6. Lake Area Wells Reported to Texas Water Development Board
It appears there is significant seepage
from Lytle into aquifers surrounding &
below lake. Seepage of water above a
set level can be accelerated for storage.
Also, appears aquifers extend deeper
than any of the wells reported thus far.
7. Proposed towers / tanks / waterfalls
seen from Northwest Shore
OVERLAY RENDERING OF PROPOSED EQUIPMENT
8. CONSTRUCTION PLAN PHASES
1. Gain approval for cooling system structure, appearance
& location areas from all stakeholders including: Board,
Residents & City; simultaneously conduct underground
surveys of planned areas; then plan drilling schedule.
2. Drill, cement, & cap wells sequentially – 25 total - depth
determined based on water depth, formations, flow,
qualities & previous well results tentatively as follows:
• Center of dam (1)
• Ends of dam (2 &3)
• 9 additional locations around lake (4-12)
3. Plan additional 13 wells based on results of first 12.
4. Adjust cooling system design based on well results.
1
3
2 4
6
7
10
11
12
*Dry
Well
5
8
9