LAPORAN TUGAS BESAR SI-3131 IRIGASI DAN DRAINASE
PERENCANAAN DAERAH IRIGASI SUNGAI CIBEUSI
Disusun sebagai Salah Satu Syarat Kelulusan Mata Kuliah SI-3131 Irigasi dan Drainase
Dosen:
Dr. Ir. Agung Wiyono Hadi Soeharno, MS, M.Eng.
Joko Nugroho ST, MT, Ph.D
Asisten:
Dian Purwo Saputro 15012072
Alfredo Bastian 15013003
Daniel Christianto 15013015
Karina Dwita S 15013038
Disusun oleh:
Robbie Kurniawan Winata
15014048
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
INSTITUT TEKNOLOGI BANDUNG
BANDUNG
2016
ii
LEMBAR PENGESAHAN LAPORAN TUGAS BESAR
SI-3131 IRIGASI DAN DRAINASE
PERENCANAAN DAERAH IRIGASI CIBEUSI
diajukan untuk memenuhi syarat kelulusan
mata kuliah SI-3131 Irigasi dan Drainase
Disusun Oleh :
Robbie Kurniawan Winata
NIM 15014048
Telah Disetujui dan Disahkan oleh :
Asisten
Karina Dwita S.
NIM. 15013038
Dosen Dosen
Dr. Ir. Agung Wiyono Hadi Joko Nugroho ST., MT., Ph.D
Soeharno, MS, M.Eng.
NIP. 195906021986011001 NIP. 197406011999031004
iii
PRAKATA
Puji dan syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa karena dengan
rahmat dan berkat-Nya mengizinkan penulis untuk menyelesaikan laporan tugas
besar mata kuliah SI-3131 Irigasi dan Drainase. Tugas besar ini merupakan syarat
kelulusan mata kuliah ini dengan baik.
Pembuatan laporan ini tidak terlepas dari pihak-pihak yang secara langsung dan
tidak langsung telah membantu penulis dalam penyelesaian tugas besar ini. Penulis
mengucapkan terima kasih kepada:
1. Orang tua yang selalu mendukung dan mendoakan penulis.
2. Dr. Ir. Agung Wiyono Hadi Soeharno, MS, M.Eng., dan Joko Nugroho
ST, MT, Ph.D, selaku dosen pengajar mata kuliah SI-3131 Irigasi dan
Drainase.
3. Asisten tugas besar antara lain Karina Dwita S, Daniel Christianto, Dian
Purwo Saputro, dan Alfredo Bastian atas bimbingannya.
4. Teman-teman kelas 01 mata kuliah SI-3131 Irigasi dan Drainase yang
saling memberi dukungan dan semangat.
5. Pihak-pihak lain yang secara tidak langsung ikut membantu dalam proses
pengerjaan laporan.
Penulis menyadari bahwa dalam pengerjaan laporan tugas besar ini masih terdapat
banyak kekurangan, baik dalam redaksi maupun penyajian laporan. Penulis
berharap terdapat kritik dan saran yang membangun pembaca sehinggaterdapat
bahan pembelajaran untuk perbaikan di masa depan.
Bandung, November 2016
Penulis
iv
DAFTAR ISI
LEMBAR PENGESAHAN LAPORAN TUGAS BESAR .................................ii
PRAKATA.............................................................................................................iii
DAFTAR ISI..........................................................................................................iv
DAFTAR TABEL .................................................................................................vi
DAFTAR GAMBAR............................................................................................vii
DAFTAR GRAFIK.............................................................................................viii
BAB I PENDAHULUAN.......................................................................................1
1.1 Latar Belakang ........................................................................................1
1.2 Tujuan......................................................................................................1
1.3 Ruang Lingkup........................................................................................1
1.4 Metodologi Penyusunan Tugas ..............................................................2
1.4.1 Tahapan Pengumpulan Data ................................................................2
1.4.2 Tahapan Pengerjaan .............................................................................2
1.5 Sistematika Penyusunan.........................................................................3
BAB II TINJAUAN PUSTAKA ...........................................................................4
2.1 Sistem Irigasi ...........................................................................................4
2.2 Teori Perencanaan Petak, Saluran, dan Bangunan Air ......................7
2.2.1 Teori Perencanaan Petak ................................................................7
2.2.2 Teori Perencanaan Saluran ............................................................8
2.3 Teori Perhitungan Ketersediaan Air...................................................11
2.4 Teori Perhitungan Kebutuhan Air ...........................................................12
2.5 Teori Keseimbangan Air ...........................................................................18
2.6 Sistem Tata Nama (Nomenklatur)............................................................19
BAB III DAERAH ALIRAN KALI CIBEUSI..................................................20
3.1 Lokasi Daerah Aliran Kali Cibeusi .....................................................20
3.2 Luas DAS Kali Cibeusi .........................................................................20
3.3 Stasiun Hujan ........................................................................................21
3.4 Data Pengukuran Hidrometeorologi ...................................................21
BAB IV SISTEM IRIGASI DAERAH KALI CIBEUSI ..................................23
4.1 Perencanaan Petak, Saluran, dan Bangunan Air ...................................23
4.1.1 Perencanaan Petak ..............................................................................23
4.1.2 Perencanaan Saluran.....................................................................23
4.1.3 Perencanaan Bangunan Air................................................................24
4.1.4 Skema Petak, Saluran Irigasi, dan Bangunan Air............................25
4.2 Perhitungan ketersediaan Air Daerah Irigasi Kali Cibeusi...................25
4.2.1 Memperbaiki Data Curah Hujan yang Hilang.................................25
4.2.2 Mencari Data Curah Hujan Rata-Rata.............................................26
4.3 Perhitungan Kebutuhan Air Daerah Irigasi Kali Cibeusi .....................31
4.3.1 Pengumpulan Data iklim ....................................................................31
4.3.2 Perhitungan Evapotranspirasi ...........................................................32
v
4.3.3 Nilai Perkolasi ......................................................................................35
4.3.4 Perhitungan Curah Hujan Efektif .....................................................35
4.3.5 Perhitungan WLR ...............................................................................36
4.3.6 Penentuan Koefisien Tanaman...........................................................36
4.3.7 Perhitungan ETc, NFR, dan DR ........................................................37
4.4 Evaluasi Keseimbangan Air Daerah Irigasi Kali Cibeusi......................41
4.4.1 Luas Sawah Maksimum yang Dapat Diari .......................................41
4.4.2 Luas Sawah Rencana yang dapat Diairi............................................41
4.4.3 Keseimbangan Air ...............................................................................42
BAB V PERENCANAAN DAN PERHITUNGAN DIMENSI SALURAN ....43
5.1 Perencanaan Saluran Supply ....................................................................43
5.1.1 Perencanaan Saluran Supply..............................................................43
5.1.2 Pendimensian Saluran Supply ............................................................43
5.1.3 Penentuan Tinggu Muka Air (TMA).................................................44
5.1.4 Contoh Perhitungan Saluran Supply .................................................44
5.1.5 Contoh Perhitungan Tinggi Muka Air (TMA) .................................51
5.2 Saluran Pembuang .....................................................................................56
5.2.1 Perencanaan Saluran Pembuang .......................................................56
5.2.2 Pendimensian Saluran Pembuang......................................................56
5.2.3 Contoh Perhitungan Saluran Pembuang...........................................57
BAB VI KESIMPULAN DAN SARAN .............................................................62
6.1 Kesimpulan.................................................................................................62
6.2 Saran............................................................................................................62
DAFTAR PUSTAKA...........................................................................................63
LAMPIRAN..........................................................................................................64
vi
DAFTAR TABEL
Tabel 2. 1 Pola Tanam.........................................................................................14
Tabel 2. 2 Koefisien Tanaman Padi Unggul dan Palawija ...............................15
Tabel 3. 1 Data Stasiun Cicalengka ....................................................................21
Tabel 3. 2 Data Stasiun Cadasngampar.............................................................21
Tabel 3. 3 Data Stasiun Leles..............................................................................22
Tabel 3. 4 Data Temperatur Udara Rata-Rata .................................................22
Tabel 3. 5 Data Radiasi Sinar Matahari Rata-Rata .........................................22
Tabel 3. 6 Data Kelembapan Udara Rata-Rata ................................................22
Tabel 3. 7 Data Kecepatan Angin Rata-Rata ....................................................22
Tabel 4. 1 Data Stasiun Cicalengka ....................................................................25
Tabel 4. 2 Data Stasiun Cadasngampar.............................................................26
Tabel 4. 3 Data Stasiun Leles..............................................................................26
Tabel 4. 4 Perhitungan Error Curah Hujan Rata-Rata...................................30
Tabel 4. 5 Hasil Rata-Rata dari Error Aritmatik dan Error Theissen...........31
Tabel 4. 6 Perhitungan Evapotranspirasi metode Penmann Modifikasi........32
Tabel 4. 7 Koreksi suhu ke dalam ea, W, dan f(t).............................................32
Tabel 4. 8 Koreksi nilai Ra terhadap bulan dalam satu tahun........................33
Tabel 4. 9 Konstanta C tiap bulan menurut Penman.......................................33
Tabel 4. 10 Re 80 dan Re 50................................................................................35
Tabel 4. 11 Perhitungan WLR ............................................................................36
Tabel 4. 12 Koefisien Tanaman Kelompok A....................................................37
Tabel 4. 13 Koefisien Tanaman Kelompok B ....................................................37
Tabel 4. 14 Koefisien Tanaman Kelompok C....................................................37
Tabel 4. 15 Kebutuhan Air Kelompok A ...........................................................37
Tabel 4. 16 Tabel Interpolasi untuk ETc ...........................................................38
Tabel 4. 17 Kebutuhan Air Kelompok B ...........................................................38
Tabel 4. 18 Kebutuhan Air kelompok C............................................................39
Tabel 4. 19 Alternatif Kelompok Penamaan .....................................................40
Tabel 4. 20 Luas Area Berdasarkan Alternatif Pola Tanam ...........................40
Tabel 4. 21 Pemilihan Alternatif Pola Tanam...................................................40
Tabel 4. 22 Luas Area Berdasarkan Alternatif Pola Tanam ...........................41
Tabel 5. 1 Karakteristik Saluran........................................................................46
Tabel 5. 2 Dimensi Saluran .................................................................................51
Tabel 5. 3 Tipe Pintu Romijin.............................................................................52
Tabel 5. 4 Tinggi Muka Air Saluran ..................................................................55
Tabel 5. 5 Luas Petak Sawah ..............................................................................57
Tabel 5. 6 Nilai kemiringan talud, perbandingan b/h dan kofisien k .............59
Tabel 5. 7 Perhitungan DN dan DM...................................................................61
Tabel 5. 8 Perhitungan Saluran Pembuang Tersier .........................................61
Tabel 5. 9 Perhitungan Saluran Pembuang Sekunder .....................................61
Tabel 5. 10 Perhitungan Saluran Pembuang Primer .......................................61
vii
DAFTAR GAMBAR
Gambar 2. 1 Bendung tetap dengan mercu tipe bulat .......................................9
Gambar 2. 2 Bendung Gerak ................................................................................9
Gambar 2. 3 Bendung Karet.................................................................................9
Gambar 2. 4 Kolam Olak ....................................................................................10
Gambar 2. 5 Pintu Pembilas ...............................................................................10
Gambar 2. 6 Saluran Kantong Lumpur ............................................................10
Gambar 2. 7 Tanggul Banjir Dalam Konstruksi ..............................................10
Gambar 2. 8 Sistem Tata Nama (Nomenklatur) ...............................................19
Gambar 3. 1 Peta Lokasi Aliran Kali Cibeusi...................................................20
Gambar 3. 2 Ilustrasi DAS ..................................................................................20
Gambar 4. 1 Skema Petak...................................................................................25
Gambar 4. 2 Luas Poligon Thiessen untuk DAS Cibeusi.................................28
viii
DAFTAR GRAFIK
Grafik 4. 1 Re 80 ..................................................................................................36
Grafik 4. 2 Re 50 ..................................................................................................36
1
BAB I
PENDAHULUAN
1.1 Latar Belakang
Air merupakan sumber kehidupan bagi manusia. Air memenuhi setiap
kebutuhan manusia seperti kebutuhan rumah tangga yaitu sebagai air minum
dan MCK, kebutuhan industri, pembangkit listrik tenaga air, sampai irigasi
untuk pertanian. Sebagai negara agraris, Indonesia sangat berkepentingan
terhadap keberadaan air untuk menunjang sektor pertanian. Namun, dari tahun
ke tahun, seiring dengan pertambahan jumlah penduduk, kebutuhan terhadap
air semakin tinggi. Sementara itu, ketersediaan air cenderung semakin langka.
Oleh karena itu, perlu pemanfaatan air yang seefisien dan seefektif mungkin.
Salah satu solusi ialah dengan memanfaatkan air dalam jaringan irigasi. Dengan
demikian pembangunan saluran irigasi sangat diperlukan untuk menunjang
penyediaan bahan pangan sehingga ketersediaan air di lahan akan terpenuhi
walaupun lahan tersebut berada jauh dari sumber air permukaan (sungai). Hal
tersebut tidak terlepas dari usaha teknik irigasi yaitu memberikan air dengan
kondisi tepat mutu, tepat ruang dan tepat waktu dengan cara yang efektif dan
ekonomis.
1.2 Tujuan
Adapun maksud dan tujuan pengerjaan tugas ini adalah sebagai berikut :
1. Mengetahui perencanaan sistem irigasi, petak sawah, dan bendung untuk
suatu daerah yang sudah ditentukan
2. Mempelajari langkah-langkah yang dibutuhkan dalam pembangunan
irigasi yang baik dan benar
3. Untuk memenuhi salah satu syarat kelulusan mata kuliah SI-3131 Irigasi
dan Drainase.
1.3 Ruang Lingkup
Ruang lingkup penulisan laporan ini mencakup antara lain :
2
1. Perencanaan petak, saluran, dan bangunan air
2. Kebutuhan air
3. Sistem irigasi yang digunakan
Berdasarkan cara pengaturan, pengukuran volume air, waktu pengairan dan
kelengkapan fasilitas, jaringan irigasi dapat dibedakan menjadi :
a. Irigasi sederhana
b. Irigasi semi teknis
c. Irigasi teknis
Di dalam laporan ini akan dibahas tentang petak-petak primer, saluran primer,
saluran sekunder, saluran tersier, tentang bangunan utama, saluran pembuang,
dan lain-lain. Penyusun juga akan mencoba mendesain saluran irigasi, dengan
menggunakan kombinasi antara saluran primer dan sekunder tadi. Bangunan
juga dibagi menurut fungsinya dan akan dijelaskan juga pemakaiannya dan
pada akhirnya kita akan mendesain suatu daerah irigasi serta akan dijelaskan
juga tata nama daerah irigasi yang benar. Oleh karena itu, dalam mendesain
jaringan irigasi yang tepat dibutuhkan data-data seperti data curah hujan,
evapotranspirasi, dan data debit andalan. Sehingga dari data tersebut, dapat
diolah sehingga kita bisa mengatur output yang maksimal dari jaringan irigasi
tersebut.
1.4 Metodologi Penyusunan Tugas
1.4.1 Tahapan Pengumpulan Data
Data-data yang diperlukan adalah sebagai berikut:
1. Data topografi
2. Data hidrologi
3. Data iklim
1.4.2 Tahapan Pengerjaan
Tahapan pengerjaan adalah sebagai berikut:
1. Penghitungan kebutuhan air
2. Penghitungan luas area yang dapat diairi
3. Perencanaan petak dan saluran irigasi
4. Penghitungan dimensi saluran dan tinggi muka air
3
1.5 Sistematika Penyusunan
Dalam laporan ini, sistematika penulisannya adalah sebagai berikut:
BAB I PENDAHULUAN
Berisi tentang pendahulan yang terdiri dari latar belakang, maksud dan tujuan,
ruang lingkup, metodologi penyusunan tugas, dan sistematika.
BAB II TINJAUAN PUSTAKA
Berisi tentang penyajian studi pustaka.Teori dasar dan dasar pemikiran tentang
irigasi serta acuan yang dipakai dalam perencanaan saluran irigasi.
BAB III DAERAH ALIRAN KALI CIBEUSI
Berisi tentang kondisi sungai, DAS (daerah aliran sungai), stasiun hujan, data
curah hujan dan data iklim.
BAB IV SISTEM IRIGASI DAERAH KALI CIBEUSI
Berisi tentang tahap-tahap pembuatan perencanaan sistem mulai dari
perencanaan petak, perencanaan saluran, perencanaan bangunan air, dan juga
skema dari masing-masing perencanaan. Terdapat juga perhitungan
ketersediaan air, perhitungan kebutuhan air, dan evaluasi keseimbangan air.
BAB V PERENCANAAN DAN PERHITUNGAN DIMENSI SALURAN
Berisi tentang perencanaan saluran, penentuan dimensi saluran, dan
perhitungan tinggi muka air dan tentang perencanaan disertai perhitungan
dimensi saluran buang.
BAB VI KESIMPULAN DAN SARAN
Berisi tentang kesimpulan dan saran yang didapat dari hasil laporan ini.
4
BAB II
TINJAUAN PUSTAKA
2.1 Sistem Irigasi
Sistem irigasi ialah sistem yang mengatur pengambilan air dari suatu sumber
guna menunjang kegiatan pertanian kemudian memberikannya secara teratur ke
petak-petak sawah melalui saluran irigasi dan membuang air yang berlebih dari
petak-petak sawah ke sungai-sungai melalui saluran pembuang. Untuk lahan
pertanian, sawah merupakan lahan budi daya tanaman yang membutuhkan air.
Dalam hal ini, air harus tersedia cukup untuk pertumbuhan tanaman. Terdapat
beberapa tujuan akan pentingnya sistem irigasi, di antaranya:
1. Membasahi tanah
Pembasahan tanah dengan menggunakan air bertujuan untuk memenuhi
kekurangan air selama tidak ada atau sedikit curah hujan.
2. Merabuk tanah
Membasahi tanah dengan air sungai yang banyak mengandung mineral.
3. Mengatur suhu tanah
Melalui perencanaan sistem irigasi yang baik, pengaturan air irigasi dapat
memungkinkan kita mengatur suhu yang optimal bagi pertumbuhan
tanaman.
4. Membersihkan tanah
Hal ini bertujuan menghilangkan hama tanaman, seperti ulat, tikus,
serangga, dan lain-lain.
5. Kolmatase
Merupakan usaha meninggikan muka tanah melalui proses pengendapan
bahan-bahan suspensi dari sungai.
6. Membersihkan air kotor
Berguna untuk mencuci bahan-bahan yang membahayakan tanaman pada
air kotor sehingga tidak membahayakan lagi bagi tanaman.
7. Memperbesar persediaan air tanah
5
Tanah akan tergenangi oleh air irigasi sehingga mengakibatkan terjadinya
perembesan yang akhirnya menyebabkan naiknya permukaan air tanah.
Dengan naiknya muka air tanah, maka debit sungai pada musim kemarau
akan naik.
8. Memperbaiki struktur tanah
Bila tanah berbutir, maka ia akan mempunyai banyak pori dan perlu banyak
air untuk mengairinya. Akan tetapi, dengan adanya bahan-bahan yang
dibawa oleh sungai maka butir-butir tanah akan menjadi lebih padat.
Terdapat tiga jenis sistem irigasi yang bisa gunakan dalam perencanaan suatu
sistem irigasi. Pemilihan sistem irigasi yang digunakan bergantung pada
keadaan topografi, biaya, dan teknologi yang tersedia. Berikut adalah
penjelasan mengenai jenis–jenis sistem irigasi.
a. Sistem Gravitasi
Sistem gravitasi merupakan sistem irigasi yang sumber airnya diambil dari
air yang ada di permukaan bumi, yaitu dari sungai, waduk, dan danau di
dataran tinggi. Pengaturan dan pembagian air irigasi menuju ke petak-petak
yang membutuhkan air dilakukan secara gravitasi.
b. Sistem Pompa
Tipe irigasi ini digunakan apabila pengambilan air secara gravitasi tidak
layak dan membutuhkan biaya yang jauh lebih banyak serta tidak dapat
secara teknis. Sistem ini menggunakan pompa untuk mengambil air dari
sumbernya, seperti sungai dan waduk.
c. Sistem Pasang Surut
Irigasi pasang surut adalah suatu tipe irigasi yang memanfaatkan
pengempangan air sungai akibat peristiwa pasang surut air laut. Daerah yang
direncanakan untuk tipe irigasi ini adalah daerah yang mendapat pengaruh
langsung dari peristiwa pasang surut air laut.
Jaringan irigasi apabila ditinjau dari cara pengukuran aliran air dan lengkapnya
fasilitas dibedakan menjadi tiga tingkatan, yaitu :
a. Irigasi Sederhana
6
Di dalam irigasi sederhana, pembagian air tidak diukur atau diatur, air lebih
akan mengalir ke saluran pembuang. Para petani pemakai air itu tergabung
dalam satu kelompok jaringan irigasi yang sama sehingga tidak
memerlukan keterlibatan pemerintah di dalam organisasi jaringan irigas i
semacam ini. Persediaan air biasanya berlimpah dengan kemiringan
berkisar antara sedang sampai curam. Oleh karena itu, hampir-hampir tidak
diperlukan teknik yang sulit untuk sistem pembagian airnya.
Jaringan irigasi yang masih sederhana itu mudah diorganisasi, tetapi
memiliki kelemahan-kelemahan yang serius. Pertama-tama, ada
pemborosan air dan, karena pada umumnya jaringan ini terletak di daerah
yang tinggi, air yang terbuang itu tidak selalu dapat mencapai daerah
rendah yang lebih subur. Kedua, terdapat banyak penyadapan yang
memerlukan lebih banyak biaya lagi dari penduduk karena setiap desa
membuat jaringan dan pengambilan sendiri-sendiri. Karena bangunan
pengelaknya bukan bangunan tetap/permanen, maka umurnya mungkin
pendek.
b. Irigasi Semiteknis
Dalam banyak hal, perbedaan satu-satunya antara jaringan irigasi
sederhana dan jaringan semiteknis adalah bahwa jaringan semiteknis ini
bendungnya terletak di sungai lengkap dengan bangunan pengambilan dan
bangunan pengukur di bagian hilirnya. Mungkin juga dibangun beberapa
bangunan permanen di jaringan saluran. Sistem pembagian air biasanya
serupa dengan jaringan sederhana. Adalah mungkin bahwa pengambilan
dipakai untuk melayani/mengairi daerah yang lebih luas dari daerah
layanan pada jaringan sederhana. Oleh karena itu, biayanya ditanggung
oleh lebih banyak daerah layanan. Organisasinya akan lebih rumit jika
bangunan tetapnya berupa bangunan pengambilan dari sungai karena
diperlukan lebih banyak keterlibatan dari pemerintah, dalam hal ini
Departemen Pekerjaan Umum.
c. Irigasi Teknis
Salah satu prinsip dalam perencanaan jaringan teknis adalah pemisahan
antara jaringan irigasi dan jaringan pembuang/pematus. Hal ini berarti
7
bahwa baik saluran irigasi maupun pembuang tetap bekerja sesuai dengan
fungsinya masing-masing, dari pangkal hingga ujung. Saluran irigasi
mengalirkan air irigasi ke sawah-sawah dan saluran pembuang
mengalirkan air lebih dari sawah-sawah ke saluran pembuang alamiah
yang kemudian akan diteruskan ke laut.
Petak tersier menduduki fungsi sentral dalam jaringan irigasi teknis.
Sebuah petak tersier terdiri dari sejumlah sawah dengan luas keseluruhan
yang idealnya minimum 50 ha. Semakin kecil luas petak dan luas
kepemilikan, maka semakin mudah organisasi setingkat P3A/GP3A untuk
melaksanakan tugasnya dalam melaksanakan operasi dan pemeliharaan.
Pembagian air di dalam petak tersier diserahkan kepada para petani.
Jaringan saluran tersier dan kuarter mengalirkan air ke sawah. Kelebihan
air ditampung di dalam suatu jaringan saluran pembuang tersier dan kuarter
dan selanjutnya dialirkan ke jaringan pembuang primer.
2.2 Teori Perencanaan Petak, Saluran, dan Bangunan Air
Dalam tugas besar ini, sistem irigasi yang digunakan adalah sistem irigasi
teknis. Terdapat beberapa kelebihan dalam penggunaan irigasi permukaan ini
yaitu sebagai berikut:
1. Keseragaman
Keseragaman ini menunjukkan bahwa dalam pengairan, distribusi air ke
lahan sawah terdistribusi secara merata
2. Efisiensi
Efisiensi pengaliran air dari bangunan air ke petak-petak sawah mempunyai
efisiensi kurang lebih sebesar 65%
2.2.1 Teori Perencanaan Petak
Petak irigasi adalah petak-petak atau daerah-daerah yang akan diairi dari
suatu sumber air baik dari waduk, sungai, bendungan, rumah pompa atau
pengambilan bebas. Perencanaan petak sawah yang ditugaskan adalah
perencanaan luas dan batas petak tersier serta tempat penyadapan airnya.
Ada tiga macam petak irigasi, yaitu :
a. Petak Primer
8
Petak primer terdiri dari beberapa petak sekunder yang mengambil
air langsung dari saluran primer. Petak primer dilayani oleh satu
saluran primer yang mengambil airnya langsung dari sumber air,
biasanya sungai. Daerah di sepanjang saluran primer sering tidak
dapat dilayani dengan mudah dengan cara menyadap air dari saluran
sekunder.
b. Petak Sekunder
Petak sekunder terdiri dari beberapa petak tersier yang semuanya
dilayani oleh satu saluran sekunder. Biasanya petak sekunder
menerima air dari bangunan bagi yang terletak di saluran primer atau
sekunder. Batas-batas petak sekunder pada umumnya berupa tanda-
tanda topografi yang jelas, misalnya saluran pembuang. Luas petak
sekunder bisa berbeda-beda, tergantung pada situasi daerah.
c. Petak Tersier
Perenc anaan dasar yang berkenaan dengan unit tanah adalah petak
tersier. Petak ini menerima air irigasi yang dialirkan dan diukur pada
bangunan sadap (off take) tersier yang menjadi tanggung jawab Dinas
Pengairan. Bangunan sadap tersier mengalirkan airnya ke saluran
tersier.
Di petak tersier pembagian air, eksploitasi, dan pemeliharaan menjadi
tanggung jawab para petani yang bersangkutan, di bawah bimbingan
pemerintah. Ini juga menentukan ukuran petak tersier. Petak yang kelewat
besar akan mengakibatkan pembagian air menjadi tidak efisien. Faktor-
faktor penting lainnya adalah jumlah petani dalam satu petak, jenis
tanaman, dan topografi. Di daerah-daerah yang ditanami padi luas petak
tersier idealnya minimun 50 ha. Petak tersier harus mempunyai batas-
batas yang jelas, seperti parit, jalan, batas desa, dan batas perubahan
bentuk medan (terrain fault).
2.2.2 Teori Perencanaan Saluran
1. Saluran primer
Saluran primer merupakan saluran yang berhubungan langsung
dengan sungai.
9
2. Saluran sekunder
Saluran sekunder merupakan saluran yang menyadap air dari saluran
primer ke saluran tersier.
3. Saluran tersier
Saluran tersier merupakan saluran yang membawa air dari saluran
sekunder dan membagikannya ke petak-petak.
4. Saluran pembuang
Saluran pembuang merupakan saluran yang berfungsi untuk
membuang air-air yang berlebihan dari petak-petak sawah ke sungai.
2.2.3 Teori Perencanaan Bangunan Air
1. Bendung
Bendung merupakan bangunan yang dibangun di sungai untuk
meninggikan pemukaan air pada sungai sehingga air pada sungai
dapat dialirkan menuju petak-petak sawah melalui saluran-saluran
yang sudah didesign. Terdapat beberapa jenis bendung:
a. Bendung tetap (weir)
Gambar 2. 1 Bendung tetap dengan mercu tipe bulat
b. Bendung gerak (barrage)
Gambar 2. 2 Bendung Gerak
c. Bendung karet (inflamable weir)
Gambar 2. 3 Bendung Karet
Bangunan penunjang bendung adalah sebagai berikut:
a. Bangunan pengelak
10
b. Peredam energi
Gambar 2. 4 Kolam Olak
c. Bangunan pengambilan
d. Bangunan pembilas
Gambar 2. 5 Pintu Pembilas
e. Kantong lumpur
Gambar 2. 6 Saluran Kantong Lumpur
f. Tanggul banjir
Gambar 2. 7 Tanggul Banjir Dalam Konstruksi
2. Pengambilan bebas
Pengambilan bebas merupakan bangunan yang dibangun ditepi
sungai untuk menyadap air sungai dan dialirkan ke daerah irigasi.
Pengambilan bebas tidak mengatur tinggi muka air pada sungai
untuk pengambilan air. Pengambilan bebas memanfaatkan
perbedaan ketinggian sungai dan daerah irigasi.
3. Pengambilan dari waduk
Waduk merupakan bangunan untuk menampung air yang berlebih
dan mengalirkan airnya sewaktu-waktu air dibutuhkan. Waduk
merupakan bangunan multi guna. Beberapa fungsi waduk:
11
a. Irigasi
b. Pembangkit listrik
c. Peredam banjir
d. Pariwisata
e. Perikanan
4. Stasiun pompa
Stasiun pompa merupakan bangunan pendukung yang digunakan
untuk memompa air dari ketinggian yang lebih rendah ke ketinggian
yang lebih tinggi. Pompa digunakan jika penyadapan air secara
gravitasi tidak memungkinkan untuk digunakan.
2.3 Teori Perhitungan Ketersediaan Air
Air yang digunakan untuk irigasi menggunakan air dari sungai yang telah
ditetapkan. Dalam hal ini sungai adalah Sungai Cibeusi. Sungai umumnya
mendapat tambahan air dari air hujan atau dari daerah di sekitarnya. Daerah
yang mempengaruhi jumlah air dan curah hujan yang berpengaruh kepada
sungai disebut Daerah Aliran Sungai. Untuk menentukan ketersediaan air,
diperlukan data-data curah hujan selama 10 tahun dan tiga stasiun dari DAS
yang telah ditentukan sesuai dengan ketentuan tugas besar irigasi dan
bangunan air. Setelah data diperoleh dan diolah dapat ditentukan debit air
yang mengaliri Sungai Cibeusi. Setelah itu ada 2 metode untuk mengolah data
menjadi data hujan regional yaitu:
 Metode Thiessen
 Metode Aritmatik
Untuk menentukan metode yang dipakai digunakan cara error checking dengan
memilih metode yang menghasilkan error yang lebih kecil dari kedua metode
tersebut. Dari error checking yang telah dihitung maka dalam perhitungan ini
digunakan Metode Aritmatik.
Metode Error Checking ini menggunakan persamaan:
Keterangan:
𝑅
̅=Curah hujan rata-rata tiap metode yang digunakan
12
Ri= Curah hujan 3 stasiun tiap satu bulannya
Untuk mencari data yang hilang dari data-data hujan yang telah dikumpulkan
digunakan persamaan:
Keterangan :
𝑅
̅= curah hujan rata-rata awal ketika masih ada data hilang
R= curah hujan dari stasiun lain yang tersedia datanya.
Setelah itu mencari rata-rata regional dari masing-masing metode,
Keterangan :
A1 = Luas dari DAS stasiun 1
Atotal = Luas DAS total
R1 = Curah hujan dari stasiun 1 tiap bulannya.
Dan seterusnya hingga R3
Keterangan :
R1 = Curah Hujan stasiun 1
Dan seterusnya hingga R3
n = jumlah stasiun
2.4 Teori Perhitungan Kebutuhan Air
Banyaknya kebutuhan air dalam suatu sistem irigasi dipengaruhi oleh :
a. Jenis Tanaman
Dalam sistem irigasi, tanaman membutuhkan air yang berbeda-beda
junlahnya. Contohnya jika ditanami padi maka membutuhkan air yang
banyak atau menggenang karena padi tumbuh di daerah yang menggenangi
tempat hidupnya.
b. Jenis tanah
Tanah yang memiliki permeabilitas yang kecil dan mampu menahan air lebih
sedikit membutuhkan air daripada yang memiliki permeabilitas yang besar dan
menyerap air lebih banyak.
13
c. Topografi wilayah
Air yang mengalir di permukaan daerah yang miring membutuhkan air yang lebih
banyak dari air yang mengalir di daerah yang datar. Karena pada daerah yang
miring air yang mengalir akan lebih banyak daripada air yang meresap ke tanah,
berbeda dengan air yang mengalir di daerah yang datar.
d. Iklim
Daerah yang memiliki iklim yang panas, kebutuhan airnya akan lebih besar
daripada daerah yang iklimnya dingin. Hal ini disebabkan karena besarnya
penguapan di daerah yang panas.
e. Cara bercocok tanam
Penanaman secara bergilir lebih sedikit membutuhkan air maksimum yang
dialirkan ke suatu daerahdibandingkan dengan penanaman yang dilakukan dengan
cara serentak.
Penentuan kebutuhan air ini dimaksudkan untuk menentukan banyaknya air yang
diperlukan untuk dapat mengoptimalkan lahan yang dikelola. Selain itu, kebutuhan
air harus disesuaikan dengan efisiensi saluran dan koefisien tanaman sesuaidengan
tanaman yang akan ditanami. Unsur-unsur yang mempengaruhi penentuan
kebutuhan air diantaranya:
 Evapotranspirasi Potensial
Evapotranspirasi adalah banyaknya air yang dilepaskan ke udara dalam
bentuk uap air yang dihasilkan dari proses evaporasi dan transpirasi.
Evaporasi terjadi pada permukaan badan-badan air, misalnya danau,
sungai dan genangan air. Sedangkan transpirasi terjadi pada tumbuhan
akibat proses asimilasi.
Metode Penman:
ET= c.( w . Rn + ( 1 - w ) . f(u) . ( ea - ed ) )
Keterangan :
ET : Evapotranspirasi dalam mm/hari
c : Faktor koreksi akibat keadaan iklim siang dan malam
w : Faktor bobot tergantung dari temperatur udara dan
