Profile: Adaptive and innovative team player in the field of marine projects ,Bridges,
Culverts, Shipyard ,Piling works, Quay wall construction ,Structural fabrication , Erections works
etc.Self capable of handling all types of marine works, procedure control and monitoring .
Qualification: B A.
Total Experience: 23 Years
PERSONAL DETAILS:
Permanent Address: Amina Manzil,
Shivaji peth,
At post-jath,
Sangali Dist ,
Maharastra-416404
Phone No: +918493867143
E-mail: makbul.inamdar@yahoo.com
Date of Birth: 10th April -1972
Nationality: Indian.
Languages Known: English, Hindi, Marathi, and Kannada.Gujrati.
Marital Status: Married.
Passport No:
PROFESSIONAL EXPERIENCE :
1.AFCONS INFRASTRUCTURE LTD, CHENAB BRIDGE PROJECT UNDERTAKING.J&K. (FEB
2015 to till date)
2. AFCONS INFRASTRUCTURE LTD, OPAL DAHEJ. ( March-2012 to dec2014)
ONGC PETRO ADDITIONS LIMITED.
Civil & Structural Steel Works of Polypropylene plant of ONGC Petro Additions Limited.
Client: Technimont ICB, Italy.
Responsibilities:
 Excavation of foundations.
 Equipment and machinery Handling.
 Errection of Crane and Structures.
3. AFCONS INFRASTRUCTURE LTD, Hazira –Surat, Gujarat. (July 2011 to March 2012).
CONSTRUCTION OF CONTAINER BERT.
Client: Adani Hazira port pvt. Limited
Responsibilities: Direct supervision of Rolling gantry erection and execution of marine piling using
NCB Hydraulic Hammering, Rotational drilling operation and civil works.
Floating barge, and shifting of materials by cranes.Involved in fabrication
Of floating barges and cranes
.Execution land piles using DMC method.
.Jack up Shifting.
4. AFCONS INFRASTRUCTURE LTD,. Sultanate of Oman, Muscat.. (June 2009 to March 2011)
Construction of Breakwater, 2.1Km, Sultanate of Oman, Muscat
Client: Royal Court Of Affairs, Sultanate Of Oman.
Consultant: CEC.
Responsibilities:
 Site execution works of East and West Breakwaters.
 Core loc and Quay wall Block Shifting and Placing.
 Jack up Shifting and Positioning for Dredging.
5. AFCONS INFRASTRUCTURE LTD. Pipavav (Jan 2009-June 2009)
Construction Of Pipavav Dry Dock 669 Mtrs in length, Gujarat, India .Job no.2248
Client: Pipavav Shipyard Limited
Responsibilities: Construction of Diaphragm walls,
Anchors in dry docks,
Grouting of Anchors, block placing in jetty Works.
6. AFCONS INFRASTRUCTURE LTD.. Pipavav, Gujarat (july 2008 to Dec 2009 )
Construction of Integrated Shipyard in pipavav, Gujarat, India. Job No.2250
Client: Pipavav Shipyard Limited
Responsibilities:
Construction of major Foundation Works and Pipe culverts Industrial structures, Fabrication and
erection of Trusses.
7. AFCONS INFRASTRUCTURE LTD. Pipavav, Gujarat
Construction: of 200 m Long Bridge in Pipavav shipyard, Gujarat. Job No.2253
Client: Pipavav Shipyard Limited
Responsibilities:
 Minor bridge and several of culverts in record time.
8. OVERSEAS AST COMPANY L.L.C (july 2005 to June 2008).
Construction of Break water, 2.5 Km
Responsibilities:
 Dredging works, Culverts, Block Placing, piers in the sea, Quay wall casting are among
the major works executed.
 Construction of R.C Culvert at -13 m level at Dubai marine.
9. HINDUSTAN CONSTRUCTION CO LTD (oct 2003 to June 2005).
Construction Of cable stayed Sea Link Bridge between Bandra and Worli.
Responsibilities:
 Jack up Shifting and Positioning for piling 1200mm liner.
 Sheet piling for copper Dam.
10. NASS MURRY & ROBERTS J.V –BAHRAIN (July 2001 to Oct 2003)
Construction of Quay wall For Khalifa bin Salman, port Hidd.
 Responsibilities: Jetty work, Block placing 160Mtr and 1100Rmt, Trenching, Back
filling of soil etc.
 Placing of Quay wall 160MT.
11. BESIX KIER DABHOL E S.A (Sep 1999 to June 2001)
Ling tech construction Jetty project.
Responsibilities:
 The major works handled are inclined pilling, Construction, Placing of Precast
Girders over pile caps.
 Jack up Shifting, Positioning for steel piling.
12. AFCONS INFRASTRUCTURE LTD.Porbunder, Gujarat (March 1998 to August 1999)
A.W Port, Saurashtra cement ltd, Jetty project and pump house.
13. AFCONS INFRASTRUCTURE LTD. Mumbai, India (February 1997 to March 1998)
Construction of DMC Pile Foundation for 220 KVA Transmission Tower line for M.S.E.B.
14. AFCONS INFRASTRUCTURE LTD. Pipavav, Gujarat ( December 1995 to February 1997)
Construction of Jetty for Pipavav port, Gujarat.
15. AFCONS INFRASTRUCTURE LTD. Nellore, Andhra Pradesh (September 1994 to December1995)
Construction of jetty for Sarat Sea foods ltd.
16. AFCONS INFRASTRUCTURE LTD. Okha, Gujrat (August 1992 to September 1994)
Construction of Jetty for Okha port.
Date:
Place: Signature

