7. MATERIALS SPECIFICATION AND COSTING
SERIAL NAME Specification UNIT QUANTITY COST
01 WOOD Malayesian tick 120/CFT 20 CFT 2400/=
02 Foam 4” Arthopedic foam 150/SFT 28 SFT 4200/=
03 LABOUR CHARGE Macking charge 1200/person 2 nos 2400/=
04 Fabric Deep Green 220/FEET 16 FEET 3520/=
05 Adhesion Fevicol 150/KG 2KG 300/=
06 Pin 1.5” Aluminum pin 200/KG 200 gm 40/=
07 Polish Hand polish 140/SFT 40 sft 5600/=
08 Transportation charge van - - 800/-
TOTAL – BDT- 19,260/= ONLY
IN WORD- NINETEEN THOUSAND TWO HUNDRED SIXTY TAKA ONLY
8. MATERIALS SPECIFICATION AND COSTING FOR SOFA
SERIAL NAME Specification UNIT QUANTITY COST
01 Gorjon Board 8’ x 4’ 2700/pcs 5 pcs 13,500/=
02 Veneer Board Red oak 2800/pcs 4 pcs 11,200/=
03 Color Barzar paint 220/Kg 20 Kg 4400/=
04 Adhesion Fevicol 150/Kg 6KG 900/=
05 Air Condition 01 Ton 35,000/pcs 1 pcs 35,000/=
06 Glass 10 mm Tempered 220/mm 80 sft 17,600/=
07 Spot Light 4” for ceiling 260/pcs 20 pcs 5200/=
08 Strip Light Warm color 120/feet 50 feet 6000/=
09 Wall Bracket China ziau 430/ pcs 10 pcs 4300/=
10 Chair Metal Body 6500/pcs 3 pcs 19,500/=
11 LABOUR CHARGE Making charge 1200/person 3 nos 3600/=
12 Transportation charge van - - 800/-
TOTAL – BDT- 1,22,000/= ONLY
IN WORD- ONE LAKH TWENTY TWO THOUSANDS TAKA ONLY
9. CONCEPT
When a person works all day in the
office with only table, chair, file,
cabinet, computer etc. But there is no
green to breathe fresh green then at
the end of the day the person gets his
headache
On the other hand, if we keep some
green in the office, a person can
breathe fresh air and not be bothered
with his work.
10. • When a person work at office hole days with just table, chairs, files, cabinet,
computer e.t.c but there is no any green to take the breath freshly. Then at
the end of day the person get pain of his head.