ketinggian
Rn : Radiasi netto ekivalen dengan evaporasi mm/hari = Rns
- Rnl
1 - w : Faktor bobot tergantung pada temperatur udara
f(u) : Fungsi kecepatan angin
ea : Tekanan uap jenuh tergantung pada temperatur
ed : ea . Rh/100
 Curah Hujan Efektif
14
Curah hujan efektif untuk tanaman padi adalah 80% dari curah hujan rata-rata
dan 50% untuk tanaman palawija. Data ini diperoleh dari analisis data hujan
yang diperlukan untuk
 Curah Hujan Efektif, untuk menentukan kebutuhan air untuk irigasi
 Curah Hujan Lebih, untuk menentukan kebutuhan pembuangan dan
debit banjir.
Cara mencari R80 dan R50 adalah:
 Mengumpulkan data hujan 10 tahun dari 1969-1978 yang telah
dihitung data hilangnya.
 Mengurutkan data dari yang terbesar hingga yang terkecil dari
masing-masing bulan.
 Menentukan probabilitas masing-masing ranking dengan persamaan
Dimana:
P = probabilitas
m = Ranking setelah sorting
n = jumlah tahun yang disorting
 Mencari R80 dan R50 dengan melakukan interpolasi dari masing-
masing bulan
 Pola Tanam
Pola tanam akan ditinjau dengan memperhatikan kemampuan tanah
menurut hasil-hasil survey. Kalau perlu diadakan penyesuaian-
penyesuaian. Dalam membuat pola tanam ini yang sangat perlu
diperhatikan adalah curah hujan yang terjadi. Baik curah hujan
maksimum ataupun minimum. Dengan melihat kondisi curah hujan
tersebut akan bisa direncanakan berbagai pola tanam dengan masing-
masing keuntungan dan kekurangan.
Tabel 2. 1 Pola Tanam
 Koefisien Tanaman
Ketersediaan Air untuk Jaringan Irigasi Pola Tanam dalam 1 Tahun
Tersedia air cukup banyak Padi-padi-palawija
Tersedia air dalam jumlah cukup Padi-padi-bera
Padi-palawija-bera
Palawija-padi-bera
Daerah yang cenderung kekurangan air
15
Koefisien Tanaman digunakan untuk pengolahan data skema tanam.
Untuk koefisien tanaman padi unggul dan palawija adalah:
Tabel 2. 2 Koefisien Tanaman Padi Unggul dan Palawija
 Perkolasi dan Rembesan
Perkolasi adalah peristiwa meresapnya air ke dalam tanah ketika tanah
dalam keadaan jenuh. Laju perkolasi ini tergantung dari sifat-sifat
tanah tertentu.
 Penggantian Lapisan Air (WLR)
Penggantian lapisan air dilakukan selama setengah bulan pada bulan
ke 1,5 dan bulan ke 2,5. Di Indonesia penggantian air ini sebesar 3.3
mm/hari selama sebulan.
 Masa Penyiapan Lahan
Dalam penentuan kebutuhan air, dibedakan yaitu kebutuhan air pada
masa penyiapan lahan dan kebutuhan air pada masa tanam, sebagai
berikut:
a) Kebutuhan air pada masa penyiapan lahan
Kebutuhan air untuk penyiapan lahan umumnya menentukan kebutuhan
maksimum air irigasi pada suatu proyek irigasi. Faktor-faktor yang
menentukan besarnya kebutuhan air untuk penyiapan lahan adalah:
- Lamanya waktu yang dibutuhkan untuk menyelesaikan
pekerjaan penyiapan lahan
Yang menentukan lamanya jangka waktu penyiapan lahan adalah :
 Tersedianya tenaga kerja dan ternak penghela atau traktor untuk
menggarap tanah.
 Perlunya memperpendek jangka waktu tersebut agar tersedia
cukup waktu menanam padi sawah atau padi ladang kedua.
Kondisi sosial budaya yang ada di daerah penanaman padi akan
mempengaruhi lamanya waktu yang diperlukan untuk penyiapan
Periode
Koefisien Tanaman
pada Padi (unggul)
Koefisien Tanaman
untuk Palawija
1 1,2 0,5
2 1,27 0,75
3 1,33 1
4 1,3 1
5 1,3 0,82
6 0 0,45
16
lahan. Untuk daerah-daerah proyek baru, jangka waktu penyiapan
lahan akan ditetapkan berdasarkan kebiasaan yang berlaku di daerah
sekitarnya. Sebagai pedoman diambil jangka waktu 1.5 bulan untuk
menyelesaikan penyiapan lahan di seluruh petak tersier. Bilamana
untuk penyiapan lahan diperkirakan akan dipakai mesin secara luas
maka jangka waktu penyiapan lahan akan diambil 1 bulan.
- Jumlah air yang diperlukan untuk penyiapan lahan.
Pada umumnya jumlah air yang dibutuhkan untuk penyiapan lahan
dapat ditentukan berdasarkan kedalaman serta porositas tanah di
sawah. Untuk perhitungan kebutuhan air total selama penyiapan lahan
digunakan metode yang dikembangkan oleh Van de Goor dan Zijlstra
(1968). Metode ini didasarkan pada laju air yang konstan l/dt selama
periode penyiapan lahan dan menghasilkan rumus sebagai berikut :
IR = M.ek
/ (ek
- 1)
dengan:
IR = kebutuhan air total dalam mm/hari
M = kebutuhan air untuk mengganti kehilangan air akibat evaporasi
dan perkolasi di sawah yang sudah dijenuhkan .
M = Eo + P
Eo = 1.1 * Eto
P = perkolasi
K = M.T/S
T = jangka waktu penyiapan lahan, hari
S = 300 mm
Adapun kebutuhan air total untuk penyiapan lahan sawah dihitung
dengan prosedur sebagai berikut :
a. Menghitung kebutuhan air total seperti yang sudah diterangkan
diatas (LP).
b. Menghitung curah hujan efektif ( Re)
c. Menghitung kebutuhan air selama penyiapan lahan dengan rumus:
DR = (LP - Re) / ( 0.65 * 8.64 )
dengan:
 0.65 adalah perkalian harga efisiensi saluran tersier,
sekunder dan primer.
17
 adalah konstanta untuk mengubah satuan dari mm/hari ke
liter/detik/ha.
Secara lebih jelas diuraikan langkah-langkahnya di bawah ini:
 Menghitung curah hujan efektif (Re) dengan cara seperti yang
sudah diterangkan diatas.
 Menghitung evapotranspirasi potensial dengan metode Penmann
Modifikasi yang sudah diterangkan diatas.
 Menentukan perkolasi (P),jangka waktu penyiapan lahan (T). dan
kebutuhan penjenuhan (S).
 Menghitung kebutuhan air total.
Eo = 1.1 * Eto
 Menghitung M = Eo + P
 Menghitung K = M * T/S
 Menghitung kebutuhan bersi air di sawah untuk padi (NFR)
NFR = LP - Re
dengan
LP = ( M * ek
)/(ek
- 1)
 Menghitung kebutuhan air irigasi untuk padi
IR = NFR/0.64
 Menghitung kebutuhan air untuk irigasi (DR=a)
DR(a) = IR/8.64 (l/dt/ha)
b) Kebutuhan Air Pada Masa Tanam
- Untuk Padi Sawah
Secara umum unsur-unsur yang mempengaruhi kebutuhan air
pada masa tanam adalah sama dengan kebutuhan air pada masa
penyiapan lahan. Hanya ada tambahan yaitu:
 Penggantian lapisan air
Setelah pemupukan, diusahakan untuk menjadwalkan dan
mengganti lapisan air menurut kebutuhan. Jika tidak ada
penjadwalan semacam itu maka dilakukan penggantian air
sebanyak 2 kali masing-masing 50 mm (atau 3.3 mm/hari
selama 0.5 bulan) selama sebulan dan 2 bulan setelah
transplantasi.
18
Perhitungan kebutuhan pada masa tanam diuraikan secara
mendetail secara berikut sehingga dapat dilihat perbedaannya
pada perhitungan kebutuhan air pada masa penyiapan lahan,
yaitu:
 Menghitung curah hujan efektif (Re) dengan cara seperti yang
sudah diterangkan diatas.
 Menghitung evapotranspirasi potensial dengan metode
Penmann modifikasi yang sudah diterangkan diatas.
 Mencari data perkolasi (P) dan Penggantian lapisan air
(WLR)
 Menghitung ETc = Eto * c dengan c adalah koefisien tanaman
 Menghitung kebutuhan air total (bersih) disawah untuk padi
NFR = Etc + P + WLR - Re
 Menghitung kebutuhan air irigasi untuk padi (IR)
IR = NFR/0.64
 Menghitung kebutuhan air untuk irigasi (DR=a)
DR(a) = IR/8.64
 Untuk keperluan perencanaan jaringan irigasi maka harga “a”
yang diambil adalah harga “a“ yang terbesar.
- Untuk Palawija
Kebutuhan air untuk palawija diperhitungkan dari harga Etc dan Re,
dalam hal ini langkah pengerjaannya sama seperti pada padi. Jadi
yang mempengaruhi adalah evapotranspirasi dan curah hujan
efektif.
2.5 Teori Keseimbangan Air
Keseimbangan air ditentukan oleh besarnya kebutuhan dan ketersediaan air.
Untuk menentukan kebutuhan air, dibuat golongan-golongan atau kelompok
rotasi yang dianggap sama luasnya. Kebutuhan pengambilan air berbeda
untuk masing-masing golongan. Untuk menentukan luas areal yang dapat
diairi, kebutuhan air yang dipakai adalah yang terbesar dari aternatif yang
ada. Kebutuhan air yang diperlukan kemudian dibandingkan dengan jumlah
ketersediaan air. Jumlah ketersediaan air ditentukan dengan cara
19
menganalisis data yang ada sehingga menghasilkan debit andalan dimana
besaran debit andalan & kebutuhan pengambilan air menentukan areal lahan
yang dapat diairi. Dengan kata lain, kebutuhan air pada luasan areal tertentu
dapat ditentukan terpenuhi atau tidak dari ketersediaan air yang ada.
2.6 Sistem Tata Nama (Nomenklatur)
Sistem tata nama yang digunakan dalam perencanaan irigasi dapat dilihat
dalam ilustrasi di bawah:
Gambar 2. 8 Sistem Tata Nama (Nomenklatur)
Nama saluran primer mengikuti nama sungai, contohnya di atas, Sungai Cibeusi
disingkat menjadi CBS yang digunakan sebagai nama saluran primer.
Selanjutnya, saluran sekunder terdekat dengan saluran primer diberi nama S1,
untuk saluran sekunder setelahnya diberi nama S2 dan seterusnya. Untuk
penamaan petak, nama disingkat menjadi T (tersier), penamaan petak mengikuti
saluran sekunder dan primer yang mengalirinya. Contohnya untuk petak tersier
pertama yang dialiri oleh saluran primer 1 dan sekunder 3 diberi nama
CBS1.S3.T1.
Q (m3
/s)
Intake
CBS 1 CBS 2
Bangunan bagi/sadap
Bendung
CBS1_S1 Saluran sekunder
CBS1_S1 Saluran primer
CBS2_S1 CBS2_S2 CBS2_S3 CBS2_S4
Saluran tersier
`
64.48 0.113258 50.88 0.08937
50 0.087824 50 0.087824 50 0.087824 92.12 0.161808
CBS1_S2 CBS1_S2
79.2 0.139114 54.6 0.095904
CBS1_S3 JUDUL GAMBAR:
DOSEN:
90 0.158084 NAMA/NIM:
ASISTEN:
Alfredo Bastian 15013003
Daniel Christianto 15013015
Karina Dwita S. 15013038
Dian Purwo S. 15012072
No Gambar: Tanggal:
1 17-Nov-16
CBS 2 _ S4 _ T1
CBS 1 _ S2 _ T1
CBS 2 _ S2 _ T1
CBS 2 _ S1 _ T1
ROBBIE KURNIAWAN WINATA
15014048
Kali
Tanggul
Sungai
Cibeusi
A (hektar)
CBS 1 _ S1 _ T1
CBS 1 _ S3 _ T1
CBS 1 _ S1 _ T2
CBS 1 _ S2_ T2
SISTEMIRIGASI DAN DRAINASE
INSTITUT TEKNOLOGI BANDUNG
FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
PROGRAM STUDI TEKNIK SIPIL
CBS 2 _ S3 _ T1
NAMA DAERAH_INDEKS PRIMER_SEKUNDER_TERSIER_POSISI
SI - 3131
SEMESTER I 2016/2017
SKEMA IRIGASI
Dr Ir. Agung Wiyono HS.,MS.,M.Eng
20
BAB III
DAERAH ALIRAN KALI CIBEUSI
3.1 Lokasi Daerah Aliran Kali Cibeusi
Dengan software Google Earth, DAS CIbeusi dapat dilihat dari gambar
berikut:
Gambar 3. 1 Peta Lokasi Aliran Kali Cibeusi
Lokasi daerah aliran Kali Cibeusi memiliki luas DAS yang besar. Hal ini
disebabkan oleh hulu sungai yang berada di elevasi tinggi (600 m di atas
permukaan laut), dengan hilir jauh berada di utara kota Subang.
3.2 Luas DAS Kali Cibeusi
Dengan meninjau titik bendung pada koordinat 8°08'05.5"LS 113°45'03.8"BT,
luas DAS ini mencakup area sebesar 1267,66 km2 .
Gambar 3. 2 Ilustrasi DAS
21
3.3 Stasiun Hujan
Setelah memperhitungkan banyaknya data eksis dan yang hilang dan dengan
pengolahan luas DAS dari Cibeusi, selanjutnya menentukan 3 stasiun hujan
yang diperlukan untuk mengolah data hujan selanjutnya. Dalam tugas besar
ini, data stasiun hujan yang digunakan tidak berada di sekitar sungai. Maka
untuk DAS Cibeusi, stasiun yang telah ditentukan adalah: Stasiun
1. Stasiun Cicalengka (196a)
2. Stasiun Cadasngampar (200c)
3. Stasiun Leles (205a)
Ketiga stasiun tersebut selanjutnya akan diolah untuk dicari data hilangnya dan
menentukan data hujan dan debit andalan.
3.4 Data Pengukuran Hidrometeorologi
Dari data-data hidrometeorologi untuk DAS Cibeusi diperoleh data sebagai
berikut:
Tabel 3. 1 Data Stasiun Cicalengka
Tabel 3. 2 Data Stasiun Cadasngampar
Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1969 300 482 365 298 50 140 20 0 0 195 190 405
1970 402 118 565 369 410 195 171 0 38 104
1971 321 213 148 107 173 30 0 0 0 213 470 374
1972 164 172 216 91 115 0 0 0 0 2 130 329
1973 333 249 199 170 246 25 26 24 132 32 281 231
1974 44 135 76 303 168 143 66 88 157 258 253
1975 340 206 252 189 69 65 33 10 106 408 186 161
1976 102 90 216 114 72 15 4 0 21 268 390 241
1977 320 247 239 90 102 161 0 5 40 4 146 278
1978 175 185 346 138 108 183 93 70 59 49 93 344
Curah Hujan (mm)
Curah Hujan (mm)
Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1969 231 197 117 243 18 124 53 0 25 119 324 243
1970 360 313 559 431 491 113 92 0 34 56 185 641
1971 489 188 399 296 430 144 77 77 10 327 709 387
1972 324 315 546 96 128 0 0 0 0 0 153 365
1973 315 396 272 213 520 338 25 48 165 48 287 380
1974 102 267 253 295 177 11 111 417 95 253 293 400
1975 478 311 401 333 175 63 25 0 166 487 450 262
1976 92 259 431 76 47 19 0 47 3 239 224 258
1977 246 448 561 245 136 342 0 0 57 44 292 461
1978 162 264 561 84 126 121 188 131 153 43 362 459
Bulan
22
Tabel 3. 3 Data Stasiun Leles
Tabel 3. 4 Data Temperatur Udara Rata-Rata
Tabel 3. 5 Data Radiasi Sinar Matahari Rata-Rata
Tabel 3. 6 Data Kelembapan Udara Rata-Rata
Tabel 3. 7 Data Kecepatan Angin Rata-Rata
Curah Hujan (mm)
Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1969 290 344 177 123 35 30 0 63 217 129 250
1970 295 194 545 232 114 5 105 0 56 54 173 378
1971 243 145 274 162 234 72 0 0 9 323 435 425
1972 140 143 169 30 142 0 0 0 0 7 83 273
1973 220 186 211 99 154 78 25 21 134 37 176 82
1974 84 99 24 198 20 0 47 90 26 190 304 381
1975 359 221 279 337 103 13 160 608 194 318
1976 332 49 122 52 0 0 0 0 0 147 297 180
1977 236 145 205 219 226 0 145 84 291
1978 219 132 134 180 43 97 271 191 185
Bulan
Temperatur (o
C)
Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember
1969
1970
1971
1972 25.7 26.3 25.9 26.9 27 27.1 26.9 28.1 28.7 29.9 29.5 27.6
1973 26.5 26.5 26.7 27.1 26.5 26.6 26.4 26.9 26.8 27.8 26.9 26.2
1974 24.9 25.4 25.8 26.7 26.3 25.9 25.9 26 26.8 26.7 26.8 26.4
1975 25.7 25.7 25.8 26.7 26.4 26 25.7 26.6 27.1 26.6 26.6 26.3
1976 24.9 25.8 25.8 26.5 25.8 25.8 25.7 26.6 27.6 27.9 27 26.9
1977 25.9 25.5 25.8 27.1 27.2 26.1 25.8 26.6 27.5 29.4 28.6 26.5
1978 27.15 27.1 27.45 27.8 28.15 27 26.45 27.35 27.9 27.6 27.05
Rata-rata 25.82143 26.04286 26.17857 26.97143 26.76429 26.35714 26.12143 26.8 27.40714 28.02857 27.57143 26.70714
Bulan
Sinar Matahari (%)
Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember
1969
1970
1971
1972 36 65 68 80 66 78 83 63 57 57 69
1973 55 61 59 56 86 87 87 82 75 66 56
1974 29 51 55 61 49 51 61 74 61 50
1975
1976 32 66 76 61 64 68 80 42 84 46
1977 58
1978 50 58 61 65 64 64 72 78 76
Rata-rata 40.4 60.2 61 64.6 64.4 65.8 71.2 77.8 73.75 58.75 69 55.8
Bulan
Kelembapan (%)
Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember
1969
1970
1971
1972 86 83 85 79 80 68 64 63 53 55 64 79
1973 87 87 86 86 87 85 81 78 76 75 82 85
1974 89 88 88 84 86 83 82 83 80 82 83 86
1975 88 88 87 87 87 80 80 74 77 82 84 85
1976 89 86 88 82 79 74 70 71 65 73 81 85
1977 88 88 88 82 81 84 69 64 61 57 69 86
1978 88 87 89 83 83 84 80 75 73 76 85
Rata-rata 87.85714 86.71429 87.28571 83.28571 83.28571 79.71429 75.14286 72.16667 69.57143 71 77 84.42857
Bulan
Kecepatan Angin (knot)
Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember
1969
1970
1971
1972 2.572 2.572 2.572 3.0864 2.0576 3.0864 4.1152 3.6008 3.6008 3.6008 2.572 2.572
1973 3.0864 2.572 3.0864 2.572 2.572 2.572 2.572 2.572 3.0864 3.0864 2.0576 3.0864
1974 1.5432 2.572 2.0576 2.0576 2.0576 2.0576 3.0864 3.0864 3.0864 2.572 2.572 2.0576
1975 2.572 3.0864 3.0864 2.0576 2.572 2.0576 2.0576 2.572 2.0576 1.5432 1.5432 1.5432
1976 3.0864 3.0864 3.0864 2.572 2.572 2.572 2.572 2.572 2.572 2.572 2.572 2.572
1977
1978 3.0864 2.572 2.572 2.572 2.572 1.5432 2.572 0 2.0576 2.572 2.572 2.572
Rata-rata 2.657733 2.743467 2.743467 2.486267 2.400533 2.3148 2.8292 2.400533 2.743467 2.657733 2.3148 2.400533
Bulan
23
BAB IV
SISTEM IRIGASI DAERAH KALI CIBEUSI
4.1 Perencanaan Petak, Saluran, dan Bangunan Air
4.1.1 Perencanaan Petak
Yang dimaksud dengan petak irigasi adalah petak-petak atau daerah-
daerah yang akan diairi dari suatu sumber air, baik yang berasal dari
waduk maupun langsung dari satu atau beberapa sungai melalui suatu
bangunan pengambilan yang dapat berupa bendungan, rumah pompa,
ataupun pengambilan bebas. Di dalam tugas besar irigasi yang
merencanakan bendung di sungai Cimanuk, direncanakan petak tersier
yang berjumlah 7 petak tersier dan tiap petak memiliki luas sebesar 50
hektar (ha). Petak yang direncanakan berbentuk pesegi, namun tidak
seutuhnya berbentuk persegi.
4.1.2 Perencanaan Saluran
Saluran yang direncanakan untuk mengaliri petak-petak sawah terdiri
dari beberapa bagian, yaitu :
 Saluran primer
Saluran yang membawa air dari bendung ke saluran sekunder
maupun langsung ke petak-petak tersier yang direncanakan. Panjang
saluran primer yang direncanakan adalah 700 m untuk saluran
pertama (CBS 1) dan 1420 m untuk saluran kedua (CBS 2)
 Saluran sekunder
Saluran yang membawa air saluran primer ke petak tersier yang
dilayani oleh saluran sekunder tersebut. Panjang saluran yang
direncanakan adalah 100 m untuk sekunder pertama (CBS1_S1)
dihitung dari saluran primer pertama dan 280 m untuk sekunder
kedua (CBS2_S1) dihitung dari saluran primer kedua.
 Saluran tersier
24
Yaitu petak-petak sawah yang mendapat air dari bangunan
sadap. Perencanaan dasar yang berkenaan dengan unit tanah adalah
petak tersier. Petak ini menerima air irigasi yang dialirkan dan
diukur pada bangunan sadap tersier yang menjadi tanggung
jawab dinas pengairan. Bangunan sadap tersier mengalirkan
airnya ke saluran tersier. Saluran ini mengalirkan air ke petak-
petak yang telah direncanakan seluas 50-100 ha. Saluran tersier
yang direncanakan dinamai CBS1-S1-T1, CBS1-S1-T2, CBS1-S2-
T1, CBS1-S2-T2, CBS1-S53-T1, CBS2-S1-T1, CBS2-S2-T1,
CBS2-S3-T1, CBS2-S4-T1.
4.1.3 Perencanaan Bangunan Air
Bangunan irigasi yang dipakai adalah bangunan utama, dalam hal ini
bendung (untuk meninggikan tinggi muka air di sungai sampai
ketinggian yang diperlukan sehingga air dapat dialirkan ke lahan di
sekitarnya). Selain itu, dalam sistem irigasi daerah Sungai Cimanuk ini
juga digunakan :
 Bangunan bagi
Bangunan yang terletak pada saluran primer yang membagi air ke
saluran-saluran sekunder atau pada saluran sekunder yang membagi air
ke saluran sekunder lainnya. Bangunan bagi terdiri dari pintu-pintu yang
dengan teliti mengukur dan mengatur air yang mengalir ke berbagai
saluran.
 Bangunan sadap
Bangunan yang terletak di saluran primer ataupun sekunder yang
memberi air kepada saluran tersier
 Bangunan bagi sadap
Bangunan yang berupa bangunan bagi dan juga sebagai bangunan sadap.
Bangunan bagi-sadap merupakan kombinasi dari bangunan bagi dan
bangunan sadap (bangunan yang terletak di saluran primer atau sekunder
yang memberi air ke saluran tersier).
25
4.1.4 Skema Petak, Saluran Irigasi, dan Bangunan Air
Berikut adalah skema petak, saluran-saluran irigasi, serta bangunan air.
Gambar 4. 1 Skema Petak
4.2 Perhitungan ketersediaan Air Daerah Irigasi Kali Cibeusi
4.2.1 Memperbaiki Data Curah Hujan yang Hilang
Data stasiun pencatatan curah hujan seringkali tidak lengkap/ terdapat
data curah hujan yang kosong, hal itu dapat disebabkan oleh tidak
beroperasinya stasiun hujan, data yang dianggap tidak valid, kesalahan,
kerusakan , dll. Data-data yang kosong tersebut dapat diisi dengan
berbagai metode pengisian data hujan. Pada laporan ini metode pengisian
data curah hujan yang hilang adalah metode reciprocal (kebalikan
kuadrat jarak)
Berikut adalah hasil tabel data hujan setelah telah dilakukan pengisian
data yang hilang:
1 Stasiun No. 196a (Cicalengka ), ketinggian 705 meter.
Tabel 4. 1 Data Stasiun Cicalengka
2. Stasiun No. 200c (Cadasngampar),ketinggian 230m.
Q (m3
/s)
Intake
CBS 1 CBS 2
Bangunan bagi/sadap
Bendung
CBS1_S1 Saluran sekunder
CBS1_S1 Saluran primer
CBS2_S1 CBS2_S2 CBS2_S3 CBS2_S4
Saluran tersier
`
64.48 0.113258 50.88 0.08937
50 0.087824 50 0.087824 50 0.087824 92.12 0.161808
CBS1_S2 CBS1_S2
79.2 0.139114 54.6 0.095904
CBS1_S3 JUDUL GAMBAR:
DOSEN:
90 0.158084 NAMA/NIM:
ASISTEN:
Alfredo Bastian 15013003
Daniel Christianto 15013015
Karina Dwita S. 15013038
Dian Purwo S. 15012072
No Gambar: Tanggal:
1 17-Nov-16
CBS 2 _ S4 _ T1
CBS 1 _ S2 _ T1
CBS 2 _ S2 _ T1
CBS 2 _ S1 _ T1
ROBBIE KURNIAWAN WINATA
15014048
Kali
Tanggul
Sungai
Cibeusi
A (hektar)
CBS 1 _ S1 _ T1
CBS 1 _ S3 _ T1
CBS 1 _ S1 _ T2
CBS 1 _ S2_ T2
SISTEMIRIGASI DAN DRAINASE
INSTITUT TEKNOLOGI BANDUNG
FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN
PROGRAM STUDI TEKNIK SIPIL
CBS 2 _ S3 _ T1
NAMA DAERAH_INDEKS PRIMER_SEKUNDER_TERSIER_POSISI
SI - 3131
SEMESTER I 2016/2017
SKEMA IRIGASI
Dr Ir. Agung Wiyono HS.,MS.,M.Eng
Curah Hujan (mm)
Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1969 300 482 365 298 50 140 20 0 0 195 190 405
1970 402 118 565 369 410 195 171 0 38 104 72.7455 252.053
1971 321 213 148 107 173 30 0 0 0 213 470 374
1972 164 172 216 91 115 0 0 0 0 2 130 329
1973 333 249 199 170 246 25 26 24 132 32 281 231
1974 44 135 76 303 168 132.908 143 66 88 157 258 253
1975 340 206 252 189 69 65 33 10 106 408 186 161
1976 102 90 216 114 72 15 4 0 21 268 390 241
1977 320 247 239 90 102 161 0 5 40 4 146 278
1978 175 185 346 138 108 183 93 70 59 49 93 344
Bulan
26
Tabel 4. 2 Data Stasiun Cadasngampar
3. Stasiun No. 205a (Leles), ketinggian 710m.
Tabel 4. 3 Data Stasiun Leles
Contoh perhitungan:
Menghitung data yang hilang menggunakan metode Reciprocal
Stasiun Leles, Agustus 1975
Ha =
Σ
Hx
Rx
2
Σ
1
Rx
2
=
(
10
13535.58642) + (
0
24137.54392)
(
1
13535.58642) + (
1
24137.54392)
= 0,00000005458155 mm
4.2.2 Mencari Data Curah Hujan Rata-Rata
Pada makalah ini perhitungan curah hujan rata-rata menggunakan data
curah hujan yang telah dilengkapi dengan metode Reciprocal.
Perhitungan curah hujan rata-rata pada makalah ini menggunakan
metode rata-rata aljabar dan metode poligon thiessen.
 Metode Rata-rata Aritmatik
𝑅 =
1
𝑛
(𝑅1 + 𝑅2 + 𝑅3 + ⋯ + 𝑅𝑛)
Keterangan :
R = Curah hujan rata-rata bulanan (mm)
n = Jumlah stasiun yang digunakan
Curah Hujan (mm)
Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1969 231 197 117 243 18 124 53 0 25 119 324 243
1970 360 313 559 431 491 113 92 0 34 56 185 641
1971 489 188 399 296 430 144 77 77 10 327 709 387
1972 324 315 546 96 128 0 0 0 0 0 153 365
1973 315 396 272 213 520 338 25 48 165 48 287 380
1974 102 267 253 295 177 11 111 417 95 253 293 400
1975 478 311 401 333 175 63 25 0 166 487 450 262
1976 92 259 431 76 47 19 0 47 3 239 224 258
1977 246 448 561 245 136 342 0 0 57 44 292 461
1978 162 264 561 84 126 121 188 131 153 43 362 459
Bulan
Curah Hujan (mm)
Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1969 290 344 177 123 35 30 0 0 63 217 129 250
1970 295 194 545 232 114 5 105 0 56 54 173 378
1971 243 145 274 162 234 72 0 0 9 323 435 425
1972 140 143 169 30 142 0 0 0 0 7 83 273
1973 220 186 211 99 154 78 25 21 134 37 176 82
1974 84 99 24 198 20 0 47 90 26 190 304 381
1975 359 221 279 337 103 13 5.98 0.00 160 608 194 318
1976 332 49 122 52 0 0 0 0 0 147 297 180
1977 236 145 205 58.61 219 226 0 0.00 145 10.53 84 291
1978 219 63.16 134.21 132 134 28.95 180 43 97 271 191 185
Bulan
27
R1 + R2 + R3 + Rn = Curah hujan bulanan di tiap titik pengamatan
(mm)
Sebagai contoh perhitungan, nilai curah hujan rata-rata yang akan
dihitung adalah pada tahun 1969.
Diketahui:
Curah hujan Stasiun Cicalengka Januari 1969 (R1) = 300 mm
Curah hujan Stasiun Cadasngampar Januari 1969 (R2) = 231
mm
Curah hujan Stasiun Paseh Leles 1969 (R3) = 290 mm
𝑅 =
1
3
(321 + 641 + 197) = 273.67 mm
 Metode Poligon Thiessen
𝐻𝑥 =
∑ 𝐴 𝑥 𝐻
∑ 𝐴
Dengan:
A = Luas pengaruh stasiun
H = Curah hujan per bulan
Hx = Curah hujan rata-rata wilayah per bulan
Untuk mencari luas pengaruh stasiun dibutuhkan bantuan aplikasi Global
Mapper, WMS, dan Autocad.WMS berguna untuk mengkonversi gambar
DAS agar bisa dibuka di Global Mapper. Penentuan letak stasiun akan
dilakukan di global mapper dengan menyesuaikan jarak dan koordinat
stasiun pada peta. Global Mapper juga akan mengkonversi gambar agar
dapat dibuka di file autocad. Selanjutnya jika DAS sudah terbentuk di
autocad maka dicari poligon thiessen-nya dengan cara yang sudah
dijelaskan di teori umum. Dari Gambar 2.2 dapat kita lihat bahwa luas
pengaruh masing-masing stasiun adalah sebagai berikut:
 Stasiun Cicalengka nomor 196a (Yellow) = 35.61 km2
 Stasiun Cadasngampar nomor 200c (Cyan) = 19.07 km2
 Stasiun Leles nomor 205a (Blue) = 1212.97 km2
28
Gambar 4. 2 Luas Poligon Thiessen untuk DAS Cibeusi
Sebagai contoh perhitungan, curah hujan rata-rata wilayah yang dicari
adalah data tahun 1969 pada bulan Januari. Dengan memakai rumus
diatas perhitungannya menjadi:
𝐻𝑥 =
(𝐴1 𝑥 𝐻1)+ (𝐴2 𝑥 𝐻2)+ (𝐴3 𝑥 𝐻3)
𝐴1 + 𝐴2 + 𝐴3
Dengan: H1 = Curah hujan Stasiun Cimangsud Januari 1969
= 300
H2 = Curah hujan Stasiun Citambur Januari 1969
= 231
H3 = Curah hujan Stasiun Paseh Januari 1969
= 290
𝐻𝑥 =
(35.61 𝑥 300)+(19.07 𝑥 231)+(1212 .97 𝑥 290)
35.61+19.07+1212.97
=297,17 mm
Dari tiap metode yang digunakan untuk mencari curah hujan rata-rata,
akan dicari errornya, dan metode dengan error yang paling kecil yang
akan digunakan untuk pengolahan data selanjutnya.
Perhitungan error dapat dituliskan sebagai berikut:
𝐸𝑟𝑟𝑜𝑟 =
∑ |𝑅𝑟𝑎𝑡𝑎2 − 𝑅𝑖|/𝑅𝑖
𝑛
𝑖=1
𝑛
Dengan:
29
Rrata2 = rata-rata curah hujan bulanan
Ri = curah hujan pada bulan ke-i
n = jumlah pembanding (stasiun)
Untuk contoh perhitungan error dengan metode rata-rata aritmatik,
diambil data tahun 1969 sebagai berikut:
Curah hujan Stasiun Cicalengka Januari 1969 = 300 mm
Curah hujan Stasiun Cadasngampar Januari 1969 = 231 mm
Curah hujan Stasiun Leles Januari 1969 = 290 mm
Curah hujan rata-rata bulanan metode aritmatik 1969 = 273.67 mm
Maka,
𝐸𝑟𝑟𝑜𝑟 =
|300 − 273.67|
300
+
|231 − 273.67|
231
+
|290 − 273.67|
290
3
= 0.1096
Dengan cara yang sama, dilakukan perhitungan error untuk perhitungan
curah hujan rata-rata dengan Metode Thiessen, misalnya untuk tahun
1969:
Curah hujan Stasiun Cicalengka Januari 1969 = 300 mm
Curah hujan Stasiun Cadasngampar Januari 1969 = 231 mm
Curah hujan Stasiun Leles Januari 1969 = 290 mm
Curah hujan rata-rata bulanan metode Thiessen 1969 = 289.39 mm
Maka,
𝐸𝑟𝑟𝑜𝑟 =
|300 − 289.39 |
300
+
|231 − 289.39 |
231
+
|290 − 289.39 |
290
3
= 0.0967
Perhitungan error dapat dilihat pada tabel dibawah ini:
30
Tabel 4. 4 Perhitungan Error Curah Hujan Rata-Rata
Curah Hujan (mm)
1969 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 300 482 365 298 50 140 20 0 0 195 190 405 203.8
Cadasngampar 231 197 117 243 18 124 53 0 25 119 324 243 141.2
Leles 290 344 177 123 35 30 0 0 63 217 129 250 138.2
Rerata Aritmatik 273.67 341.00 219.67 221.33 34.33 98.00 24.33 0.00 29.33 177.00 214.33 299.33
Rerata Theissen 289.39 345.67 181.38 129.72 35.17 34.50 1.36 0.00 60.66 214.91 133.65 254.25
Error Aritmatik 0.1096 0.3441 0.5056 0.3820 0.4133 0.9254 0.2525 0.0000 0.2359 0.2547 0.3760 0.2300 0.3358
Error Theissen 0.0967 0.3474 0.3594 0.3618 0.4184 0.5418 0.6355 0.0000 0.4878 0.3059 0.3067 0.1452 0.3339
Curah Hujan (mm)
1970 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 402 118 565 369 410 195 171 0 38 104 72.7455 252.053 224.7
Cadasngampar 360 313 559 431 491 113 92 0 34 56 185 641 272.9
Leles 295 194 545 232 114 5 105 0 56 54 173 378 179.3
Rerata Aritmatik 352.33 208.33 556.33 344.00 338.33 104.33 122.67 0.00 42.67 71.33 143.58 423.68
Rerata Theissen 298.98 193.66 545.77 238.84 127.99 11.96 106.66 0.00 55.16 55.43 170.36 378.42
Error Aritmatik 0.1131 0.3913 0.0136 0.2508 0.8179 6.8028 0.2614 0.0000 0.2053 0.3030 0.4559 0.3803 0.4181
Error Theissen 0.1464 0.3414 0.0197 0.2760 0.5166 1.0751 0.1838 0.0000 0.3630 0.1679 0.4788 0.3040 0.3227
Curah Hujan (mm)
1971 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 321 213 148 107 173 30 0 0 0 213 470 374 170.8
Cadasngampar 489 188 399 296 430 144 77 77 10 327 709 387 294.4
Leles 243 145 274 162 234 72 0 0 9 323 435 425 193.5
Rerata Aritmatik 351.00 182.00 273.67 188.33 279.00 82.00 25.67 25.67 6.33 287.67 538.00 395.33
Rerata Theissen 248.89 147.56 272.34 162.47 235.23 71.90 1.16 1.16 8.76 319.97 440.11 423.00
Error Aritmatik 0.2734 0.1442 0.3881 0.4288 0.3854 0.7676 0.2222 0.2222 0.2210 0.1934 0.2075 0.0495 0.2919
Error Theissen 0.2466 0.1800 0.3879 0.3241 0.2727 0.6329 0.3283 0.3283 0.0501 0.1777 0.1515 0.0762 0.2630
Curah Hujan (mm)
1972 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 164 172 216 91 115 0 0 0 0 2 130 329 101.6
Cadasngampar 324 315 546 96 128 0 0 0 0 0 153 365 160.6
Leles 140 143 169 30 142 0 0 0 0 7 83 273 82.3
Rerata Aritmatik 209.33 210.00 310.33 72.33 128.33 0.00 0.00 0.00 0.00 3.00 122.00 322.33
Rerata Theissen 143.44 146.40 175.99 32.71 141.03 0.00 0.00 0.00 0.00 6.75 85.37 275.96
Error Aritmatik 0.3752 0.3409 0.5682 0.6209 0.0716 0.0000 0.0000 0.0000 0.0000 0.3571 0.2447 0.1060 0.2237
Error Theissen 0.2357 0.2359 0.3014 0.4634 0.1117 0.0000 0.0000 0.0000 0.0000 0.8041 0.2713 0.1387 0.2135
Curah Hujan (mm)
1973 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 333 249 199 170 246 25 26 24 132 32 281 231 162.3
Cadasngampar 315 396 272 213 520 338 25 48 165 48 287 380 250.6
Leles 220 186 211 99 154 78 25 21 134 37 176 82 118.6
Rerata Aritmatik 289.33 277.00 227.33 160.67 306.67 147.00 25.33 31.00 143.67 39.00 248.00 231.00
Rerata Theissen 224.60 190.93 211.58 102.71 162.09 80.42 25.03 21.49 134.41 37.03 180.62 90.67
Error Aritmatik 0.1759 0.3007 0.1280 0.3078 0.5494 2.1099 0.0174 0.3740 0.0966 0.1534 0.2208 0.7364 0.4309
Error Theissen 0.2111 0.2592 0.0960 0.3170 0.3606 1.0033 0.0132 0.2267 0.0689 0.1288 0.2514 0.4915 0.2857
Curah Hujan (mm)
1974 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 44 135 76 303 168 132.908 143 66 88 157 258 253 152.0
Cadasngampar 102 267 253 295 177 11 111 417 95 253 293 400 222.8
Leles 84 99 24 198 20 0 47 90 26 190 304 381 121.9
Rerata Aritmatik 76.67 167.00 117.67 265.33 121.67 47.97 100.33 191.00 69.67 200.00 285.00 344.67
Rerata Theissen 83.15 102.54 28.91 202.41 26.52 3.90 50.66 94.25 28.78 190.02 302.54 377.69
Error Aritmatik 0.3594 0.4328 1.6620 0.1883 1.8906 1.3333 0.5097 1.1860 0.7182 0.1787 0.0648 0.1987 0.7269
Error Theissen 0.3616 0.2974 0.5699 0.2227 0.6728 0.5387 0.4224 0.4164 0.4923 0.1531 0.0700 0.1858 0.3669
Curah Hujan (mm)
1975 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 340 206 252 189 69 65 33 10 106 408 186 161 168.8
Cadasngampar 478 311 401 333 175 63 25 0 166 487 450 262 262.6
Leles 359 221 279 337 103 13 5.98 0 160 608 194 318 216.5
Rerata Aritmatik 392.33 246.00 310.67 286.33 115.67 47.00 21.33 3.33 144.00 501.00 276.67 247.00
Rerata Theissen 360.26 221.93 280.08 332.78 103.13 15.21 7.03 0.28 158.57 600.56 197.63 312.75
Error Aritmatik 0.1420 0.1721 0.1905 0.2685 0.3795 1.0488 1.0223 0.6667 0.1970 0.1442 0.4329 0.2716 0.4113
Error Theissen 0.1031 0.1227 0.1389 0.2580 0.3022 0.5649 0.5603 0.9719 0.1832 0.2391 0.2140 0.3842 0.3369
Rerata Error
Rerata
Bulan
Rerata
Bulan
Rerata
Rerata Error
Bulan
Rerata
Rerata Error
Rerata Error
Rerata Error
Rerata Error
Bulan
Bulan
Rerata
Bulan
Rerata
Rerata Error
Bulan
Rerata
31
Dari perhitungan di atas, kita mengambil rata-rata dari seluruh rerata error
antara metode Aritmatik dan Theissen sehingga didapat tabel berikut ini:
Tabel 4. 5 Hasil Rata-Rata dari Error Aritmatik dan Error Theissen
Dapat dilihat bahwa perhitungan curah hujan rata-rata dengan metode
Thiessen memiliki error yang lebih kecil, dengan kata lain, prediksi dari
curah hujan rata-rata di DAS lebih akurat, sehingga pada pengolahan data
selanjutnya, bila diperlukan, curah hujan rata-rata yang lebih tepat untuk
diambil adalah curah hujan rata-rata metode Theissen.
4.3 Perhitungan Kebutuhan Air Daerah Irigasi Kali Cibeusi
4.3.1 Pengumpulan Data iklim
Data-data iklim diperlukan untuk menganalisis kebutuhan air di suatu
daerah. Selain data curah hujan, diperlukan juga data temperature udara
rata-rata (0C), kecepatan angin (m/s), data radiasi sinar matahari rata-rata
(%), dan data kelembaban rata-rata (%). Data-data iklim didapat dari
Curah Hujan (mm)
1976 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 102 90 216 114 72 15 4 0 21 268 390 241 127.8
Cadasngampar 92 259 431 76 47 19 0 47 3 239 224 258 141.3
Leles 332 49 122 52 0 0 0 0 0 147 297 180 98.3
Rerata Aritmatik 175.33 132.67 256.33 80.67 39.67 11.33 1.33 15.67 8.00 218.00 303.67 226.33
Rerata Theissen 321.93 53.31 129.29 54.10 2.73 0.71 0.11 0.71 0.64 151.78 298.51 182.89
Error Aritmatik 0.6989 0.8898 0.5644 0.3017 0.2017 0.2160 0.2222 0.2222 0.7619 0.2525 0.1998 0.1470 0.3898
Error Theissen 1.5619 0.4299 0.3871 0.2847 0.6347 0.6385 0.3240 0.3283 0.5860 0.2770 0.1908 0.1828 0.4855
Curah Hujan (mm)
1977 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 320 247 239 90 102 161 0 5 40 4 146 278 136.0
Cadasngampar 246 448 561 245 136 342 0 0 57 44 292 461 236.0
Leles 236 145 205 58.61 219 226 0 0 145 10.53 84 291 135.0
Rerata Aritmatik 267.33 280.00 335.00 131.20 152.33 243.00 0.00 1.67 80.67 19.51 174.00 343.33
Rerata Theissen 238.51 152.42 211.31 62.30 214.46 225.92 0.00 0.14 140.73 10.85 88.87 293.19
Error Aritmatik 0.1280 0.4799 0.4796 0.7203 0.3060 0.2913 0.0000 0.6667 0.6252 1.7623 0.5558 0.2234 0.5199
Error Theissen 0.0986 0.3646 0.2567 0.3721 0.5668 0.2477 0.0000 0.9719 1.3388 0.8321 0.3816 0.1421 0.4644
Curah Hujan (mm)
1978 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
Cicalengka 175 185 346 138 108 183 93 70 59 49 93 344 153.6
Cadasngampar 162 264 561 84 126 121 188 131 153 43 362 459 221.2
Leles 219 63.16 134.21 132 134 28.95 180 43 97 271 191 185 139.9
Rerata Aritmatik 185.33 170.72 347.07 118.00 122.67 110.98 153.67 81.33 103.00 121.00 215.33 329.33
Rerata Theissen 216.91 69.60 146.58 131.45 133.15 34.66 177.68 45.08 96.77 261.33 190.82 193.59
