More Related Content
Similar to Mohamed Mousa CV
Similar to Mohamed Mousa CV (20)
Mohamed Mousa CV
- 1. MohamedAbdelazizMousa
Personal details – Contact Information
Name :MohamedAbdelazizMousa
Birthdate :15 December1956
Profession :Mechanical Engineering
VisaStatus :ResidencyVisa
Contact Number :+971-50-7926779
E-Mail :Mohamed.mousa@musanada.com
Mohamed.mousa65@gmail.com
DrivingLicense :UAE ValidDrivingLicense
Marital Status :Married– 4 dependents
Nationality :Egyptian
Academic Qualifications
May 1980: Bachelorof Mechanical Engineering –Facultyof Engineering –Shobra– Al-
ZagazigUniversity,Egypt.
June 1983: HighDiplomaof AirConditioningandVentilation –Facultyof Engineering –Ain
ShamsUniversity,Egypt.
Practical Qualifiations
Jan2009 – Present
Abu Dhabi General Services Co. (Musanada) – Design section (Abu Dhabi)
Position: Senior Mechanical Engineer.
Reviewandmanage the designof several majorandminormechanical projectsdue to
ESTIDAMA suchas:
1. ADEC SchoolsinAbuDhabi and Al-Ain(Phase1,2,3,4and 5).
2. The Judicial Academy.
3. Newbuildings atEquestrianclub.
4. NewbuildingsatLadiesclub.
5. SiloGrains.
6. EmiratesCollege.
7. Bani-YasStadium.
8. Federal supreme court.
9. National rehabilitationcenter.
10. Office of prosecutionbuilding.
11. Landscape worksat ZayedCityFDF headquarterbuilding.
12. Al-Yabana,Al-Remah,Umm-Al-Ashtan,MazyadandUmm-Ghafa,Neima& Salamatvillas.
13. AbuDhabi ladiesclub.
14. Al-Ainladiesclub.
15. Slaughterhouse atShahama.
16. Publicprosecutor’s office.
17. Al-Falahresidential project.
18. Yas Islandresidential project.
- 2. MohamedAbdelazizMousa
The nextare some tasksrelatedtothose projects;
Satisfyingthe client’sbudget/requirementsasperthe time schedule of the projects
(optimummanagement).
Supportthe otherservices tosatisfyingtheirobjectivesinthe meantime of the projects
(Teamwork).
Propose andencourage usingenergysavingsolutionsinprojects.
Ensure designguidelinesare properlyimplementedinprojects.
Revise the specifications,drawings,vendorlistandB.O.Qwiththe quantitiesshownon
drawings.
Answerall the technical clarificationsrelatedtothe above mentionedprojects.
Value engineers,costsavingandlessonlearned.
Buildingevaluations.
Mechanical submittal evaluation.
Evaluationof consultant andmanagementstaff onsite.
April1998 - Jan2009
Works Department –Governmental buildings projects management –Design section (Abu
Dhabi).
Position: Senior Mechanical Engineer.
Responsibilities and tasks:
Designandpreparationof detailedMechanical design(drawingsandcalculations)forair
conditioning–Swimmingpools –Water supply – Fire fighting.
Checking–Reviewingthe submitteddesignsfromconsultantsandcontractorsfor
miscellaneousprojects.
Preparationof workshopdrawings.
Pre-qualificationandevaluationof consultantsandcontractors.
Memberof the mechanical material approval committee.
October1996-April1998
Private Real State (Abu Dhabi).
Responsibilities and tasks:
Supervisionengineerforair-conditioningmaintenance inAbuDhabi.
Supervisionmaintenance forthe department’sbuildingsinAbuDhabi.
June1995-September1996
Electric and Water department (Abu Dhabi).
Responsibilities and tasks:
Westregionmaintenance engineerforair-conditioningequipments.
NewAl Mafraa plantstationsupervisorengineer.
- 3. MohamedAbdelazizMousa
Checkingandapprovingthe workingdrawingsforthe air-conditioningatAl Mafraa new
plant.
June1994-June1995
Woods parker Engineering Consultant (Abu Dhabi).
Responsibilities and tasks:
Designingof AirConditioning-Plumbing-Fire fightingNetworks-WaterDesign–
Preparationof Drawings&specifications-Supervisionof constructionworksfor
multistorybuildingsat AbuDhabi.
SupplyNetworks-ElevatorsNetworks.
November1992-May1994
Bin Laden Group – (Saudi Arabia).
Responsibilities and tasks:
Design– Preparationof Drawings&specifications-forHotels&Royal PalacesatSaudi
Arabia.
Designingof AirConditioning-Plumbing-Fire fightingNetworks-WaterSupply
Networks-ElevatorsNetworks.
July1987-November1992
Nile Aster International Co. (Branch of Aster Co. –Milan/Italy)
Responsibilities and tasks:
Design–SupervisionforAir-conditioning–Drainage Systems-water&Fire fighting
Networks.
Preparationof WorkingDrawings& specifications.
ProjectsManager.
November1983-July1987
The Egyptian Commercial and Industrial Trading Company.
Responsibilities and tasks:
DesignforAir-conditioningwork.
July1982-October1983
CAC for Air-Conditioning.
Responsibilities and tasks:
DesignforAir-conditioningwork.
August1980-October1982
Technical Engineering Services Co.
Responsibilities and tasks:
Maintenance &OperationsEngineerforAir-conditioningwork.