PROPOSED OVERALL PROCESS SCHEMATIC
Existing Water Cooling System
Graphic provided by D. Hall
Water Cooling Diagram
Graphic provided by D. Hall
Evaporation Reduction Projection
50,000,000+ GALLONS
Underground Temperature DifferentialUnderground Temperature Differential
Lake Area Wells Reported to Texas Water Development Board
It appears there is significant seepage
from Lytle into aquifers surrounding &
below lake. Seepage of water above a
set level can be accelerated for storage.
Also, appears aquifers extend deeper
than any of the wells reported thus far.
Proposed towers / tanks / waterfalls
seen from Northwest Shore
OVERLAY RENDERING OF PROPOSED EQUIPMENT
CONSTRUCTION PLAN PHASES
1. Gain approval for cooling system structure, appearance
& location areas from all stakeholders including: Board,
Residents & City; simultaneously conduct underground
surveys of planned areas; then plan drilling schedule.
2. Drill, cement, & cap wells sequentially – 25 total - depth
determined based on water depth, formations, flow,
qualities & previous well results tentatively as follows:
• Center of dam (1)
• Ends of dam (2 &3)
• 9 additional locations around lake (4-12)
3. Plan additional 13 wells based on results of first 12.
4. Adjust cooling system design based on well results.
1
3
2 4
6
7
10
11
12
*Dry
Well
5
8
9

More Related Content

What's hot

Ground Water Resources Estimation By GEC 2015 Methodology
Ground Water Resources Estimation By GEC 2015 MethodologyGround Water Resources Estimation By GEC 2015 Methodology
Ground Water Resources Estimation By GEC 2015 MethodologyAnand A.V.S.S
 
Steps for planning_layout_design_constru
Steps for planning_layout_design_construSteps for planning_layout_design_constru
Steps for planning_layout_design_construMuhammad Umer Aleem
 
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_projectSaddam Mussie
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devicesGurdeep singh Johar
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...hydrologyproject001
 
Rule level & gate operation
Rule level & gate operationRule level & gate operation
Rule level & gate operationTushar Dholakia
 
Sea Water Air Conditioning [SWAC]: A Cost Effective Alternative
Sea Water Air Conditioning [SWAC]: A Cost Effective AlternativeSea Water Air Conditioning [SWAC]: A Cost Effective Alternative
Sea Water Air Conditioning [SWAC]: A Cost Effective AlternativeCSCJournals
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flowCivil engeeneer
 
TERS Presentation
TERS PresentationTERS Presentation
TERS Presentationhtgcd
 
DESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTMLDESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTMLS.m. Kumar
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringLatif Hyder Wadho
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety DevicesTushar Dholakia
 
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...Dirk Kassenaar M.Sc. P.Eng.
 
Moscow 2009, 3P Arctic
Moscow 2009, 3P ArcticMoscow 2009, 3P Arctic
Moscow 2009, 3P Arcticpsobolev
 
NY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans FrackingNY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans FrackingMarcellus Drilling News
 
Desired Future Condition (DFC) Presentation
Desired Future Condition (DFC) PresentationDesired Future Condition (DFC) Presentation
Desired Future Condition (DFC) Presentationhtgcd
 

What's hot (20)

Ground Water Resources Estimation By GEC 2015 Methodology
Ground Water Resources Estimation By GEC 2015 MethodologyGround Water Resources Estimation By GEC 2015 Methodology
Ground Water Resources Estimation By GEC 2015 Methodology
 
Al Burj Abstract
Al Burj AbstractAl Burj Abstract
Al Burj Abstract
 
Steps for planning_layout_design_constru
Steps for planning_layout_design_construSteps for planning_layout_design_constru
Steps for planning_layout_design_constru
 
2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project2.2 gl for-hydaulic_design_of_shp_project
2.2 gl for-hydaulic_design_of_shp_project
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devices
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 
Rating curve design,practice and problems
Rating curve design,practice and problemsRating curve design,practice and problems
Rating curve design,practice and problems
 