More Related Content

Similar to RESUME INAMDAR (20)

Resume latest-1
Resume latest-1Resume latest-1
Resume latest-1
 
Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15
 
cv1
cv1cv1
cv1
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
haq_(3)
haq_(3)haq_(3)
haq_(3)
 
spar iso
spar isospar iso
spar iso
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
CV -Nadeem chishti surveyor
CV -Nadeem chishti surveyorCV -Nadeem chishti surveyor
CV -Nadeem chishti surveyor
 
SYED MUHAMMED ANWAR
SYED MUHAMMED ANWARSYED MUHAMMED ANWAR
SYED MUHAMMED ANWAR
 
CV 17 Oct 2015
CV 17 Oct 2015CV 17 Oct 2015
CV 17 Oct 2015
 
SENIOR LAND SURVEYOR
SENIOR LAND SURVEYORSENIOR LAND SURVEYOR
SENIOR LAND SURVEYOR
 
Ak. engg profile updated
Ak. engg  profile   updatedAk. engg  profile   updated
Ak. engg profile updated
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
Billy`s CV
Billy`s CVBilly`s CV
Billy`s CV
 

RESUME INAMDAR

  • 1. M.S Inamdar E-mail: makbul.inamdar@yahoo.com Mobile: +918867250810. Resi:+919036250810 SENIOR FORMAN MARINE Profile: Adaptive and innovative team player in the field of marine projects ,Bridges, Culverts, Shipyard ,Piling works, Quay wall construction ,Structural fabrication , Erections works etc.Self capable of handling all types of marine works, procedure control and monitoring . Qualification: B A. Total Experience: 23 Years PERSONAL DETAILS: Permanent Address: Amina Manzil, Shivaji peth, At post-jath, Sangali Dist , Maharastra-416404 Phone No: +918493867143 E-mail: makbul.inamdar@yahoo.com Date of Birth: 10th April -1972 Nationality: Indian. Languages Known: English, Hindi, Marathi, and Kannada.Gujrati. Marital Status: Married. Passport No: PROFESSIONAL EXPERIENCE : 1.AFCONS INFRASTRUCTURE LTD, CHENAB BRIDGE PROJECT UNDERTAKING.J&K. (FEB 2015 to till date) 2. AFCONS INFRASTRUCTURE LTD, OPAL DAHEJ. ( March-2012 to dec2014)
  • 2. ONGC PETRO ADDITIONS LIMITED. Civil & Structural Steel Works of Polypropylene plant of ONGC Petro Additions Limited. Client: Technimont ICB, Italy. Responsibilities:  Excavation of foundations.  Equipment and machinery Handling.  Errection of Crane and Structures. 3. AFCONS INFRASTRUCTURE LTD, Hazira –Surat, Gujarat. (July 2011 to March 2012). CONSTRUCTION OF CONTAINER BERT. Client: Adani Hazira port pvt. Limited Responsibilities: Direct supervision of Rolling gantry erection and execution of marine piling using NCB Hydraulic Hammering, Rotational drilling operation and civil works. Floating barge, and shifting of materials by cranes.Involved in fabrication Of floating barges and cranes .Execution land piles using DMC method. .Jack up Shifting. 4. AFCONS INFRASTRUCTURE LTD,. Sultanate of Oman, Muscat.. (June 2009 to March 2011) Construction of Breakwater, 2.1Km, Sultanate of Oman, Muscat Client: Royal Court Of Affairs, Sultanate Of Oman. Consultant: CEC. Responsibilities:  Site execution works of East and West Breakwaters.  