4. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
4
Historical Background
1957
1941-19451910 2010
20132013
1896 2010
5. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Launch service
5
Pleyades (ESA) Gaia (ESA)Resurs-P (Russia)Mars-Express (ESA)
Over 1800 manned
and unmanned
launches of the
Soyuz rocket since
1967
More than 90
launches of
spacecraft were
performed since
1999 under the
agreement with
foreign customers.Obzor-R (Russia) 2015
6. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Bion-M with piggyback satellites
Bion-M is a large spacecraft for
research in the field of space
biology and medicine.
Launch of Bion-M № 1 was
performed in 2013.
Aist spacecraft and five foreign
small satellites of CubeSat type
were used as a piggyback
payload.
6
Image source: http://samspace.ru/multimedia/images/selected_images/142/
8. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Multi-interface (satellites or
orbital stages)
Reliable and proven
components
Experimental validation
No debris
Design Principles
8
9. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Modular design
Door module
Hinges, latches, hold down and
release mechanism
Base module
Guide rails
Separation spring module
Separation spring, platform
with guide rails
9
10. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Multi-format
10
1U 2U 3U, 3U+
Modular design allows to
build deployers for various
CubeSat form-factors
Set of separation springs is
developed to separate
satellites at a speed from 0.5
to 0.8 m/s
11. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Sensors
The separation sensor detects
the separation of the CubeSat
from the platform
The temperature sensor
measures the temperature inside
the base module. All the surfaces
of the deployer are wrapped by a
multi-layer Insulation
11
12. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
CubeSat Requirements
Form factors:
1U, 1.5U
2U
3U, 3U+
Standard CubeSat
requirements*
12
*Munakata, Riki. "Cubesat design specification rev. 13." The CubeSat Program, California Polytechnic State University 1 (2009).
14. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Separation dynamics
Separation speed
0.5 … 0.8 m/s
Angular velocity
1U CubeSats: < 15 °/s
3U CubeSats: < 5 °/s
14
15. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Angular velocity of 1U CubeSat
Angular velocity of 1U CubeSat
for different COG offset and δ =0.5 mm
15
16. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Angular velocity of 3U CubeSat
16
Angular velocity of 3U CubeSat
for different COG offset and δ =0.5 mm
17. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
3-Unit Deployer Simulation
17
19. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Transfer compartment
19
Image source: R.N. Akhmetov et al. Low-cost launch services for micro satellites by means of utilization
of Soyuz orbital stage Small Satell. Earth Obs. Dig. 7-th Int. Symp. Int. Acad. Astronaut. Berlin, 2009.
20. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Transfer compartment
H≈250-300 km
The orbital stage is rotated by
gas engine after the separation
of the main payload
The attitude motion of the
orbital stage will affect to the
motion of the separated
CubeSats
20
21. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Satellites
Bion-M / Foton-M
satellites
Circular orbit
H = 500 – 600 km
21
Platform for external equipment
22. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
H=1000 km, i = 62.8°
H=1500 km, i = 82.4°
H=835 km, i = 98.7° (SSO)
“Volga” upper stage
22
Image source: http://samspace.ru/multimedia/images/selected_images/103/
23. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Main payloads
Aist-2, Lomonosov
Additional payload
3U CubeSat SamSat-218/D
Planned start date
December 2015
Space-launch complex
Vostochny
The First Launch
23
24. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Modular multiformat design: 1U, 1.5U, 2U, 3U, 3U+
Low angular velocities of separated satellites
High reliability p>0,999
Temperature sensor
Separation sensor
Passive thermal control system
Adaptation to the SRC space vehicles
Key features of the Deployer
24
25. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Vadim Yudintsev, Dmitriy Zaretskiy, Eugeni Kosmodemyanskii , Oksana Vagner,
Aleksandr Romanov, Maxim Sivov, Maxim Trusov
The CubeSat deployer developer team
26. 1st Latin American IAA CubeSat WorkShop. Brasília, Brasil. December 8th - 11th, 2014
Contacts
JSC SRC «Progress»,
18, Zemetsa str., Samara, Russia
Phone: +7 (846) 955-13-61
Fax: +7 (846) 992-65-18
e-mail: ved878@samspace.ru
http://www.samspace.ru