planking, or equivalent, shall conform with Section 1637. (1) When wood scaffold planks are used as platforms, poles used for pump jacks shall not be spaced more than 10 feet center to center. When fabricated platforms are used that fully comply with all other provisions of this Order, pole spacing may exceed 10 feet center to center. (2) Poles shall not exceed 30 feet in height. (3) Poles shall be secured to the work wall by rigid triangular bracing, or equivalent, at the bottom, top, and other points as necessary, to provide a maximum vertical spacing of not more than 10 feet between braces. Each brace shall be capable of supporting a minimum of 225 pounds tension or compression. (4) For the pump jack bracket to pass bracing already installed, an extra brace shall be used approximately 4 feet above the one to be passed until the original brace is reinstalled. (d) All poles shall bear on mud sill or other adequate firm foundations. (e) Pole lumber shall be two 2 x 4's, of Douglas fir, or equivalent, straight-grained, clear, free of cross-grain, shakes, large loose or dead knots, and other defects which might impair strength. (f) When poles are constructed of two continuous lengths, they shall be 2 x 4's, spiked together with the seam parallel to the bracket, and with 10d common nails, no more than 12 inches center to center, staggered uniformly from opposite outside edges. (g) If 2 x 4's are spliced to make up the pole, the splices shall be so constructed as to develop the full strength of the member. (h) Not more than two employees shall be permitted at one time upon a pump jack scaffold between any two supports.
  • 3. Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17 (i) Pump jacks scaffolds shall be provided with standard guardrails as described in Article 16 but no guardrail is required when safety belts with lanyards are provided for and used by employees. (j) When a work bench is used at an approximate height of 42 inches, the top guardrail may be eliminated, if the work bench is fully decked, the planking secured, and is capable of withstanding 200 pounds load in any direction. (k) Employees shall not be permitted to use a work bench as a scaffold platform. NOTE: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code. HISTORY 1. New section filed 11-14-75; effective thirtieth day thereafter (Register 75, No. 46). 2. Amendment filed 7-24-87; operative 8-23-87 (Register 87, No. 33).
  • 4. Wrap Administration  Risk Management & Loss Control  Certificate Tracking  Construction - Public & General Industry Safety Please contact Neil Trenerry CESSWI Lic#2956: (888)-240-4431 Ext 17 EMPLOYEE TRAINING AND INSTRUCTION RECORD Subject: Pump Jack Scaffolding Location: Instructor’s name & Signature: _______ Date of Session: / / Time Started : am / pm Time Finished : am / pm Please print your name and job title. Then sign your name. ATTENDEES: Print Name Job Title Signature