Gopal K - UEI Day 1 - Kochi Jan18
Gopal K - UEI Day 1 - Kochi Jan18Gopal K - UEI Day 1 - Kochi Jan18
Gopal K - UEI Day 1 - Kochi Jan18
 
Rule level & gate operation
Rule level & gate operationRule level & gate operation
Rule level & gate operation
 
Sea Water Air Conditioning [SWAC]: A Cost Effective Alternative
Sea Water Air Conditioning [SWAC]: A Cost Effective AlternativeSea Water Air Conditioning [SWAC]: A Cost Effective Alternative
Sea Water Air Conditioning [SWAC]: A Cost Effective Alternative
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
 
TERS Presentation
TERS PresentationTERS Presentation
TERS Presentation
 
DESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTMLDESIGN OF CANAL REGULATOR USING HTML
DESIGN OF CANAL REGULATOR USING HTML
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil Engineering
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety Devices
 
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
 
Moscow 2009, 3P Arctic
Moscow 2009, 3P ArcticMoscow 2009, 3P Arctic
Moscow 2009, 3P Arctic
 
5.1 reservoir planning
5.1 reservoir planning5.1 reservoir planning
5.1 reservoir planning
 
NY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans FrackingNY FSGEIS "Findings Statement" that Temporarily Bans Fracking
NY FSGEIS "Findings Statement" that Temporarily Bans Fracking
 
Desired Future Condition (DFC) Presentation
Desired Future Condition (DFC) PresentationDesired Future Condition (DFC) Presentation
Desired Future Condition (DFC) Presentation
 

Viewers also liked

Estudo empírico da metodologia do desenvolvimento ágil de software
Estudo empírico da metodologia do desenvolvimento ágil de softwareEstudo empírico da metodologia do desenvolvimento ágil de software
Estudo empírico da metodologia do desenvolvimento ágil de softwareMarlon Paranhos
 
Double page ajnsjnssan
Double page ajnsjnssanDouble page ajnsjnssan
Double page ajnsjnssanHarryateccles
 
Janvier 2006 Communiqué de Presse Arrow
Janvier 2006 Communiqué de Presse ArrowJanvier 2006 Communiqué de Presse Arrow
Janvier 2006 Communiqué de Presse Arrowpbcom1998
 
Capability Statement Globus Solutions
Capability Statement Globus SolutionsCapability Statement Globus Solutions
Capability Statement Globus SolutionsTim Cole
 
Cijferlijst Bachelor
Cijferlijst BachelorCijferlijst Bachelor
Cijferlijst BachelorTara Frakking
 
Neural network - how does it work - I mean... literally!
Neural network - how does it work - I mean... literally!Neural network - how does it work - I mean... literally!
Neural network - how does it work - I mean... literally!Christoph Diefenthal
 
7. Utilización de mecanismos de comunicación asíncrona
7. Utilización de mecanismos de comunicación asíncrona7. Utilización de mecanismos de comunicación asíncrona
7. Utilización de mecanismos de comunicación asíncronaLaura Folgado Galache
 

Viewers also liked (11)

Editing analysis
Editing analysisEditing analysis
Editing analysis
 
Taller 13 dahiana holguin 8 b
Taller 13 dahiana holguin 8 bTaller 13 dahiana holguin 8 b
Taller 13 dahiana holguin 8 b
 
Estudo empírico da metodologia do desenvolvimento ágil de software
Estudo empírico da metodologia do desenvolvimento ágil de softwareEstudo empírico da metodologia do desenvolvimento ágil de software
Estudo empírico da metodologia do desenvolvimento ágil de software
 
Double page ajnsjnssan
Double page ajnsjnssanDouble page ajnsjnssan
Double page ajnsjnssan
 
Janvier 2006 Communiqué de Presse Arrow
Janvier 2006 Communiqué de Presse ArrowJanvier 2006 Communiqué de Presse Arrow
Janvier 2006 Communiqué de Presse Arrow
 
Wkspb09
Wkspb09Wkspb09
Wkspb09
 
Ahmed Hegazy CV
Ahmed Hegazy CVAhmed Hegazy CV
Ahmed Hegazy CV
 
Capability Statement Globus Solutions
Capability Statement Globus SolutionsCapability Statement Globus Solutions
Capability Statement Globus Solutions
 
Cijferlijst Bachelor
Cijferlijst BachelorCijferlijst Bachelor
Cijferlijst Bachelor
 
Neural network - how does it work - I mean... literally!
Neural network - how does it work - I mean... literally!Neural network - how does it work - I mean... literally!
Neural network - how does it work - I mean... literally!
 