Error Aritmatik 0.1189 0.7112 0.6568 0.2186 0.0823 1.1033 0.3271 0.4775 0.3781 1.2789 0.6160 0.3684 0.5281
Error Theissen 0.1960 0.4874 0.4691 0.2055 0.0987 0.5738 0.3261 0.3534 0.3367 3.1488 0.5085 0.3540 0.5882
Bulan
Rerata
Rerata Error
Bulan
Rerata
Rerata Error
Bulan
Rerata
Rerata Error
Error
Aritmatik
0.4276
Error
Theissen
0.3661
32
stasiun pengukuran hidrometeorologi yang paling dekat dengan bendung
yaitu Stasiun Jatiwangi, Jawa Barat. Data-data yang dipergunakan
berawal dari tahun 1969 hingga 1978.
4.3.2 Perhitungan Evapotranspirasi
Menghitung nilai evapotranspirasi potensial (ETo) dengan menggunakan
metode Pennman seperti tabel yang disajikan berikut:
Tabel 4. 6 Perhitungan Evapotranspirasi metode Penmann Modifikasi
Contoh perhitungan nilai Evapotranspirasi dengan metode Penmann
Modifikasi:
Contoh perhitungan: (Januari)
Setelah memiliki data rata-rata dari suhu, kelembapan, penyinaran
matahari, dan kecepatan angin, serta data tabel berikut :
Tabel 4. 7 Koreksi suhu ke dalam ea, W, dan f(t)
Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember
1 T (°C) 25.8 26.0 26.2 27.0 26.8 26.4 26.1 26.8 27.4 28.0 27.6 26.7
2 Rh (%) 87.86 86.71 87.29 83.29 83.29 79.71 75.14 72.17 69.57 71.00 77.00 84.43
3 n/N (%) 40.40 60.20 61.00 64.60 64.40 65.80 71.20 77.80 73.75 58.75 69.00 55.80
4 U(knot) 2.66 2.74 2.74 2.49 2.40 2.31 2.83 2.40 2.74 2.66 2.31 2.40
5 U(m/detik) 1.3671 1.4112 1.4112 1.2789 1.2348 1.1907 1.4553 1.2348 1.4112 1.3671 1.1907 1.2348
6 ea (mbar) 32.2300 33.6170 34.0240 35.6660 35.2470 34.4310 33.8189 35.2470 36.5150 37.8070 36.9450 35.0465
7 W 0.7530 0.7550 0.7570 0.7650 0.7630 0.7590 0.7560 0.7630 0.7690 0.7750 0.7710 0.7620
8 1-W 0.2470 0.2450 0.2430 0.2350 0.2370 0.2410 0.2440 0.2370 0.2310 0.2250 0.2290 0.2380
9 f(T) 15.8080 15.8530 15.8980 16.0790 16.0340 15.9440 15.8757 16.0340 16.1700 16.3050 16.2150 16.0114
10 ed (mbar) 28.3164 29.1507 29.6981 29.7047 29.3557 27.4464 25.4125 25.4366 25.4040 26.8430 28.4477 29.5893
11 ea-ed (mbar) 3.9136 4.4663 4.3259 5.9613 5.8913 6.9846 8.4064 9.8104 11.1110 10.9640 8.4974 5.4572
12 f(ed) 0.1059 0.1024 0.1002 0.1002 0.1016 0.1095 0.1182 0.1181 0.1182 0.1120 0.1053 0.1007
13 Ra (mm/hari) 15.9425 16.0475 15.5525 14.5575 13.2575 13.0100 12.9100 13.8575 14.9525 15.7475 15.8688 15.8900
14 Rs (mm/hari) 7.2060 8.8422 8.6316 8.3414 7.5833 7.5328 7.8235 8.8549 9.2519 8.5627 9.4419 8.4058
15 f(n/N) 0.4636 0.6418 0.6490 0.6814 0.6796 0.6922 0.7408 0.8002 0.7638 0.6288 0.7210 0.6022
16 f(u) (m/detik) 0.2737 0.2738 0.2738 0.2735 0.2733 0.2732 0.2739 0.2733 0.2738 0.2737 0.2732 0.2733
17 Rn1(mm/hari) 0.7758 1.0422 1.0340 1.0977 1.1071 1.2083 1.3900 1.5151 1.4601 1.1486 1.2313 0.9705
18 Rns (mm/hari) 5.4045 6.6316 6.4737 6.2561 5.6875 5.6496 5.8676 6.6412 6.9389 6.4220 7.0814 6.3044
19 Rn (mm/hari) 4.6287 5.5894 5.4397 5.1584 4.5803 4.4412 4.4776 5.1261 5.4788 5.2735 5.8501 5.3338
20 C 1.1000 1.1000 1.0000 1.0000 0.9500 0.9500 1.0000 1.0000 1.1000 1.1000 1.1500 1.1500
21 ETo (mm/hari) 4.1250 4.9716 4.4057 4.3292 3.6826 3.6393 3.9469 4.5467 5.4075 5.2383 5.7984 5.0823
22 Eto (mm/bulan) 127.874 154.1182 136.5761 134.2063 114.1606 112.8172 122.3544 140.9487 167.634 162.3879 179.7508 157.5508
Langkah Eto
Bulan
33
Tabel 4. 8 Koreksi nilai Ra terhadap bulan dalam satu tahun
Tabel 4. 9 Konstanta C tiap bulan menurut Penman
Selanjutnya, bisa dihitung evapotranspirasi potensial dengan langkah:
1) Mengkonversi satuan kecepatan angin dari knot menjadi m/detik
2) Menghitung ea dari interpolasi Tabel 4.7 terhadap suhu
Pada Januari, ea bernilai sebesar 32.23 mbar karena suhu 25.8⁰ C
3) Menentukan Faktor bobot (W) ditentukan melalui Tabel 4.7 dengan
menggunakan interpolasi, kita dapatkan nilai W = 0,753 pada
temperatur 25.8oC.
4) (1-W) = 1 – 0,753 = 0.247
5) Menentukan nilai f(T) dari Tabel 4.7 dengan menggunakan
interpolasi, nilai f(T) untuk bulan Januari = 15.808
6) Menghitung nilai ed
ed = ea× Rh
ed = 32.23 × 89.786%
ed = 28.3164 mbar
7) Menghitung nilai (ea-ad)
ea-ed = 3.9136 mbar
8) Menghitung nilai f(ed)
f(ed) =0.34-0.044×√ed
=0.34-0.044×√28.3164
34
=0.1059
9) Menghitung nilai Ra dan Rs
Dengan menggunakan interpolasi dari Tabel 4.8 terhadap koordinat,
dihitung nilai Ra=15.9425 mm/hari.
Rs = (0.25+0.5 n/N)Ra
= (0.25+0.5 × 40.4%)×15.9425
= 7.206 mm/hari
10) Menghitung f(n/N)
f(n/N) =0.1+(0.9 ×40.4%)
=0.4636
11) Menghitung f(u)
f(u) = 0.27 × (1 + 𝑈 𝑥 0,864)
= 0.27 × (1 + 1.3671 𝑥 0,864)
= 0.2737 m/detik
12) Menghitung radiasi gelombang pendek yang dipancarkan Rnl
Rnl = f(T) × f(ed) × f(n/N)
= 15.808 × 0.1059 ×0.4636
= 0.7758 mm/hari
13) Menghitung gelombang pendek radiasi matahari yang diserap
Rns = (1−𝛼)Rs
= (1−0,25)× 7.206
= 5.4045 mm/hari
14) Menghitung radiasi netto
Rn = Rns-Rnl
= 5.4045-0.7758
= 4.6287 mm/hari
15) Menentukan nilai C dari interpolasi Tabel 4.7
16) Menghitung Evapotranspirasi Potensial
𝐸𝑇𝑜 = 𝐶[𝑊.𝑅𝑛+(1−𝑊)𝑓(𝑢)(𝑒𝑎−𝑒𝑑)]
𝐸𝑇𝑜 = 4.125 mm/hari
𝐸𝑇𝑜 = 127.874 mm/bulan
35
4.3.3 Nilai Perkolasi
Kehilangan air akibat perkolasi dalam kasus ini diasumsikan sebesar 2
mm/hari.
4.3.4 Perhitungan Curah Hujan Efektif
Sebelum menghitung curah hujan efektif, kita tentukan terlebih dahulu
stasiun yang paling dekat dengan daerah irigasi. Setelah ditentukan maka
kita baru bisa menentukan curah hujan efektifnya. Nilai Re padi
merupakan kemungkinan 80% terjadinya curah hujan pada suatu bulan
dikali dengan safety factor 0,7 dan dibagi dengan jumlah tinjauan hari,
sedangkan nilai Re palawija merupakan kemungkinan 50% terjadinya
curah hujan pada suatu bulan dikali dengan safety factor 0,7 dan dibagi
dengan jumlah tinjauan hari.
Tabel 4. 10 Re 80 dan Re 50
Contoh: pada Bulan Januari curah hujan padi adalah 155.25 mm/bulan,
sedangkan curah hujan palawija pada bulan Januari adalah 241.0968
mm/bulan. Namun karena yang akan dianalisis adalah per harian selama
15 hari, maka nilai Re padi dan Re palawija dibagi dengan 30 dengan
asumsi bahwa selama sebulan curah hujan sama. Jadi nilai Re bulan
Januari per hari adalah:
𝑅𝑒 𝑝𝑎𝑑𝑖 =
0,7 𝑥 155.25
30
= 3.505573 𝑚𝑚/ℎ𝑎𝑟𝑖
𝐑𝐞 𝐩𝐚𝐥𝐚𝐰𝐢𝐣𝐚 =
𝟎,𝟕 𝒙 𝟐𝟒𝟏.𝟎𝟗𝟔𝟖
𝟑𝟎
= 𝟓.𝟒𝟒𝟒𝟏𝟐𝟐 𝐦𝐦/𝐡𝐚𝐫𝐢
Tahun Rank P Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
1969 1 9.1 357 355 543 349 231 254 249 749 687 601 440 423
1970 2 18.2 324 321 277 244 214 84 146 359 573 320 303 378
1971 3 27.3 297 295 269 207 155 81 68 21 445 261 299 378
1972 4 36.4 289 289 209 170 140 76 29 2 319 215 198 313
1973 5 45.5 245 243 205 136 132 35 25 1 124 190 191 293
1974 6 54.5 238 236 181 130 122 15 1 1 118 152 181 276
1975 7 63.6 222 221 169 100 101 7 1 1 61 55 170 254
1976 8 72.7 215 215 140 54 35 0 0 0 15 55 134 194
1977 9 81.8 140 140 124 32 24 0 0 0 0 37 89 183
1978 10 90.9 63 82 25 25 2 0 0 0 0 7 85 91
155.25 154.87 127.16 36.69 26.28 0.06 0.01 0.00 2.96 40.71 97.83 185.03
241.0968381 239.4581807 193.1508931 132.8864293 126.93447 24.74793084 13.06 1.20265898 121.04 170.901752 185.7196581 284.5761504
31 28 31 30 31 30 31 31 30 31 30 31
108.6727687 108.4084274 89.01249707 25.6804677 18.3974 0.044640315 0.00650376 0 2.07322226 28.497 68.47879822 129.5193227
3.505573184 3.87172955 2.871370873 0.85601559 0.593464516 0.00148801 0.0002098 0 0.06910741 0.919258065 2.282626607 4.178042669
168.7677867 167.6207265 135.2056252 93.0205005 88.85412898 17.32355159 9.142 0.84186129 84.728 119.6312264 130.0037606 199.2033053
5.444122152 5.986454519 4.36147178 3.10068335 2.866262225 0.57745172 0.29490323 0.02715682 2.82426667 3.85907182 4.333458688 6.425913075
nhari
Re 80mm/bulan
Re 80mm/hari
Re 50mm/bulan
Re 50mm/hari
R80(mm/bulan)
R50(mm/bulan)
36
Grafik 4. 1 Re 80
Grafik 4. 2 Re 50
4.3.5 Perhitungan WLR
Perhitungan WLR adalah dengan menggunakan tabel panduan WLR
sebagai berikut :
Tabel 4. 11 Perhitungan WLR
4.3.6 Penentuan Koefisien Tanaman
Penentukan Koefisien Tanaman dibedakan berdasarkan kelompok /
golongan yang disajikan sesuai tabel berikut:
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
WLR1 3,3 3,3 3,3 3,3
WLR2 3,3 3,3 3,3 3,3
WLR3 3,3 3,3 3,3 3,3
WLR 1,1 1,1 2,2 1,1 1,1 1,1 1,1 2,2 1,1 1,1
Okt
Nov Des Jan Feb Mar Apr Mei Jun Jul Agu Sep
37
Tabel 4. 12 Koefisien Tanaman Kelompok A
Tabel 4. 13 Koefisien Tanaman Kelompok B
Tabel 4. 14 Koefisien Tanaman Kelompok C
4.3.7 Perhitungan ETc, NFR, dan DR
Dengan menggunakan koefisien tanaman untuk masing-masing
kelompok (kelompok A, kelompok B, dan kelompok C), maka dapat
dihitung ETc, NFR, dan DR untuk setiap masing-masing bulan dari
masing-masing kelompok pola tanaman.
Tabel 4. 15 Kebutuhan Air Kelompok A
Contoh Perhitungan ETc, NFR, dan DR pada Bulan Oktober di Kelompok A
a. Menghitung ETc
𝑬𝑻𝒄 = 𝑬𝑻𝒐 𝒙 𝑪
𝑬𝑻𝒄 = 𝟓. 𝟐𝟒𝒙 𝑳𝑷
𝑬𝑻𝒄 = 𝟏𝟏.𝟒𝟏
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
C1 1,27 1,33 1,30 1,30 0 LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP 1,20
C2 1,20 1,27 1,33 1,30 1,30 0 LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP LP
C3 LP 1,20 1,27 1,33 1,30 1,30 0 LP LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1,00 0,82 0,45 LP LP
c LP 1,27 1,30 1,31 0,87 0,65 0 LP LP LP 1,27 1,30 1,31 0,87 0,60 0,42 0,75 0,92 0,94 0,76 0,64 0,45 LP LP
Nov Okt
Sep
Agu
Jul
Jun
Mei
Apr
Mar
Feb
Jan
Des
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
C1 1,20 1,27 1,33 1,30 1,30 0 LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP
C2 LP 1,20 1,27 1,33 1,30 1,30 0 LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP
C3 LP LP 1,20 1,27 1,33 1,30 1,30 0 LP LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1,00 0,82 0,45 LP
c LP LP 1,27 1,30 1,31 0,87 0,65 0 LP LP LP 1,27 1,30 1,31 0,87 0,60 0,42 0,75 0,92 0,94 0,76 0,64 0,45 LP
Jul Agu Sep Okt
Feb Mar Apr Mei Jun
Nov Des Jan
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
C1 LP 1,27 1,33 1,30 1,30 0 LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP
C2 LP 1,20 1,27 1,33 1,30 1,30 0 LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP
C3 LP LP 1,20 1,27 1,33 1,30 1,30 0 LP LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1,00 0,82 0,45 LP
c LP LP 1,27 1,30 1,31 0,87 0,65 0 LP LP LP 1,27 1,30 1,31 0,87 0,60 0,42 0,75 0,92 0,94 0,76 0,64 0,45 LP
Agu Sep Okt
Mar Apr Mei Jun Jul
Nov Des Jan Feb
ETo
mm/h
P
mm/h
Re
mm/h
WLR
mm/h
C1 C2 C3 c rata-rata ETc NFR DR
(10) (11) (12)
(9)x(2)
(10)+(3)+(9)-
(4)
(11)/(0.64*8
.64)
1 5.80 2 0.94033 1.3 1.2 LP LP 8.3782539 11.90 10.96 1.98
2 1.27277 1.1 1.33 1.3 1.2 1.28 7.40 9.41 1.70
1 5.08 2 1.00032 1.1 1.3 1.33 1.3 1.31 6.66 8.97 1.62
2 1.9782 2.2 1.3 1.3 1.33 1.31 6.66 7.99 1.44
1 4.12 2 4.02808 1.1 0 1.3 1.3 0.87 3.57 2.41 0.44
2 3.84775 1.1 0 1.3 0.65 2.68 1.48 0.27
1 4.97 2 4.01138 0 0 0 0 0
2 3.81092 LP LP LP LP 7.4687103 11.17 7.36 1.33
1 4.41 2 3.37437 1.2 LP LP LP 6.8462499 10.61 7.23 1.31
2 2.93523 1.27 1.2 LP LP 6.8462499 10.61 7.67 1.39
1 4.33 2 1.87239 1.1 1.33 1.27 1.2 1.27 5.48 6.88 1.24
2 2.46857 1.1 1.3 1.33 1.27 1.3 5.63 6.46 1.17
1 3.68 2 2.31716 2.2 1.3 1.3 1.33 1.31 4.82 5.82 1.05
2 1.82937 1.1 0 1.3 1.3 0.87 3.19 4.23 0.76
1 3.64 2 0.64431 1.1 0.5 0 1.3 0.6 2.18 4.14 0.75
2 0.34951 0.75 0.5 0 0.42 1.52 3.58 0.65
1 3.95 2 0.30013 1 0.75 0.5 0.75 2.96 5.41 0.98
2 0.30934 1 1 0.75 0.92 3.62 6.23 1.13
1 4.55 2 0.00662 0.82 1 1 0.94 4.27 7.21 1.30
2 0.0495 0.45 0.82 1 0.76 3.44 6.15 1.11
1 5.41 2 1.60353 0.45 0.82 0.635 3.43 4.47 0.81
2 2.35044 0.45 0.45 2.43 2.53 0.46
1 5.24 2 2.36335 LP LP LP LP 7.7621526 11.41 9.05 1.64
2 3.21944 1.2 LP LP LP 7.7621526 11.41 8.19 1.48
AGT
SEP
OKT
MAR
APR
MEI
JUN
JUL
Eo+P
NOV
DES
JAN
FEB
(6) (7) (8) (9)
(5)
Periode
(1) (2) (3) (4)
38
Untuk c rata-rata bernilai LP, ETc dicari dengan mencari nilai
Eo + P terlebih dahulu (Eo + P = 1,1ETo + P) kemudian nilai
yang diperoleh dari Eo + P diinterpolasi dengan tabel Eo + P
untuk T 45 hari dan S 300mm.
b. Menentukan NFR
𝑵𝑭𝑹 = 𝑬𝑻𝒄 − 𝑹𝒆
𝑵𝑭𝑹 = 𝟏𝟏.𝟒𝟏 − 𝟐. 𝟑𝟔𝟑𝟑𝟓
𝑵𝑭𝑹 = 𝟗.𝟎𝟓
Bila hasil NFR bernilai negatif, maka nilai NFR sama dengan
0.
c. Menentukan DR
𝑫𝑹 =
𝑵𝑭𝑹
(𝟎, 𝟔𝟓 × 𝟖, 𝟔𝟒)
𝑫𝑹 =
𝟗. 𝟎𝟓
(𝟎, 𝟔𝟒 × 𝟖, 𝟔𝟒)
𝑫𝑹 = 𝟏.𝟔𝟒
Tabel 4. 16 Tabel Interpolasi untuk ETc
Tabel 4. 17 Kebutuhan Air Kelompok B
Eo + P T 45 hari
5 9,5
5,5 9,8
6 10,1
6,5 10,4
7 10,8
7,5 11,1
8 11,4
8,5 11,8
9 12,1
9,5 12,5
10 12,9
10,5 13,2
11 13,6
S 300 mm
ETo
mm/h
P
mm/h
Re
mm/h
WLR
mm/h
C1 C2 C3 c rata-rata ETc NFR DR
(10) (11) (12)
(9)x(2)
(10)+(3)+(9)-
(4)
(11)/(0.64*8
.64)
1 5.80 2 0.94033 1.2 LP LP LP 8.3782539 11.90 10.96 1.98
2 1.27277 1.3 1.2 LP LP 8.3782539 11.63 10.35 1.87
1 5.08 2 1.00032 1.1 1.33 1.3 1.20 1.28 6.49 8.76 1.59
2 1.9782 1.1 1.3 1.33 1.30 1.31 6.66 7.99 1.44
1 4.12 2 4.02808 2.2 1.3 1.3 1.33 1.31 5.40 4.69 0.85
2 3.84775 1.1 0 1.3 1.30 0.87 3.57 2.59 0.47
1 4.97 2 4.01138 1.1 0 1.30 0.65 3.23 1.87 0.34
2 3.81092 0.00 0.00 0.00 0.00 0.00
1 4.41 2 3.37437 LP LP LP LP 6.8462499 10.61 7.23 1.31
2 2.93523 1.2 LP LP LP 6.8462499 10.61 7.67 1.39
1 4.33 2 1.87239 1.27 1.2 LP LP 6.762158 10.56 8.68 1.57
2 2.46857 1.1 1.33 1.27 1.20 1.24 5.35 6.11 1.11
1 3.68 2 2.31716 1.1 1.3 1.33 1.27 1.27 4.66 5.61 1.02
2 1.82937 2.2 1.3 1.3 1.33 1.30 4.79 6.26 1.13
1 3.64 2 0.64431 1.1 0 1.3 1.30 1.31 4.77 7.43 1.34
2 0.34951 1.1 0.5 0 1.30 0.87 3.15 5.67 1.03
1 3.95 2 0.30013 0.75 0.5 0.00 0.60 2.37 4.67 0.84
2 0.30934 1 0.75 0.50 0.42 1.64 3.75 0.68
1 4.55 2 0.00662 1 1 0.75 0.75 3.41 6.15 1.11
2 0.0495 0.82 1 1.00 0.92 4.17 7.04 1.27
1 5.41 2 1.60353 0.45 0.82 1.00 0.94 5.08 6.42 1.16
2 2.35044 0.45 0.82 0.76 4.09 4.50 0.81
1 5.24 2 2.36335 0.45 0.64 3.33 3.60 0.65
2 3.21944 LP LP LP LP 7.7621526 11.41 8.19 1.48
AGT
SEP
OKT
MAR
APR
MEI
JUN
JUL
Eo+P
NOV
DES
JAN
FEB
(1)
Periode
(2) (3) (4) (5) (6) (7) (8) (9)
39
Perhitungan ETc, NFR, dan Dr untuk Kelompok B sama dengan Kelompok A.
Tabel 4. 18 Kebutuhan Air kelompok C
Perhitungan ETc, NFR, dan Dr untuk Kelompok C sama dengan
Kelompok A.
Setelah diperoleh analisis altenatif penanaman, dilakukan analisis
alternatif kelompok penanaman.
Alternatif 1 : Golongan A
Alternatif 2 : Golongan B
Alternatif 3 : Golongan C
Alternatif 4 : Average Golongan A + Golongan B
Alternatif 5 : Average Golongan A + Golongan C
Alternatif 6 : Average Golongan A + Golongan B + Golongan C
Tabel di bawah menunjukkan besarnya DR tiap alternatif.
ETo
mm/h
P
mm/h
Re
mm/h
WLR
mm/h
C1 C2 C3 c rata-rata ETc NFR DR
(10) (11) (12)
(9)x(2)
(10)+(3)+(9)-
(4)
(11)/(0.64*8
.64)
1 5.80 2 0.94033 1.1 1.33 1.3 1.2 1.28 7.40 9.74 1.76
2 1.27277 1.1 1.3 1.33 1.3 1.31 7.60 9.63 1.74
1 5.08 2 1.00032 2.2 1.3 1.3 1.33 1.31 6.66 8.97 1.62
2 1.9782 1.1 0 1.3 1.3 0.87 6.66 7.55 1.36
1 4.12 2 4.02808 1.1 0 1.3 0.65 2.68 1.30 0.24
2 3.84775 0 0.00 0.00 0.00 0.00
1 4.97 2 4.01138 LP LP LP LP 7.4687103 11.17 7.16 1.30
2 3.81092 1.2 LP LP LP 7.4687103 11.17 7.36 1.33
1 4.41 2 3.37437 1.27 1.2 LP LP 6.8462499 10.61 7.23 1.31
2 2.93523 1.1 1.33 1.27 1.2 1.27 6.50 3.56 0.64
1 4.33 2 1.87239 1.1 1.3 1.33 1.27 1.30 6.50 4.63 0.84
2 2.46857 2.2 1.3 1.3 1.33 1.31 5.67 6.51 1.18
1 3.68 2 2.31716 1.1 0 1.3 1.3 0.87 3.75 4.30 0.78
2 1.82937 1.1 0.5 0 1.3 0.60 2.21 2.98 0.54
1 3.64 2 0.64431 0.75 0.5 0 0.42 1.53 3.31 0.60
2 0.34951 1 0.75 0.5 0.75 2.73 5.13 0.93
1 3.95 2 0.30013 1 1 0.75 0.92 3.34 5.95 1.08
2 0.30934 0.82 1 1 0.94 3.71 6.34 1.15
1 4.55 2 0.00662 0.45 0.82 1 0.76 2.99 5.74 1.04
2 0.0495 0.45 0.82 0.64 2.89 5.47 0.99
1 5.41 2 1.60353 0.45 0.45 2.05 2.89 0.52
2 2.35044 LP LP LP LP 7.9483041 11.56 9.21 1.67
1 5.24 2 2.36335 1.2 LP LP LP 7.7621526 11.41 9.05 1.64
2 3.21944 1.3 1.2 LP LP 7.7621526 11.41 8.19 1.48
(9)
Eo+P
(4) (5) (6) (7) (8)
JUN
JUL
AGT
SEP
OKT
JAN
FEB
MAR
APR
MEI
NOV
DES
(1)
Periode
(2) (3)
40
Tabel 4. 19 Alternatif Kelompok Penamaan
Tabel 4. 20 Luas Area Berdasarkan Alternatif Pola Tanam
Nilai total dari alternatif 2 merupakan yang terbesar di antara alternatif
lainnya sehingga dipilih alternatif ke-2 tersebut sebagai luas pengairan,
yaitu 21458.68 ha. Setelah mengetahui luas sawah yang dapat diairi,
kemudian sawah-sawah potensial diberi tanda mana saja yang dapat diairi.
Dengan DR max yang didapat dari Kelompok A sebesar 1.9825
Tabel 4. 21 Pemilihan Alternatif Pola Tanam
Alternatif 1 Alternatif 2 Alternatif 3 Alternatif 4 Alternatif 5 Alternatif 6 Alternatif 7
A B C (A+B)/2 (B+C)/2 (A+C)/2 (A+B+C)/3
NOV 1 1.9825 1.9825 1.7612 1.9825 1.8719 1.8719 1.9087
2 1.7011 1.8725 1.7421 1.7868 1.8073 1.7216 1.7719
DES 1 1.6217 1.5851 1.6217 1.6034 1.6034 1.6217 1.6095
2 1.4449 1.4449 1.3647 1.4449 1.4048 1.4048 1.4182
JAN 1 0.4365 0.8474 0.2357 0.6419 0.5415 0.3361 0.5065 Padi I
2 0.2683 0.4691 0 0.3687 0.2345 0.1341 0.2458 Padi II
FEB 1 0 0.3382 1.2955 0.1691 0.8169 0.6477 0.5446 Palawija
2 1.3317 0 1.3317 0.6659 0.6659 1.3317 0.8878
MAR 1 1.3081 1.3081 1.3081 1.3081 1.3081 1.3081 1.3081
2 1.3875 1.3875 0.6447 1.3875 1.0161 1.0161 1.1399
APR 1 1.2438 1.5706 0.8369 1.4072 1.2038 1.0404 1.2171
2 1.1682 1.1055 1.1778 1.1368 1.1417 1.1730 1.1505
MEI 1 1.0520 1.0153 0.7779 1.0336 0.8966 0.9149 0.9484
2 0.7648 1.1317 0.5390 0.9483 0.8353 0.6519 0.8118
JUN 1 0.7486 1.3442 0.5980 1.0464 0.9711 0.6733 0.8969
2 0.6481 1.0256 0.9277 0.8368 0.9767 0.7879 0.8671
JUL 1 0.9784 0.8442 1.0765 0.9113 0.9603 1.0274 0.9664
2 1.1258 0.6785 1.1467 0.9022 0.9126 1.1363 0.9837
AGU 1 1.3034 1.1128 1.0374 1.2081 1.0751 1.1704 1.1512
2 1.1117 1.2722 0.9897 1.1920 1.1310 1.0507 1.1246
SEP 1 0.8075 1.1609 0.5231 0.9842 0.8420 0.6653 0.8305
2 0.4581 0.8134 1.6653 0.6358 1.2393 1.0617 0.9789
OKT 1 1.6360 0.6507 1.6360 1.1433 1.1433 1.6360 1.3076
2 1.4812 1.4812 1.4812 1.4812 1.4812 1.4812 1.4812
Periode
Alternatif 1 Alternatif 2 Alternatif 3 Alternatif 4 Alternatif 5 Alternatif 6 Alternatif 7
A B C (A+B)/2 (B+C)/2 (A+C)/2 (A+B+C)/3
NOV 1 7528.435 7528.435 8474.070 7528.435 7973.312 7973.312 7819.291
2 8773.552 7970.570 8567.159 8352.807 8258.104 8669.127 8423.056
DES 1 45742.169 46800.261 45742.169 46265.166 46265.166 45742.169 46089.510
2 51340.794 51340.794 54357.004 51340.794 52805.863 52805.863 52308.304
JAN 1 49101.614 25292.179 90940.814 33386.840 39577.254 63771.255 42313.113
2 79886.722 45688.196 MAKS 58130.720 91376.392 159773.444 87196.080
FEB 1 MAKS 133273.351 34792.462 266546.701 55179.670 69584.925 82769.505
2 33845.392 MAKS 33845.392 67690.784 67690.784 33845.392 50768.088
MAR 1 63477.853 63477.853 63477.853 63477.853 63477.853 63477.853 63477.853
2 59844.716 59844.716 128804.894 59844.716 81720.734 81720.734 72844.696
APR 1 7528.084 5961.834 11188.921 6654.034 7778.840 9000.493 7693.419
2 8015.860 8470.085 7950.268 8236.715 8201.949 7982.929 8138.967
MEI 1 12878.625 13344.100 17416.108 13107.231 15110.580 14807.559 14285.331
2 17715.198 11971.142 25137.821 14287.457 16218.638 20783.669 16688.582
JUN 1 47268.791 26322.327 59168.650 33814.531 36435.578 52553.510 39449.282
2 54599.180 34500.206 38140.240 42282.737 36229.021 44909.184 40805.414
JUL 1 6421.679 7442.481 5836.452 6894.500 6542.346 6115.096 6501.623
2 5580.692 9259.815 5479.101 6964.206 6884.558 5529.430 6387.131
AGU 1 11314.218 13251.970 14215.012 12206.671 13716.608 12599.812 12809.947
2 13264.702 11591.338 14900.415 12371.693 13039.209 14035.061 13113.516
SEP 1 15289.993 10635.275 23603.752 12544.772 14663.524 18558.316 14866.564
2 26954.245 15178.932 7414.463 19421.116 9962.525 11629.838 12612.873
OKT 1 5646.797 14197.686 5646.797 8079.974 8079.974 5646.797 7065.189
2 6237.028 6237.028 6237.028 6237.028 6237.028 6237.028 6237.028
Periode
Padi I Padi II Palawija Jumlah
Alt 1 Gol A 5646.797 7528.084 5580.692 18755.57
Alt 2 Gol B 6237.028 5961.834 9259.815 21458.68
Alt 3 Gol C 5646.797 7950.268 5479.101 19076.17
Alt 4 Gol A+B 6237.028 6654.034 6964.206 19855.27
Alt 5 Gol B+C 6237.028 7778.840 6542.346 20558.21
Alt 7 Gol A+B+C 6237.028 7693.419 6387.131 20317.58
Alternatif
Luas Lahan
41
4.4 Evaluasi Keseimbangan Air Daerah Irigasi Kali Cibeusi
Keseimbangan air memiliki arti bahwa air yang tersedia di daerah irigasi
tersebut dapat memenuhi kebutuhan air di sawah yang akan diairi sehingga
tidak ada sawah yang mengalami kekurangan air.
4.4.1 Luas Sawah Maksimum yang Dapat Diari
Setelah mendapatkan DR dari alternatif, yaitu sebesar 1.9825, dicari pula
luas yang dapat diairi. Luas yang dapat dialiri dapat dihitung dengan
rumus:
𝑨 =
𝑸
𝑫𝑹
Untuk masing-masing alternatif, dicari nilai minimumnya dari setiap jenis
tanaman (padi unggul 1, padi unggul 2, dan palawija). Kemudian nilai
minimum untuk ketiga tanaman dijumlahkan dari setiap alternatif. Setelah
itu dipilih nilai yang paling besar dari setiap nilai minimum. Nilai yang
paling besar itu merupakan luas maksimum sawah yang dapat dialiri.
Berdasarkan hasil perhitungan diperoleh bahwa alternatif 1 adalah
alternatif yang memiliki luas paling besar dengan nilai 21458.68 hektar.
4.4.2 Luas Sawah Rencana yang dapat Diairi
Luas sawah rencana yang dapat diari dengan menggunakan perhitungan
luas tiap masing-masing sawah dengan menggunakan skala pada peta
topografi adalah sebagai berikut:
Tabel 4. 22 Luas Area Berdasarkan Alternatif Pola Tanam
No Jenis Petak Ruas
Luas Pelayanan
(Ha)
1 Primer CBS1 581.28
2 Sekunder CBS1-S1 339.16
3 Tersier CBS1-S1-T1 64.48
4 Tersier CBS1-S1-T2 50.88
5 Sekunder CBS1-S2 223.8
6 Tersier CBS1-S2-T1 79.2
7 Tersier CBS1-S2-T2 54.6
8 Sekunder CBS1-S3 90
9 Tersier CBS1-S3-T1 90
10 Primer CBS2 242.12
11 Sekunder CBS2-S1 242.12
12 Tersier CBS2-S1-T1 50
13 Sekunder CBS2-S2 192.12
14 Tersier CBS2-S2-T1 50
15 Sekunder CBS2-S3 142.12
16 Tersier CBS2-S3-T1 50
17 Sekunder CBS2-S4 92.12
18 Tersier CBS2-S4-T1 92.12
42
4.4.3 Keseimbangan Air
Setelah melakukan perhitungan, luas maksimum yang dapat diairi dan
luas rencana petak sawah yang akan diairi sudah dapat diketahui. Luas
maksimum yang dapat dialiri sebesar 21458.68 hektar, sedangkan luas
petak sawah rencana yang akan diairi hanya sebesar 581.28 hektar. Hal
tersebut berarti bahwa luas petak sawah yang direncanakan untuk diairi
dapat dilaksanakan karena air yang tersedia mencukupi, terlihat dari luas
petak sawah maksimum yang lebih besar dari luas petak sawah rencana.
43
BAB V
PERENCANAAN DAN PERHITUNGAN DIMENSI
SALURAN
5.1 Perencanaan Saluran Supply
5.1.1 Perencanaan Saluran Supply
Perhitungan dimensi saluran dilakukan untuk mendapatkan dimensi
saluran yang digunakan untuk mengairi petak-petak sawah yang sudah
ditentukan sebelumnya. Dalam perhitungan ini, akan ditentukan dimensi
saluran primer, sekunder, dan tersier. Dalam penentuan dimensi saluran
primer, sekunder, dan tersier dilakukan perhitungan dengan mengikuti
langkah-langkah berikut: (Keterangan: Untuk contoh perhitungan, lihat
Tabel 5.3)
5.1.2 Pendimensian Saluran Supply
Dalam menentukan dimensi saluran, terdapat beberapa langkah yang
harus dilakukan antara lain:
o Menentukan efisiensi saluran
o Menentukan luas kumulatif (ha)
o Menentukan DR
o Menghitung nilai debit rencana Q (m3/s)
o Menentukan kecepatan
o Menentukan kemiringan talud (m)
o Menentukan perbandingan dimensi lebar (b) terhadap tinggi (h) yaitu
disimbolkan sebagai n
o Menentukan lebar saluran (b) dan tinggi muka air (h)
o Menentukan luas penampang basah (A’)
o Menentukan keliling basah (P’)
o Menentukan perbandingan luas basah dengan keliling penampang (R)
o Menentukan koefisien k
o Menentukan kecepatan aliran (V’)
44
o Menentukan kemiringan saluran (i)
o Menentukan freeboard (f)
o Menentukan tinggi saluran (h’)
5.1.3 Penentuan Tinggu Muka Air (TMA)
Sama seperti pendimensian saluran supply, terdapat beberapa langkah
yang dilakukan untuk menentukan tinggi muka air (TMA) antara lain:
 Membaca elevasi tertinggi dari saluran dan petak yang telah dibuat
 Menentukan jarak terdekat ke pintu air
 Perkalian antara kemiringan dan jarak terdekat ke pintu air
 Menentukan tipe Pintu Romijin
 Menentukan jumlah pintu air yang diperlukan untuk tiap saluran
 Menentukan lebar pintu dengan membaca tabel Pintu Romijin
 Menghitung tinggi muka air dekat pintu ukur baik di hilir maupun
hulu dan menentukan tinggi muka air maksimum
 Menghitung perkalian antara kemiringan dan panjang saluran
5.1.4 Contoh Perhitungan Saluran Supply
1. Menentukan efisiensi saluran
Dalam penentuan efisiensi saluran, efisiensi yang diisi hanya efisiensi
saluran tersier yaitu sebesar 0,648 atau sekitar 65%. Untuk saluran
primer dan sekunder, efisiensi tidak diisi. Dalam penentuan debit
saluran sekunder, debit yang diperlukan dihitung dari debit saluran
tersier yang dialiri oleh saluran sekunder yang bersangkutan, demikian
juga dengan saluran primer, debit primer dihitung dari saluran
sekunder yang dialiri.
2. Menentukan luas kumulatif (ha)
Luas kumulatif ditentukan dengan menghitung luas petak yang
sudah dibuat dalam peta. Untuk luas kumulatif saluran tersier, didapat
dengan menghitung luas petak yang terdapat saluran tersier tersebut.
Untuk luas kumulatif saluran sekunder, didapat dengan
menjumlahkan luas kumulatif saluran tersier yang mendapatkan air
dari saluran sekunder tersebut. Untuk luas kumulatif saluran primer,
45
didapat dengan menjumlahkan luas kumulatif saluran sekunder yang
mendapatkan air dari saluran primer tersebut. Berdasarkan
perhitungan langsung pada peta daerah irigasi luas daerah layan
saluran primer SP 1 adalah 581.28 hektar.
1. Menentukan DR
Nilai DR didapatkan dari perhitungan alternatif pada BAB
IV. DR maksimum yang digunakan sebesar 1.9825 L/detik Ha.
2. Menghitung nilai debit rencana Q (m3/s)
Debit rencana saluran tersier dapat ditentukan dengan cara sebagai
berikut:
𝑄 =
𝐷𝑅𝑚𝑎𝑥 ∗ 𝐿𝑢𝑎𝑠 𝐾𝑢𝑚𝑢𝑙𝑎𝑡𝑖𝑓
𝑒 ∗ 1000
Contoh perhitungan untuk saluran tersier CBS1.S1.T1:
𝑄 =
1.9825 ∗ 64.48
0,648 ∗ 1000
𝑄 = 0.216 𝑚3/𝑠
3. Menentukan Kecepatan
Cara menentukan Kecepatan adalah dengan menggunakan rumus
sebagai berikut, yaitu :
𝑣 = 0,42 ∗ 𝑄0,182
Contoh perhitungan untuk CBS1.S1.T1:
𝑣 = 0,42 ∗ 0.2160,182
𝑣 = 0.318 𝑚/𝑠
4. Menentukan m
Cara menentukan m adalah dengan melihat Q (m3/s) yang telah
didapatkan sebelumnya. Catat nilai m berdasarkan besarnya nilai Q
(m3/s) seperti pada tabel berikut.
46
Tabel 5. 1 Karakteristik Saluran
Contoh Perhitungan :
Debit CBS1.S1.T1 yang dihitung bernilai 0.216 m3/s. Maka dengan
melihat tabel, m yang didapatkan adalah sebesar 1.
5. Menentukan n
Cara menentukan n adalah dengan menggunakan rumus berikut,
yaitu :
𝑛 = (0,96 ∗ 𝑄
1
4)+ 𝑚
Dimana : n adalah perbandingan b terhadap h.
m adalah perbandingan tinggi terhadap jarak melintang trapesium.
Contoh Perhitungan SP1.S1.T1 :
𝑛 = (0,96 ∗ 0,216
1
4) + 1
𝑛 = 1.654
6. Menentukan h
Cara menentukan h adalah dengan menggunakan rumus berikut,
yaitu :
ℎ = 3 ∗ 𝑣1,56
Dimana : h adalah ketinggian muka air.
47
v adalah kecepatan aliran air.
Contoh Perhitungan SP1.S1.T1:
ℎ = 3 ∗ 0.3181,56
ℎ = 0.501 𝑚
7. Menentukan b
Cara menentukan b adalah dengan cara menggunakan rumus berikut,
yaitu :
𝑏 = 𝑛 ∗ ℎ
Dimana : n adalah perbandingan b terhadap h.
b adalah lebar penampang.
h adalah ketinggian saluran.
Setelah menentukan b, maka kita cari nilai b’ dengan cara
membulatkan nilai b ke atas dengan kelipatan 0.5.
Contoh Perhitungan CBS1.S1.T1:
𝑏 = 𝑛 ∗ ℎ
𝑏 = 1,654 ∗ 0,501
𝑏 = 0.829 ≈ 0.83 𝑚
8. Menentukan A’
Cara menentukan A’ adalah dengan cara menggunakan rumus
berikut, yaitu :
𝐴′
= (𝑏′
+ (𝑚 ∗ ℎ)) ∗ ℎ
Dimana : A’ adalah luas penampang basah
b’ adalah lebar penampang.
m adalah perbandingan tinggi terhadap jarak melintang trapesium.
48
h adalah ketinggian saluran.
Contoh Perhitungan SP1.S1.T1:
𝐴′
= (0.83 + (1 ∗ 0,501))∗ 0.501
𝐴′
= 0.668 𝑚2
9. Menentukan P’
Cara menentukan P’ adalah dengan cara menggunakan rumus
berikut, yaitu :
𝑃′ = √𝑚2 + 1 (𝑏′
+ 2ℎ)
Dimana : P’ adalah keliling basah.
m adalah perbandingan tinggi terhadap jarak melintang
trapesium.
b’ adalah lebar penampang.
h adalah ketinggian muka air.
Contoh Perhitungan SP1.S1.T1:
𝑃′ = √12 + 1 (0.83+ 2 ∗ 0,501)
𝑃′
= 2,248 𝑚
10. Menentukan R
Cara menentukan R adalah dengan cara menggunakan rumus
berikut, yaitu :
𝑅 =
𝐴′
𝑃′
Dimana:
R adalah perbandingan luas basah dengan keliling penampang.
A’ adalah luas penampang basah.
P’ adalah keliling basah.
49
Contoh Perhitungan CBS1.S1.T1:
𝑅 =
0,668
2.248
𝑅 = 0.297
11. Menentukan k
Cara menentukan k adalah dengan membandingkan nilai Q terhadap
k pada tabel.
Contoh perhitungan CBS1.S1.T1:
Debit yang dihitung bernilai 0,216 m3/s. Maka dengan melihat tabel
1, k yang didapatkan adalah sebesar 35.
12. Menentukan V’
Cara menentukan V’ adalah dengan menggunakan rumus sebagai
berikut :
𝑉′
=
𝑄
𝐴′
Dimana : V’ adalah kecepatan aliran.
Q adalah debit.
A’ adalah luas penampang basah.
Contoh Perhitungan CBS1.S1.T1:
𝑉′
=
0,216
0,668
𝑉′
= 0,323 𝑚/𝑠
13. Menentukan i
Cara menentukan i adalah dengan menggunakan rumus sebagai
berikut :
𝑖 =
𝑉′2
𝑘2𝑅
4
3
50
Dimana : I adalah kemiringan.
Contoh Perhitungan SP1.S1.T1:
𝑖 =
0,3232
352 ∗ 0,297
4
3
𝑖 = 0,0004
14. Menentukan Freeboard
Cara menentukan Free Board adalah dengan menggunakan rumus
sebagai berikut :
𝑓 = 0,676 ∗ √ℎ
Contoh Perhitungan SP1.S1.T1:
𝑓 = 0,676 ∗ √0,501
𝑓 = 0,502𝑚
15. Menentukan ketinggian saluran (H)
Ketinggian saluran (H) adalah penjumlahan dari ketinggian
freeboard (f) dan ketinggian muka air (h).
Conoh perhitungan SP1.S1.T1:
𝐻 = 𝑓 + ℎ
𝐻 = 0,502 + 0,501 = 1,003 𝑚
Dalam pembangunan saluran, diusahakan agar ukuran saluran
mudah dibuat sehingga tinggi saluran dibulatkan menjadi h’, untuk
CBS1.S1.T1 tinggi saluran menjadi 1 m.
51
Tabel 5. 2 Dimensi Saluran
5.1.5 Contoh Perhitungan Tinggi Muka Air (TMA)
Tinggi muka air dari setiap saluran dapat dihitung dengan langkah-
langkah berikut:
1. Menentukan elevasi sawah tertinggi
Cara menentukan elevasi sawah tertinggi adalah dengan melihat kontur
elevasi tertinggi pada peta terhadap petak ruas yang ditinjau.
2. Jarak pintu ke sawah
Jarak pintu sawah adalah jarak dari pintu ke sawah yang melalui
saluran tersier. Asumsi yang diambil pada tabel ini adalah 1 m untuk
saluran sekunder dan 5 meter untuk saluran primer, sedangkan saluran
tersier memiliki jarak ke pintu air yang sangat kecil (kurang dari 1
meter) sehingga pada perhitungannya, diasumsikan bahwa jarak ke
pintu sawah untuk saluran tersier adalah 0.
3. TMA ke sawah
TMA ke sawah dihitung berdasarkan elevasi ditambah 0,15 m. Adapun
0,15 meter diambil karena tinggi air yang diperlukan untuk mengairi
sawah adalah 0,15 meter.
Contoh perhitungan CBS1.S1.T1:
TMA ke sawah (m) = Elevasi + 0.15 m
= 663 + 0.15
= 663.15 m
4. Panjang saluran pada peta (cm)
No Jenis PetakRuas
LuasPelayanan
(Ha)
DR(L/sHa) Efisiensi(E)
Debit
RencanaQ
(m3
/s)
Kecepatan
AliranV
(m/s)
Luas
Penampa
ng A
(m2
)
m n
Ketinggian
Airh(m)
Lebar
Saluranb
(m)
Pembulatan
b'(m)
LuasBasah
RencanaA'
(m2
)
Keliling
BasahP
(m)
Jari-jari
Hidrolik
R(m)
Koefisien
Strickler(k)
(m1/3
/s)
Kecepatan
Aliran
RencanaV'
(m/s)
Kemiringan
Saluran i
h'(m) freeboard h'+fb
1 Primer CBS1 581.28 2.17 1.000 1.943 0.474 4.10 1.5 2.633 0.936 2.465 2.47 3.623 5.840 0.620 40 0.536 0.0003 0.936 0.684 1.621
2 Sekunder CBS1-S1 339.16 2.17 1.000 1.134 0.430 2.64 1 1.991 0.803 1.599 1.60 1.931 3.871 0.499 40 0.587 0.0005 0.804 0.634 1.438
3 Tersier CBS1-S1-T1 64.48 2.17 0.648 0.216 0.318 0.68 1 1.654 0.501 0.829 0.83 0.668 2.248 0.297 35 0.323 0.0004 0.502 0.501 1.003
4 Tersier CBS1-S1-T2 50.88 2.17 0.648 0.170 0.304 0.56 1 1.617 0.469 0.758 0.76 0.575 2.084 0.276 35 0.296 0.0004 0.469 0.484 0.953
5 Sekunder CBS1-S2 223.8 2.17 1.000 0.447 0.363 1.23 1 1.785 0.617 1.101 1.10 1.060 2.846 0.373 35 0.422 0.0005 0.617 0.556 1.173
6 Tersier CBS1-S2-T1 79.2 2.17 0.648 0.265 0.330 0.80 1 1.689 0.532 0.898 0.90 0.760 2.401 0.316 35 0.348 0.0005 0.532 0.516 1.047
7 Tersier CBS1-S2-T2 54.6 2.17 0.648 0.183 0.308 0.59 1 1.627 0.478 0.778 0.78 0.601 2.131 0.282 35 0.304 0.0004 0.479 0.489 0.968
8 Sekunder CBS1-S3 90 2.17 1.000 0.301 0.338 0.89 1 1.711 0.551 0.943 0.94 0.824 2.502 0.329 35 0.365 0.0005 0.552 0.525 1.077
9 Tersier CBS1-S3-T1 90 2.17 0.648 0.301 0.338 0.89 1 1.711 0.551 0.943 0.94 0.824 2.502 0.329 35 0.365 0.0005 0.552 0.525 1.077
10 Primer CBS2 242.12 2.17 1.000 0.809 0.404 2.00 1 1.911 0.730 1.395 1.40 1.551 3.459 0.448 35 0.522 0.0006 0.730 0.604 1.334
11 Sekunder CBS2-S1 242.12 2.17 1.000 0.809 0.404 2.00 1 1.911 0.730 1.395 1.40 1.551 3.459 0.448 35 0.522 0.0006 0.730 0.604 1.334
12 Tersier CBS2-S1-T1 50 2.17 0.648 0.167 0.303 0.55 1 1.614 0.466 0.753 0.75 0.569 2.072 0.275 35 0.294 0.0004 0.467 0.483 0.950
13 Sekunder CBS2-S2 192.12 2.17 1.000 0.642 0.387 1.66 1 1.859 0.684 1.271 1.27 1.337 3.205 0.417 35 0.480 0.0006 0.684 0.585 1.269
14 Tersier CBS2-S2-T1 50 2.17 0.648 0.167 0.303 0.55 1 1.614 0.466 0.753 0.75 0.569 2.072 0.275 35 0.294 0.0004 0.467 0.483 0.950
15 Sekunder CBS2-S3 142.12 2.17 1.000 0.475 0.367 1.30 1 1.797 0.628 1.128 1.13 1.102 2.903 0.380 35 0.431 0.0006 0.628 0.560 1.188
16 Tersier CBS2-S3-T1 50 2.17 0.648 0.167 0.303 0.55 1 1.614 0.466 0.753 0.75 0.569 2.072 0.275 35 0.294 0.0004 0.467 0.483 0.950
17 Sekunder CBS2-S4 92.12 2.17 1.000 0.308 0.339 0.91 1 1.715 0.555 0.952 0.95 0.836 2.521 0.332 35 0.368 0.0005 0.555 0.527 1.082
18 Tersier CBS2-S4-T1 92.12 2.17 0.648 0.308 0.339 0.91 1 1.715 0.555 0.952 0.95 0.836 2.521 0.332 35 0.368 0.0005 0.555 0.527 1.082
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx
Tugas besar irigasi_robbie_winata_docx

