1. Page 1 of 8
Resume
Name: Vivek Mehta
Email: mehta051@gmail.com
Contact: +91-9429283983, 7058079331
A) QUALIFICATIONS:
1. Educational
Details
B.Tech (Electronics & Communication) First Class from
Rajasthan Technical University, Kota in 2013 (Rajasthan).
2. Total Experience 3 year
B) SKILLS PROFILE:
1. DCS C300( Experion PKS)
2. PLC HC900(C-30,C-50,C-70,C-70R,C-75 SIL-2),ML200
3. SCADA
EPKS Honeywell SCADA HX & LX, HMIWeb Display Builder,
Point Building Utility
4. Interfaces
Ethernet, RS-232/485, HART, Profibus, Foundation Field
Bus.
5. Field
Instrumentation
Engineering / Packages
Usage
Reading P&ID’s, Instrument Index sheet, Functional loop
Schematics, System Architecture, Instrument datasheet,
Development of control philosophy & Application
Programming in FBD. Study of wiring diagram and execute
termination at PLC Panel. Conducting Software and
Hardware FAT with Customer. Graphics developed as per
P&ID’s. System Installation and commissioning of Project at
site. HC 900 Control Station (configuration of web viewing
10” & 15”), Configure the trends and history in SCADA &
Control Station, Knowledge of various Transmitters (PT,
DPT, TT, and LT), Controllers, Control valve, and mass Flow
Meters, etc.
6. Programming
Languages
FBD, Ladder Logic.
7. Databases MS Excel, MS Office, Windows 7, Windows 8.
2. Page 2 of 8
C) EXPERIENCE DETAILS:
C1) Organization Name: Artee Flow Controls Pvt. Ltd. Ankleshwar. Gujarat
From 08-Aug-2016 to Present.
Project: HPCL
End User HPCL Refinery, Visakhapatnam
Work Location:
Honeywell,
Pune.
Duration: 10-08-16 to 16-08-16
Position: Sr. Project
engineer
Platforms Honeywell EPKS R431.3, TPS
Responsibilities
Installation of server panel.
Migration of FTE network.
Replace existing hardware material. (MOU connector,
OEP/IKB Adapter kit, CPU, Monitor, ATEN USB KVMP switch,
Redundant Server, Phoenix FOC to Ethernet convertor)
Asset assignment.
Trends & Groups assignment.
Project: ELSTER –Instroment Pvt.Ltd, Vadodara.
End User GAIL INDIA LTD.
Work Location:
Honeywell,
Pune.
Duration: 17-08-16 to present
Position: Sr. Project
engineer
Platforms Honeywell EPKS R431.3 SCADA, ML 50,ELSETR FLOW COMUTER
Responsibilities
Flow computer data read directly read scada.
Report generation
Installation of EPKS HS package.
Asset assignment.
Trends & Groups assignment.
FAT conducted.
Graphics designing and scripting.
Code developed as per control narrative.
Project: NaranLala Pvt.Ltd, Navasari,Gujarat
End User NaranLala Pvt.Ltd (solapur, Maharashtra distillation plant)
Work Location:
Honeywell,
Pune.
Duration: 26-09-16 to present
Position:Sr. Project
engineer
Platforms DCS C300
Responsibilities
EPKS LS 431.3 installation.
Customer graphics comment understand and resolution
with proper time.
Installation of EPKS package.
Asset assignment.
Trends & Groups assignment.
IO assignment in programming & code development as per
control narrative.
Segregate the IO assignment from the P&ID.
3. Page 3 of 8
C2) Organization Name: iPAC Automation Pvt. Ltd. Pune.
From 23-DEC-2015 to 22-June-2016.
Project: Johnson & Johnson Projects.
End User Johnson & Johnson, Janssen Biologics Cork, Ireland
Work Location:
Honeywell,
Pune.
Duration: 04-04-16 to 15-06-16 Position: Project engineer
Platforms Honeywell XL Web II ,BACnet/IP, LON, Honeywell XL800, OE JACE
Responsibilities
QC of point list.