7. Utilización de mecanismos de comunicación asíncrona
7. Utilización de mecanismos de comunicación asíncrona7. Utilización de mecanismos de comunicación asíncrona
7. Utilización de mecanismos de comunicación asíncrona
 

Similar to WATER CONSERVATION PROPOSAL

Modeling analyses for fort lewis jblm drinking water system, aspect 2009
Modeling analyses for fort lewis jblm drinking water system, aspect 2009Modeling analyses for fort lewis jblm drinking water system, aspect 2009
Modeling analyses for fort lewis jblm drinking water system, aspect 2009Sequalitchew Creek Watershed Council
 
Thermal Impact Assessment of Below-Water-Table Aggregate Extraction
Thermal Impact Assessment of Below-Water-Table Aggregate ExtractionThermal Impact Assessment of Below-Water-Table Aggregate Extraction
Thermal Impact Assessment of Below-Water-Table Aggregate ExtractionDirk Kassenaar M.Sc. P.Eng.
 
0509 presentation to_rwqcb
0509 presentation to_rwqcb0509 presentation to_rwqcb
0509 presentation to_rwqcbguest68898e
 
wells purposes.ppt
wells purposes.pptwells purposes.ppt
wells purposes.pptAli Al-naqa
 
Halliburton Deepwater Cementing Presentation
Halliburton Deepwater Cementing PresentationHalliburton Deepwater Cementing Presentation
Halliburton Deepwater Cementing Presentationfiredoglake
 
Water Management in Thermal Power Plants .pdf
Water Management in Thermal Power Plants .pdfWater Management in Thermal Power Plants .pdf
Water Management in Thermal Power Plants .pdfeldoctol
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project listAhmad Mousa
 
Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.
Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.
Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.METER Group, Inc. USA
 
carothers_ewriPoster_whole_final.compressed
carothers_ewriPoster_whole_final.compressedcarothers_ewriPoster_whole_final.compressed
carothers_ewriPoster_whole_final.compressedRichard Carothers, EIT
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureDave Campbell
 
Construction Dewatering PowerPoint
Construction Dewatering PowerPointConstruction Dewatering PowerPoint
Construction Dewatering PowerPointTerry Aylward
 
Dam Removal and Stream Restoration
Dam Removal and Stream RestorationDam Removal and Stream Restoration
Dam Removal and Stream Restorationkylejanco
 

Similar to WATER CONSERVATION PROPOSAL (20)

Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
V Wright Sess2 102109
V Wright Sess2 102109V Wright Sess2 102109
V Wright Sess2 102109
 
Modeling analyses for fort lewis jblm drinking water system, aspect 2009
Modeling analyses for fort lewis jblm drinking water system, aspect 2009Modeling analyses for fort lewis jblm drinking water system, aspect 2009
Modeling analyses for fort lewis jblm drinking water system, aspect 2009
 
Thermal Impact Assessment of Below-Water-Table Aggregate Extraction
Thermal Impact Assessment of Below-Water-Table Aggregate ExtractionThermal Impact Assessment of Below-Water-Table Aggregate Extraction
Thermal Impact Assessment of Below-Water-Table Aggregate Extraction
 
2018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 1012018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 101
 
0509 presentation to_rwqcb
0509 presentation to_rwqcb0509 presentation to_rwqcb
0509 presentation to_rwqcb
 
wells purposes.ppt
wells purposes.pptwells purposes.ppt
wells purposes.ppt
 
Halliburton Deepwater Cementing Presentation
Halliburton Deepwater Cementing PresentationHalliburton Deepwater Cementing Presentation
Halliburton Deepwater Cementing Presentation
 
Water Management in Thermal Power Plants .pdf
Water Management in Thermal Power Plants .pdfWater Management in Thermal Power Plants .pdf
Water Management in Thermal Power Plants .pdf
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.
Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.
Soil Infiltration 101: What It Is. Why You Need It. How To Measure It.
 