More Related Content

Similar to Tugas besar irigasi_robbie_winata_docx

Permanent_Record_Thesis_MinjieLu_11450458
Permanent_Record_Thesis_MinjieLu_11450458Permanent_Record_Thesis_MinjieLu_11450458
Permanent_Record_Thesis_MinjieLu_11450458Minjie Lu
 
Recommended Best Management Practices for Marcellus Shale Gas Development in ...
Recommended Best Management Practices for Marcellus Shale Gas Development in ...Recommended Best Management Practices for Marcellus Shale Gas Development in ...
Recommended Best Management Practices for Marcellus Shale Gas Development in ...Marcellus Drilling News
 
Front page format summer project
Front page format   summer projectFront page format   summer project
Front page format summer projectNithin Varghese
 
Front page format summer project
Front page format   summer projectFront page format   summer project
Front page format summer projectNithin Varghese
 
Seismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankSeismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankKalaivanan Murthy
 
Navaneeth Sarma_c1367799
Navaneeth Sarma_c1367799Navaneeth Sarma_c1367799
Navaneeth Sarma_c1367799Navaneeth Sarma
 
proposal
proposalproposal
proposalmucyo
 
Comparitive LCA of Waste Tyre Managment routes
Comparitive LCA of Waste Tyre Managment routesComparitive LCA of Waste Tyre Managment routes
Comparitive LCA of Waste Tyre Managment routesEddie Dooney
 
Lori Dufour - FLM
Lori Dufour - FLMLori Dufour - FLM
Lori Dufour - FLMLori Dufour
 
USBR-WWF FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)
USBR-WWF  FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)USBR-WWF  FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)
USBR-WWF FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)Benita Horn
 
A Water Handbook
A Water HandbookA Water Handbook
A Water HandbookD4Z
 
WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2
WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2
WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2Wynand Holtzhausen
 
Barry Madden thesis D08113175
Barry Madden thesis D08113175Barry Madden thesis D08113175
Barry Madden thesis D08113175Madden Barry
 
Tuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FT
Tuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FTTuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FT
Tuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FTShane O’Reilly MCIOB
 
Life cycle assessment (LCA) - from analysing methodology development to intro...
Life cycle assessment (LCA) - from analysing methodology development to intro...Life cycle assessment (LCA) - from analysing methodology development to intro...
Life cycle assessment (LCA) - from analysing methodology development to intro...Janie Ling Chin
 

Similar to Tugas besar irigasi_robbie_winata_docx (20)

Permanent_Record_Thesis_MinjieLu_11450458
Permanent_Record_Thesis_MinjieLu_11450458Permanent_Record_Thesis_MinjieLu_11450458
Permanent_Record_Thesis_MinjieLu_11450458
 
Recommended Best Management Practices for Marcellus Shale Gas Development in ...
Recommended Best Management Practices for Marcellus Shale Gas Development in ...Recommended Best Management Practices for Marcellus Shale Gas Development in ...
Recommended Best Management Practices for Marcellus Shale Gas Development in ...
 
