SlideShare a Scribd company logo
1 of 10
Not For Distribution or Use Outside of Mondelēz International
Grievance Redressal
ZERO Loss
Approach to
Traditional Approach “Solve the Grievances”
Recording
Coordinat
ion with
Stakehold
ers
Solutions
with in
Agreed time
frame
Feedback
to SFC’s
Focus the
Time &
Closing %
Grievances - Rec Vs Closed
Month Rec Closed
Pending
till date
%
Closed
with in
time
frame
Grievances
Pending
beyond time
March 21 21 0 100.00 0
April 63 62 1 98.41 2
May 91 82 10 90.11 9
June 139 130 19 93.53 2
July 150 149 20 99.33 1
August 375 369 26 98.40 24
September 466 392 100 84.12 20
October 370 325 57 87.84 28
November 178 150 49 84.27 0
December 145 113 47 77.93 2
Total 1998 1793 47 89.74
Happy Customers Best Approach Till 2012
Introduction of IL6S
ZERO
DEFECTS
ZERO
LOSSES
ZERO
INCIDENTS
ZERO LOSS
MINDSET
WHY NOT
ZERO
GRIEVANCES ?
IL6S Approach : Kill the Cause of Grievance
Discussion With Team & Use of DMAIC Methodology
We can Use IL6S
tools to reduce
Grievances !!!!
Define
Measure
Analyze
Innovative
Improvement
Control
Control Define
Measure
Analyse
Improve
Grievances Rec. 2187 (Apr
12 to Mar 13) resulting 1040
Man hrs lost
•Baseline 0.13 GEM
•Target 0.06 GEM
Out of 2187 Grievances
76% was from Salary &
12% from Staff Sale
25 Grievances Category
identified , Set focus on
6 Top Categories
Brainstorming With Team & Use of IL6S Tools
Team WorkTill Date –
A Snap Shot
•Pain Area : Salary & Staff Sale related Grievances
•Identified Top 3 Cat in Salary & 2 Cat in Staff Sale
Pareto
•Identified 4 Low Hanging Fruits
•Identified other 18 Grievances Cat, till date not recorded anywhere,
but can become potential ER Issues in future
Fishbone
•Identified Top 8 Issues to focus & there impact on ER relations
•Helps in identifying Controls, action plans to reduce grievance
FMEA
Result During Analyses & Improve Phase
CI Tools
Actions
implemented
Team work
Grievances
Reduction up
to 52%
&
The Journey
Continuous
Project Status
&
The Journey
Continuous
Project Completed till
Analyse Phase
12 Easy Actions
implemented
2 Actions are under
implementation
Team is charged to deliver more
Action Implemented – Salary Related
1. Guidance to Time office personal for taking extra care while preparing Daily Att. Report
specifically on following steps:
A) While Removing duplicate entries, Mgr entries
B) While Copying to Master File (Cross check with selection with Col Nos enteries)
C) While removing C Shift Exit entries as First Swipe
D) In Case of Machine error, update master att from att. Log books immediately without any
delay.
2. Update Master ROTA before starting of the month, it is very important to update it as soon as
any change requested.
3. Update Master Att. file for W/O after Master ROTA updation.
4. While Update leaves from Leave cards, also check for any C/O & shift change request and
update the master ROTA immediately.
5. Update Manual entry, Gate Pass Entry on daily basis.
6. Pass Other Unit Manual Entry immediately to other Unit Time Office personal.
7. Prepare different Files for LTA/Medical/VPF/Advance salary/PF Nomination and update it
monthly. (forms to be signed off after including it in salary preparation file – Pending)
8. Prepare Different Files for Personal forms and update it in ascending order for all live
employees.
Action Implemented – Salary Related
9. Preparing direct PMS Payroll report by HRBP’s and send it to Time office for salary
preparation.
10. Monthly tracking of Bal. Leaves, sample checking with leave cards with excel report.
11. Before preparing LWOP report , cross check with both time office personals for updated
Master att. and also take last month solved grievances list to be included in current
month salary.
12. Prepare LWOP report only on or after 24th to enable updation of all leaves specially for
19th & 20th and correction of attendance through grievance tracker.
13. After Preparing LWOP report cross check total Absent days in LWOP report & Master att
file.
14. Update all OT forms on same day & take extra care while updating for all entries (DO Not
update forms while Interaction time with SFC’s)
15. For blocking & unblocking personal area confirm from HRBP’s (Pending)
16. Prepare SOP for all time office report (Pending)
17. Keep Maximum 2 month att in Master att file. (Pending)
Action Implemented – Staff Sale Related
1. Preparing Common staff sale requirement format instead of different forms.
2. Putting more controls on deduction file like auto calculation of amount, auto generation
of name. (Pending)
3. Awareness around deduction of staff sale by notice.
4. Preparing direct Staff sale payroll deduction report. (Pending)

