Coal based thermal power
plant works on the principal
of Modified Rankine Cycle.
The Rankine cycle is a
model that is used to predict
the performance of steam
engines. The Rankine cycle
is an idealised
thermodynamic cycle of a
heat engine that converts
heat into mechanical work.
15 March 2015 3
 Coal handling plant
 Economiser
 Air Pre heater
 Re heater
 Steam turbines
 Condenser
 Boiler
 Cooling tower
 Ash handling
 Generator
15 March 2015 4
: In coal-fired power stations, the raw feed
coal from the coal storage area is first crushed into small pieces and then
conveyed to the coal feed hoppers at the boilers.
: they are used in order to remove the excess moisture from coal
mainly wetted during transport.
 : coal which is brought may contain iron
particles. The iron particles may include bolts, nuts wire fish plates etc.
so these are unwanted and so are removed with the help of magnetic
separators.
15 March 2015 5
These are detect the presence of any ferrous and non-ferrous
metal in the coal and sends a signal to a relay which closes to seize the
movement of belt until the metal is removed. It basically consists of a
transmitter and a receiver
To SSTPS from gudla
via a single railway
track
Wagon
tippler
hoppers
Crusher
house
bunkers
Raw coal
feeders
Coal mills
(pulverization)
Boiler furnace ( tangential firing
of pulverized coal)
 Boiler is a combustion chamber
where water is heated at such
a temperature to achieve high
pressure steam .
 1) fire tube boiler
 2) water tube boiler
15 March 2015 7
 Flue gases coming out of the boiler carry lot of heat. An
economizer extracts a part of this heat from flue gases and uses it
for heating feed water. This use of economizer results in saving
coal consumption and higher boiler efficiency
15 March 2015 8
The heat carried out with the flue
gases coming out of economiser are further utilized
for preheating the air before supplying to the
combustion chamber. It is a necessary equipment for
supply of hot air for drying the coal in pulverized fuel
systems to facilitate grinding and satisfactory
combustion of fuel in the furnace
 Power plant furnaces may have a re-heater
section containing tubes heated by hot flue gases
outside the tubes. Exhaust steam from the high
pressure turbine is rerouted to go inside the re-heater
tubes to pickup more energy to go drive intermediate
or lower pressure turbines.
15 March 2015 9
 A steam turbine is a device that extracts thermal energy from
pressurized steam and uses it to do mechanical work on a rotating
output shaft . Because the turbine generates rotary motion, it is
particularly suited to be used to drive an electrical generator.
15 March 2015 10
HPT IPT LPT
RH
Steam
Steam
Shaft
Super
Heater
Condenser
GeneratorHPT IPT LPT
Generator or Alternator is the electrical end of a turbo-generator
set. It is generally known as the piece of equipment that converts
the mechanical energy of turbine into electricity. The generation
of electricity is based on the principle of electromagnetic
induction. Generally three phase synchronous generator is used
15 March 2015 11
15 March 2015 12
15 March 2015 13
 The disposal of ash from a large capacity power station is of same
importance as ash is produced in large quantities. Ash handling
is a major problem.
While barrows are used for this. The ash is
collected directly through the ash outlet door from the boiler
into the container from manually.
Mechanical equipment is used for ash
disposal, mainly bucket elevator, belt conveyer. Ash generated is
20% in the form of bottom ash and next 80% through flue gases,
so called Fly ash and collected in ESP.
The dust particles are ionized and
attracted by charged electrodes. The electrodes are maintained at
60KV.Hammering is done to the plates so that fly ash comes
down and collect at the bottom.
15 March 2015 14
15 March 2015 15
They can respond to rapidly changing loads
without difficulty
A portion of the steam generated can be used as a
process steam in different industries
Steam engines and turbines can work under 25 %
of overload continuously
Fuel used is cheaper
Cheaper in production cost in comparison with
that of diesel power stations
15 March 2015 16
 Maintenance and operating costs are high
 Long time required for erection and putting
into action
 A large quantity of water is required
 Great difficulty experienced in coal handling
 Presence of troubles due to smoke and heat in the
plant
 Unavailability of good quality coal
 Maximum of heat energy lost
 Problem of ash removing
15 March 2015 17
15 March 2015 18

More Related Content

What's hot

A seminar report on stps by ashok khoja
A seminar report on stps by ashok khojaA seminar report on stps by ashok khoja
A seminar report on stps by ashok khoja
ASHOK KHOJA
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
ravi kant
 

What's hot (20)

Super thermal power station,suratgarh,by rajesh nayak
Super thermal power station,suratgarh,by rajesh nayakSuper thermal power station,suratgarh,by rajesh nayak
Super thermal power station,suratgarh,by rajesh nayak
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plant
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Industrial Traning at SSTPS ppt
Industrial Traning at SSTPS pptIndustrial Traning at SSTPS ppt
Industrial Traning at SSTPS ppt
 
Surathgarh thermal powerplant
Surathgarh thermal powerplantSurathgarh thermal powerplant
Surathgarh thermal powerplant
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtu
 
A seminar report on stps by ashok khoja
A seminar report on stps by ashok khojaA seminar report on stps by ashok khoja
A seminar report on stps by ashok khoja
 
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIKKOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
 