1.pdf
1.pdf1.pdf
1.pdf
 
carothers_ewriPoster_whole_final.compressed
carothers_ewriPoster_whole_final.compressedcarothers_ewriPoster_whole_final.compressed
carothers_ewriPoster_whole_final.compressed
 
Unit2 hbn
Unit2 hbnUnit2 hbn
Unit2 hbn
 
Asdso
AsdsoAsdso
Asdso
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain Future
 
Construction Dewatering PowerPoint
Construction Dewatering PowerPointConstruction Dewatering PowerPoint
Construction Dewatering PowerPoint
 
Dam Removal and Stream Restoration
Dam Removal and Stream RestorationDam Removal and Stream Restoration
Dam Removal and Stream Restoration
 

More from Mark Schwedel

091214_SDC MEP Model
091214_SDC MEP Model091214_SDC MEP Model
091214_SDC MEP ModelMark Schwedel
 
data-center-framework (1)
data-center-framework (1)data-center-framework (1)
data-center-framework (1)Mark Schwedel
 
DRUPS configurations
DRUPS configurationsDRUPS configurations
DRUPS configurationsMark Schwedel
 
Custom AHU Start-up Form
Custom AHU Start-up FormCustom AHU Start-up Form
Custom AHU Start-up FormMark Schwedel
 
Springfield Data Center Photos 2012-2013
Springfield Data Center Photos 2012-2013Springfield Data Center Photos 2012-2013
Springfield Data Center Photos 2012-2013Mark Schwedel
 
Springfield Data Center
Springfield Data CenterSpringfield Data Center
Springfield Data CenterMark Schwedel
 

More from Mark Schwedel (7)

091214_SDC MEP Model
091214_SDC MEP Model091214_SDC MEP Model
091214_SDC MEP Model
 
data-center-framework (1)
data-center-framework (1)data-center-framework (1)
data-center-framework (1)
 
DRUPS configurations
DRUPS configurationsDRUPS configurations
DRUPS configurations
 
Custom AHU Start-up Form
Custom AHU Start-up FormCustom AHU Start-up Form
Custom AHU Start-up Form
 
ITC_HLInfraPlan_v8
ITC_HLInfraPlan_v8ITC_HLInfraPlan_v8
ITC_HLInfraPlan_v8
 
Springfield Data Center Photos 2012-2013
Springfield Data Center Photos 2012-2013Springfield Data Center Photos 2012-2013
Springfield Data Center Photos 2012-2013
 
Springfield Data Center
Springfield Data CenterSpringfield Data Center
Springfield Data Center
 

WATER CONSERVATION PROPOSAL

  • 2. Existing Water Cooling System Graphic provided by D. Hall
  • 3. Water Cooling Diagram Graphic provided by D. Hall
  • 6. Lake Area Wells Reported to Texas Water Development Board It appears there is significant seepage from Lytle into aquifers surrounding & below lake. Seepage of water above a set level can be accelerated for storage. Also, appears aquifers extend deeper than any of the wells reported thus far.
  • 7. Proposed towers / tanks / waterfalls seen from Northwest Shore OVERLAY RENDERING OF PROPOSED EQUIPMENT
  • 8. CONSTRUCTION PLAN PHASES 1. Gain approval for cooling system structure, appearance & location areas from all stakeholders including: Board, Residents & City; simultaneously conduct underground surveys of planned areas; then plan drilling schedule. 2. Drill, cement, & cap wells sequentially – 25 total - depth determined based on water depth, formations, flow, qualities & previous well results tentatively as follows: • Center of dam (1) • Ends of dam (2 &3) • 9 additional locations around lake (4-12) 3. Plan additional 13 wells based on results of first 12. 4. Adjust cooling system design based on well results. 1 3 2 4 6 7 10 11 12 *Dry Well 5 8 9