Front page format summer project
Front page format   summer projectFront page format   summer project
Front page format summer project
 
Front page format summer project
Front page format   summer projectFront page format   summer project
Front page format summer project
 
Seismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankSeismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water Tank
 
Navaneeth Sarma_c1367799
Navaneeth Sarma_c1367799Navaneeth Sarma_c1367799
Navaneeth Sarma_c1367799
 
Water Handbook
Water HandbookWater Handbook
Water Handbook
 
proposal
proposalproposal
proposal
 
Comparitive LCA of Waste Tyre Managment routes
Comparitive LCA of Waste Tyre Managment routesComparitive LCA of Waste Tyre Managment routes
Comparitive LCA of Waste Tyre Managment routes
 
Lori Dufour - FLM
Lori Dufour - FLMLori Dufour - FLM
Lori Dufour - FLM
 
USBR-WWF FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)
USBR-WWF  FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)USBR-WWF  FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)
USBR-WWF FINAL REPORT 2010-2014 (FINAL COPY 10-30-14)
 
A Water Handbook
A Water HandbookA Water Handbook
A Water Handbook
 
Water & sanitation handbook
Water & sanitation handbookWater & sanitation handbook
Water & sanitation handbook
 
WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2
WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2
WHoltzhausen_22745548_NCVp_Analyser_Micro_Burner_rev2
 
CSIRO Project Report
CSIRO Project ReportCSIRO Project Report
CSIRO Project Report
 
ErosionSedimentManual.pdf
ErosionSedimentManual.pdfErosionSedimentManual.pdf
ErosionSedimentManual.pdf
 
Barry Madden thesis D08113175
Barry Madden thesis D08113175Barry Madden thesis D08113175
Barry Madden thesis D08113175
 
NSW Sustainable Households Study 2014
NSW Sustainable Households Study 2014NSW Sustainable Households Study 2014
NSW Sustainable Households Study 2014
 
Tuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FT
Tuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FTTuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FT
Tuan Du Vu Hoang & Shane O'Reilly - Major Report - PM FT
 
Life cycle assessment (LCA) - from analysing methodology development to intro...
Life cycle assessment (LCA) - from analysing methodology development to intro...Life cycle assessment (LCA) - from analysing methodology development to intro...
Life cycle assessment (LCA) - from analysing methodology development to intro...
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Tugas besar irigasi_robbie_winata_docx