Core loc and Quay wall Block Shifting and Placing.  Jack up Shifting and Positioning for Dredging. 5. AFCONS INFRASTRUCTURE LTD. Pipavav (Jan 2009-June 2009) Construction Of Pipavav Dry Dock 669 Mtrs in length, Gujarat, India .Job no.2248 Client: Pipavav Shipyard Limited Responsibilities: Construction of Diaphragm walls,
  • 3. Anchors in dry docks, Grouting of Anchors, block placing in jetty Works. 6. AFCONS INFRASTRUCTURE LTD.. Pipavav, Gujarat (july 2008 to Dec 2009 ) Construction of Integrated Shipyard in pipavav, Gujarat, India. Job No.2250 Client: Pipavav Shipyard Limited Responsibilities: Construction of major Foundation Works and Pipe culverts Industrial structures, Fabrication and erection of Trusses. 7. AFCONS INFRASTRUCTURE LTD. Pipavav, Gujarat Construction: of 200 m Long Bridge in Pipavav shipyard, Gujarat. Job No.2253 Client: Pipavav Shipyard Limited Responsibilities:  Minor bridge and several of culverts in record time. 8. OVERSEAS AST COMPANY L.L.C (july 2005 to June 2008). Construction of Break water, 2.5 Km Responsibilities:  Dredging works, Culverts, Block Placing, piers in the sea, Quay wall casting are among the major works executed.  Construction of R.C Culvert at -13 m level at Dubai marine. 9. HINDUSTAN CONSTRUCTION CO LTD (oct 2003 to June 2005). Construction Of cable stayed Sea Link Bridge between Bandra and Worli. Responsibilities:  Jack up Shifting and Positioning for piling 1200mm liner.  Sheet piling for copper Dam. 10. NASS MURRY & ROBERTS J.V –BAHRAIN (July 2001 to Oct 2003) Construction of Quay wall For Khalifa bin Salman, port Hidd.  Responsibilities: Jetty work, Block placing 160Mtr and 1100Rmt, Trenching, Back filling of soil etc.  Placing of Quay wall 160MT.
  • 4. 11. BESIX KIER DABHOL E S.A (Sep 1999 to June 2001) Ling tech construction Jetty project. Responsibilities:  The major works handled are inclined pilling, Construction, Placing of Precast Girders over pile caps.  Jack up Shifting, Positioning for steel piling. 12. AFCONS INFRASTRUCTURE LTD.Porbunder, Gujarat (March 1998 to August 1999) A.W Port, Saurashtra cement ltd, Jetty project and pump house. 13. AFCONS INFRASTRUCTURE LTD. Mumbai, India (February 1997 to March 1998) Construction of DMC Pile Foundation for 220 KVA Transmission Tower line for M.S.E.B. 14. AFCONS INFRASTRUCTURE LTD. Pipavav, Gujarat ( December 1995 to February 1997) Construction of Jetty for Pipavav port, Gujarat. 15. AFCONS INFRASTRUCTURE LTD. Nellore, Andhra Pradesh (September 1994 to December1995) Construction of jetty for Sarat Sea foods ltd. 16. AFCONS INFRASTRUCTURE LTD. Okha, Gujrat (August 1992 to September 1994) Construction of Jetty for Okha port. Date: Place: Signature