Fill the Defect uploaded template.
Understanding the chilled water system and its control
loops with their control strategy.
Write the Factory Acceptance Test.
Project: Johnson & Johnson Projects.
End User
Synthesis Raron Ltd (Synthesis Production GmbH Cooling System
Remediation and Fire Protection Upgrade Synthesis, Switzerland)
Work Location:
Honeywell,
Pune.
Duration: 26-03-16 to 21-04-16 Position: Project engineer
Platforms HC900, Building Management System, 700 I/Os.
Responsibilities Update the code according to changes requirement.
Project: Johnson & Johnson Supply Chain Manufacturing Base of Xian
End User Xian Janssen Pharmaceutical Ltd.(China)
Work Location:
Honeywell,
Pune.
Duration: 04-01-16 to 21-06-16 Position: Project engineer
Platforms
HC900, Building Management System, Environment Management
System, EBI 430 SCADA, 4000 I/Os.
4. Page 4 of 8
Responsibilities
QC of coding.
QC of Instrument List.
QC of Alarm Parameter List.
QC of Detailed Functional Design Specification.
Fill the AHU matrix in Excel format.
Fill the Defect uploaded template.
Understanding the P&ID and its control loops with their
control strategy.
Understanding the Functionality Design Specification
System.
Integration testing.
Project:
JAZAN REFINERY AND TERMINAL PROJECT
End User Saudi Arabian Oil Company
Work Location:
Honeywell,
Pune.
Duration: 23-12-15 to 03-01-16 Position: Project engineer
Platforms C300
Responsibilities
I/O allocation
I/O assignment
Designing of C300 controller, I/O module, I/O links, control
module, Assigned FF devices and Series devices
Used ERDB and Import/Export for backup purpose.
Preparation of logic from control narrative.
Used Bulk build process.
Understanding control loops.
Logic testing
C3) Organization Name: Artee Flow Control Pvt. Ltd. Ankleshwar.
From 07-NOV-2012 to 28-FEB-2015.
Project:
4*600 MW Power Plant
End User Jindal steel & power Ltd, Tamnar, Raigadh.
Work Location:
Ankleshwar,
Gujarat.
Duration: - 07-11-2012 to10-02-2013 Position: Project engineer
Platforms
ML200R, 4600 IOS, 2 Engineering Station & 4 Operating
Station
Responsibilities Panel built as per drawing I/O assignment.
AI, AO, DI, DO testing during the FAT.
Project: Process automation.
5. Page 5 of 8
End User Par drugs & chemicals ltd, Bhavnagar
Work Location:
Bhavnagar,
Gujarat.
Duration: - 15-02-2013 to 30-03-2013
Position: Project
Engineer
Platforms
HC 900 C70R , Redundant Unit Provided, EPKS SCADA, 1
Engineering Station, 2 Operating Station & 1 HMI(900 control
station), 1800 I/Os.
Responsibilities
Development of graphics & FBD programming
System Installation on site.
FAT & Commissioning.
Used Point Building Utility.
Understanding control loops.
Logic testing with graphics.
Project: Water purified plant
End User Structural water proofing company Pvt. Ltd, Alwar
Work Location:
Alwar,
Rajasthan.
Duration: 20-04-2013 to 30-04-2013. Position: Project Engineer
Platforms
Hybrid Controller 900 C50, SCADA, 1 Engineering Station & 1
Operating Station, 250 I/Os.
Responsibilities
Development of graphics & FBD programming
HC 900 & SCADA Training conducted.
RS485 communication using terminal server.
Project: Champhor & Allied Process.
End User Champhor & Allied Ltd. Nandesari, Baroda.
Work Location: Baroda,
Gujarat.
Duration: 15-06-2013 to
22-09- 2013.
Position: Project Engineer
Platforms
Hybrid Controller 900 C70, SCADA, 1 Engineering Station & 2
Operating Station, 600 I/Os.