More Related Content

Similar to Grievance Reduction GB project.pptx

6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx
alinainglis
 
Running head  SIMPLIFIED PROJECT PLAN .docx
Running head  SIMPLIFIED PROJECT PLAN                          .docxRunning head  SIMPLIFIED PROJECT PLAN                          .docx
Running head  SIMPLIFIED PROJECT PLAN .docx
rtodd599
 
Curriculum_ODMS_eng_2016
Curriculum_ODMS_eng_2016Curriculum_ODMS_eng_2016
Curriculum_ODMS_eng_2016
Omar Mora
 
Call center Christmas Project
Call center Christmas ProjectCall center Christmas Project
Call center Christmas Project
ahmed Elaydy
 
Mastura's Resume (4)
Mastura's Resume (4)Mastura's Resume (4)
Mastura's Resume (4)
Is Mas
 
Resume -pd 241020106 (2)
Resume -pd 241020106 (2)Resume -pd 241020106 (2)
Resume -pd 241020106 (2)
Pankaj Dass
 
INF20015 Requirements Analysis & Modelling pg. 1 Swi.docx
INF20015 Requirements Analysis & Modelling   pg. 1 Swi.docxINF20015 Requirements Analysis & Modelling   pg. 1 Swi.docx
INF20015 Requirements Analysis & Modelling pg. 1 Swi.docx
jaggernaoma
 
White paper surviving an erp data migration
White paper  surviving an erp data migration White paper  surviving an erp data migration
White paper surviving an erp data migration
camrituraj
 

Similar to Grievance Reduction GB project.pptx (20)

Accounting Manual
Accounting ManualAccounting Manual
Accounting Manual
 
6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx
 
Running head  SIMPLIFIED PROJECT PLAN .docx
Running head  SIMPLIFIED PROJECT PLAN                          .docxRunning head  SIMPLIFIED PROJECT PLAN                          .docx
Running head  SIMPLIFIED PROJECT PLAN .docx
 
Curriculum_ODMS_eng_2016
Curriculum_ODMS_eng_2016Curriculum_ODMS_eng_2016
Curriculum_ODMS_eng_2016
 
Rakesh_CV
Rakesh_CVRakesh_CV
Rakesh_CV
 
Maureen Coetzee CV
Maureen Coetzee CVMaureen Coetzee CV
Maureen Coetzee CV
 
Brajesh.Shrivastava
Brajesh.ShrivastavaBrajesh.Shrivastava
Brajesh.Shrivastava
 
Budgeting
BudgetingBudgeting
Budgeting
 
3 types of monitoring for 2020
3 types of monitoring for 20203 types of monitoring for 2020
3 types of monitoring for 2020
 
GF CV
GF CVGF CV
GF CV
 
Call center Christmas Project
Call center Christmas ProjectCall center Christmas Project
Call center Christmas Project
 
Preparing for ICD-10
Preparing for ICD-10Preparing for ICD-10
Preparing for ICD-10
 
Mastura's Resume (4)
Mastura's Resume (4)Mastura's Resume (4)
Mastura's Resume (4)
 
JDE Projects Month End Course - Work Orders
JDE Projects Month End Course - Work OrdersJDE Projects Month End Course - Work Orders
JDE Projects Month End Course - Work Orders
 
Resume -pd 241020106 (2)
Resume -pd 241020106 (2)Resume -pd 241020106 (2)
Resume -pd 241020106 (2)
 
Financial Share Service Centre
Financial Share Service CentreFinancial Share Service Centre
Financial Share Service Centre
 
INF20015 Requirements Analysis & Modelling pg. 1 Swi.docx
INF20015 Requirements Analysis & Modelling   pg. 1 Swi.docxINF20015 Requirements Analysis & Modelling   pg. 1 Swi.docx
INF20015 Requirements Analysis & Modelling pg. 1 Swi.docx
 
2 Emerging Categories for Trusted Business: ACA & SALT
2 Emerging Categories for Trusted Business: ACA & SALT2 Emerging Categories for Trusted Business: ACA & SALT
2 Emerging Categories for Trusted Business: ACA & SALT
 
White paper surviving an erp data migration
White paper  surviving an erp data migration White paper  surviving an erp data migration
White paper surviving an erp data migration
 
Appointment scheduling app
Appointment scheduling appAppointment scheduling app
Appointment scheduling app
 

Recently uploaded

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 

Recently uploaded (14)