  • 1. LAPORAN TUGAS BESAR SI-3131 IRIGASI DAN DRAINASE PERENCANAAN DAERAH IRIGASI SUNGAI CIBEUSI Disusun sebagai Salah Satu Syarat Kelulusan Mata Kuliah SI-3131 Irigasi dan Drainase Dosen: Dr. Ir. Agung Wiyono Hadi Soeharno, MS, M.Eng. Joko Nugroho ST, MT, Ph.D Asisten: Dian Purwo Saputro 15012072 Alfredo Bastian 15013003 Daniel Christianto 15013015 Karina Dwita S 15013038 Disusun oleh: Robbie Kurniawan Winata 15014048 PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN INSTITUT TEKNOLOGI BANDUNG BANDUNG 2016
  • 2. ii LEMBAR PENGESAHAN LAPORAN TUGAS BESAR SI-3131 IRIGASI DAN DRAINASE PERENCANAAN DAERAH IRIGASI CIBEUSI diajukan untuk memenuhi syarat kelulusan mata kuliah SI-3131 Irigasi dan Drainase Disusun Oleh : Robbie Kurniawan Winata NIM 15014048 Telah Disetujui dan Disahkan oleh : Asisten Karina Dwita S. NIM. 15013038 Dosen Dosen Dr. Ir. Agung Wiyono Hadi Joko Nugroho ST., MT., Ph.D Soeharno, MS, M.Eng. NIP. 195906021986011001 NIP. 197406011999031004
  • 3. iii PRAKATA Puji dan syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa karena dengan rahmat dan berkat-Nya mengizinkan penulis untuk menyelesaikan laporan tugas besar mata kuliah SI-3131 Irigasi dan Drainase. Tugas besar ini merupakan syarat kelulusan mata kuliah ini dengan baik. Pembuatan laporan ini tidak terlepas dari pihak-pihak yang secara langsung dan tidak langsung telah membantu penulis dalam penyelesaian tugas besar ini. Penulis mengucapkan terima kasih kepada: 1. Orang tua yang selalu mendukung dan mendoakan penulis. 2. Dr. Ir. Agung Wiyono Hadi Soeharno, MS, M.Eng., dan Joko Nugroho ST, MT, Ph.D, selaku dosen pengajar mata kuliah SI-3131 Irigasi dan Drainase. 3. Asisten tugas besar antara lain Karina Dwita S, Daniel Christianto, Dian Purwo Saputro, dan Alfredo Bastian atas bimbingannya. 4. Teman-teman kelas 01 mata kuliah SI-3131 Irigasi dan Drainase yang saling memberi dukungan dan semangat. 5. Pihak-pihak lain yang secara tidak langsung ikut membantu dalam proses pengerjaan laporan. Penulis menyadari bahwa dalam pengerjaan laporan tugas besar ini masih terdapat banyak kekurangan, baik dalam redaksi maupun penyajian laporan. Penulis berharap terdapat kritik dan saran yang membangun pembaca sehinggaterdapat bahan pembelajaran untuk perbaikan di masa depan. Bandung, November 2016 Penulis
  • 4. iv DAFTAR ISI LEMBAR PENGESAHAN LAPORAN TUGAS BESAR .................................ii PRAKATA.............................................................................................................iii DAFTAR ISI..........................................................................................................iv DAFTAR TABEL .................................................................................................vi DAFTAR GAMBAR............................................................................................vii DAFTAR GRAFIK.............................................................................................viii BAB I PENDAHULUAN.......................................................................................1 1.1 Latar Belakang ........................................................................................1 1.2 Tujuan......................................................................................................1 1.3 Ruang Lingkup........................................................................................1 1.4 Metodologi Penyusunan Tugas ..............................................................2 1.4.1 Tahapan Pengumpulan Data ................................................................2 1.4.2 Tahapan Pengerjaan .............................................................................2 1.5 Sistematika Penyusunan.........................................................................3 BAB II TINJAUAN PUSTAKA ...........................................................................4 2.1 Sistem Irigasi ...........................................................................................4 2.2 Teori Perencanaan Petak, Saluran, dan Bangunan Air ......................7 2.2.1 Teori Perencanaan Petak ................................................................7 2.2.2 Teori Perencanaan Saluran ............................................................8 2.3 Teori Perhitungan Ketersediaan Air...................................................11 2.4 Teori Perhitungan Kebutuhan Air ...........................................................12 2.5 Teori Keseimbangan Air ...........................................................................18 2.6 Sistem Tata Nama (Nomenklatur)............................................................19 BAB III DAERAH ALIRAN KALI CIBEUSI..................................................20 3.1 Lokasi Daerah Aliran Kali Cibeusi .....................................................20 3.2 Luas DAS Kali Cibeusi .........................................................................20 3.3 Stasiun Hujan ........................................................................................21 3.4 Data Pengukuran Hidrometeorologi ...................................................21 BAB IV SISTEM IRIGASI DAERAH KALI CIBEUSI ..................................23 4.1 Perencanaan Petak, Saluran, dan Bangunan Air ...................................23 4.1.1 Perencanaan Petak ..............................................................................23 4.1.2 Perencanaan Saluran.....................................................................23 4.1.3 Perencanaan Bangunan Air................................................................24 4.1.4 Skema Petak, Saluran Irigasi, dan Bangunan Air............................25 4.2 Perhitungan ketersediaan Air Daerah Irigasi Kali Cibeusi...................25 4.2.1 Memperbaiki Data Curah Hujan yang Hilang.................................25 4.2.2 Mencari Data Curah Hujan Rata-Rata.............................................26 4.3 Perhitungan Kebutuhan Air Daerah Irigasi Kali Cibeusi .....................31 4.3.1 Pengumpulan Data iklim ....................................................................31 4.3.2 Perhitungan Evapotranspirasi ...........................................................32
  • 5. v 4.3.3 Nilai Perkolasi ......................................................................................35 4.3.4 Perhitungan Curah Hujan Efektif .....................................................35 4.3.5 Perhitungan WLR ...............................................................................36 4.3.6 Penentuan Koefisien Tanaman...........................................................36 4.3.7 Perhitungan ETc, NFR, dan DR ........................................................37 4.4 Evaluasi Keseimbangan Air Daerah Irigasi Kali Cibeusi......................41 4.4.1 Luas Sawah Maksimum yang Dapat Diari .......................................41 4.4.2 Luas Sawah Rencana yang dapat Diairi............................................41 4.4.3 Keseimbangan Air ...............................................................................42 BAB V PERENCANAAN DAN PERHITUNGAN DIMENSI SALURAN ....43 5.1 Perencanaan Saluran Supply ....................................................................43 5.1.1 Perencanaan Saluran Supply..............................................................43 5.1.2 Pendimensian Saluran Supply ............................................................43 5.1.3 Penentuan Tinggu Muka Air (TMA).................................................44 5.1.4 Contoh Perhitungan Saluran Supply .................................................44 5.1.5 Contoh Perhitungan Tinggi Muka Air (TMA) .................................51 5.2 Saluran Pembuang .....................................................................................56 5.2.1 Perencanaan Saluran Pembuang .......................................................56 5.2.2 Pendimensian Saluran Pembuang......................................................56 5.2.3 Contoh Perhitungan Saluran Pembuang...........................................57 BAB VI KESIMPULAN DAN SARAN .............................................................62 6.1 Kesimpulan.................................................................................................62 6.2 Saran............................................................................................................62 DAFTAR PUSTAKA...........................................................................................63 LAMPIRAN..........................................................................................................64
  • 6. vi DAFTAR TABEL Tabel 2. 1 Pola Tanam.........................................................................................14 Tabel 2. 2 Koefisien Tanaman Padi Unggul dan Palawija ...............................15 Tabel 3. 1 Data Stasiun Cicalengka ....................................................................21 Tabel 3. 2 Data Stasiun Cadasngampar.............................................................21 Tabel 3. 3 Data Stasiun Leles..............................................................................22 Tabel 3. 4 Data Temperatur Udara Rata-Rata .................................................22 Tabel 3. 5 Data Radiasi Sinar Matahari Rata-Rata .........................................22 Tabel 3. 6 Data Kelembapan Udara Rata-Rata ................................................22 Tabel 3. 7 Data Kecepatan Angin Rata-Rata ....................................................22 Tabel 4. 1 Data Stasiun Cicalengka ....................................................................25 Tabel 4. 2 Data Stasiun Cadasngampar.............................................................26 Tabel 4. 3 Data Stasiun Leles..............................................................................26 Tabel 4. 4 Perhitungan Error Curah Hujan Rata-Rata...................................30 Tabel 4. 5 Hasil Rata-Rata dari Error Aritmatik dan Error Theissen...........31 Tabel 4. 6 Perhitungan Evapotranspirasi metode Penmann Modifikasi........32 Tabel 4. 7 Koreksi suhu ke dalam ea, W, dan f(t).............................................32 Tabel 4. 8 Koreksi nilai Ra terhadap bulan dalam satu tahun........................33 Tabel 4. 9 Konstanta C tiap bulan menurut Penman.......................................33 Tabel 4. 10 Re 80 dan Re 50................................................................................35 Tabel 4. 11 Perhitungan WLR ............................................................................36 Tabel 4. 12 Koefisien Tanaman Kelompok A....................................................37 Tabel 4. 13 Koefisien Tanaman Kelompok B ....................................................37 Tabel 4. 14 Koefisien Tanaman Kelompok C....................................................37 Tabel 4. 15 Kebutuhan Air Kelompok A ...........................................................37 Tabel 4. 16 Tabel Interpolasi untuk ETc ...........................................................38 Tabel 4. 17 Kebutuhan Air Kelompok B ...........................................................38 Tabel 4. 18 Kebutuhan Air kelompok C............................................................39 Tabel 4. 19 Alternatif Kelompok Penamaan .....................................................40 Tabel 4. 20 Luas Area Berdasarkan Alternatif Pola Tanam ...........................40 Tabel 4. 21 Pemilihan Alternatif Pola Tanam...................................................40 Tabel 4. 22 Luas Area Berdasarkan Alternatif Pola Tanam ...........................41 Tabel 5. 1 Karakteristik Saluran........................................................................46 Tabel 5. 2 Dimensi Saluran .................................................................................51 Tabel 5. 3 Tipe Pintu Romijin.............................................................................52 Tabel 5. 4 Tinggi Muka Air Saluran ..................................................................55 Tabel 5. 5 Luas Petak Sawah ..............................................................................57 Tabel 5. 6 Nilai kemiringan talud, perbandingan b/h dan kofisien k .............59 Tabel 5. 7 Perhitungan DN dan DM...................................................................61 Tabel 5. 8 Perhitungan Saluran Pembuang Tersier .........................................61 Tabel 5. 9 Perhitungan Saluran Pembuang Sekunder .....................................61 Tabel 5. 10 Perhitungan Saluran Pembuang Primer .......................................61
  • 7. vii DAFTAR GAMBAR Gambar 2. 1 Bendung tetap dengan mercu tipe bulat .......................................9 Gambar 2. 2 Bendung Gerak ................................................................................9 Gambar 2. 3 Bendung Karet.................................................................................9 Gambar 2. 4 Kolam Olak ....................................................................................10 Gambar 2. 5 Pintu Pembilas ...............................................................................10 Gambar 2. 6 Saluran Kantong Lumpur ............................................................10 Gambar 2. 7 Tanggul Banjir Dalam Konstruksi ..............................................10 Gambar 2. 8 Sistem Tata Nama (Nomenklatur) ...............................................19 Gambar 3. 1 Peta Lokasi Aliran Kali Cibeusi...................................................20 Gambar 3. 2 Ilustrasi DAS ..................................................................................20 Gambar 4. 1 Skema Petak...................................................................................25 Gambar 4. 2 Luas Poligon Thiessen untuk DAS Cibeusi.................................28
  • 8. viii DAFTAR GRAFIK Grafik 4. 1 Re 80 ..................................................................................................36 Grafik 4. 2 Re 50 ..................................................................................................36
  • 9. 1 BAB I PENDAHULUAN 1.1 Latar Belakang Air merupakan sumber kehidupan bagi manusia. Air memenuhi setiap kebutuhan manusia seperti kebutuhan rumah tangga yaitu sebagai air minum dan MCK, kebutuhan industri, pembangkit listrik tenaga air, sampai irigasi untuk pertanian. Sebagai negara agraris, Indonesia sangat berkepentingan terhadap keberadaan air untuk menunjang sektor pertanian. Namun, dari tahun ke tahun, seiring dengan pertambahan jumlah penduduk, kebutuhan terhadap air semakin tinggi. Sementara itu, ketersediaan air cenderung semakin langka. Oleh karena itu, perlu pemanfaatan air yang seefisien dan seefektif mungkin. Salah satu solusi ialah dengan memanfaatkan air dalam jaringan irigasi. Dengan demikian pembangunan saluran irigasi sangat diperlukan untuk menunjang penyediaan bahan pangan sehingga ketersediaan air di lahan akan terpenuhi walaupun lahan tersebut berada jauh dari sumber air permukaan (sungai). Hal tersebut tidak terlepas dari usaha teknik irigasi yaitu memberikan air dengan kondisi tepat mutu, tepat ruang dan tepat waktu dengan cara yang efektif dan ekonomis. 1.2 Tujuan Adapun maksud dan tujuan pengerjaan tugas ini adalah sebagai berikut : 1. Mengetahui perencanaan sistem irigasi, petak sawah, dan bendung untuk suatu daerah yang sudah ditentukan 2. Mempelajari langkah-langkah yang dibutuhkan dalam pembangunan irigasi yang baik dan benar 3. Untuk memenuhi salah satu syarat kelulusan mata kuliah SI-3131 Irigasi dan Drainase. 1.3 Ruang Lingkup Ruang lingkup penulisan laporan ini mencakup antara lain :
  • 10. 2 1. Perencanaan petak, saluran, dan bangunan air 2. Kebutuhan air 3. Sistem irigasi yang digunakan Berdasarkan cara pengaturan, pengukuran volume air, waktu pengairan dan kelengkapan fasilitas, jaringan irigasi dapat dibedakan menjadi : a. Irigasi sederhana b. Irigasi semi teknis c. Irigasi teknis Di dalam laporan ini akan dibahas tentang petak-petak primer, saluran primer, saluran sekunder, saluran tersier, tentang bangunan utama, saluran pembuang, dan lain-lain. Penyusun juga akan mencoba mendesain saluran irigasi, dengan menggunakan kombinasi antara saluran primer dan sekunder tadi. Bangunan juga dibagi menurut fungsinya dan akan dijelaskan juga pemakaiannya dan pada akhirnya kita akan mendesain suatu daerah irigasi serta akan dijelaskan juga tata nama daerah irigasi yang benar. Oleh karena itu, dalam mendesain jaringan irigasi yang tepat dibutuhkan data-data seperti data curah hujan, evapotranspirasi, dan data debit andalan. Sehingga dari data tersebut, dapat diolah sehingga kita bisa mengatur output yang maksimal dari jaringan irigasi tersebut. 1.4 Metodologi Penyusunan Tugas 1.4.1 Tahapan Pengumpulan Data Data-data yang diperlukan adalah sebagai berikut: 1. Data topografi 2. Data hidrologi 3. Data iklim 1.4.2 Tahapan Pengerjaan Tahapan pengerjaan adalah sebagai berikut: 1. Penghitungan kebutuhan air 2. Penghitungan luas area yang dapat diairi 3. Perencanaan petak dan saluran irigasi 4. Penghitungan dimensi saluran dan tinggi muka air
  • 11. 3 1.5 Sistematika Penyusunan Dalam laporan ini, sistematika penulisannya adalah sebagai berikut: BAB I PENDAHULUAN Berisi tentang pendahulan yang terdiri dari latar belakang, maksud dan tujuan, ruang lingkup, metodologi penyusunan tugas, dan sistematika. BAB II TINJAUAN PUSTAKA Berisi tentang penyajian studi pustaka.Teori dasar dan dasar pemikiran tentang irigasi serta acuan yang dipakai dalam perencanaan saluran irigasi. BAB III DAERAH ALIRAN KALI CIBEUSI Berisi tentang kondisi sungai, DAS (daerah aliran sungai), stasiun hujan, data curah hujan dan data iklim. BAB IV SISTEM IRIGASI DAERAH KALI CIBEUSI Berisi tentang tahap-tahap pembuatan perencanaan sistem mulai dari perencanaan petak, perencanaan saluran, perencanaan bangunan air, dan juga skema dari masing-masing perencanaan. Terdapat juga perhitungan ketersediaan air, perhitungan kebutuhan air, dan evaluasi keseimbangan air. BAB V PERENCANAAN DAN PERHITUNGAN DIMENSI SALURAN Berisi tentang perencanaan saluran, penentuan dimensi saluran, dan perhitungan tinggi muka air dan tentang perencanaan disertai perhitungan dimensi saluran buang. BAB VI KESIMPULAN DAN SARAN Berisi tentang kesimpulan dan saran yang didapat dari hasil laporan ini.
  • 12. 4 BAB II TINJAUAN PUSTAKA 2.1 Sistem Irigasi Sistem irigasi ialah sistem yang mengatur pengambilan air dari suatu sumber guna menunjang kegiatan pertanian kemudian memberikannya secara teratur ke petak-petak sawah melalui saluran irigasi dan membuang air yang berlebih dari petak-petak sawah ke sungai-sungai melalui saluran pembuang. Untuk lahan pertanian, sawah merupakan lahan budi daya tanaman yang membutuhkan air. Dalam hal ini, air harus tersedia cukup untuk pertumbuhan tanaman. Terdapat beberapa tujuan akan pentingnya sistem irigasi, di antaranya: 1. Membasahi tanah Pembasahan tanah dengan menggunakan air bertujuan untuk memenuhi kekurangan air selama tidak ada atau sedikit curah hujan. 2. Merabuk tanah Membasahi tanah dengan air sungai yang banyak mengandung mineral. 3. Mengatur suhu tanah Melalui perencanaan sistem irigasi yang baik, pengaturan air irigasi dapat memungkinkan kita mengatur suhu yang optimal bagi pertumbuhan tanaman. 4. Membersihkan tanah Hal ini bertujuan menghilangkan hama tanaman, seperti ulat, tikus, serangga, dan lain-lain. 5. Kolmatase Merupakan usaha meninggikan muka tanah melalui proses pengendapan bahan-bahan suspensi dari sungai. 6. Membersihkan air kotor Berguna untuk mencuci bahan-bahan yang membahayakan tanaman pada air kotor sehingga tidak membahayakan lagi bagi tanaman. 7. Memperbesar persediaan air tanah
  • 13. 5 Tanah akan tergenangi oleh air irigasi sehingga mengakibatkan terjadinya perembesan yang akhirnya menyebabkan naiknya permukaan air tanah. Dengan naiknya muka air tanah, maka debit sungai pada musim kemarau akan naik. 8. Memperbaiki struktur tanah Bila tanah berbutir, maka ia akan mempunyai banyak pori dan perlu banyak air untuk mengairinya. Akan tetapi, dengan adanya bahan-bahan yang dibawa oleh sungai maka butir-butir tanah akan menjadi lebih padat. Terdapat tiga jenis sistem irigasi yang bisa gunakan dalam perencanaan suatu sistem irigasi. Pemilihan sistem irigasi yang digunakan bergantung pada keadaan topografi, biaya, dan teknologi yang tersedia. Berikut adalah penjelasan mengenai jenis–jenis sistem irigasi. a. Sistem Gravitasi Sistem gravitasi merupakan sistem irigasi yang sumber airnya diambil dari air yang ada di permukaan bumi, yaitu dari sungai, waduk, dan danau di dataran tinggi. Pengaturan dan pembagian air irigasi menuju ke petak-petak yang membutuhkan air dilakukan secara gravitasi. b. Sistem Pompa Tipe irigasi ini digunakan apabila pengambilan air secara gravitasi tidak layak dan membutuhkan biaya yang jauh lebih banyak serta tidak dapat secara teknis. Sistem ini menggunakan pompa untuk mengambil air dari sumbernya, seperti sungai dan waduk. c. Sistem Pasang Surut Irigasi pasang surut adalah suatu tipe irigasi yang memanfaatkan pengempangan air sungai akibat peristiwa pasang surut air laut. Daerah yang direncanakan untuk tipe irigasi ini adalah daerah yang mendapat pengaruh langsung dari peristiwa pasang surut air laut. Jaringan irigasi apabila ditinjau dari cara pengukuran aliran air dan lengkapnya fasilitas dibedakan menjadi tiga tingkatan, yaitu : a. Irigasi Sederhana
  • 14. 6 Di dalam irigasi sederhana, pembagian air tidak diukur atau diatur, air lebih akan mengalir ke saluran pembuang. Para petani pemakai air itu tergabung dalam satu kelompok jaringan irigasi yang sama sehingga tidak memerlukan keterlibatan pemerintah di dalam organisasi jaringan irigas i semacam ini. Persediaan air biasanya berlimpah dengan kemiringan berkisar antara sedang sampai curam. Oleh karena itu, hampir-hampir tidak diperlukan teknik yang sulit untuk sistem pembagian airnya. Jaringan irigasi yang masih sederhana itu mudah diorganisasi, tetapi memiliki kelemahan-kelemahan yang serius. Pertama-tama, ada pemborosan air dan, karena pada umumnya jaringan ini terletak di daerah yang tinggi, air yang terbuang itu tidak selalu dapat mencapai daerah rendah yang lebih subur. Kedua, terdapat banyak penyadapan yang memerlukan lebih banyak biaya lagi dari penduduk karena setiap desa membuat jaringan dan pengambilan sendiri-sendiri. Karena bangunan pengelaknya bukan bangunan tetap/permanen, maka umurnya mungkin pendek. b. Irigasi Semiteknis Dalam banyak hal, perbedaan satu-satunya antara jaringan irigasi sederhana dan jaringan semiteknis adalah bahwa jaringan semiteknis ini bendungnya terletak di sungai lengkap dengan bangunan pengambilan dan bangunan pengukur di bagian hilirnya. Mungkin juga dibangun beberapa bangunan permanen di jaringan saluran. Sistem pembagian air biasanya serupa dengan jaringan sederhana. Adalah mungkin bahwa pengambilan dipakai untuk melayani/mengairi daerah yang lebih luas dari daerah layanan pada jaringan sederhana. Oleh karena itu, biayanya ditanggung oleh lebih banyak daerah layanan. Organisasinya akan lebih rumit jika bangunan tetapnya berupa bangunan pengambilan dari sungai karena diperlukan lebih banyak keterlibatan dari pemerintah, dalam hal ini Departemen Pekerjaan Umum. c. Irigasi Teknis Salah satu prinsip dalam perencanaan jaringan teknis adalah pemisahan antara jaringan irigasi dan jaringan pembuang/pematus. Hal ini berarti
  • 15. 7 bahwa baik saluran irigasi maupun pembuang tetap bekerja sesuai dengan fungsinya masing-masing, dari pangkal hingga ujung. Saluran irigasi mengalirkan air irigasi ke sawah-sawah dan saluran pembuang mengalirkan air lebih dari sawah-sawah ke saluran pembuang alamiah yang kemudian akan diteruskan ke laut. Petak tersier menduduki fungsi sentral dalam jaringan irigasi teknis. Sebuah petak tersier terdiri dari sejumlah sawah dengan luas keseluruhan yang idealnya minimum 50 ha. Semakin kecil luas petak dan luas kepemilikan, maka semakin mudah organisasi setingkat P3A/GP3A untuk melaksanakan tugasnya dalam melaksanakan operasi dan pemeliharaan. Pembagian air di dalam petak tersier diserahkan kepada para petani. Jaringan saluran tersier dan kuarter mengalirkan air ke sawah. Kelebihan air ditampung di dalam suatu jaringan saluran pembuang tersier dan kuarter dan selanjutnya dialirkan ke jaringan pembuang primer. 2.2 Teori Perencanaan Petak, Saluran, dan Bangunan Air Dalam tugas besar ini, sistem irigasi yang digunakan adalah sistem irigasi teknis. Terdapat beberapa kelebihan dalam penggunaan irigasi permukaan ini yaitu sebagai berikut: 1. Keseragaman Keseragaman ini menunjukkan bahwa dalam pengairan, distribusi air ke lahan sawah terdistribusi secara merata 2. Efisiensi Efisiensi pengaliran air dari bangunan air ke petak-petak sawah mempunyai efisiensi kurang lebih sebesar 65% 2.2.1 Teori Perencanaan Petak Petak irigasi adalah petak-petak atau daerah-daerah yang akan diairi dari suatu sumber air baik dari waduk, sungai, bendungan, rumah pompa atau pengambilan bebas. Perencanaan petak sawah yang ditugaskan adalah perencanaan luas dan batas petak tersier serta tempat penyadapan airnya. Ada tiga macam petak irigasi, yaitu : a. Petak Primer
  • 16. 8 Petak primer terdiri dari beberapa petak sekunder yang mengambil air langsung dari saluran primer. Petak primer dilayani oleh satu saluran primer yang mengambil airnya langsung dari sumber air, biasanya sungai. Daerah di sepanjang saluran primer sering tidak dapat dilayani dengan mudah dengan cara menyadap air dari saluran sekunder. b. Petak Sekunder Petak sekunder terdiri dari beberapa petak tersier yang semuanya dilayani oleh satu saluran sekunder. Biasanya petak sekunder menerima air dari bangunan bagi yang terletak di saluran primer atau sekunder. Batas-batas petak sekunder pada umumnya berupa tanda- tanda topografi yang jelas, misalnya saluran pembuang. Luas petak sekunder bisa berbeda-beda, tergantung pada situasi daerah. c. Petak Tersier Perenc anaan dasar yang berkenaan dengan unit tanah adalah petak tersier. Petak ini menerima air irigasi yang dialirkan dan diukur pada bangunan sadap (off take) tersier yang menjadi tanggung jawab Dinas Pengairan. Bangunan sadap tersier mengalirkan airnya ke saluran tersier. Di petak tersier pembagian air, eksploitasi, dan pemeliharaan menjadi tanggung jawab para petani yang bersangkutan, di bawah bimbingan pemerintah. Ini juga menentukan ukuran petak tersier. Petak yang kelewat besar akan mengakibatkan pembagian air menjadi tidak efisien. Faktor- faktor penting lainnya adalah jumlah petani dalam satu petak, jenis tanaman, dan topografi. Di daerah-daerah yang ditanami padi luas petak tersier idealnya minimun 50 ha. Petak tersier harus mempunyai batas- batas yang jelas, seperti parit, jalan, batas desa, dan batas perubahan bentuk medan (terrain fault). 2.2.2 Teori Perencanaan Saluran 1. Saluran primer Saluran primer merupakan saluran yang berhubungan langsung dengan sungai.
  • 17. 9 2. Saluran sekunder Saluran sekunder merupakan saluran yang menyadap air dari saluran primer ke saluran tersier. 3. Saluran tersier Saluran tersier merupakan saluran yang membawa air dari saluran sekunder dan membagikannya ke petak-petak. 4. Saluran pembuang Saluran pembuang merupakan saluran yang berfungsi untuk membuang air-air yang berlebihan dari petak-petak sawah ke sungai. 2.2.3 Teori Perencanaan Bangunan Air 1. Bendung Bendung merupakan bangunan yang dibangun di sungai untuk meninggikan pemukaan air pada sungai sehingga air pada sungai dapat dialirkan menuju petak-petak sawah melalui saluran-saluran yang sudah didesign. Terdapat beberapa jenis bendung: a. Bendung tetap (weir) Gambar 2. 1 Bendung tetap dengan mercu tipe bulat b. Bendung gerak (barrage) Gambar 2. 2 Bendung Gerak c. Bendung karet (inflamable weir) Gambar 2. 3 Bendung Karet Bangunan penunjang bendung adalah sebagai berikut: a. Bangunan pengelak
  • 18. 10 b. Peredam energi Gambar 2. 4 Kolam Olak c. Bangunan pengambilan d. Bangunan pembilas Gambar 2. 5 Pintu Pembilas e. Kantong lumpur Gambar 2. 6 Saluran Kantong Lumpur f. Tanggul banjir Gambar 2. 7 Tanggul Banjir Dalam Konstruksi 2. Pengambilan bebas Pengambilan bebas merupakan bangunan yang dibangun ditepi sungai untuk menyadap air sungai dan dialirkan ke daerah irigasi. Pengambilan bebas tidak mengatur tinggi muka air pada sungai untuk pengambilan air. Pengambilan bebas memanfaatkan perbedaan ketinggian sungai dan daerah irigasi. 3. Pengambilan dari waduk Waduk merupakan bangunan untuk menampung air yang berlebih dan mengalirkan airnya sewaktu-waktu air dibutuhkan. Waduk merupakan bangunan multi guna. Beberapa fungsi waduk:
  • 19. 11 a. Irigasi b. Pembangkit listrik c. Peredam banjir d. Pariwisata e. Perikanan 4. Stasiun pompa Stasiun pompa merupakan bangunan pendukung yang digunakan untuk memompa air dari ketinggian yang lebih rendah ke ketinggian yang lebih tinggi. Pompa digunakan jika penyadapan air secara gravitasi tidak memungkinkan untuk digunakan. 2.3 Teori Perhitungan Ketersediaan Air Air yang digunakan untuk irigasi menggunakan air dari sungai yang telah ditetapkan. Dalam hal ini sungai adalah Sungai Cibeusi. Sungai umumnya mendapat tambahan air dari air hujan atau dari daerah di sekitarnya. Daerah yang mempengaruhi jumlah air dan curah hujan yang berpengaruh kepada sungai disebut Daerah Aliran Sungai. Untuk menentukan ketersediaan air, diperlukan data-data curah hujan selama 10 tahun dan tiga stasiun dari DAS yang telah ditentukan sesuai dengan ketentuan tugas besar irigasi dan bangunan air. Setelah data diperoleh dan diolah dapat ditentukan debit air yang mengaliri Sungai Cibeusi. Setelah itu ada 2 metode untuk mengolah data menjadi data hujan regional yaitu:  Metode Thiessen  Metode Aritmatik Untuk menentukan metode yang dipakai digunakan cara error checking dengan memilih metode yang menghasilkan error yang lebih kecil dari kedua metode tersebut. Dari error checking yang telah dihitung maka dalam perhitungan ini digunakan Metode Aritmatik. Metode Error Checking ini menggunakan persamaan: Keterangan: 𝑅 ̅=Curah hujan rata-rata tiap metode yang digunakan
  • 20. 12 Ri= Curah hujan 3 stasiun tiap satu bulannya Untuk mencari data yang hilang dari data-data hujan yang telah dikumpulkan digunakan persamaan: Keterangan : 𝑅 ̅= curah hujan rata-rata awal ketika masih ada data hilang R= curah hujan dari stasiun lain yang tersedia datanya. Setelah itu mencari rata-rata regional dari masing-masing metode, Keterangan : A1 = Luas dari DAS stasiun 1 Atotal = Luas DAS total R1 = Curah hujan dari stasiun 1 tiap bulannya. Dan seterusnya hingga R3 Keterangan : R1 = Curah Hujan stasiun 1 Dan seterusnya hingga R3 n = jumlah stasiun 2.4 Teori Perhitungan Kebutuhan Air Banyaknya kebutuhan air dalam suatu sistem irigasi dipengaruhi oleh : a. Jenis Tanaman Dalam sistem irigasi, tanaman membutuhkan air yang berbeda-beda junlahnya. Contohnya jika ditanami padi maka membutuhkan air yang banyak atau menggenang karena padi tumbuh di daerah yang menggenangi tempat hidupnya. b. Jenis tanah Tanah yang memiliki permeabilitas yang kecil dan mampu menahan air lebih sedikit membutuhkan air daripada yang memiliki permeabilitas yang besar dan menyerap air lebih banyak.
  • 21. 13 c. Topografi wilayah Air yang mengalir di permukaan daerah yang miring membutuhkan air yang lebih banyak dari air yang mengalir di daerah yang datar. Karena pada daerah yang miring air yang mengalir akan lebih banyak daripada air yang meresap ke tanah, berbeda dengan air yang mengalir di daerah yang datar. d. Iklim Daerah yang memiliki iklim yang panas, kebutuhan airnya akan lebih besar daripada daerah yang iklimnya dingin. Hal ini disebabkan karena besarnya penguapan di daerah yang panas. e. Cara bercocok tanam Penanaman secara bergilir lebih sedikit membutuhkan air maksimum yang dialirkan ke suatu daerahdibandingkan dengan penanaman yang dilakukan dengan cara serentak. Penentuan kebutuhan air ini dimaksudkan untuk menentukan banyaknya air yang diperlukan untuk dapat mengoptimalkan lahan yang dikelola. Selain itu, kebutuhan air harus disesuaikan dengan efisiensi saluran dan koefisien tanaman sesuaidengan tanaman yang akan ditanami. Unsur-unsur yang mempengaruhi penentuan kebutuhan air diantaranya:  Evapotranspirasi Potensial Evapotranspirasi adalah banyaknya air yang dilepaskan ke udara dalam bentuk uap air yang dihasilkan dari proses evaporasi dan transpirasi. Evaporasi terjadi pada permukaan badan-badan air, misalnya danau, sungai dan genangan air. Sedangkan transpirasi terjadi pada tumbuhan akibat proses asimilasi. Metode Penman: ET= c.( w . Rn + ( 1 - w ) . f(u) . ( ea - ed ) ) Keterangan : ET : Evapotranspirasi dalam mm/hari c : Faktor koreksi akibat keadaan iklim siang dan malam w : Faktor bobot tergantung dari temperatur udara dan ketinggian Rn : Radiasi netto ekivalen dengan evaporasi mm/hari = Rns - Rnl 1 - w : Faktor bobot tergantung pada temperatur udara f(u) : Fungsi kecepatan angin ea : Tekanan uap jenuh tergantung pada temperatur ed : ea . Rh/100  Curah Hujan Efektif
