Click Here---> https://bit.ly/3W4457l <---Get complete detail on CT-MBT exam guide to crack CT-MBT 2015. You can collect all information on CT-MBT tutorial, practice test, books, study material, exam questions, and syllabus. Firm your knowledge on CT-MBT 2015 and get ready to crack CT-MBT certification. Explore all information on CT-MBT exam with number of questions, passing percentage and time duration to complete test.
2. ISTQB CT - MBT Exam Summary:
Vendor ISTQB
Exam Code CT-MBT
Full Exam Name ISTQB Certified Tester - Model-Based Tester
Number of Questions 40
Sample Questions ISTQB CT-MBT Exam Sample Questions and Answers
Practice Exam ISTQB CT-MBT Practice Test
Passing Score 26/40
Time Limit 60 Minutes
Exam Fee USD $199
3. CT-MBT Certification Syllabus Content:
Syllabus Topics:
● Introduction to Model-Based Testing
● MBT Modeling
● Selection Criteria for Test Case Generation
● MBT Test Implementation and Execution
● Evaluating and Deploying an MBT Approach
4. CT-MBT Study Guide:
● Know about ISTQB CT - Model-Based Tester book
details.
● Go through ISTQB CT-MBT exam syllabus.
● Go through ISTQB CT - Model-Based Tester sample
questions. This will give you a clear idea about the real
exam.
● Enroll for CT-MBT practice test on ProcessExam.com.
● Identify your weak areas from CT-MBT sample exam
and do more practice with system.
6. Que.: 1. Consider the following tools supporting the MBT
modeling process. Which tool provides support for
writing syntactically correct MBT models?
Options:
a) UML modeling tool.
b) State/transition diagram editor.
c) All of these.
d) Domain-specific language editor.
8. Que.: 2. Time for test execution is running short. How can
MBT help you?
Options:
a) If the MBT model contains information on priorities, you may apply project-
driven test case selection to limit the number of generated test cases to those
with high priority.
b) You will not run into this problem, because the automated test case generation
in MBT provides you with new test cases within a few seconds by pressing a
button.
c) Test execution is far less important in MBT, because requirements validation
takes place even before the first test is performed.
d) Not at all. MBT does not provide any support for test management in difficult
situations.
9. Answer:
a) If the MBT model contains
information on priorities, you
may apply project-driven test
case selection to limit the
number of generated test cases
to those with high priority.
10. Que.: 3. An MBT approach is deployed in a project. Which
one of the following statements describes good practice?
Options:
a) Deploying MBT with manual test execution requires additional risk
management.
b) Configuration management does not have to cover the MBT models, if the
generated test cases are controlled.
c) For projects applying continuous integration, MBT should be used for
higher test levels only (system testing, user acceptance testing).
d) Establishing traceability between requirements and MBT model elements is
part of an MBT approach.
12. Que.: 4. A company decided to use MBT for acceptance testing
of a transport ticketing system. Which one of the following
metrics would a test manager use to best measure the progress
of MBT activities?
Options:
a) The number of requirements managed and traced in the MBT model, and
requirements coverage (percentage) by generated test cases.
b) The effort (in person-days) done for code development.
c) The number of bugs discovered in the component testing phase.
d) The effort (in person-days) spent on developing test models and applying
test selection criteria.
13. Answer:
a) The number of
requirements managed and
traced in the MBT model,
and requirements coverage
(percentage) by generated
test cases.
14. Que.: 5. Which one of the following statements is the best
definition of model-based testing?
Options:
a) A testing technique using models to generate automated scripts.
b) A test design technique that uses state transition diagrams to design
test cases.
c) Acceptance testing using business process models.
d) Testing based on or involving models.
16. Unique Features Continued….
● ProcessExam.com has provided good quality CT-MBT sample
questions.
● One can go through the CT - Model-Based Tester sample questions
before buying the CT-MBT online practice test.
● One can take unlimited attempts to practice from the CT-MBT practice
test.
● It is available for two months.
● A candidate is able to measure his speed from the online practice test.
● Best CT-MBT book links are also provided on the website syllabus
page.
17. Unique Features Continued….
● If a candidate wants to know about CT - Model-Based Tester training
detail, our website provides information about that too.
● A candidate is able to know about his performance depending on the
result section of CT - Model-Based Tester online test.
● Marks obtained could be a motivator factor to prepare more or less
depending on the result.
● Last but not the least, we have a money back policy in our website,that
makes us really unique.
● Testimonials written on the website, could be helpful to choose our
website, as these are shared by our valuable users, who availed our
online practice test.
18. To Know More about ISTQB CT-MBT
Certification
VISIT www.processexam.com