9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 2
What is EcoVapor?
• We’re focused on recovering flash gas from oil storage tanks at sites connected to gas
gathering systems.
• We’ve been recovering flash gas since 2010. We currently have systems deployed in
Colorado, Wyoming, Oklahoma, North Dakota and Texas.
• Our systems remove free oxygen and deliver gas with O2 consistently below 8 ppm.
• Our patented suction pressure control technology allows our systems to pull tank
pressures down as low as 1.0 oz/in^2.
• Our stand alone ZerO2 units can work with any existing VRUs and be used in lieu of
VRTs.
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 2
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 3
ZerO2 System
• Compatible with any VRUs
• The next evolution from VRTs
• Two sizes currently available:
• 300 MCFD
• 1200 MCFD
• All Electric
• Gas version available early 2019
• No moving parts
• Standard unit can be customized if special
operator requirements exist
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 4
ZerO2 on the
Wellsite
Skid mounted and small footprint
ensures unit is portable, inexpensive
to install and/or move.
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 5
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 6
EcoVapor ZerO2 E300
Processing Capacity – 300 MCFD
Footprint – 4’ x 4’
Processing cost per MMBtu - $0.14
EcoVapor ZerO2 E1200
Processing Capacity – 1200 MCFD
Footprint – 5.5’ x 6.5’
Processing cost per MMBtu - $0.11
Inlet and Outlet
O2 Analyzers (optional)
Gas Inlet
& Y Filter
Cleanout
Hatch
Gas Outlet
Forklift
Slots
Lift rings
Gas-to-Gas
Heat Exchanger
PSV Vent
4’
Reactor
(Insulated)
Basic Specifications of the two
sizes of ZerO2 units
Current
Installation in
West Texas
Three EcoVapor ZerO2 E300 units
processing over 1200 MCFD with
20,000 PPM O2 (2%) inlet and only 0.6
ppm O2 at discharge.
Gross Monthly Revenue ~ $200,000
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 7
De-risking
Production and
Cash Flow
Examples of de-risking:
• LLCs
• Employee safety programs
• Insurances – Liability, Well Control, Auto/Truck
• Blow out preventers
• Hazop Reviews
• Process Safety Management
• Management of Change
• Hedging oil, gas, and NGL prices and differentials
Vapor Recovery w/ O2 control is another step in that process
• Flow assurance
• Pipeline integrity via corrosion control
• Ensure gas is pipeline quality - no shut ins
• Regulatory compliance – minimize venting and leaks via low tank
pressures
• Safer operations
• Title V PTE reductions – avoid Federal NSPS OOOO qualifying
emission levels
Multiple benefits for
• Economic returns
• Operational safety
• Meeting emissions standards,
current and future
• Uptime
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 8
Inlet O2 Outlet O2
Chronic oxygen
issue
Oxygen
event
Reactor outlet temperatures
showing thermostat on/off function
Shut in time – 0 hours