  • 22. 14 Curah hujan efektif untuk tanaman padi adalah 80% dari curah hujan rata-rata dan 50% untuk tanaman palawija. Data ini diperoleh dari analisis data hujan yang diperlukan untuk  Curah Hujan Efektif, untuk menentukan kebutuhan air untuk irigasi  Curah Hujan Lebih, untuk menentukan kebutuhan pembuangan dan debit banjir. Cara mencari R80 dan R50 adalah:  Mengumpulkan data hujan 10 tahun dari 1969-1978 yang telah dihitung data hilangnya.  Mengurutkan data dari yang terbesar hingga yang terkecil dari masing-masing bulan.  Menentukan probabilitas masing-masing ranking dengan persamaan Dimana: P = probabilitas m = Ranking setelah sorting n = jumlah tahun yang disorting  Mencari R80 dan R50 dengan melakukan interpolasi dari masing- masing bulan  Pola Tanam Pola tanam akan ditinjau dengan memperhatikan kemampuan tanah menurut hasil-hasil survey. Kalau perlu diadakan penyesuaian- penyesuaian. Dalam membuat pola tanam ini yang sangat perlu diperhatikan adalah curah hujan yang terjadi. Baik curah hujan maksimum ataupun minimum. Dengan melihat kondisi curah hujan tersebut akan bisa direncanakan berbagai pola tanam dengan masing- masing keuntungan dan kekurangan. Tabel 2. 1 Pola Tanam  Koefisien Tanaman Ketersediaan Air untuk Jaringan Irigasi Pola Tanam dalam 1 Tahun Tersedia air cukup banyak Padi-padi-palawija Tersedia air dalam jumlah cukup Padi-padi-bera Padi-palawija-bera Palawija-padi-bera Daerah yang cenderung kekurangan air
  • 23. 15 Koefisien Tanaman digunakan untuk pengolahan data skema tanam. Untuk koefisien tanaman padi unggul dan palawija adalah: Tabel 2. 2 Koefisien Tanaman Padi Unggul dan Palawija  Perkolasi dan Rembesan Perkolasi adalah peristiwa meresapnya air ke dalam tanah ketika tanah dalam keadaan jenuh. Laju perkolasi ini tergantung dari sifat-sifat tanah tertentu.  Penggantian Lapisan Air (WLR) Penggantian lapisan air dilakukan selama setengah bulan pada bulan ke 1,5 dan bulan ke 2,5. Di Indonesia penggantian air ini sebesar 3.3 mm/hari selama sebulan.  Masa Penyiapan Lahan Dalam penentuan kebutuhan air, dibedakan yaitu kebutuhan air pada masa penyiapan lahan dan kebutuhan air pada masa tanam, sebagai berikut: a) Kebutuhan air pada masa penyiapan lahan Kebutuhan air untuk penyiapan lahan umumnya menentukan kebutuhan maksimum air irigasi pada suatu proyek irigasi. Faktor-faktor yang menentukan besarnya kebutuhan air untuk penyiapan lahan adalah: - Lamanya waktu yang dibutuhkan untuk menyelesaikan pekerjaan penyiapan lahan Yang menentukan lamanya jangka waktu penyiapan lahan adalah :  Tersedianya tenaga kerja dan ternak penghela atau traktor untuk menggarap tanah.  Perlunya memperpendek jangka waktu tersebut agar tersedia cukup waktu menanam padi sawah atau padi ladang kedua. Kondisi sosial budaya yang ada di daerah penanaman padi akan mempengaruhi lamanya waktu yang diperlukan untuk penyiapan Periode Koefisien Tanaman pada Padi (unggul) Koefisien Tanaman untuk Palawija 1 1,2 0,5 2 1,27 0,75 3 1,33 1 4 1,3 1 5 1,3 0,82 6 0 0,45
  • 24. 16 lahan. Untuk daerah-daerah proyek baru, jangka waktu penyiapan lahan akan ditetapkan berdasarkan kebiasaan yang berlaku di daerah sekitarnya. Sebagai pedoman diambil jangka waktu 1.5 bulan untuk menyelesaikan penyiapan lahan di seluruh petak tersier. Bilamana untuk penyiapan lahan diperkirakan akan dipakai mesin secara luas maka jangka waktu penyiapan lahan akan diambil 1 bulan. - Jumlah air yang diperlukan untuk penyiapan lahan. Pada umumnya jumlah air yang dibutuhkan untuk penyiapan lahan dapat ditentukan berdasarkan kedalaman serta porositas tanah di sawah. Untuk perhitungan kebutuhan air total selama penyiapan lahan digunakan metode yang dikembangkan oleh Van de Goor dan Zijlstra (1968). Metode ini didasarkan pada laju air yang konstan l/dt selama periode penyiapan lahan dan menghasilkan rumus sebagai berikut : IR = M.ek / (ek - 1) dengan: IR = kebutuhan air total dalam mm/hari M = kebutuhan air untuk mengganti kehilangan air akibat evaporasi dan perkolasi di sawah yang sudah dijenuhkan . M = Eo + P Eo = 1.1 * Eto P = perkolasi K = M.T/S T = jangka waktu penyiapan lahan, hari S = 300 mm Adapun kebutuhan air total untuk penyiapan lahan sawah dihitung dengan prosedur sebagai berikut : a. Menghitung kebutuhan air total seperti yang sudah diterangkan diatas (LP). b. Menghitung curah hujan efektif ( Re) c. Menghitung kebutuhan air selama penyiapan lahan dengan rumus: DR = (LP - Re) / ( 0.65 * 8.64 ) dengan:  0.65 adalah perkalian harga efisiensi saluran tersier, sekunder dan primer.
  • 25. 17  adalah konstanta untuk mengubah satuan dari mm/hari ke liter/detik/ha. Secara lebih jelas diuraikan langkah-langkahnya di bawah ini:  Menghitung curah hujan efektif (Re) dengan cara seperti yang sudah diterangkan diatas.  Menghitung evapotranspirasi potensial dengan metode Penmann Modifikasi yang sudah diterangkan diatas.  Menentukan perkolasi (P),jangka waktu penyiapan lahan (T). dan kebutuhan penjenuhan (S).  Menghitung kebutuhan air total. Eo = 1.1 * Eto  Menghitung M = Eo + P  Menghitung K = M * T/S  Menghitung kebutuhan bersi air di sawah untuk padi (NFR) NFR = LP - Re dengan LP = ( M * ek )/(ek - 1)  Menghitung kebutuhan air irigasi untuk padi IR = NFR/0.64  Menghitung kebutuhan air untuk irigasi (DR=a) DR(a) = IR/8.64 (l/dt/ha) b) Kebutuhan Air Pada Masa Tanam - Untuk Padi Sawah Secara umum unsur-unsur yang mempengaruhi kebutuhan air pada masa tanam adalah sama dengan kebutuhan air pada masa penyiapan lahan. Hanya ada tambahan yaitu:  Penggantian lapisan air Setelah pemupukan, diusahakan untuk menjadwalkan dan mengganti lapisan air menurut kebutuhan. Jika tidak ada penjadwalan semacam itu maka dilakukan penggantian air sebanyak 2 kali masing-masing 50 mm (atau 3.3 mm/hari selama 0.5 bulan) selama sebulan dan 2 bulan setelah transplantasi.
  • 26. 18 Perhitungan kebutuhan pada masa tanam diuraikan secara mendetail secara berikut sehingga dapat dilihat perbedaannya pada perhitungan kebutuhan air pada masa penyiapan lahan, yaitu:  Menghitung curah hujan efektif (Re) dengan cara seperti yang sudah diterangkan diatas.  Menghitung evapotranspirasi potensial dengan metode Penmann modifikasi yang sudah diterangkan diatas.  Mencari data perkolasi (P) dan Penggantian lapisan air (WLR)  Menghitung ETc = Eto * c dengan c adalah koefisien tanaman  Menghitung kebutuhan air total (bersih) disawah untuk padi NFR = Etc + P + WLR - Re  Menghitung kebutuhan air irigasi untuk padi (IR) IR = NFR/0.64  Menghitung kebutuhan air untuk irigasi (DR=a) DR(a) = IR/8.64  Untuk keperluan perencanaan jaringan irigasi maka harga “a” yang diambil adalah harga “a“ yang terbesar. - Untuk Palawija Kebutuhan air untuk palawija diperhitungkan dari harga Etc dan Re, dalam hal ini langkah pengerjaannya sama seperti pada padi. Jadi yang mempengaruhi adalah evapotranspirasi dan curah hujan efektif. 2.5 Teori Keseimbangan Air Keseimbangan air ditentukan oleh besarnya kebutuhan dan ketersediaan air. Untuk menentukan kebutuhan air, dibuat golongan-golongan atau kelompok rotasi yang dianggap sama luasnya. Kebutuhan pengambilan air berbeda untuk masing-masing golongan. Untuk menentukan luas areal yang dapat diairi, kebutuhan air yang dipakai adalah yang terbesar dari aternatif yang ada. Kebutuhan air yang diperlukan kemudian dibandingkan dengan jumlah ketersediaan air. Jumlah ketersediaan air ditentukan dengan cara
  • 27. 19 menganalisis data yang ada sehingga menghasilkan debit andalan dimana besaran debit andalan & kebutuhan pengambilan air menentukan areal lahan yang dapat diairi. Dengan kata lain, kebutuhan air pada luasan areal tertentu dapat ditentukan terpenuhi atau tidak dari ketersediaan air yang ada. 2.6 Sistem Tata Nama (Nomenklatur) Sistem tata nama yang digunakan dalam perencanaan irigasi dapat dilihat dalam ilustrasi di bawah: Gambar 2. 8 Sistem Tata Nama (Nomenklatur) Nama saluran primer mengikuti nama sungai, contohnya di atas, Sungai Cibeusi disingkat menjadi CBS yang digunakan sebagai nama saluran primer. Selanjutnya, saluran sekunder terdekat dengan saluran primer diberi nama S1, untuk saluran sekunder setelahnya diberi nama S2 dan seterusnya. Untuk penamaan petak, nama disingkat menjadi T (tersier), penamaan petak mengikuti saluran sekunder dan primer yang mengalirinya. Contohnya untuk petak tersier pertama yang dialiri oleh saluran primer 1 dan sekunder 3 diberi nama CBS1.S3.T1. Q (m3 /s) Intake CBS 1 CBS 2 Bangunan bagi/sadap Bendung CBS1_S1 Saluran sekunder CBS1_S1 Saluran primer CBS2_S1 CBS2_S2 CBS2_S3 CBS2_S4 Saluran tersier ` 64.48 0.113258 50.88 0.08937 50 0.087824 50 0.087824 50 0.087824 92.12 0.161808 CBS1_S2 CBS1_S2 79.2 0.139114 54.6 0.095904 CBS1_S3 JUDUL GAMBAR: DOSEN: 90 0.158084 NAMA/NIM: ASISTEN: Alfredo Bastian 15013003 Daniel Christianto 15013015 Karina Dwita S. 15013038 Dian Purwo S. 15012072 No Gambar: Tanggal: 1 17-Nov-16 CBS 2 _ S4 _ T1 CBS 1 _ S2 _ T1 CBS 2 _ S2 _ T1 CBS 2 _ S1 _ T1 ROBBIE KURNIAWAN WINATA 15014048 Kali Tanggul Sungai Cibeusi A (hektar) CBS 1 _ S1 _ T1 CBS 1 _ S3 _ T1 CBS 1 _ S1 _ T2 CBS 1 _ S2_ T2 SISTEMIRIGASI DAN DRAINASE INSTITUT TEKNOLOGI BANDUNG FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN PROGRAM STUDI TEKNIK SIPIL CBS 2 _ S3 _ T1 NAMA DAERAH_INDEKS PRIMER_SEKUNDER_TERSIER_POSISI SI - 3131 SEMESTER I 2016/2017 SKEMA IRIGASI Dr Ir. Agung Wiyono HS.,MS.,M.Eng
  • 28. 20 BAB III DAERAH ALIRAN KALI CIBEUSI 3.1 Lokasi Daerah Aliran Kali Cibeusi Dengan software Google Earth, DAS CIbeusi dapat dilihat dari gambar berikut: Gambar 3. 1 Peta Lokasi Aliran Kali Cibeusi Lokasi daerah aliran Kali Cibeusi memiliki luas DAS yang besar. Hal ini disebabkan oleh hulu sungai yang berada di elevasi tinggi (600 m di atas permukaan laut), dengan hilir jauh berada di utara kota Subang. 3.2 Luas DAS Kali Cibeusi Dengan meninjau titik bendung pada koordinat 8°08'05.5"LS 113°45'03.8"BT, luas DAS ini mencakup area sebesar 1267,66 km2 . Gambar 3. 2 Ilustrasi DAS
  • 29. 21 3.3 Stasiun Hujan Setelah memperhitungkan banyaknya data eksis dan yang hilang dan dengan pengolahan luas DAS dari Cibeusi, selanjutnya menentukan 3 stasiun hujan yang diperlukan untuk mengolah data hujan selanjutnya. Dalam tugas besar ini, data stasiun hujan yang digunakan tidak berada di sekitar sungai. Maka untuk DAS Cibeusi, stasiun yang telah ditentukan adalah: Stasiun 1. Stasiun Cicalengka (196a) 2. Stasiun Cadasngampar (200c) 3. Stasiun Leles (205a) Ketiga stasiun tersebut selanjutnya akan diolah untuk dicari data hilangnya dan menentukan data hujan dan debit andalan. 3.4 Data Pengukuran Hidrometeorologi Dari data-data hidrometeorologi untuk DAS Cibeusi diperoleh data sebagai berikut: Tabel 3. 1 Data Stasiun Cicalengka Tabel 3. 2 Data Stasiun Cadasngampar Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des 1969 300 482 365 298 50 140 20 0 0 195 190 405 1970 402 118 565 369 410 195 171 0 38 104 1971 321 213 148 107 173 30 0 0 0 213 470 374 1972 164 172 216 91 115 0 0 0 0 2 130 329 1973 333 249 199 170 246 25 26 24 132 32 281 231 1974 44 135 76 303 168 143 66 88 157 258 253 1975 340 206 252 189 69 65 33 10 106 408 186 161 1976 102 90 216 114 72 15 4 0 21 268 390 241 1977 320 247 239 90 102 161 0 5 40 4 146 278 1978 175 185 346 138 108 183 93 70 59 49 93 344 Curah Hujan (mm) Curah Hujan (mm) Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des 1969 231 197 117 243 18 124 53 0 25 119 324 243 1970 360 313 559 431 491 113 92 0 34 56 185 641 1971 489 188 399 296 430 144 77 77 10 327 709 387 1972 324 315 546 96 128 0 0 0 0 0 153 365 1973 315 396 272 213 520 338 25 48 165 48 287 380 1974 102 267 253 295 177 11 111 417 95 253 293 400 1975 478 311 401 333 175 63 25 0 166 487 450 262 1976 92 259 431 76 47 19 0 47 3 239 224 258 1977 246 448 561 245 136 342 0 0 57 44 292 461 1978 162 264 561 84 126 121 188 131 153 43 362 459 Bulan
  • 30. 22 Tabel 3. 3 Data Stasiun Leles Tabel 3. 4 Data Temperatur Udara Rata-Rata Tabel 3. 5 Data Radiasi Sinar Matahari Rata-Rata Tabel 3. 6 Data Kelembapan Udara Rata-Rata Tabel 3. 7 Data Kecepatan Angin Rata-Rata Curah Hujan (mm) Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des 1969 290 344 177 123 35 30 0 63 217 129 250 1970 295 194 545 232 114 5 105 0 56 54 173 378 1971 243 145 274 162 234 72 0 0 9 323 435 425 1972 140 143 169 30 142 0 0 0 0 7 83 273 1973 220 186 211 99 154 78 25 21 134 37 176 82 1974 84 99 24 198 20 0 47 90 26 190 304 381 1975 359 221 279 337 103 13 160 608 194 318 1976 332 49 122 52 0 0 0 0 0 147 297 180 1977 236 145 205 219 226 0 145 84 291 1978 219 132 134 180 43 97 271 191 185 Bulan Temperatur (o C) Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember 1969 1970 1971 1972 25.7 26.3 25.9 26.9 27 27.1 26.9 28.1 28.7 29.9 29.5 27.6 1973 26.5 26.5 26.7 27.1 26.5 26.6 26.4 26.9 26.8 27.8 26.9 26.2 1974 24.9 25.4 25.8 26.7 26.3 25.9 25.9 26 26.8 26.7 26.8 26.4 1975 25.7 25.7 25.8 26.7 26.4 26 25.7 26.6 27.1 26.6 26.6 26.3 1976 24.9 25.8 25.8 26.5 25.8 25.8 25.7 26.6 27.6 27.9 27 26.9 1977 25.9 25.5 25.8 27.1 27.2 26.1 25.8 26.6 27.5 29.4 28.6 26.5 1978 27.15 27.1 27.45 27.8 28.15 27 26.45 27.35 27.9 27.6 27.05 Rata-rata 25.82143 26.04286 26.17857 26.97143 26.76429 26.35714 26.12143 26.8 27.40714 28.02857 27.57143 26.70714 Bulan Sinar Matahari (%) Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember 1969 1970 1971 1972 36 65 68 80 66 78 83 63 57 57 69 1973 55 61 59 56 86 87 87 82 75 66 56 1974 29 51 55 61 49 51 61 74 61 50 1975 1976 32 66 76 61 64 68 80 42 84 46 1977 58 1978 50 58 61 65 64 64 72 78 76 Rata-rata 40.4 60.2 61 64.6 64.4 65.8 71.2 77.8 73.75 58.75 69 55.8 Bulan Kelembapan (%) Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember 1969 1970 1971 1972 86 83 85 79 80 68 64 63 53 55 64 79 1973 87 87 86 86 87 85 81 78 76 75 82 85 1974 89 88 88 84 86 83 82 83 80 82 83 86 1975 88 88 87 87 87 80 80 74 77 82 84 85 1976 89 86 88 82 79 74 70 71 65 73 81 85 1977 88 88 88 82 81 84 69 64 61 57 69 86 1978 88 87 89 83 83 84 80 75 73 76 85 Rata-rata 87.85714 86.71429 87.28571 83.28571 83.28571 79.71429 75.14286 72.16667 69.57143 71 77 84.42857 Bulan Kecepatan Angin (knot) Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember 1969 1970 1971 1972 2.572 2.572 2.572 3.0864 2.0576 3.0864 4.1152 3.6008 3.6008 3.6008 2.572 2.572 1973 3.0864 2.572 3.0864 2.572 2.572 2.572 2.572 2.572 3.0864 3.0864 2.0576 3.0864 1974 1.5432 2.572 2.0576 2.0576 2.0576 2.0576 3.0864 3.0864 3.0864 2.572 2.572 2.0576 1975 2.572 3.0864 3.0864 2.0576 2.572 2.0576 2.0576 2.572 2.0576 1.5432 1.5432 1.5432 1976 3.0864 3.0864 3.0864 2.572 2.572 2.572 2.572 2.572 2.572 2.572 2.572 2.572 1977 1978 3.0864 2.572 2.572 2.572 2.572 1.5432 2.572 0 2.0576 2.572 2.572 2.572 Rata-rata 2.657733 2.743467 2.743467 2.486267 2.400533 2.3148 2.8292 2.400533 2.743467 2.657733 2.3148 2.400533 Bulan
  • 31. 23 BAB IV SISTEM IRIGASI DAERAH KALI CIBEUSI 4.1 Perencanaan Petak, Saluran, dan Bangunan Air 4.1.1 Perencanaan Petak Yang dimaksud dengan petak irigasi adalah petak-petak atau daerah- daerah yang akan diairi dari suatu sumber air, baik yang berasal dari waduk maupun langsung dari satu atau beberapa sungai melalui suatu bangunan pengambilan yang dapat berupa bendungan, rumah pompa, ataupun pengambilan bebas. Di dalam tugas besar irigasi yang merencanakan bendung di sungai Cimanuk, direncanakan petak tersier yang berjumlah 7 petak tersier dan tiap petak memiliki luas sebesar 50 hektar (ha). Petak yang direncanakan berbentuk pesegi, namun tidak seutuhnya berbentuk persegi. 4.1.2 Perencanaan Saluran Saluran yang direncanakan untuk mengaliri petak-petak sawah terdiri dari beberapa bagian, yaitu :  Saluran primer Saluran yang membawa air dari bendung ke saluran sekunder maupun langsung ke petak-petak tersier yang direncanakan. Panjang saluran primer yang direncanakan adalah 700 m untuk saluran pertama (CBS 1) dan 1420 m untuk saluran kedua (CBS 2)  Saluran sekunder Saluran yang membawa air saluran primer ke petak tersier yang dilayani oleh saluran sekunder tersebut. Panjang saluran yang direncanakan adalah 100 m untuk sekunder pertama (CBS1_S1) dihitung dari saluran primer pertama dan 280 m untuk sekunder kedua (CBS2_S1) dihitung dari saluran primer kedua.  Saluran tersier
  • 32. 24 Yaitu petak-petak sawah yang mendapat air dari bangunan sadap. Perencanaan dasar yang berkenaan dengan unit tanah adalah petak tersier. Petak ini menerima air irigasi yang dialirkan dan diukur pada bangunan sadap tersier yang menjadi tanggung jawab dinas pengairan. Bangunan sadap tersier mengalirkan airnya ke saluran tersier. Saluran ini mengalirkan air ke petak- petak yang telah direncanakan seluas 50-100 ha. Saluran tersier yang direncanakan dinamai CBS1-S1-T1, CBS1-S1-T2, CBS1-S2- T1, CBS1-S2-T2, CBS1-S53-T1, CBS2-S1-T1, CBS2-S2-T1, CBS2-S3-T1, CBS2-S4-T1. 4.1.3 Perencanaan Bangunan Air Bangunan irigasi yang dipakai adalah bangunan utama, dalam hal ini bendung (untuk meninggikan tinggi muka air di sungai sampai ketinggian yang diperlukan sehingga air dapat dialirkan ke lahan di sekitarnya). Selain itu, dalam sistem irigasi daerah Sungai Cimanuk ini juga digunakan :  Bangunan bagi Bangunan yang terletak pada saluran primer yang membagi air ke saluran-saluran sekunder atau pada saluran sekunder yang membagi air ke saluran sekunder lainnya. Bangunan bagi terdiri dari pintu-pintu yang dengan teliti mengukur dan mengatur air yang mengalir ke berbagai saluran.  Bangunan sadap Bangunan yang terletak di saluran primer ataupun sekunder yang memberi air kepada saluran tersier  Bangunan bagi sadap Bangunan yang berupa bangunan bagi dan juga sebagai bangunan sadap. Bangunan bagi-sadap merupakan kombinasi dari bangunan bagi dan bangunan sadap (bangunan yang terletak di saluran primer atau sekunder yang memberi air ke saluran tersier).
  • 33. 25 4.1.4 Skema Petak, Saluran Irigasi, dan Bangunan Air Berikut adalah skema petak, saluran-saluran irigasi, serta bangunan air. Gambar 4. 1 Skema Petak 4.2 Perhitungan ketersediaan Air Daerah Irigasi Kali Cibeusi 4.2.1 Memperbaiki Data Curah Hujan yang Hilang Data stasiun pencatatan curah hujan seringkali tidak lengkap/ terdapat data curah hujan yang kosong, hal itu dapat disebabkan oleh tidak beroperasinya stasiun hujan, data yang dianggap tidak valid, kesalahan, kerusakan , dll. Data-data yang kosong tersebut dapat diisi dengan berbagai metode pengisian data hujan. Pada laporan ini metode pengisian data curah hujan yang hilang adalah metode reciprocal (kebalikan kuadrat jarak) Berikut adalah hasil tabel data hujan setelah telah dilakukan pengisian data yang hilang: 1 Stasiun No. 196a (Cicalengka ), ketinggian 705 meter. Tabel 4. 1 Data Stasiun Cicalengka 2. Stasiun No. 200c (Cadasngampar),ketinggian 230m. Q (m3 /s) Intake CBS 1 CBS 2 Bangunan bagi/sadap Bendung CBS1_S1 Saluran sekunder CBS1_S1 Saluran primer CBS2_S1 CBS2_S2 CBS2_S3 CBS2_S4 Saluran tersier ` 64.48 0.113258 50.88 0.08937 50 0.087824 50 0.087824 50 0.087824 92.12 0.161808 CBS1_S2 CBS1_S2 79.2 0.139114 54.6 0.095904 CBS1_S3 JUDUL GAMBAR: DOSEN: 90 0.158084 NAMA/NIM: ASISTEN: Alfredo Bastian 15013003 Daniel Christianto 15013015 Karina Dwita S. 15013038 Dian Purwo S. 15012072 No Gambar: Tanggal: 1 17-Nov-16 CBS 2 _ S4 _ T1 CBS 1 _ S2 _ T1 CBS 2 _ S2 _ T1 CBS 2 _ S1 _ T1 ROBBIE KURNIAWAN WINATA 15014048 Kali Tanggul Sungai Cibeusi A (hektar) CBS 1 _ S1 _ T1 CBS 1 _ S3 _ T1 CBS 1 _ S1 _ T2 CBS 1 _ S2_ T2 SISTEMIRIGASI DAN DRAINASE INSTITUT TEKNOLOGI BANDUNG FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN PROGRAM STUDI TEKNIK SIPIL CBS 2 _ S3 _ T1 NAMA DAERAH_INDEKS PRIMER_SEKUNDER_TERSIER_POSISI SI - 3131 SEMESTER I 2016/2017 SKEMA IRIGASI Dr Ir. Agung Wiyono HS.,MS.,M.Eng Curah Hujan (mm) Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des 1969 300 482 365 298 50 140 20 0 0 195 190 405 1970 402 118 565 369 410 195 171 0 38 104 72.7455 252.053 1971 321 213 148 107 173 30 0 0 0 213 470 374 1972 164 172 216 91 115 0 0 0 0 2 130 329 1973 333 249 199 170 246 25 26 24 132 32 281 231 1974 44 135 76 303 168 132.908 143 66 88 157 258 253 1975 340 206 252 189 69 65 33 10 106 408 186 161 1976 102 90 216 114 72 15 4 0 21 268 390 241 1977 320 247 239 90 102 161 0 5 40 4 146 278 1978 175 185 346 138 108 183 93 70 59 49 93 344 Bulan
  • 34. 26 Tabel 4. 2 Data Stasiun Cadasngampar 3. Stasiun No. 205a (Leles), ketinggian 710m. Tabel 4. 3 Data Stasiun Leles Contoh perhitungan: Menghitung data yang hilang menggunakan metode Reciprocal Stasiun Leles, Agustus 1975 Ha = Σ Hx Rx 2 Σ 1 Rx 2 = ( 10 13535.58642) + ( 0 24137.54392) ( 1 13535.58642) + ( 1 24137.54392) = 0,00000005458155 mm 4.2.2 Mencari Data Curah Hujan Rata-Rata Pada makalah ini perhitungan curah hujan rata-rata menggunakan data curah hujan yang telah dilengkapi dengan metode Reciprocal. Perhitungan curah hujan rata-rata pada makalah ini menggunakan metode rata-rata aljabar dan metode poligon thiessen.  Metode Rata-rata Aritmatik 𝑅 = 1 𝑛 (𝑅1 + 𝑅2 + 𝑅3 + ⋯ + 𝑅𝑛) Keterangan : R = Curah hujan rata-rata bulanan (mm) n = Jumlah stasiun yang digunakan Curah Hujan (mm) Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des 1969 231 197 117 243 18 124 53 0 25 119 324 243 1970 360 313 559 431 491 113 92 0 34 56 185 641 1971 489 188 399 296 430 144 77 77 10 327 709 387 1972 324 315 546 96 128 0 0 0 0 0 153 365 1973 315 396 272 213 520 338 25 48 165 48 287 380 1974 102 267 253 295 177 11 111 417 95 253 293 400 1975 478 311 401 333 175 63 25 0 166 487 450 262 1976 92 259 431 76 47 19 0 47 3 239 224 258 1977 246 448 561 245 136 342 0 0 57 44 292 461 1978 162 264 561 84 126 121 188 131 153 43 362 459 Bulan Curah Hujan (mm) Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des 1969 290 344 177 123 35 30 0 0 63 217 129 250 1970 295 194 545 232 114 5 105 0 56 54 173 378 1971 243 145 274 162 234 72 0 0 9 323 435 425 1972 140 143 169 30 142 0 0 0 0 7 83 273 1973 220 186 211 99 154 78 25 21 134 37 176 82 1974 84 99 24 198 20 0 47 90 26 190 304 381 1975 359 221 279 337 103 13 5.98 0.00 160 608 194 318 1976 332 49 122 52 0 0 0 0 0 147 297 180 1977 236 145 205 58.61 219 226 0 0.00 145 10.53 84 291 1978 219 63.16 134.21 132 134 28.95 180 43 97 271 191 185 Bulan
  • 35. 27 R1 + R2 + R3 + Rn = Curah hujan bulanan di tiap titik pengamatan (mm) Sebagai contoh perhitungan, nilai curah hujan rata-rata yang akan dihitung adalah pada tahun 1969. Diketahui: Curah hujan Stasiun Cicalengka Januari 1969 (R1) = 300 mm Curah hujan Stasiun Cadasngampar Januari 1969 (R2) = 231 mm Curah hujan Stasiun Paseh Leles 1969 (R3) = 290 mm 𝑅 = 1 3 (321 + 641 + 197) = 273.67 mm  Metode Poligon Thiessen 𝐻𝑥 = ∑ 𝐴 𝑥 𝐻 ∑ 𝐴 Dengan: A = Luas pengaruh stasiun H = Curah hujan per bulan Hx = Curah hujan rata-rata wilayah per bulan Untuk mencari luas pengaruh stasiun dibutuhkan bantuan aplikasi Global Mapper, WMS, dan Autocad.WMS berguna untuk mengkonversi gambar DAS agar bisa dibuka di Global Mapper. Penentuan letak stasiun akan dilakukan di global mapper dengan menyesuaikan jarak dan koordinat stasiun pada peta. Global Mapper juga akan mengkonversi gambar agar dapat dibuka di file autocad. Selanjutnya jika DAS sudah terbentuk di autocad maka dicari poligon thiessen-nya dengan cara yang sudah dijelaskan di teori umum. Dari Gambar 2.2 dapat kita lihat bahwa luas pengaruh masing-masing stasiun adalah sebagai berikut:  Stasiun Cicalengka nomor 196a (Yellow) = 35.61 km2  Stasiun Cadasngampar nomor 200c (Cyan) = 19.07 km2  Stasiun Leles nomor 205a (Blue) = 1212.97 km2
  • 36. 28 Gambar 4. 2 Luas Poligon Thiessen untuk DAS Cibeusi Sebagai contoh perhitungan, curah hujan rata-rata wilayah yang dicari adalah data tahun 1969 pada bulan Januari. Dengan memakai rumus diatas perhitungannya menjadi: 𝐻𝑥 = (𝐴1 𝑥 𝐻1)+ (𝐴2 𝑥 𝐻2)+ (𝐴3 𝑥 𝐻3) 𝐴1 + 𝐴2 + 𝐴3 Dengan: H1 = Curah hujan Stasiun Cimangsud Januari 1969 = 300 H2 = Curah hujan Stasiun Citambur Januari 1969 = 231 H3 = Curah hujan Stasiun Paseh Januari 1969 = 290 𝐻𝑥 = (35.61 𝑥 300)+(19.07 𝑥 231)+(1212 .97 𝑥 290) 35.61+19.07+1212.97 =297,17 mm Dari tiap metode yang digunakan untuk mencari curah hujan rata-rata, akan dicari errornya, dan metode dengan error yang paling kecil yang akan digunakan untuk pengolahan data selanjutnya. Perhitungan error dapat dituliskan sebagai berikut: 𝐸𝑟𝑟𝑜𝑟 = ∑ |𝑅𝑟𝑎𝑡𝑎2 − 𝑅𝑖|/𝑅𝑖 𝑛 𝑖=1 𝑛 Dengan:
  • 37. 29 Rrata2 = rata-rata curah hujan bulanan Ri = curah hujan pada bulan ke-i n = jumlah pembanding (stasiun) Untuk contoh perhitungan error dengan metode rata-rata aritmatik, diambil data tahun 1969 sebagai berikut: Curah hujan Stasiun Cicalengka Januari 1969 = 300 mm Curah hujan Stasiun Cadasngampar Januari 1969 = 231 mm Curah hujan Stasiun Leles Januari 1969 = 290 mm Curah hujan rata-rata bulanan metode aritmatik 1969 = 273.67 mm Maka, 𝐸𝑟𝑟𝑜𝑟 = |300 − 273.67| 300 + |231 − 273.67| 231 + |290 − 273.67| 290 3 = 0.1096 Dengan cara yang sama, dilakukan perhitungan error untuk perhitungan curah hujan rata-rata dengan Metode Thiessen, misalnya untuk tahun 1969: Curah hujan Stasiun Cicalengka Januari 1969 = 300 mm Curah hujan Stasiun Cadasngampar Januari 1969 = 231 mm Curah hujan Stasiun Leles Januari 1969 = 290 mm Curah hujan rata-rata bulanan metode Thiessen 1969 = 289.39 mm Maka, 𝐸𝑟𝑟𝑜𝑟 = |300 − 289.39 | 300 + |231 − 289.39 | 231 + |290 − 289.39 | 290 3 = 0.0967 Perhitungan error dapat dilihat pada tabel dibawah ini:
  • 38. 30 Tabel 4. 4 Perhitungan Error Curah Hujan Rata-Rata Curah Hujan (mm) 1969 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 300 482 365 298 50 140 20 0 0 195 190 405 203.8 Cadasngampar 231 197 117 243 18 124 53 0 25 119 324 243 141.2 Leles 290 344 177 123 35 30 0 0 63 217 129 250 138.2 Rerata Aritmatik 273.67 341.00 219.67 221.33 34.33 98.00 24.33 0.00 29.33 177.00 214.33 299.33 Rerata Theissen 289.39 345.67 181.38 129.72 35.17 34.50 1.36 0.00 60.66 214.91 133.65 254.25 Error Aritmatik 0.1096 0.3441 0.5056 0.3820 0.4133 0.9254 0.2525 0.0000 0.2359 0.2547 0.3760 0.2300 0.3358 Error Theissen 0.0967 0.3474 0.3594 0.3618 0.4184 0.5418 0.6355 0.0000 0.4878 0.3059 0.3067 0.1452 0.3339 Curah Hujan (mm) 1970 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 402 118 565 369 410 195 171 0 38 104 72.7455 252.053 224.7 Cadasngampar 360 313 559 431 491 113 92 0 34 56 185 641 272.9 Leles 295 194 545 232 114 5 105 0 56 54 173 378 179.3 Rerata Aritmatik 352.33 208.33 556.33 344.00 338.33 104.33 122.67 0.00 42.67 71.33 143.58 423.68 Rerata Theissen 298.98 193.66 545.77 238.84 127.99 11.96 106.66 0.00 55.16 55.43 170.36 378.42 Error Aritmatik 0.1131 0.3913 0.0136 0.2508 0.8179 6.8028 0.2614 0.0000 0.2053 0.3030 0.4559 0.3803 0.4181 Error Theissen 0.1464 0.3414 0.0197 0.2760 0.5166 1.0751 0.1838 0.0000 0.3630 0.1679 0.4788 0.3040 0.3227 Curah Hujan (mm) 1971 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 321 213 148 107 173 30 0 0 0 213 470 374 170.8 Cadasngampar 489 188 399 296 430 144 77 77 10 327 709 387 294.4 Leles 243 145 274 162 234 72 0 0 9 323 435 425 193.5 Rerata Aritmatik 351.00 182.00 273.67 188.33 279.00 82.00 25.67 25.67 6.33 287.67 538.00 395.33 Rerata Theissen 248.89 147.56 272.34 162.47 235.23 71.90 1.16 1.16 8.76 319.97 440.11 423.00 Error Aritmatik 0.2734 0.1442 0.3881 0.4288 0.3854 0.7676 0.2222 0.2222 0.2210 0.1934 0.2075 0.0495 0.2919 Error Theissen 0.2466 0.1800 0.3879 0.3241 0.2727 0.6329 0.3283 0.3283 0.0501 0.1777 0.1515 0.0762 0.2630 Curah Hujan (mm) 1972 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 164 172 216 91 115 0 0 0 0 2 130 329 101.6 Cadasngampar 324 315 546 96 128 0 0 0 0 0 153 365 160.6 Leles 140 143 169 30 142 0 0 0 0 7 83 273 82.3 Rerata Aritmatik 209.33 210.00 310.33 72.33 128.33 0.00 0.00 0.00 0.00 3.00 122.00 322.33 Rerata Theissen 143.44 146.40 175.99 32.71 141.03 0.00 0.00 0.00 0.00 6.75 85.37 275.96 Error Aritmatik 0.3752 0.3409 0.5682 0.6209 0.0716 0.0000 0.0000 0.0000 0.0000 0.3571 0.2447 0.1060 0.2237 Error Theissen 0.2357 0.2359 0.3014 0.4634 0.1117 0.0000 0.0000 0.0000 0.0000 0.8041 0.2713 0.1387 0.2135 Curah Hujan (mm) 1973 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 333 249 199 170 246 25 26 24 132 32 281 231 162.3 Cadasngampar 315 396 272 213 520 338 25 48 165 48 287 380 250.6 Leles 220 186 211 99 154 78 25 21 134 37 176 82 118.6 Rerata Aritmatik 289.33 277.00 227.33 160.67 306.67 147.00 25.33 31.00 143.67 39.00 248.00 231.00 Rerata Theissen 224.60 190.93 211.58 102.71 162.09 80.42 25.03 21.49 134.41 37.03 180.62 90.67 Error Aritmatik 0.1759 0.3007 0.1280 0.3078 0.5494 2.1099 0.0174 0.3740 0.0966 0.1534 0.2208 0.7364 0.4309 Error Theissen 0.2111 0.2592 0.0960 0.3170 0.3606 1.0033 0.0132 0.2267 0.0689 0.1288 0.2514 0.4915 0.2857 Curah Hujan (mm) 1974 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 44 135 76 303 168 132.908 143 66 88 157 258 253 152.0 Cadasngampar 102 267 253 295 177 11 111 417 95 253 293 400 222.8 Leles 84 99 24 198 20 0 47 90 26 190 304 381 121.9 Rerata Aritmatik 76.67 167.00 117.67 265.33 121.67 47.97 100.33 191.00 69.67 200.00 285.00 344.67 Rerata Theissen 83.15 102.54 28.91 202.41 26.52 3.90 50.66 94.25 28.78 190.02 302.54 377.69 Error Aritmatik 0.3594 0.4328 1.6620 0.1883 1.8906 1.3333 0.5097 1.1860 0.7182 0.1787 0.0648 0.1987 0.7269 Error Theissen 0.3616 0.2974 0.5699 0.2227 0.6728 0.5387 0.4224 0.4164 0.4923 0.1531 0.0700 0.1858 0.3669 Curah Hujan (mm) 1975 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 340 206 252 189 69 65 33 10 106 408 186 161 168.8 Cadasngampar 478 311 401 333 175 63 25 0 166 487 450 262 262.6 Leles 359 221 279 337 103 13 5.98 0 160 608 194 318 216.5 Rerata Aritmatik 392.33 246.00 310.67 286.33 115.67 47.00 21.33 3.33 144.00 501.00 276.67 247.00 Rerata Theissen 360.26 221.93 280.08 332.78 103.13 15.21 7.03 0.28 158.57 600.56 197.63 312.75 Error Aritmatik 0.1420 0.1721 0.1905 0.2685 0.3795 1.0488 1.0223 0.6667 0.1970 0.1442 0.4329 0.2716 0.4113 Error Theissen 0.1031 0.1227 0.1389 0.2580 0.3022 0.5649 0.5603 0.9719 0.1832 0.2391 0.2140 0.3842 0.3369 Rerata Error Rerata Bulan Rerata Bulan Rerata Rerata Error Bulan Rerata Rerata Error Rerata Error Rerata Error Rerata Error Bulan Bulan Rerata Bulan Rerata Rerata Error Bulan Rerata
  • 39. 31 Dari perhitungan di atas, kita mengambil rata-rata dari seluruh rerata error antara metode Aritmatik dan Theissen sehingga didapat tabel berikut ini: Tabel 4. 5 Hasil Rata-Rata dari Error Aritmatik dan Error Theissen Dapat dilihat bahwa perhitungan curah hujan rata-rata dengan metode Thiessen memiliki error yang lebih kecil, dengan kata lain, prediksi dari curah hujan rata-rata di DAS lebih akurat, sehingga pada pengolahan data selanjutnya, bila diperlukan, curah hujan rata-rata yang lebih tepat untuk diambil adalah curah hujan rata-rata metode Theissen. 4.3 Perhitungan Kebutuhan Air Daerah Irigasi Kali Cibeusi 4.3.1 Pengumpulan Data iklim Data-data iklim diperlukan untuk menganalisis kebutuhan air di suatu daerah. Selain data curah hujan, diperlukan juga data temperature udara rata-rata (0C), kecepatan angin (m/s), data radiasi sinar matahari rata-rata (%), dan data kelembaban rata-rata (%). Data-data iklim didapat dari Curah Hujan (mm) 1976 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 102 90 216 114 72 15 4 0 21 268 390 241 127.8 Cadasngampar 92 259 431 76 47 19 0 47 3 239 224 258 141.3 Leles 332 49 122 52 0 0 0 0 0 147 297 180 98.3 Rerata Aritmatik 175.33 132.67 256.33 80.67 39.67 11.33 1.33 15.67 8.00 218.00 303.67 226.33 Rerata Theissen 321.93 53.31 129.29 54.10 2.73 0.71 0.11 0.71 0.64 151.78 298.51 182.89 Error Aritmatik 0.6989 0.8898 0.5644 0.3017 0.2017 0.2160 0.2222 0.2222 0.7619 0.2525 0.1998 0.1470 0.3898 Error Theissen 1.5619 0.4299 0.3871 0.2847 0.6347 0.6385 0.3240 0.3283 0.5860 0.2770 0.1908 0.1828 0.4855 Curah Hujan (mm) 1977 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 320 247 239 90 102 161 0 5 40 4 146 278 136.0 Cadasngampar 246 448 561 245 136 342 0 0 57 44 292 461 236.0 Leles 236 145 205 58.61 219 226 0 0 145 10.53 84 291 135.0 Rerata Aritmatik 267.33 280.00 335.00 131.20 152.33 243.00 0.00 1.67 80.67 19.51 174.00 343.33 Rerata Theissen 238.51 152.42 211.31 62.30 214.46 225.92 0.00 0.14 140.73 10.85 88.87 293.19 Error Aritmatik 0.1280 0.4799 0.4796 0.7203 0.3060 0.2913 0.0000 0.6667 0.6252 1.7623 0.5558 0.2234 0.5199 Error Theissen 0.0986 0.3646 0.2567 0.3721 0.5668 0.2477 0.0000 0.9719 1.3388 0.8321 0.3816 0.1421 0.4644 Curah Hujan (mm) 1978 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Cicalengka 175 185 346 138 108 183 93 70 59 49 93 344 153.6 Cadasngampar 162 264 561 84 126 121 188 131 153 43 362 459 221.2 Leles 219 63.16 134.21 132 134 28.95 180 43 97 271 191 185 139.9 Rerata Aritmatik 185.33 170.72 347.07 118.00 122.67 110.98 153.67 81.33 103.00 121.00 215.33 329.33 Rerata Theissen 216.91 69.60 146.58 131.45 133.15 34.66 177.68 45.08 96.77 261.33 190.82 193.59 Error Aritmatik 0.1189 0.7112 0.6568 0.2186 0.0823 1.1033 0.3271 0.4775 0.3781 1.2789 0.6160 0.3684 0.5281 Error Theissen 0.1960 0.4874 0.4691 0.2055 0.0987 0.5738 0.3261 0.3534 0.3367 3.1488 0.5085 0.3540 0.5882 Bulan Rerata Rerata Error Bulan Rerata Rerata Error Bulan Rerata Rerata Error Error Aritmatik 0.4276 Error Theissen 0.3661