How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 

Grievance Reduction GB project.pptx

  • 1. Not For Distribution or Use Outside of Mondelēz International Grievance Redressal ZERO Loss Approach to
  • 2. Traditional Approach “Solve the Grievances” Recording Coordinat ion with Stakehold ers Solutions with in Agreed time frame Feedback to SFC’s Focus the Time & Closing % Grievances - Rec Vs Closed Month Rec Closed Pending till date % Closed with in time frame Grievances Pending beyond time March 21 21 0 100.00 0 April 63 62 1 98.41 2 May 91 82 10 90.11 9 June 139 130 19 93.53 2 July 150 149 20 99.33 1 August 375 369 26 98.40 24 September 466 392 100 84.12 20 October 370 325 57 87.84 28 November 178 150 49 84.27 0 December 145 113 47 77.93 2 Total 1998 1793 47 89.74 Happy Customers Best Approach Till 2012
  • 3. Introduction of IL6S ZERO DEFECTS ZERO LOSSES ZERO INCIDENTS ZERO LOSS MINDSET WHY NOT ZERO GRIEVANCES ? IL6S Approach : Kill the Cause of Grievance
  • 4. Discussion With Team & Use of DMAIC Methodology We can Use IL6S tools to reduce Grievances !!!! Define Measure Analyze Innovative Improvement Control Control Define Measure Analyse Improve Grievances Rec. 2187 (Apr 12 to Mar 13) resulting 1040 Man hrs lost •Baseline 0.13 GEM •Target 0.06 GEM Out of 2187 Grievances 76% was from Salary & 12% from Staff Sale 25 Grievances Category identified , Set focus on 6 Top Categories
  • 5. Brainstorming With Team & Use of IL6S Tools Team WorkTill Date – A Snap Shot •Pain Area : Salary & Staff Sale related Grievances •Identified Top 3 Cat in Salary & 2 Cat in Staff Sale Pareto •Identified 4 Low Hanging Fruits •Identified other 18 Grievances Cat, till date not recorded anywhere, but can become potential ER Issues in future Fishbone •Identified Top 8 Issues to focus & there impact on ER relations •Helps in identifying Controls, action plans to reduce grievance FMEA
  • 6. Result During Analyses & Improve Phase CI Tools Actions implemented Team work Grievances Reduction up to 52% & The Journey Continuous
  • 7. Project Status & The Journey Continuous Project Completed till Analyse Phase 12 Easy Actions implemented 2 Actions are under implementation Team is charged to deliver more
  • 8. Action Implemented – Salary Related 1. Guidance to Time office personal for taking extra care while preparing Daily Att. Report specifically on following steps: A) While Removing duplicate entries, Mgr entries B) While Copying to Master File (Cross check with selection with Col Nos enteries) C) While removing C Shift Exit entries as First Swipe D) In Case of Machine error, update master att from att. Log books immediately without any delay. 2. Update Master ROTA before starting of the month, it is very important to update it as soon as any change requested. 3. Update Master Att. file for W/O after Master ROTA updation. 4. While Update leaves from Leave cards, also check for any C/O & shift change request and update the master ROTA immediately. 5. Update Manual entry, Gate Pass Entry on daily basis. 6. Pass Other Unit Manual Entry immediately to other Unit Time Office personal. 7. Prepare different Files for LTA/Medical/VPF/Advance salary/PF Nomination and update it monthly. (forms to be signed off after including it in salary preparation file – Pending) 8. Prepare Different Files for Personal forms and update it in ascending order for all live employees.
  • 9. Action Implemented – Salary Related 9. Preparing direct PMS Payroll report by HRBP’s and send it to Time office for salary preparation. 10. Monthly tracking of Bal. Leaves, sample checking with leave cards with excel report. 11. Before preparing LWOP report , cross check with both time office personals for updated Master att. and also take last month solved grievances list to be included in current month salary. 12. Prepare LWOP report only on or after 24th to enable updation of all leaves specially for 19th & 20th and correction of attendance through grievance tracker. 13. After Preparing LWOP report cross check total Absent days in LWOP report & Master att file. 14. Update all OT forms on same day & take extra care while updating for all entries (DO Not update forms while Interaction time with SFC’s) 15. For blocking & unblocking personal area confirm from HRBP’s (Pending) 16. Prepare SOP for all time office report (Pending) 17. Keep Maximum 2 month att in Master att file. (Pending)
  • 10. Action Implemented – Staff Sale Related 1. Preparing Common staff sale requirement format instead of different forms. 2. Putting more controls on deduction file like auto calculation of amount, auto generation of name. (Pending) 3. Awareness around deduction of staff sale by notice. 4. Preparing direct Staff sale payroll deduction report. (Pending)