Divert to flare – 0 MCF
Oxygen
Removal
Over 24
Hours
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 9
Oxygen
Conversion
Performance
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 10
2O2 + CH4 -> CO2 + 2H2O
Site with VRU / VRT System
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 11
Gas Pipeline to Processing Plant
Wells
HP
Separators
Oil Tanks
Combustor
Natural Gas
Flash
Gas w/ O2
Custody Meter
VRT
VRU
Site with VRU / ZerO2 System
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 12
Gas Pipeline to Processing Plant
Wells
HP
Separators Oil Tanks
Combustor
Natural Gas
Flash
Gas w/ O2
Custody Meter
VRUZerO2 E300
Site wit Dual VRU and ZerO2 Systems
9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 13
Gas Pipeline to Processing Plant
Wells Separators
Oil Tanks
Combustor
Natural Gas
Flash
Gas w/ O2
Custody Meter
VRUs
Inlet
Scrubber
Scrubber
Oil
Tank Gas - MCFD 300 Tank Gas Btu/SCF 2800
VRT Gas - MCFD 240 VRT Gas Btu/SCF 2600
VRT lease $/mo* 1,200$ ZerO2 lease $/Mo 3,200$
Natural Gas Price $/MMBtu $2.50 VRU lease $/Mo 3,000$
VRT Efficiency**: 80% VRU Maint $/Mo 300$
VRT and VRU ZerO2 and VRU
Estimated Btu/SCF of recovered gas 2600 2800
VRT Lease (1,200)$ -$
VRT Maint / Mo (250)$ -$
VRT Installation (4,000)$ -$
VRU Lease (3,000)$ (3,000)$
VRU Maint / Mo (300)$ (300)$
VRU Installation (2,500)$ (2,500)$
EcoVapor Lease -$ (3,200)$
EcoVapor Maint/ Mo -$ (500)$
EcoVapor Installation -$ (7,500)$
Total Lease (4,200)$ (6,200)$
Total Maint / Mo (550)$ (800)$
Total Installation (6,500)$ (10,000)$
Recovered MCFD 240 300
Recovered Gas $/MCF Btu Adjusted $6.50 $7.00
Rev $/Mo - Gross 47,424$ 63,840$
Annual Revenue Netted to 80% 455,270$ 612,864$
First year OPEX & CAPEX (63,500)$ (94,000)$
First year net income to Operator 391,770$ 518,864$
First Year Gain / (Loss) using ZerO2 127,094$
Unit Profit / (Cost)
Annual Addnl MMBtu Sold 59,130 2.15$
Addnl MCFD Recovered 60 5.80$
Estimated VOC TPY Reduction 20.0 6,355$
Estimated NOx TPY Reduction 1.9 66,891$
Estimated CO TPY Reduction 16.9 7,520$
*VRT Leased at 1,200$ /mo is = to purchase @ 28,800$
**VRT efficiencies are higher with low gravity crudes and lower with high gravity condensates.
Vapor Recovery Options - ZerO2 vs. VRT
Variables
Vapor Recovery
Options – VRT
vs. Full Recovery
9/3/2018
Limitations & Considerations
• Power – 480v 3 ph connection. 45 kW at startup, drops to 10-15 kW after warmup. Higher
O2 lowers power consumption.
• System is designed to heat gas, not boil oil.
• Flow at inlet needs to be in vapor phase, so proximity to VRU discharge and/or inlet
scrubber is required.
• H2S can foul catalyst.
• Iron sponge (i.e. H2SZero) or Triazene liquid scavengers work well. Liquids need to be
removed prior to our unit.
Current EcoVapor
Installation Areas,
Target Areas and
Customers
9/3/2018
For More info call
Mark Lancaster
432-638-6749
or email
marklancaster@ecovaporrs.com
EcoVapor Recovery Systems, LLC