  • 40. 32 stasiun pengukuran hidrometeorologi yang paling dekat dengan bendung yaitu Stasiun Jatiwangi, Jawa Barat. Data-data yang dipergunakan berawal dari tahun 1969 hingga 1978. 4.3.2 Perhitungan Evapotranspirasi Menghitung nilai evapotranspirasi potensial (ETo) dengan menggunakan metode Pennman seperti tabel yang disajikan berikut: Tabel 4. 6 Perhitungan Evapotranspirasi metode Penmann Modifikasi Contoh perhitungan nilai Evapotranspirasi dengan metode Penmann Modifikasi: Contoh perhitungan: (Januari) Setelah memiliki data rata-rata dari suhu, kelembapan, penyinaran matahari, dan kecepatan angin, serta data tabel berikut : Tabel 4. 7 Koreksi suhu ke dalam ea, W, dan f(t) Januari Februari Maret April Mei Juni Juli Agustus September Oktober NovemberDesember 1 T (°C) 25.8 26.0 26.2 27.0 26.8 26.4 26.1 26.8 27.4 28.0 27.6 26.7 2 Rh (%) 87.86 86.71 87.29 83.29 83.29 79.71 75.14 72.17 69.57 71.00 77.00 84.43 3 n/N (%) 40.40 60.20 61.00 64.60 64.40 65.80 71.20 77.80 73.75 58.75 69.00 55.80 4 U(knot) 2.66 2.74 2.74 2.49 2.40 2.31 2.83 2.40 2.74 2.66 2.31 2.40 5 U(m/detik) 1.3671 1.4112 1.4112 1.2789 1.2348 1.1907 1.4553 1.2348 1.4112 1.3671 1.1907 1.2348 6 ea (mbar) 32.2300 33.6170 34.0240 35.6660 35.2470 34.4310 33.8189 35.2470 36.5150 37.8070 36.9450 35.0465 7 W 0.7530 0.7550 0.7570 0.7650 0.7630 0.7590 0.7560 0.7630 0.7690 0.7750 0.7710 0.7620 8 1-W 0.2470 0.2450 0.2430 0.2350 0.2370 0.2410 0.2440 0.2370 0.2310 0.2250 0.2290 0.2380 9 f(T) 15.8080 15.8530 15.8980 16.0790 16.0340 15.9440 15.8757 16.0340 16.1700 16.3050 16.2150 16.0114 10 ed (mbar) 28.3164 29.1507 29.6981 29.7047 29.3557 27.4464 25.4125 25.4366 25.4040 26.8430 28.4477 29.5893 11 ea-ed (mbar) 3.9136 4.4663 4.3259 5.9613 5.8913 6.9846 8.4064 9.8104 11.1110 10.9640 8.4974 5.4572 12 f(ed) 0.1059 0.1024 0.1002 0.1002 0.1016 0.1095 0.1182 0.1181 0.1182 0.1120 0.1053 0.1007 13 Ra (mm/hari) 15.9425 16.0475 15.5525 14.5575 13.2575 13.0100 12.9100 13.8575 14.9525 15.7475 15.8688 15.8900 14 Rs (mm/hari) 7.2060 8.8422 8.6316 8.3414 7.5833 7.5328 7.8235 8.8549 9.2519 8.5627 9.4419 8.4058 15 f(n/N) 0.4636 0.6418 0.6490 0.6814 0.6796 0.6922 0.7408 0.8002 0.7638 0.6288 0.7210 0.6022 16 f(u) (m/detik) 0.2737 0.2738 0.2738 0.2735 0.2733 0.2732 0.2739 0.2733 0.2738 0.2737 0.2732 0.2733 17 Rn1(mm/hari) 0.7758 1.0422 1.0340 1.0977 1.1071 1.2083 1.3900 1.5151 1.4601 1.1486 1.2313 0.9705 18 Rns (mm/hari) 5.4045 6.6316 6.4737 6.2561 5.6875 5.6496 5.8676 6.6412 6.9389 6.4220 7.0814 6.3044 19 Rn (mm/hari) 4.6287 5.5894 5.4397 5.1584 4.5803 4.4412 4.4776 5.1261 5.4788 5.2735 5.8501 5.3338 20 C 1.1000 1.1000 1.0000 1.0000 0.9500 0.9500 1.0000 1.0000 1.1000 1.1000 1.1500 1.1500 21 ETo (mm/hari) 4.1250 4.9716 4.4057 4.3292 3.6826 3.6393 3.9469 4.5467 5.4075 5.2383 5.7984 5.0823 22 Eto (mm/bulan) 127.874 154.1182 136.5761 134.2063 114.1606 112.8172 122.3544 140.9487 167.634 162.3879 179.7508 157.5508 Langkah Eto Bulan
  • 41. 33 Tabel 4. 8 Koreksi nilai Ra terhadap bulan dalam satu tahun Tabel 4. 9 Konstanta C tiap bulan menurut Penman Selanjutnya, bisa dihitung evapotranspirasi potensial dengan langkah: 1) Mengkonversi satuan kecepatan angin dari knot menjadi m/detik 2) Menghitung ea dari interpolasi Tabel 4.7 terhadap suhu Pada Januari, ea bernilai sebesar 32.23 mbar karena suhu 25.8⁰ C 3) Menentukan Faktor bobot (W) ditentukan melalui Tabel 4.7 dengan menggunakan interpolasi, kita dapatkan nilai W = 0,753 pada temperatur 25.8oC. 4) (1-W) = 1 – 0,753 = 0.247 5) Menentukan nilai f(T) dari Tabel 4.7 dengan menggunakan interpolasi, nilai f(T) untuk bulan Januari = 15.808 6) Menghitung nilai ed ed = ea× Rh ed = 32.23 × 89.786% ed = 28.3164 mbar 7) Menghitung nilai (ea-ad) ea-ed = 3.9136 mbar 8) Menghitung nilai f(ed) f(ed) =0.34-0.044×√ed =0.34-0.044×√28.3164
  • 42. 34 =0.1059 9) Menghitung nilai Ra dan Rs Dengan menggunakan interpolasi dari Tabel 4.8 terhadap koordinat, dihitung nilai Ra=15.9425 mm/hari. Rs = (0.25+0.5 n/N)Ra = (0.25+0.5 × 40.4%)×15.9425 = 7.206 mm/hari 10) Menghitung f(n/N) f(n/N) =0.1+(0.9 ×40.4%) =0.4636 11) Menghitung f(u) f(u) = 0.27 × (1 + 𝑈 𝑥 0,864) = 0.27 × (1 + 1.3671 𝑥 0,864) = 0.2737 m/detik 12) Menghitung radiasi gelombang pendek yang dipancarkan Rnl Rnl = f(T) × f(ed) × f(n/N) = 15.808 × 0.1059 ×0.4636 = 0.7758 mm/hari 13) Menghitung gelombang pendek radiasi matahari yang diserap Rns = (1−𝛼)Rs = (1−0,25)× 7.206 = 5.4045 mm/hari 14) Menghitung radiasi netto Rn = Rns-Rnl = 5.4045-0.7758 = 4.6287 mm/hari 15) Menentukan nilai C dari interpolasi Tabel 4.7 16) Menghitung Evapotranspirasi Potensial 𝐸𝑇𝑜 = 𝐶[𝑊.𝑅𝑛+(1−𝑊)𝑓(𝑢)(𝑒𝑎−𝑒𝑑)] 𝐸𝑇𝑜 = 4.125 mm/hari 𝐸𝑇𝑜 = 127.874 mm/bulan
  • 43. 35 4.3.3 Nilai Perkolasi Kehilangan air akibat perkolasi dalam kasus ini diasumsikan sebesar 2 mm/hari. 4.3.4 Perhitungan Curah Hujan Efektif Sebelum menghitung curah hujan efektif, kita tentukan terlebih dahulu stasiun yang paling dekat dengan daerah irigasi. Setelah ditentukan maka kita baru bisa menentukan curah hujan efektifnya. Nilai Re padi merupakan kemungkinan 80% terjadinya curah hujan pada suatu bulan dikali dengan safety factor 0,7 dan dibagi dengan jumlah tinjauan hari, sedangkan nilai Re palawija merupakan kemungkinan 50% terjadinya curah hujan pada suatu bulan dikali dengan safety factor 0,7 dan dibagi dengan jumlah tinjauan hari. Tabel 4. 10 Re 80 dan Re 50 Contoh: pada Bulan Januari curah hujan padi adalah 155.25 mm/bulan, sedangkan curah hujan palawija pada bulan Januari adalah 241.0968 mm/bulan. Namun karena yang akan dianalisis adalah per harian selama 15 hari, maka nilai Re padi dan Re palawija dibagi dengan 30 dengan asumsi bahwa selama sebulan curah hujan sama. Jadi nilai Re bulan Januari per hari adalah: 𝑅𝑒 𝑝𝑎𝑑𝑖 = 0,7 𝑥 155.25 30 = 3.505573 𝑚𝑚/ℎ𝑎𝑟𝑖 𝐑𝐞 𝐩𝐚𝐥𝐚𝐰𝐢𝐣𝐚 = 𝟎,𝟕 𝒙 𝟐𝟒𝟏.𝟎𝟗𝟔𝟖 𝟑𝟎 = 𝟓.𝟒𝟒𝟒𝟏𝟐𝟐 𝐦𝐦/𝐡𝐚𝐫𝐢 Tahun Rank P Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember 1969 1 9.1 357 355 543 349 231 254 249 749 687 601 440 423 1970 2 18.2 324 321 277 244 214 84 146 359 573 320 303 378 1971 3 27.3 297 295 269 207 155 81 68 21 445 261 299 378 1972 4 36.4 289 289 209 170 140 76 29 2 319 215 198 313 1973 5 45.5 245 243 205 136 132 35 25 1 124 190 191 293 1974 6 54.5 238 236 181 130 122 15 1 1 118 152 181 276 1975 7 63.6 222 221 169 100 101 7 1 1 61 55 170 254 1976 8 72.7 215 215 140 54 35 0 0 0 15 55 134 194 1977 9 81.8 140 140 124 32 24 0 0 0 0 37 89 183 1978 10 90.9 63 82 25 25 2 0 0 0 0 7 85 91 155.25 154.87 127.16 36.69 26.28 0.06 0.01 0.00 2.96 40.71 97.83 185.03 241.0968381 239.4581807 193.1508931 132.8864293 126.93447 24.74793084 13.06 1.20265898 121.04 170.901752 185.7196581 284.5761504 31 28 31 30 31 30 31 31 30 31 30 31 108.6727687 108.4084274 89.01249707 25.6804677 18.3974 0.044640315 0.00650376 0 2.07322226 28.497 68.47879822 129.5193227 3.505573184 3.87172955 2.871370873 0.85601559 0.593464516 0.00148801 0.0002098 0 0.06910741 0.919258065 2.282626607 4.178042669 168.7677867 167.6207265 135.2056252 93.0205005 88.85412898 17.32355159 9.142 0.84186129 84.728 119.6312264 130.0037606 199.2033053 5.444122152 5.986454519 4.36147178 3.10068335 2.866262225 0.57745172 0.29490323 0.02715682 2.82426667 3.85907182 4.333458688 6.425913075 nhari Re 80mm/bulan Re 80mm/hari Re 50mm/bulan Re 50mm/hari R80(mm/bulan) R50(mm/bulan)
  • 44. 36 Grafik 4. 1 Re 80 Grafik 4. 2 Re 50 4.3.5 Perhitungan WLR Perhitungan WLR adalah dengan menggunakan tabel panduan WLR sebagai berikut : Tabel 4. 11 Perhitungan WLR 4.3.6 Penentuan Koefisien Tanaman Penentukan Koefisien Tanaman dibedakan berdasarkan kelompok / golongan yang disajikan sesuai tabel berikut: 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 WLR1 3,3 3,3 3,3 3,3 WLR2 3,3 3,3 3,3 3,3 WLR3 3,3 3,3 3,3 3,3 WLR 1,1 1,1 2,2 1,1 1,1 1,1 1,1 2,2 1,1 1,1 Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Agu Sep
  • 45. 37 Tabel 4. 12 Koefisien Tanaman Kelompok A Tabel 4. 13 Koefisien Tanaman Kelompok B Tabel 4. 14 Koefisien Tanaman Kelompok C 4.3.7 Perhitungan ETc, NFR, dan DR Dengan menggunakan koefisien tanaman untuk masing-masing kelompok (kelompok A, kelompok B, dan kelompok C), maka dapat dihitung ETc, NFR, dan DR untuk setiap masing-masing bulan dari masing-masing kelompok pola tanaman. Tabel 4. 15 Kebutuhan Air Kelompok A Contoh Perhitungan ETc, NFR, dan DR pada Bulan Oktober di Kelompok A a. Menghitung ETc 𝑬𝑻𝒄 = 𝑬𝑻𝒐 𝒙 𝑪 𝑬𝑻𝒄 = 𝟓. 𝟐𝟒𝒙 𝑳𝑷 𝑬𝑻𝒄 = 𝟏𝟏.𝟒𝟏 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 C1 1,27 1,33 1,30 1,30 0 LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP 1,20 C2 1,20 1,27 1,33 1,30 1,30 0 LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP LP C3 LP 1,20 1,27 1,33 1,30 1,30 0 LP LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1,00 0,82 0,45 LP LP c LP 1,27 1,30 1,31 0,87 0,65 0 LP LP LP 1,27 1,30 1,31 0,87 0,60 0,42 0,75 0,92 0,94 0,76 0,64 0,45 LP LP Nov Okt Sep Agu Jul Jun Mei Apr Mar Feb Jan Des 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 C1 1,20 1,27 1,33 1,30 1,30 0 LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP C2 LP 1,20 1,27 1,33 1,30 1,30 0 LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP C3 LP LP 1,20 1,27 1,33 1,30 1,30 0 LP LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1,00 0,82 0,45 LP c LP LP 1,27 1,30 1,31 0,87 0,65 0 LP LP LP 1,27 1,30 1,31 0,87 0,60 0,42 0,75 0,92 0,94 0,76 0,64 0,45 LP Jul Agu Sep Okt Feb Mar Apr Mei Jun Nov Des Jan 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 C1 LP 1,27 1,33 1,30 1,30 0 LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP C2 LP 1,20 1,27 1,33 1,30 1,30 0 LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1 0,82 0,45 LP C3 LP LP 1,20 1,27 1,33 1,30 1,30 0 LP LP LP 1,20 1,27 1,33 1,30 1,30 0 0,50 0,75 1 1,00 0,82 0,45 LP c LP LP 1,27 1,30 1,31 0,87 0,65 0 LP LP LP 1,27 1,30 1,31 0,87 0,60 0,42 0,75 0,92 0,94 0,76 0,64 0,45 LP Agu Sep Okt Mar Apr Mei Jun Jul Nov Des Jan Feb ETo mm/h P mm/h Re mm/h WLR mm/h C1 C2 C3 c rata-rata ETc NFR DR (10) (11) (12) (9)x(2) (10)+(3)+(9)- (4) (11)/(0.64*8 .64) 1 5.80 2 0.94033 1.3 1.2 LP LP 8.3782539 11.90 10.96 1.98 2 1.27277 1.1 1.33 1.3 1.2 1.28 7.40 9.41 1.70 1 5.08 2 1.00032 1.1 1.3 1.33 1.3 1.31 6.66 8.97 1.62 2 1.9782 2.2 1.3 1.3 1.33 1.31 6.66 7.99 1.44 1 4.12 2 4.02808 1.1 0 1.3 1.3 0.87 3.57 2.41 0.44 2 3.84775 1.1 0 1.3 0.65 2.68 1.48 0.27 1 4.97 2 4.01138 0 0 0 0 0 2 3.81092 LP LP LP LP 7.4687103 11.17 7.36 1.33 1 4.41 2 3.37437 1.2 LP LP LP 6.8462499 10.61 7.23 1.31 2 2.93523 1.27 1.2 LP LP 6.8462499 10.61 7.67 1.39 1 4.33 2 1.87239 1.1 1.33 1.27 1.2 1.27 5.48 6.88 1.24 2 2.46857 1.1 1.3 1.33 1.27 1.3 5.63 6.46 1.17 1 3.68 2 2.31716 2.2 1.3 1.3 1.33 1.31 4.82 5.82 1.05 2 1.82937 1.1 0 1.3 1.3 0.87 3.19 4.23 0.76 1 3.64 2 0.64431 1.1 0.5 0 1.3 0.6 2.18 4.14 0.75 2 0.34951 0.75 0.5 0 0.42 1.52 3.58 0.65 1 3.95 2 0.30013 1 0.75 0.5 0.75 2.96 5.41 0.98 2 0.30934 1 1 0.75 0.92 3.62 6.23 1.13 1 4.55 2 0.00662 0.82 1 1 0.94 4.27 7.21 1.30 2 0.0495 0.45 0.82 1 0.76 3.44 6.15 1.11 1 5.41 2 1.60353 0.45 0.82 0.635 3.43 4.47 0.81 2 2.35044 0.45 0.45 2.43 2.53 0.46 1 5.24 2 2.36335 LP LP LP LP 7.7621526 11.41 9.05 1.64 2 3.21944 1.2 LP LP LP 7.7621526 11.41 8.19 1.48 AGT SEP OKT MAR APR MEI JUN JUL Eo+P NOV DES JAN FEB (6) (7) (8) (9) (5) Periode (1) (2) (3) (4)
  • 46. 38 Untuk c rata-rata bernilai LP, ETc dicari dengan mencari nilai Eo + P terlebih dahulu (Eo + P = 1,1ETo + P) kemudian nilai yang diperoleh dari Eo + P diinterpolasi dengan tabel Eo + P untuk T 45 hari dan S 300mm. b. Menentukan NFR 𝑵𝑭𝑹 = 𝑬𝑻𝒄 − 𝑹𝒆 𝑵𝑭𝑹 = 𝟏𝟏.𝟒𝟏 − 𝟐. 𝟑𝟔𝟑𝟑𝟓 𝑵𝑭𝑹 = 𝟗.𝟎𝟓 Bila hasil NFR bernilai negatif, maka nilai NFR sama dengan 0. c. Menentukan DR 𝑫𝑹 = 𝑵𝑭𝑹 (𝟎, 𝟔𝟓 × 𝟖, 𝟔𝟒) 𝑫𝑹 = 𝟗. 𝟎𝟓 (𝟎, 𝟔𝟒 × 𝟖, 𝟔𝟒) 𝑫𝑹 = 𝟏.𝟔𝟒 Tabel 4. 16 Tabel Interpolasi untuk ETc Tabel 4. 17 Kebutuhan Air Kelompok B Eo + P T 45 hari 5 9,5 5,5 9,8 6 10,1 6,5 10,4 7 10,8 7,5 11,1 8 11,4 8,5 11,8 9 12,1 9,5 12,5 10 12,9 10,5 13,2 11 13,6 S 300 mm ETo mm/h P mm/h Re mm/h WLR mm/h C1 C2 C3 c rata-rata ETc NFR DR (10) (11) (12) (9)x(2) (10)+(3)+(9)- (4) (11)/(0.64*8 .64) 1 5.80 2 0.94033 1.2 LP LP LP 8.3782539 11.90 10.96 1.98 2 1.27277 1.3 1.2 LP LP 8.3782539 11.63 10.35 1.87 1 5.08 2 1.00032 1.1 1.33 1.3 1.20 1.28 6.49 8.76 1.59 2 1.9782 1.1 1.3 1.33 1.30 1.31 6.66 7.99 1.44 1 4.12 2 4.02808 2.2 1.3 1.3 1.33 1.31 5.40 4.69 0.85 2 3.84775 1.1 0 1.3 1.30 0.87 3.57 2.59 0.47 1 4.97 2 4.01138 1.1 0 1.30 0.65 3.23 1.87 0.34 2 3.81092 0.00 0.00 0.00 0.00 0.00 1 4.41 2 3.37437 LP LP LP LP 6.8462499 10.61 7.23 1.31 2 2.93523 1.2 LP LP LP 6.8462499 10.61 7.67 1.39 1 4.33 2 1.87239 1.27 1.2 LP LP 6.762158 10.56 8.68 1.57 2 2.46857 1.1 1.33 1.27 1.20 1.24 5.35 6.11 1.11 1 3.68 2 2.31716 1.1 1.3 1.33 1.27 1.27 4.66 5.61 1.02 2 1.82937 2.2 1.3 1.3 1.33 1.30 4.79 6.26 1.13 1 3.64 2 0.64431 1.1 0 1.3 1.30 1.31 4.77 7.43 1.34 2 0.34951 1.1 0.5 0 1.30 0.87 3.15 5.67 1.03 1 3.95 2 0.30013 0.75 0.5 0.00 0.60 2.37 4.67 0.84 2 0.30934 1 0.75 0.50 0.42 1.64 3.75 0.68 1 4.55 2 0.00662 1 1 0.75 0.75 3.41 6.15 1.11 2 0.0495 0.82 1 1.00 0.92 4.17 7.04 1.27 1 5.41 2 1.60353 0.45 0.82 1.00 0.94 5.08 6.42 1.16 2 2.35044 0.45 0.82 0.76 4.09 4.50 0.81 1 5.24 2 2.36335 0.45 0.64 3.33 3.60 0.65 2 3.21944 LP LP LP LP 7.7621526 11.41 8.19 1.48 AGT SEP OKT MAR APR MEI JUN JUL Eo+P NOV DES JAN FEB (1) Periode (2) (3) (4) (5) (6) (7) (8) (9)
  • 47. 39 Perhitungan ETc, NFR, dan Dr untuk Kelompok B sama dengan Kelompok A. Tabel 4. 18 Kebutuhan Air kelompok C Perhitungan ETc, NFR, dan Dr untuk Kelompok C sama dengan Kelompok A. Setelah diperoleh analisis altenatif penanaman, dilakukan analisis alternatif kelompok penanaman. Alternatif 1 : Golongan A Alternatif 2 : Golongan B Alternatif 3 : Golongan C Alternatif 4 : Average Golongan A + Golongan B Alternatif 5 : Average Golongan A + Golongan C Alternatif 6 : Average Golongan A + Golongan B + Golongan C Tabel di bawah menunjukkan besarnya DR tiap alternatif. ETo mm/h P mm/h Re mm/h WLR mm/h C1 C2 C3 c rata-rata ETc NFR DR (10) (11) (12) (9)x(2) (10)+(3)+(9)- (4) (11)/(0.64*8 .64) 1 5.80 2 0.94033 1.1 1.33 1.3 1.2 1.28 7.40 9.74 1.76 2 1.27277 1.1 1.3 1.33 1.3 1.31 7.60 9.63 1.74 1 5.08 2 1.00032 2.2 1.3 1.3 1.33 1.31 6.66 8.97 1.62 2 1.9782 1.1 0 1.3 1.3 0.87 6.66 7.55 1.36 1 4.12 2 4.02808 1.1 0 1.3 0.65 2.68 1.30 0.24 2 3.84775 0 0.00 0.00 0.00 0.00 1 4.97 2 4.01138 LP LP LP LP 7.4687103 11.17 7.16 1.30 2 3.81092 1.2 LP LP LP 7.4687103 11.17 7.36 1.33 1 4.41 2 3.37437 1.27 1.2 LP LP 6.8462499 10.61 7.23 1.31 2 2.93523 1.1 1.33 1.27 1.2 1.27 6.50 3.56 0.64 1 4.33 2 1.87239 1.1 1.3 1.33 1.27 1.30 6.50 4.63 0.84 2 2.46857 2.2 1.3 1.3 1.33 1.31 5.67 6.51 1.18 1 3.68 2 2.31716 1.1 0 1.3 1.3 0.87 3.75 4.30 0.78 2 1.82937 1.1 0.5 0 1.3 0.60 2.21 2.98 0.54 1 3.64 2 0.64431 0.75 0.5 0 0.42 1.53 3.31 0.60 2 0.34951 1 0.75 0.5 0.75 2.73 5.13 0.93 1 3.95 2 0.30013 1 1 0.75 0.92 3.34 5.95 1.08 2 0.30934 0.82 1 1 0.94 3.71 6.34 1.15 1 4.55 2 0.00662 0.45 0.82 1 0.76 2.99 5.74 1.04 2 0.0495 0.45 0.82 0.64 2.89 5.47 0.99 1 5.41 2 1.60353 0.45 0.45 2.05 2.89 0.52 2 2.35044 LP LP LP LP 7.9483041 11.56 9.21 1.67 1 5.24 2 2.36335 1.2 LP LP LP 7.7621526 11.41 9.05 1.64 2 3.21944 1.3 1.2 LP LP 7.7621526 11.41 8.19 1.48 (9) Eo+P (4) (5) (6) (7) (8) JUN JUL AGT SEP OKT JAN FEB MAR APR MEI NOV DES (1) Periode (2) (3)
  • 48. 40 Tabel 4. 19 Alternatif Kelompok Penamaan Tabel 4. 20 Luas Area Berdasarkan Alternatif Pola Tanam Nilai total dari alternatif 2 merupakan yang terbesar di antara alternatif lainnya sehingga dipilih alternatif ke-2 tersebut sebagai luas pengairan, yaitu 21458.68 ha. Setelah mengetahui luas sawah yang dapat diairi, kemudian sawah-sawah potensial diberi tanda mana saja yang dapat diairi. Dengan DR max yang didapat dari Kelompok A sebesar 1.9825 Tabel 4. 21 Pemilihan Alternatif Pola Tanam Alternatif 1 Alternatif 2 Alternatif 3 Alternatif 4 Alternatif 5 Alternatif 6 Alternatif 7 A B C (A+B)/2 (B+C)/2 (A+C)/2 (A+B+C)/3 NOV 1 1.9825 1.9825 1.7612 1.9825 1.8719 1.8719 1.9087 2 1.7011 1.8725 1.7421 1.7868 1.8073 1.7216 1.7719 DES 1 1.6217 1.5851 1.6217 1.6034 1.6034 1.6217 1.6095 2 1.4449 1.4449 1.3647 1.4449 1.4048 1.4048 1.4182 JAN 1 0.4365 0.8474 0.2357 0.6419 0.5415 0.3361 0.5065 Padi I 2 0.2683 0.4691 0 0.3687 0.2345 0.1341 0.2458 Padi II FEB 1 0 0.3382 1.2955 0.1691 0.8169 0.6477 0.5446 Palawija 2 1.3317 0 1.3317 0.6659 0.6659 1.3317 0.8878 MAR 1 1.3081 1.3081 1.3081 1.3081 1.3081 1.3081 1.3081 2 1.3875 1.3875 0.6447 1.3875 1.0161 1.0161 1.1399 APR 1 1.2438 1.5706 0.8369 1.4072 1.2038 1.0404 1.2171 2 1.1682 1.1055 1.1778 1.1368 1.1417 1.1730 1.1505 MEI 1 1.0520 1.0153 0.7779 1.0336 0.8966 0.9149 0.9484 2 0.7648 1.1317 0.5390 0.9483 0.8353 0.6519 0.8118 JUN 1 0.7486 1.3442 0.5980 1.0464 0.9711 0.6733 0.8969 2 0.6481 1.0256 0.9277 0.8368 0.9767 0.7879 0.8671 JUL 1 0.9784 0.8442 1.0765 0.9113 0.9603 1.0274 0.9664 2 1.1258 0.6785 1.1467 0.9022 0.9126 1.1363 0.9837 AGU 1 1.3034 1.1128 1.0374 1.2081 1.0751 1.1704 1.1512 2 1.1117 1.2722 0.9897 1.1920 1.1310 1.0507 1.1246 SEP 1 0.8075 1.1609 0.5231 0.9842 0.8420 0.6653 0.8305 2 0.4581 0.8134 1.6653 0.6358 1.2393 1.0617 0.9789 OKT 1 1.6360 0.6507 1.6360 1.1433 1.1433 1.6360 1.3076 2 1.4812 1.4812 1.4812 1.4812 1.4812 1.4812 1.4812 Periode Alternatif 1 Alternatif 2 Alternatif 3 Alternatif 4 Alternatif 5 Alternatif 6 Alternatif 7 A B C (A+B)/2 (B+C)/2 (A+C)/2 (A+B+C)/3 NOV 1 7528.435 7528.435 8474.070 7528.435 7973.312 7973.312 7819.291 2 8773.552 7970.570 8567.159 8352.807 8258.104 8669.127 8423.056 DES 1 45742.169 46800.261 45742.169 46265.166 46265.166 45742.169 46089.510 2 51340.794 51340.794 54357.004 51340.794 52805.863 52805.863 52308.304 JAN 1 49101.614 25292.179 90940.814 33386.840 39577.254 63771.255 42313.113 2 79886.722 45688.196 MAKS 58130.720 91376.392 159773.444 87196.080 FEB 1 MAKS 133273.351 34792.462 266546.701 55179.670 69584.925 82769.505 2 33845.392 MAKS 33845.392 67690.784 67690.784 33845.392 50768.088 MAR 1 63477.853 63477.853 63477.853 63477.853 63477.853 63477.853 63477.853 2 59844.716 59844.716 128804.894 59844.716 81720.734 81720.734 72844.696 APR 1 7528.084 5961.834 11188.921 6654.034 7778.840 9000.493 7693.419 2 8015.860 8470.085 7950.268 8236.715 8201.949 7982.929 8138.967 MEI 1 12878.625 13344.100 17416.108 13107.231 15110.580 14807.559 14285.331 2 17715.198 11971.142 25137.821 14287.457 16218.638 20783.669 16688.582 JUN 1 47268.791 26322.327 59168.650 33814.531 36435.578 52553.510 39449.282 2 54599.180 34500.206 38140.240 42282.737 36229.021 44909.184 40805.414 JUL 1 6421.679 7442.481 5836.452 6894.500 6542.346 6115.096 6501.623 2 5580.692 9259.815 5479.101 6964.206 6884.558 5529.430 6387.131 AGU 1 11314.218 13251.970 14215.012 12206.671 13716.608 12599.812 12809.947 2 13264.702 11591.338 14900.415 12371.693 13039.209 14035.061 13113.516 SEP 1 15289.993 10635.275 23603.752 12544.772 14663.524 18558.316 14866.564 2 26954.245 15178.932 7414.463 19421.116 9962.525 11629.838 12612.873 OKT 1 5646.797 14197.686 5646.797 8079.974 8079.974 5646.797 7065.189 2 6237.028 6237.028 6237.028 6237.028 6237.028 6237.028 6237.028 Periode Padi I Padi II Palawija Jumlah Alt 1 Gol A 5646.797 7528.084 5580.692 18755.57 Alt 2 Gol B 6237.028 5961.834 9259.815 21458.68 Alt 3 Gol C 5646.797 7950.268 5479.101 19076.17 Alt 4 Gol A+B 6237.028 6654.034 6964.206 19855.27 Alt 5 Gol B+C 6237.028 7778.840 6542.346 20558.21 Alt 7 Gol A+B+C 6237.028 7693.419 6387.131 20317.58 Alternatif Luas Lahan
  • 49. 41 4.4 Evaluasi Keseimbangan Air Daerah Irigasi Kali Cibeusi Keseimbangan air memiliki arti bahwa air yang tersedia di daerah irigasi tersebut dapat memenuhi kebutuhan air di sawah yang akan diairi sehingga tidak ada sawah yang mengalami kekurangan air. 4.4.1 Luas Sawah Maksimum yang Dapat Diari Setelah mendapatkan DR dari alternatif, yaitu sebesar 1.9825, dicari pula luas yang dapat diairi. Luas yang dapat dialiri dapat dihitung dengan rumus: 𝑨 = 𝑸 𝑫𝑹 Untuk masing-masing alternatif, dicari nilai minimumnya dari setiap jenis tanaman (padi unggul 1, padi unggul 2, dan palawija). Kemudian nilai minimum untuk ketiga tanaman dijumlahkan dari setiap alternatif. Setelah itu dipilih nilai yang paling besar dari setiap nilai minimum. Nilai yang paling besar itu merupakan luas maksimum sawah yang dapat dialiri. Berdasarkan hasil perhitungan diperoleh bahwa alternatif 1 adalah alternatif yang memiliki luas paling besar dengan nilai 21458.68 hektar. 4.4.2 Luas Sawah Rencana yang dapat Diairi Luas sawah rencana yang dapat diari dengan menggunakan perhitungan luas tiap masing-masing sawah dengan menggunakan skala pada peta topografi adalah sebagai berikut: Tabel 4. 22 Luas Area Berdasarkan Alternatif Pola Tanam No Jenis Petak Ruas Luas Pelayanan (Ha) 1 Primer CBS1 581.28 2 Sekunder CBS1-S1 339.16 3 Tersier CBS1-S1-T1 64.48 4 Tersier CBS1-S1-T2 50.88 5 Sekunder CBS1-S2 223.8 6 Tersier CBS1-S2-T1 79.2 7 Tersier CBS1-S2-T2 54.6 8 Sekunder CBS1-S3 90 9 Tersier CBS1-S3-T1 90 10 Primer CBS2 242.12 11 Sekunder CBS2-S1 242.12 12 Tersier CBS2-S1-T1 50 13 Sekunder CBS2-S2 192.12 14 Tersier CBS2-S2-T1 50 15 Sekunder CBS2-S3 142.12 16 Tersier CBS2-S3-T1 50 17 Sekunder CBS2-S4 92.12 18 Tersier CBS2-S4-T1 92.12
  • 50. 42 4.4.3 Keseimbangan Air Setelah melakukan perhitungan, luas maksimum yang dapat diairi dan luas rencana petak sawah yang akan diairi sudah dapat diketahui. Luas maksimum yang dapat dialiri sebesar 21458.68 hektar, sedangkan luas petak sawah rencana yang akan diairi hanya sebesar 581.28 hektar. Hal tersebut berarti bahwa luas petak sawah yang direncanakan untuk diairi dapat dilaksanakan karena air yang tersedia mencukupi, terlihat dari luas petak sawah maksimum yang lebih besar dari luas petak sawah rencana.
  • 51. 43 BAB V PERENCANAAN DAN PERHITUNGAN DIMENSI SALURAN 5.1 Perencanaan Saluran Supply 5.1.1 Perencanaan Saluran Supply Perhitungan dimensi saluran dilakukan untuk mendapatkan dimensi saluran yang digunakan untuk mengairi petak-petak sawah yang sudah ditentukan sebelumnya. Dalam perhitungan ini, akan ditentukan dimensi saluran primer, sekunder, dan tersier. Dalam penentuan dimensi saluran primer, sekunder, dan tersier dilakukan perhitungan dengan mengikuti langkah-langkah berikut: (Keterangan: Untuk contoh perhitungan, lihat Tabel 5.3) 5.1.2 Pendimensian Saluran Supply Dalam menentukan dimensi saluran, terdapat beberapa langkah yang harus dilakukan antara lain: o Menentukan efisiensi saluran o Menentukan luas kumulatif (ha) o Menentukan DR o Menghitung nilai debit rencana Q (m3/s) o Menentukan kecepatan o Menentukan kemiringan talud (m) o Menentukan perbandingan dimensi lebar (b) terhadap tinggi (h) yaitu disimbolkan sebagai n o Menentukan lebar saluran (b) dan tinggi muka air (h) o Menentukan luas penampang basah (A’) o Menentukan keliling basah (P’) o Menentukan perbandingan luas basah dengan keliling penampang (R) o Menentukan koefisien k o Menentukan kecepatan aliran (V’)
  • 52. 44 o Menentukan kemiringan saluran (i) o Menentukan freeboard (f) o Menentukan tinggi saluran (h’) 5.1.3 Penentuan Tinggu Muka Air (TMA) Sama seperti pendimensian saluran supply, terdapat beberapa langkah yang dilakukan untuk menentukan tinggi muka air (TMA) antara lain:  Membaca elevasi tertinggi dari saluran dan petak yang telah dibuat  Menentukan jarak terdekat ke pintu air  Perkalian antara kemiringan dan jarak terdekat ke pintu air  Menentukan tipe Pintu Romijin  Menentukan jumlah pintu air yang diperlukan untuk tiap saluran  Menentukan lebar pintu dengan membaca tabel Pintu Romijin  Menghitung tinggi muka air dekat pintu ukur baik di hilir maupun hulu dan menentukan tinggi muka air maksimum  Menghitung perkalian antara kemiringan dan panjang saluran 5.1.4 Contoh Perhitungan Saluran Supply 1. Menentukan efisiensi saluran Dalam penentuan efisiensi saluran, efisiensi yang diisi hanya efisiensi saluran tersier yaitu sebesar 0,648 atau sekitar 65%. Untuk saluran primer dan sekunder, efisiensi tidak diisi. Dalam penentuan debit saluran sekunder, debit yang diperlukan dihitung dari debit saluran tersier yang dialiri oleh saluran sekunder yang bersangkutan, demikian juga dengan saluran primer, debit primer dihitung dari saluran sekunder yang dialiri. 2. Menentukan luas kumulatif (ha) Luas kumulatif ditentukan dengan menghitung luas petak yang sudah dibuat dalam peta. Untuk luas kumulatif saluran tersier, didapat dengan menghitung luas petak yang terdapat saluran tersier tersebut. Untuk luas kumulatif saluran sekunder, didapat dengan menjumlahkan luas kumulatif saluran tersier yang mendapatkan air dari saluran sekunder tersebut. Untuk luas kumulatif saluran primer,
  • 53. 45 didapat dengan menjumlahkan luas kumulatif saluran sekunder yang mendapatkan air dari saluran primer tersebut. Berdasarkan perhitungan langsung pada peta daerah irigasi luas daerah layan saluran primer SP 1 adalah 581.28 hektar. 1. Menentukan DR Nilai DR didapatkan dari perhitungan alternatif pada BAB IV. DR maksimum yang digunakan sebesar 1.9825 L/detik Ha. 2. Menghitung nilai debit rencana Q (m3/s) Debit rencana saluran tersier dapat ditentukan dengan cara sebagai berikut: 𝑄 = 𝐷𝑅𝑚𝑎𝑥 ∗ 𝐿𝑢𝑎𝑠 𝐾𝑢𝑚𝑢𝑙𝑎𝑡𝑖𝑓 𝑒 ∗ 1000 Contoh perhitungan untuk saluran tersier CBS1.S1.T1: 𝑄 = 1.9825 ∗ 64.48 0,648 ∗ 1000 𝑄 = 0.216 𝑚3/𝑠 3. Menentukan Kecepatan Cara menentukan Kecepatan adalah dengan menggunakan rumus sebagai berikut, yaitu : 𝑣 = 0,42 ∗ 𝑄0,182 Contoh perhitungan untuk CBS1.S1.T1: 𝑣 = 0,42 ∗ 0.2160,182 𝑣 = 0.318 𝑚/𝑠 4. Menentukan m Cara menentukan m adalah dengan melihat Q (m3/s) yang telah didapatkan sebelumnya. Catat nilai m berdasarkan besarnya nilai Q (m3/s) seperti pada tabel berikut.
  • 54. 46 Tabel 5. 1 Karakteristik Saluran Contoh Perhitungan : Debit CBS1.S1.T1 yang dihitung bernilai 0.216 m3/s. Maka dengan melihat tabel, m yang didapatkan adalah sebesar 1. 5. Menentukan n Cara menentukan n adalah dengan menggunakan rumus berikut, yaitu : 𝑛 = (0,96 ∗ 𝑄 1 4)+ 𝑚 Dimana : n adalah perbandingan b terhadap h. m adalah perbandingan tinggi terhadap jarak melintang trapesium. Contoh Perhitungan SP1.S1.T1 : 𝑛 = (0,96 ∗ 0,216 1 4) + 1 𝑛 = 1.654 6. Menentukan h Cara menentukan h adalah dengan menggunakan rumus berikut, yaitu : ℎ = 3 ∗ 𝑣1,56 Dimana : h adalah ketinggian muka air.
  • 55. 47 v adalah kecepatan aliran air. Contoh Perhitungan SP1.S1.T1: ℎ = 3 ∗ 0.3181,56 ℎ = 0.501 𝑚 7. Menentukan b Cara menentukan b adalah dengan cara menggunakan rumus berikut, yaitu : 𝑏 = 𝑛 ∗ ℎ Dimana : n adalah perbandingan b terhadap h. b adalah lebar penampang. h adalah ketinggian saluran. Setelah menentukan b, maka kita cari nilai b’ dengan cara membulatkan nilai b ke atas dengan kelipatan 0.5. Contoh Perhitungan CBS1.S1.T1: 𝑏 = 𝑛 ∗ ℎ 𝑏 = 1,654 ∗ 0,501 𝑏 = 0.829 ≈ 0.83 𝑚 8. Menentukan A’ Cara menentukan A’ adalah dengan cara menggunakan rumus berikut, yaitu : 𝐴′ = (𝑏′ + (𝑚 ∗ ℎ)) ∗ ℎ Dimana : A’ adalah luas penampang basah b’ adalah lebar penampang. m adalah perbandingan tinggi terhadap jarak melintang trapesium.
  • 56. 48 h adalah ketinggian saluran. Contoh Perhitungan SP1.S1.T1: 𝐴′ = (0.83 + (1 ∗ 0,501))∗ 0.501 𝐴′ = 0.668 𝑚2 9. Menentukan P’ Cara menentukan P’ adalah dengan cara menggunakan rumus berikut, yaitu : 𝑃′ = √𝑚2 + 1 (𝑏′ + 2ℎ) Dimana : P’ adalah keliling basah. m adalah perbandingan tinggi terhadap jarak melintang trapesium. b’ adalah lebar penampang. h adalah ketinggian muka air. Contoh Perhitungan SP1.S1.T1: 𝑃′ = √12 + 1 (0.83+ 2 ∗ 0,501) 𝑃′ = 2,248 𝑚 10. Menentukan R Cara menentukan R adalah dengan cara menggunakan rumus berikut, yaitu : 𝑅 = 𝐴′ 𝑃′ Dimana: R adalah perbandingan luas basah dengan keliling penampang. A’ adalah luas penampang basah. P’ adalah keliling basah.
  • 57. 49 Contoh Perhitungan CBS1.S1.T1: 𝑅 = 0,668 2.248 𝑅 = 0.297 11. Menentukan k Cara menentukan k adalah dengan membandingkan nilai Q terhadap k pada tabel. Contoh perhitungan CBS1.S1.T1: Debit yang dihitung bernilai 0,216 m3/s. Maka dengan melihat tabel 1, k yang didapatkan adalah sebesar 35. 12. Menentukan V’ Cara menentukan V’ adalah dengan menggunakan rumus sebagai berikut : 𝑉′ = 𝑄 𝐴′ Dimana : V’ adalah kecepatan aliran. Q adalah debit. A’ adalah luas penampang basah. Contoh Perhitungan CBS1.S1.T1: 𝑉′ = 0,216 0,668 𝑉′ = 0,323 𝑚/𝑠 13. Menentukan i Cara menentukan i adalah dengan menggunakan rumus sebagai berikut : 𝑖 = 𝑉′2 𝑘2𝑅 4 3
  • 58. 50 Dimana : I adalah kemiringan. Contoh Perhitungan SP1.S1.T1: 𝑖 = 0,3232 352 ∗ 0,297 4 3 𝑖 = 0,0004 14. Menentukan Freeboard Cara menentukan Free Board adalah dengan menggunakan rumus sebagai berikut : 𝑓 = 0,676 ∗ √ℎ Contoh Perhitungan SP1.S1.T1: 𝑓 = 0,676 ∗ √0,501 𝑓 = 0,502𝑚 15. Menentukan ketinggian saluran (H) Ketinggian saluran (H) adalah penjumlahan dari ketinggian freeboard (f) dan ketinggian muka air (h). Conoh perhitungan SP1.S1.T1: 𝐻 = 𝑓 + ℎ 𝐻 = 0,502 + 0,501 = 1,003 𝑚 Dalam pembangunan saluran, diusahakan agar ukuran saluran mudah dibuat sehingga tinggi saluran dibulatkan menjadi h’, untuk CBS1.S1.T1 tinggi saluran menjadi 1 m.
  • 59. 51 Tabel 5. 2 Dimensi Saluran 5.1.5 Contoh Perhitungan Tinggi Muka Air (TMA) Tinggi muka air dari setiap saluran dapat dihitung dengan langkah- langkah berikut: 1. Menentukan elevasi sawah tertinggi Cara menentukan elevasi sawah tertinggi adalah dengan melihat kontur elevasi tertinggi pada peta terhadap petak ruas yang ditinjau. 2. Jarak pintu ke sawah Jarak pintu sawah adalah jarak dari pintu ke sawah yang melalui saluran tersier. Asumsi yang diambil pada tabel ini adalah 1 m untuk saluran sekunder dan 5 meter untuk saluran primer, sedangkan saluran tersier memiliki jarak ke pintu air yang sangat kecil (kurang dari 1 meter) sehingga pada perhitungannya, diasumsikan bahwa jarak ke pintu sawah untuk saluran tersier adalah 0. 3. TMA ke sawah TMA ke sawah dihitung berdasarkan elevasi ditambah 0,15 m. Adapun 0,15 meter diambil karena tinggi air yang diperlukan untuk mengairi sawah adalah 0,15 meter. Contoh perhitungan CBS1.S1.T1: TMA ke sawah (m) = Elevasi + 0.15 m = 663 + 0.15 = 663.15 m 4. Panjang saluran pada peta (cm) No Jenis PetakRuas LuasPelayanan (Ha) DR(L/sHa) Efisiensi(E) Debit RencanaQ (m3 /s) Kecepatan AliranV (m/s) Luas Penampa ng A (m2 ) m n Ketinggian Airh(m) Lebar Saluranb (m) Pembulatan b'(m) LuasBasah RencanaA' (m2 ) Keliling BasahP (m) Jari-jari Hidrolik R(m) Koefisien Strickler(k) (m1/3 /s) Kecepatan Aliran RencanaV' (m/s) Kemiringan Saluran i h'(m) freeboard h'+fb 1 Primer CBS1 581.28 2.17 1.000 1.943 0.474 4.10 1.5 2.633 0.936 2.465 2.47 3.623 5.840 0.620 40 0.536 0.0003 0.936 0.684 1.621 2 Sekunder CBS1-S1 339.16 2.17 1.000 1.134 0.430 2.64 1 1.991 0.803 1.599 1.60 1.931 3.871 0.499 40 0.587 0.0005 0.804 0.634 1.438 3 Tersier CBS1-S1-T1 64.48 2.17 0.648 0.216 0.318 0.68 1 1.654 0.501 0.829 0.83 0.668 2.248 0.297 35 0.323 0.0004 0.502 0.501 1.003 4 Tersier CBS1-S1-T2 50.88 2.17 0.648 0.170 0.304 0.56 1 1.617 0.469 0.758 0.76 0.575 2.084 0.276 35 0.296 0.0004 0.469 0.484 0.953 5 Sekunder CBS1-S2 223.8 2.17 1.000 0.447 0.363 1.23 1 1.785 0.617 1.101 1.10 1.060 2.846 0.373 35 0.422 0.0005 0.617 0.556 1.173 6 Tersier CBS1-S2-T1 79.2 2.17 0.648 0.265 0.330 0.80 1 1.689 0.532 0.898 0.90 0.760 2.401 0.316 35 0.348 0.0005 0.532 0.516 1.047 7 Tersier CBS1-S2-T2 54.6 2.17 0.648 0.183 0.308 0.59 1 1.627 0.478 0.778 0.78 0.601 2.131 0.282 35 0.304 0.0004 0.479 0.489 0.968 8 Sekunder CBS1-S3 90 2.17 1.000 0.301 0.338 0.89 1 1.711 0.551 0.943 0.94 0.824 2.502 0.329 35 0.365 0.0005 0.552 0.525 1.077 9 Tersier CBS1-S3-T1 90 2.17 0.648 0.301 0.338 0.89 1 1.711 0.551 0.943 0.94 0.824 2.502 0.329 35 0.365 0.0005 0.552 0.525 1.077 10 Primer CBS2 242.12 2.17 1.000 0.809 0.404 2.00 1 1.911 0.730 1.395 1.40 1.551 3.459 0.448 35 0.522 0.0006 0.730 0.604 1.334 11 Sekunder CBS2-S1 242.12 2.17 1.000 0.809 0.404 2.00 1 1.911 0.730 1.395 1.40 1.551 3.459 0.448 35 0.522 0.0006 0.730 0.604 1.334 12 Tersier CBS2-S1-T1 50 2.17 0.648 0.167 0.303 0.55 1 1.614 0.466 0.753 0.75 0.569 2.072 0.275 35 0.294 0.0004 0.467 0.483 0.950 13 Sekunder CBS2-S2 192.12 2.17 1.000 0.642 0.387 1.66 1 1.859 0.684 1.271 1.27 1.337 3.205 0.417 35 0.480 0.0006 0.684 0.585 1.269 14 Tersier CBS2-S2-T1 50 2.17 0.648 0.167 0.303 0.55 1 1.614 0.466 0.753 0.75 0.569 2.072 0.275 35 0.294 0.0004 0.467 0.483 0.950 15 Sekunder CBS2-S3 142.12 2.17 1.000 0.475 0.367 1.30 1 1.797 0.628 1.128 1.13 1.102 2.903 0.380 35 0.431 0.0006 0.628 0.560 1.188 16 Tersier CBS2-S3-T1 50 2.17 0.648 0.167 0.303 0.55 1 1.614 0.466 0.753 0.75 0.569 2.072 0.275 35 0.294 0.0004 0.467 0.483 0.950 17 Sekunder CBS2-S4 92.12 2.17 1.000 0.308 0.339 0.91 1 1.715 0.555 0.952 0.95 0.836 2.521 0.332 35 0.368 0.0005 0.555 0.527 1.082 18 Tersier CBS2-S4-T1 92.12 2.17 0.648 0.308 0.339 0.91 1 1.715 0.555 0.952 0.95 0.836 2.521 0.332 35 0.368 0.0005 0.555 0.527 1.082