Oracle Primavera Unifier and Project Management Services Specialist
1. MAURO (MO) DANIELE
Phoenix, A Z 85004 480.326.9920
https://www.linkedin.com/in/modaniele mo.daniele@gmail.com
PRIMAVERA UNIFIER ADMINISTRATOR & PROJECT MANAGEMENT PROCESS DEVELOPER
Diverse technical background in analysis, systematization, and customized reporting of project
related data.
Unifier solution provider focused on increasing efficiency across multi-departmental Project team requirements
throughout the project life-cycle and developing technology based project management platforms.
Areas of expertise:
Business Processes Dynamic Cost Sheet Workflow Management
Data Integration Change Management Root Cause Analysis
Budget Management Cost Reporting Implementation & Training
PROFESSIONAL EXPERIENCE
FREEPORT MCMORAN INC., Phoenix, AZ 2008 – 2016
Project Management Controls System Developer 2008 – 2014
Recruited based on prior development of technology-based project management platforms (similar to Primavera
Unifier).
UDesigner, UStage, and Unifier specialist. (2008-2013)
Administered the Oracle Primavera Unifier platform, managed users and all access rights.
Set up new projects (Unifier).
Developed new business processes to upload project costs (commitments, expenditures, and accrual data into
the Unifier cost sheets in order to track real-time project costs against budget.
Developed complex workflows (Unifier).
Created custom cost reports (Unifier).
Developed change order business processes that dynamically adjusted the cost sheet (Unifier).
Integrated costs from multiple sources into Unifier and created the initial standard for multi-tiered executive
reports pinpointing areas of concern or interest. Standardizing project reporting allowed management to review
multiple projects more efficiently.
Developed a method to capture and monitor the root cause of change orders. (Unifier).
Developed WBS coding standards and implemented the process, defining and validating WBS codes for specific
project activities, making it easy to use the program across multiple projects by controllers and accounting
teams (Unifier Cost Sheet).
Commissioning System Developer 2013 – 2016
Developed web-based Commissioning System processes to support the commissioning team during various
phases of construction projects, providing information required to complete the client turnover packages.
(Unifier) then SharePoint.
Managed and imported Commissioning data for the Equipment, Instrument, and IO data tables, Work Packages,
EQ and Inst Protocol Forms, Punch Lists, System and Sub-System definition tables, standardizing reporting
formats for tracking work package and punch lists progress at the system and detail levels.
Supplemented FAT, UAT, and field tests of applications, as well as providing instruction documents and end
user training, reducing rollout durations.
Administered the corporate commissioning projects SharePoint sites and created 1st
time method to monitor
commissioning data via mobile devices.
2. MAURO (MO) DANIELE mo.daniele@gmail.com PAGE TWO
AMEC, Mining and Metals Division, (Now AMEC Foster Wheeler), Phoenix, AZ 2002 – 2008
Technology Services Provider – Technical Consultant
Worked as a Primavera Unifier developer/consultant (Nov 2007-Sep 2008)
Functional team leader in the development of a web-based equipment data collection platform for
commissioning and maintenance system. Automated the collection and processing of electronic data and files
collected from vendors, and integrated into the client maintenance information management system for use by
the commissioning and plant maintenance teams.
Instrument field data technician during the reconstruction of a 40MW power platform. Applied instrument
equipment knowledge and ability to read construction drawings, saving additional staff expense.
Performed engineering drawing and data collection and review, and compilation of instrumentation and
equipment lists, ensuring correct items were purchased.
Provided debugging assistance during database development of an operations risk analysis program at power
plants.
Analysed resulting effects of potential equipment failure in order to prevent catastrophic events, and to justify
the cost of spare equipment inventory.
Developed an environmental safety data information management system to collect and categorized materials
safety data information for all materials used during a mine restart project to determine the impact to the
environment. Product knowledge and database skills helped to complete the compliance requirements ahead of
schedule.
ADDITIONAL RELATED EXPERIENCE
ENGINEERING MATRIX, Seattle, WA
Project Management System Development and End-User Training and Support
SIMONS ENGINEERING (Now AMEC Foster Wheeler), Phoenix, AZ
IT Systems Manager
PHELPS DODGE CORPORATION (now Freeport McMoran Inc.), Phoenix, AZ
Project Cost Data Analyst, Integrator, and Trainer
SUNDT CONSTRUCTION, Tucson, AZ
Procurement Agent
EDUCATION
Engineering studies, Western New England Engineering College, Springfield, MA
Engineering studies, Springfield Technical Community College, Springfield, MA
Percussion Performance studies, Berklee College of Music, Boston, MA
Writing studies, University of Arizona, Tucson, AZ
LANGUAGES
English, Italian, Spanish