More Related Content

Similar to Reduce your o2 to zero in your gas stream with eco vapor 9 3-18

Dr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyDr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyGlobal CCS Institute
 
Andrew Chant\'s CanWEA O & M Presentation
Andrew Chant\'s CanWEA  O  & M  PresentationAndrew Chant\'s CanWEA  O  & M  Presentation
Andrew Chant\'s CanWEA O & M Presentationmtingle
 
15th EPConf 5-14-2013 SJ Final
15th EPConf 5-14-2013 SJ Final15th EPConf 5-14-2013 SJ Final
15th EPConf 5-14-2013 SJ FinalSuresh Jambunathan
 
Reducing Emissions From Compressor Seals
Reducing Emissions From Compressor SealsReducing Emissions From Compressor Seals
Reducing Emissions From Compressor SealsSaurabh Jain
 
Benzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeBenzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeProcess Ecology Inc
 
Independent producer deploys emission free tank vapor recovery
Independent producer deploys emission   free tank vapor recoveryIndependent producer deploys emission   free tank vapor recovery
Independent producer deploys emission free tank vapor recoveryFernando_hc
 
Renewable Energy From Municipal Solid Waste And Automobile Shredder Residues
Renewable Energy From Municipal Solid Waste And Automobile Shredder ResiduesRenewable Energy From Municipal Solid Waste And Automobile Shredder Residues
Renewable Energy From Municipal Solid Waste And Automobile Shredder ResiduesJaapaz
 
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019Nicole Renee Pendini
 
Filtek presentation v2
Filtek presentation v2Filtek presentation v2
Filtek presentation v2Filtek_filters
 
Impact of Upcoming Marine Emission Control Regulations and available Options
Impact of Upcoming Marine Emission Control Regulations and available OptionsImpact of Upcoming Marine Emission Control Regulations and available Options
Impact of Upcoming Marine Emission Control Regulations and available OptionsAvinash Kadam
 
Performance report man & nissan engines with profile
Performance report man & nissan engines with profilePerformance report man & nissan engines with profile
Performance report man & nissan engines with profileM Hussam Adeni
 
Cemtek 8000 cost benefit analysis (payback calc)
Cemtek 8000 cost benefit analysis (payback calc)Cemtek 8000 cost benefit analysis (payback calc)
Cemtek 8000 cost benefit analysis (payback calc)Brian Gilmore
 
8 case study pptShubham.pptx
8 case study pptShubham.pptx8 case study pptShubham.pptx
8 case study pptShubham.pptxAakashJangid6
 
Max AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S ConcernsMax AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S ConcernsTom Lowes
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationThomas Holcombe
 
001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods 001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods Anil Palamwar
 

Similar to Reduce your o2 to zero in your gas stream with eco vapor 9 3-18 (20)

Dr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyDr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technology
 
Andrew Chant\'s CanWEA O & M Presentation
Andrew Chant\'s CanWEA  O  & M  PresentationAndrew Chant\'s CanWEA  O  & M  Presentation
Andrew Chant\'s CanWEA O & M Presentation
 
15th EPConf 5-14-2013 SJ Final
15th EPConf 5-14-2013 SJ Final15th EPConf 5-14-2013 SJ Final
15th EPConf 5-14-2013 SJ Final
 
Reducing Emissions From Compressor Seals
Reducing Emissions From Compressor SealsReducing Emissions From Compressor Seals
Reducing Emissions From Compressor Seals
 
Benzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations ChangeBenzene Emissions - Staying in Compliance as Regulations Change
Benzene Emissions - Staying in Compliance as Regulations Change
 
Independent producer deploys emission free tank vapor recovery
Independent producer deploys emission   free tank vapor recoveryIndependent producer deploys emission   free tank vapor recovery
Independent producer deploys emission free tank vapor recovery
 
Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017Amber kinetics intro non nda 06-16-2017
Amber kinetics intro non nda 06-16-2017
 
FSO Heavy Duty Diesel (DC8 8100) presentation (7)
FSO Heavy Duty Diesel (DC8 8100) presentation (7)FSO Heavy Duty Diesel (DC8 8100) presentation (7)
FSO Heavy Duty Diesel (DC8 8100) presentation (7)
 
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptxAir Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
 
Renewable Energy From Municipal Solid Waste And Automobile Shredder Residues
Renewable Energy From Municipal Solid Waste And Automobile Shredder ResiduesRenewable Energy From Municipal Solid Waste And Automobile Shredder Residues
Renewable Energy From Municipal Solid Waste And Automobile Shredder Residues
 
HEP_Feb2013_VRT
HEP_Feb2013_VRTHEP_Feb2013_VRT
HEP_Feb2013_VRT
 
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019
 
Filtek presentation v2
Filtek presentation v2Filtek presentation v2
Filtek presentation v2
 
Impact of Upcoming Marine Emission Control Regulations and available Options
Impact of Upcoming Marine Emission Control Regulations and available OptionsImpact of Upcoming Marine Emission Control Regulations and available Options
Impact of Upcoming Marine Emission Control Regulations and available Options
 
Performance report man & nissan engines with profile
Performance report man & nissan engines with profilePerformance report man & nissan engines with profile
Performance report man & nissan engines with profile
 