Anil.ppt
Anil.pptAnil.ppt
Anil.ppt
 
sstps
sstpssstps
sstps
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
Stps report
Stps reportStps report
Stps report
 
thermal power plant - GNDTP Bathinda
thermal power plant - GNDTP Bathindathermal power plant - GNDTP Bathinda
thermal power plant - GNDTP Bathinda
 
Steam plan
Steam planSteam plan
Steam plan
 
kstps training report
kstps training reportkstps training report
kstps training report
 

Similar to Super thermal power plant,suratgarh

COAL HANDLING DIVISION ANPARA
COAL HANDLING DIVISION ANPARA COAL HANDLING DIVISION ANPARA
COAL HANDLING DIVISION ANPARA
Rajat Verma
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
R G Sanjay Prakash
 

Similar to Super thermal power plant,suratgarh (20)

Ntpc2
Ntpc2Ntpc2
Ntpc2
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTTHERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Complete report
Complete reportComplete report
Complete report
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARA
 
COAL HANDLING DIVISION ANPARA
COAL HANDLING DIVISION ANPARA COAL HANDLING DIVISION ANPARA
COAL HANDLING DIVISION ANPARA
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
KTPS
KTPSKTPS
KTPS
 
Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

Super thermal power plant,suratgarh

  • 3. Coal based thermal power plant works on the principal of Modified Rankine Cycle. The Rankine cycle is a model that is used to predict the performance of steam engines. The Rankine cycle is an idealised thermodynamic cycle of a heat engine that converts heat into mechanical work. 15 March 2015 3
  • 4.  Coal handling plant  Economiser  Air Pre heater  Re heater  Steam turbines  Condenser  Boiler  Cooling tower  Ash handling  Generator 15 March 2015 4
  • 5. : In coal-fired power stations, the raw feed coal from the coal storage area is first crushed into small pieces and then conveyed to the coal feed hoppers at the boilers. : they are used in order to remove the excess moisture from coal mainly wetted during transport.  : coal which is brought may contain iron particles. The iron particles may include bolts, nuts wire fish plates etc. so these are unwanted and so are removed with the help of magnetic separators. 15 March 2015 5 These are detect the presence of any ferrous and non-ferrous metal in the coal and sends a signal to a relay which closes to seize the movement of belt until the metal is removed. It basically consists of a transmitter and a receiver
  • 6. To SSTPS from gudla via a single railway track Wagon tippler hoppers Crusher house bunkers Raw coal feeders Coal mills (pulverization) Boiler furnace ( tangential firing of pulverized coal)
  • 7.  Boiler is a combustion chamber where water is heated at such a temperature to achieve high pressure steam .  1) fire tube boiler  2) water tube boiler 15 March 2015 7
  • 8.  Flue gases coming out of the boiler carry lot of heat. An economizer extracts a part of this heat from flue gases and uses it for heating feed water. This use of economizer results in saving coal consumption and higher boiler efficiency 15 March 2015 8
  • 9. The heat carried out with the flue gases coming out of economiser are further utilized for preheating the air before supplying to the combustion chamber. It is a necessary equipment for supply of hot air for drying the coal in pulverized fuel systems to facilitate grinding and satisfactory combustion of fuel in the furnace  Power plant furnaces may have a re-heater section containing tubes heated by hot flue gases outside the tubes. Exhaust steam from the high pressure turbine is rerouted to go inside the re-heater tubes to pickup more energy to go drive intermediate or lower pressure turbines. 15 March 2015 9
  • 10.  A steam turbine is a device that extracts thermal energy from pressurized steam and uses it to do mechanical work on a rotating output shaft . Because the turbine generates rotary motion, it is particularly suited to be used to drive an electrical generator. 15 March 2015 10 HPT IPT LPT RH Steam Steam Shaft Super Heater Condenser GeneratorHPT IPT LPT
  • 11. Generator or Alternator is the electrical end of a turbo-generator set. It is generally known as the piece of equipment that converts the mechanical energy of turbine into electricity. The generation of electricity is based on the principle of electromagnetic induction. Generally three phase synchronous generator is used 15 March 2015 11
  • 14.  The disposal of ash from a large capacity power station is of same importance as ash is produced in large quantities. Ash handling is a major problem. While barrows are used for this. The ash is collected directly through the ash outlet door from the boiler into the container from manually. Mechanical equipment is used for ash disposal, mainly bucket elevator, belt conveyer. Ash generated is 20% in the form of bottom ash and next 80% through flue gases, so called Fly ash and collected in ESP. The dust particles are ionized and attracted by charged electrodes. The electrodes are maintained at 60KV.Hammering is done to the plates so that fly ash comes down and collect at the bottom. 15 March 2015 14
  • 16. They can respond to rapidly changing loads without difficulty A portion of the steam generated can be used as a process steam in different industries Steam engines and turbines can work under 25 % of overload continuously Fuel used is cheaper Cheaper in production cost in comparison with that of diesel power stations 15 March 2015 16
  • 17.  Maintenance and operating costs are high  Long time required for erection and putting into action  A large quantity of water is required  Great difficulty experienced in coal handling  Presence of troubles due to smoke and heat in the plant  Unavailability of good quality coal  Maximum of heat energy lost  Problem of ash removing 15 March 2015 17