Responsibilities
Development of graphics & FBD programming
HC 900 & SCADA Training conducted.
Adding the IOS and commissioning on site
RS485 communication using terminal server.
Project: Ganga Rasayanie.
End User Ganga Rasayanie Pvt Ltd.Ankleshwar
Work Location:
Ankleshwar,
Gujarat.
Duration: 05-05-2013 to 21-01-2015
(pending)
Position: Project Engineer
6. Page 6 of 8
Platforms
Hybrid Controller 900 C70, SCADA, 1 Engineering Station & 1
Operating Station, 200 I/Os.
Responsibilities
Development of graphics & FBD programming
HC 900 & SCADA Training conducted.
Commissioning on site
Using HART the transmitter (LT, FT, PT) range changed on
site.
Project: Yashshavi Rasayan Pvt Ltd.
End User Yashshavi Rasayan Pvt Ltd.Maroli,Gujarat
Work Location:
Maroli, Gujarat.
Duration: 24-04-2014 to 07-11-2014 Position: Project Engineer
Platforms
Hybrid Controller 900 C70, SCADA, 1 Engineering Station & 1
Operating Station, 15” Control station 1250 I/Os.
Responsibilities
Development of graphics & FBD programming
HC 900 & SCADA Training conducted.
Commissioning on site
Using RS485 port direct read the data on scada.
Using terminal server chilling plant data RS485 to Ethernet
connection on site.
Project: Atul Ltd .(ETP ,SHED H,SHED C,SHED B,SHED E)
End User Atul Ltd ETP Plant, Valsad.
Work Location:
Valsad, Gujarat.
Duration: 20-06-2014 to 24-02-
2015.
Position: Project Engineer
Platforms
Hybrid Controller 900 C70R, SCADA, 1 Engineering Station & 1
Operating Station, 1500 I/Os.
Responsibilities
Development of graphics & FBD programming
Changes done as per customer requirement in scada &
programming.
Installation of win 7, EPKS Package.
AMC visit in year three times.
All five plant backup taken in proper CD. One is given to the
customer and one is submitted in company.
Project: Cheminova Ltd.
End User Cheminova Ltd.Panoli,Gujarat
Work Location:
Panoli, Gujarat.
Duration: 05-12-2014 to 26-02-2015. Position: Project Engineer
Platforms
Hybrid Controller 900 C50, SCADA, 1 Engineering Station &
Operating Station, 176 I/Os.
7. Page 7 of 8
Responsibilities
Development of graphics & FBD programming
Changes done as per customer requirement in scada &
programming.
Installation of win 7, EPKS Package.
AMC visit in year three times.
New Development of SPP programming with ramp and
shock logic as per old logic.
Project: Combustion & Heat Transfer Engineering Co.
End User Combustion & Heat Transfer Engineering Co.Baroda,Gujarat
Work Location:
Baroda,
Gujarat.
Duration: 10-01-2014 to 27-08-2014. Position: Project Engineer
Platforms
Hybrid Controller 900 C30, SCADA, 2 Engineering Station & 4
Operating Station, 120 I/Os.
Responsibilities
Development of graphics & FBD programming
As per customer requirement in graphics & programming
developed.
Installation of win 7, EPKS Package.
Development of SPP programming and commissioning was
pending on site
FAT done with third party.
D) PROFFESSIONAL TRAININGS / WORKSHOPS / PRESENTATIONS
ATTENDED:
Course Details Organized By Location Year
HC900 SIL-2 (C75
SERIES,HC 900 15”
CONTROL STATION)
HONEYWELL Pune 2014
E) PERSONAL DETAILS:
Date of Birth 11-09-1990
Gender Male
Nationality Indian
8. Page 8 of 8
Passport No. J4307725
Marital Status Unmarried
E-Mail ID mehta051@gmail.com
Address
H.NO.109, SR.NO.101A/1/2 Near Ghule Flour Mill,
Ghule Park, Hadapsar-412307, Pune, Maharashtra,
India.
Contact Phone No. +91-9429283983,7058079331