Cemtek 8000 cost benefit analysis (payback calc)
Cemtek 8000 cost benefit analysis (payback calc)Cemtek 8000 cost benefit analysis (payback calc)
Cemtek 8000 cost benefit analysis (payback calc)
 
8 case study pptShubham.pptx
8 case study pptShubham.pptx8 case study pptShubham.pptx
8 case study pptShubham.pptx
 
Max AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S ConcernsMax AFR and Output and Relevant OH&S Concerns
Max AFR and Output and Relevant OH&S Concerns
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentation
 
001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods 001 conservation-Energy Audit -Methods
001 conservation-Energy Audit -Methods
 

Recently uploaded

Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Timedelhimodelshub1
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRjennyeacort
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxNeoV2
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfTheaMan11
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxAgrodome projects LLP
 
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527nagunakhan
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 

Recently uploaded (20)

Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 
Call Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any TimeCall Girls Abids 7001305949 all area service COD available Any Time
Call Girls Abids 7001305949 all area service COD available Any Time
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
 
AI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptxAI and Ecology - The H4rmony Project.pptx
AI and Ecology - The H4rmony Project.pptx
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdf
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
 
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
Private Escorts Aliganj \ 9548273370 Indian Call Girls Service Lucknow ₹,9527
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 

Reduce your o2 to zero in your gas stream with eco vapor 9 3-18

  • 2. 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 2 What is EcoVapor? • We’re focused on recovering flash gas from oil storage tanks at sites connected to gas gathering systems. • We’ve been recovering flash gas since 2010. We currently have systems deployed in Colorado, Wyoming, Oklahoma, North Dakota and Texas. • Our systems remove free oxygen and deliver gas with O2 consistently below 8 ppm. • Our patented suction pressure control technology allows our systems to pull tank pressures down as low as 1.0 oz/in^2. • Our stand alone ZerO2 units can work with any existing VRUs and be used in lieu of VRTs. 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 2
  • 3. 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 3
  • 4. ZerO2 System • Compatible with any VRUs • The next evolution from VRTs • Two sizes currently available: • 300 MCFD • 1200 MCFD • All Electric • Gas version available early 2019 • No moving parts • Standard unit can be customized if special operator requirements exist 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 4
  • 5. ZerO2 on the Wellsite Skid mounted and small footprint ensures unit is portable, inexpensive to install and/or move. 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 5
  • 6. 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 6 EcoVapor ZerO2 E300 Processing Capacity – 300 MCFD Footprint – 4’ x 4’ Processing cost per MMBtu - $0.14 EcoVapor ZerO2 E1200 Processing Capacity – 1200 MCFD Footprint – 5.5’ x 6.5’ Processing cost per MMBtu - $0.11 Inlet and Outlet O2 Analyzers (optional) Gas Inlet & Y Filter Cleanout Hatch Gas Outlet Forklift Slots Lift rings Gas-to-Gas Heat Exchanger PSV Vent 4’ Reactor (Insulated) Basic Specifications of the two sizes of ZerO2 units
  • 7. Current Installation in West Texas Three EcoVapor ZerO2 E300 units processing over 1200 MCFD with 20,000 PPM O2 (2%) inlet and only 0.6 ppm O2 at discharge. Gross Monthly Revenue ~ $200,000 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 7
  • 8. De-risking Production and Cash Flow Examples of de-risking: • LLCs • Employee safety programs • Insurances – Liability, Well Control, Auto/Truck • Blow out preventers • Hazop Reviews • Process Safety Management • Management of Change • Hedging oil, gas, and NGL prices and differentials Vapor Recovery w/ O2 control is another step in that process • Flow assurance • Pipeline integrity via corrosion control • Ensure gas is pipeline quality - no shut ins • Regulatory compliance – minimize venting and leaks via low tank pressures • Safer operations • Title V PTE reductions – avoid Federal NSPS OOOO qualifying emission levels Multiple benefits for • Economic returns • Operational safety • Meeting emissions standards, current and future • Uptime 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 8
  • 9. Inlet O2 Outlet O2 Chronic oxygen issue Oxygen event Reactor outlet temperatures showing thermostat on/off function Shut in time – 0 hours Divert to flare – 0 MCF Oxygen Removal Over 24 Hours 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 9
  • 10. Oxygen Conversion Performance 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 10 2O2 + CH4 -> CO2 + 2H2O
  • 11. Site with VRU / VRT System 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 11 Gas Pipeline to Processing Plant Wells HP Separators Oil Tanks Combustor Natural Gas Flash Gas w/ O2 Custody Meter VRT VRU
  • 12. Site with VRU / ZerO2 System 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 12 Gas Pipeline to Processing Plant Wells HP Separators Oil Tanks Combustor Natural Gas Flash Gas w/ O2 Custody Meter VRUZerO2 E300
  • 13. Site wit Dual VRU and ZerO2 Systems 9/3/2018 ECOVAPOR RECOVERY SYSTEMS, LLC 13 Gas Pipeline to Processing Plant Wells Separators Oil Tanks Combustor Natural Gas Flash Gas w/ O2 Custody Meter VRUs Inlet Scrubber Scrubber Oil
  • 14. Tank Gas - MCFD 300 Tank Gas Btu/SCF 2800 VRT Gas - MCFD 240 VRT Gas Btu/SCF 2600 VRT lease $/mo* 1,200$ ZerO2 lease $/Mo 3,200$ Natural Gas Price $/MMBtu $2.50 VRU lease $/Mo 3,000$ VRT Efficiency**: 80% VRU Maint $/Mo 300$ VRT and VRU ZerO2 and VRU Estimated Btu/SCF of recovered gas 2600 2800 VRT Lease (1,200)$ -$ VRT Maint / Mo (250)$ -$ VRT Installation (4,000)$ -$ VRU Lease (3,000)$ (3,000)$ VRU Maint / Mo (300)$ (300)$ VRU Installation (2,500)$ (2,500)$ EcoVapor Lease -$ (3,200)$ EcoVapor Maint/ Mo -$ (500)$ EcoVapor Installation -$ (7,500)$ Total Lease (4,200)$ (6,200)$ Total Maint / Mo (550)$ (800)$ Total Installation (6,500)$ (10,000)$ Recovered MCFD 240 300 Recovered Gas $/MCF Btu Adjusted $6.50 $7.00 Rev $/Mo - Gross 47,424$ 63,840$ Annual Revenue Netted to 80% 455,270$ 612,864$ First year OPEX & CAPEX (63,500)$ (94,000)$ First year net income to Operator 391,770$ 518,864$ First Year Gain / (Loss) using ZerO2 127,094$ Unit Profit / (Cost) Annual Addnl MMBtu Sold 59,130 2.15$ Addnl MCFD Recovered 60 5.80$ Estimated VOC TPY Reduction 20.0 6,355$ Estimated NOx TPY Reduction 1.9 66,891$ Estimated CO TPY Reduction 16.9 7,520$ *VRT Leased at 1,200$ /mo is = to purchase @ 28,800$ **VRT efficiencies are higher with low gravity crudes and lower with high gravity condensates. Vapor Recovery Options - ZerO2 vs. VRT Variables Vapor Recovery Options – VRT vs. Full Recovery 9/3/2018
  • 15. Limitations & Considerations • Power – 480v 3 ph connection. 45 kW at startup, drops to 10-15 kW after warmup. Higher O2 lowers power consumption. • System is designed to heat gas, not boil oil. • Flow at inlet needs to be in vapor phase, so proximity to VRU discharge and/or inlet scrubber is required. • H2S can foul catalyst. • Iron sponge (i.e. H2SZero) or Triazene liquid scavengers work well. Liquids need to be removed prior to our unit.
  • 16. Current EcoVapor Installation Areas, Target Areas and Customers 9/3/2018
  • 17. For More info call Mark Lancaster 432-638-6749 or email marklancaster@ecovaporrs.com EcoVapor Recovery Systems, LLC