SlideShare a Scribd company logo
1 of 33
Download to read offline
liveworx.com # L I V E W O R X
SOLAR TURBINES INCREASES PRODUCTIVITY AND
FLEXIBILITY WITH ASSOCIATIVE PROCESS PLANNING
AND INTELLIGENT PRODUCT EXECUTION
Eric Horn
PLM Solution Architect – Solar Turbines
June 8th, 2016
JP Provencher
VP, Manufacturing Strategy and Solutions - PTC
2# L I V E W O R X
 Speakers
 PTC – IOT Manufacturing
 Solar Turbines Manufacturing Journey
AGENDA
3# L I V E W O R X
JP Provencher
VP, IoT Manufacturing Solutions
PTC
Eric Horn
PLM Solution Architect
Solar Turbines Incorporated
PLM Projects
– Options and Variants
– MPMLink
– Publishing CAD Visuals
– Linked Data
SPEAKERS
4# L I V E W O R X
 Speakers
 PTC – IOT Manufacturing
 Solar Turbines Manufacturing Journey
– Now
– Coming Soon
– Future
AGENDA
5# L I V E W O R X
Smart Manufacturing
A WAVE OF TRANSFORMATION IS COMING TO MANUFACTURING
Industrie 4.0 Made in China 2025
6# L I V E W O R X
Tuesday, June 7
4:00 – 4:45 p.m.
5:00 – 5:45 p.m.
IN THE WORDS OF LEADING MANUFACTURERS
Wednesday, June 8
10:45 – 11:45 a.m.
3:30 – 4:15 p.m.
3:30 – 4:15 p.m.
3:30 – 4:15 p.m.
Thursday, June 9
9:30 – 10:15 a.m.
Aerospace OEM
10:30 – 11:15 a.m.
* A subset of the IoT for Manufacturing sessions at LiveWorx
7# L I V E W O R X
STAGE ONE: UNDERSTAND
Make decisions quickly by connecting
and unifying different sources and
structures of internal and external data
in real-time
8# L I V E W O R X
STAGE TWO: ADVANCE
Streamline your operations and
continuously innovate through
digital processes, predictive
analytics and a guided workforce
9# L I V E W O R X
STAGE TWO: ADVANCE
Streamline your operations and
continuously innovate through
digital processes, predictive
analytics and a guided workforce windchill MPMLink
ptc navigate
10# L I V E W O R X# L I V E W O R X
WINDCHILL MPMLINK
BENEFITS
CAPABILITIES
• Manufacturing BOM
Management
• Process Plan
Management
• Manufacturing Change
Management
• Integration to Operations
• Integral Work Instruction
Management
• Control Characteristic
Management
Validate Process Plan in 3D
Leverage 3D for mBOM DMU
Associative mBOM definition,
restructuring and reconciliation
Enable Engineering &
Manufacturing
Collaboration
Increased production quality
and performance
Reduce product
development cost
Shorten time to
production
(and to Market)
• Manufacturing change
control and propagation to
mBOM, process plans,
resources, instructions and
documents.
11# L I V E W O R X# L I V E W O R X
PTC NAVIGATE FOR OPERATOR EFFICIENCY
Improved operator
productivity
Improved
quality
Higher flexibility with
specific unified screen
per process /work cell
BENEFITS
Lower TCO and
higher value from
existing systems
CAPABILITIES
• One unified screen for the
operator with contextual,
order specific, information
from all sources
• Bi-directional integrations
• 3D, Augmented Reality
delivery
• Automated and manual
data capture to build
quality genealogy
• Support for smart tools
• Real-time quality check to
error proof execution
12# L I V E W O R X# L I V E W O R X
AUGMENTED REALITY GUIDED WORKERS
Augmented Reality3D Illustrations3D Animations
13# L I V E W O R X
 Speakers
 PTC – IOT Manufacturing
 Solar Turbines Manufacturing Journey
– Now
– Coming Soon
– Future
AGENDA
14# L I V E W O R X
• Low Volume
• High Complexity
• Highly Customized
• Paramount Reliability
PROBLEM
NATURAL GAS TRANSMISSION
Driving Question
Why put so much automation / upfront
definition for assembling a unique product
every time
Time to Market ---- Time to
Customer Need
• Custom Designed
• Custom Manufacturing
Planned
• Assembled / Tested /
Delivered on Time
• World Class Product Quality
• Built Safely with No Injuries
17# L I V E W O R X
MANUFACTURING JOURNEY
# L I V E W O R X 18
NOW
Build Facility
Assembly Workstation
Assembly StationWork Instruction
# L I V E W O R X 22
COMING SOON
23# L I V E W O R X
• Problem:
– mBOM in ERP Produces Flat BOM by
Manufactured Item
– Running MRP is Difficult and Time
Consuming
– Hours Spent to Reconcile
• Solution:
– Send the Operation Label as Part of the
mBOM
– ERP to Use Operation Label for MRP
Reports
mBOM
Op10
Phantom
Hardware
Kit
Bolt
Nut
WasherBracket
Support
Op20
Phantom
Module
Hardware
Kit
Bolt
Nut
WasherMotor
PARTS LIST BY OPERATION
24# L I V E W O R X
• MPMLink mBOM Released to ERP
• Vertical Lift Module (VLM)
– Integrated into ERP
– Receives Advice File from ERP
– Sends Advice Back to ERP
• Organizes by Assembly Operation
• Saves Time & Reduce Error
• Parts Consumed by Operation from
Work instruction
SMART WAREHOUSE
# L I V E W O R X 25
FUTURE
26# L I V E W O R X
• 2 Projector System
• Display Assembly Instructions
• Validation Done On-The-Fly
LIGHT GUIDED WORK INSTRUCTIONS
27# L I V E W O R X
LIGHT GUIDED DEMO
28# L I V E W O R X
EBOM MBOM Process Plan
AUGMENTED REALITY
Virtual Reality
Augmented Reality
EXPERIENCE IT IN THE XTROPOLIS
29# L I V E W O R X
Windchill
ERPMES
BIDIRECTIONAL MANUFACTURING DATA FLOOR
• Execution System Enablers
– Paperless Documentation
– Complete Definition for Operator
– Fully Illustrated Work Instructions
– Operational Flow
– Linked to PLM and ERP
• Problem Reports Back to Engineering
• Capture Operation Completeness to ERP
• Data Collection
30# L I V E W O R X
• 3D Shop
Floor Design
• Movement
of Product
• Efficiency of
Layout
FACTORY DESIGN
31# L I V E W O R X
SUMMARY
# L I V E W O R X 32
PLEASE VOTE FOR THIS
PRESENTATION
liveworx.com

More Related Content

Similar to Solar Turbines Increases Productivity and Flexibility with Associative Process Planning and Intelligent Production Execution

What Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsWhat Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsDawn Collins
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019Comit Projects Ltd
 
Real-Time Engineering Simulators
Real-Time Engineering SimulatorsReal-Time Engineering Simulators
Real-Time Engineering SimulatorsGSE Systems, Inc.
 
Realize 2022 MINO 7 year of implementation v0.1.pptx
Realize 2022 MINO 7 year of implementation v0.1.pptxRealize 2022 MINO 7 year of implementation v0.1.pptx
Realize 2022 MINO 7 year of implementation v0.1.pptxjakobkuhn
 
Manish engg ppt 26.04.16
Manish engg ppt 26.04.16Manish engg ppt 26.04.16
Manish engg ppt 26.04.16Maxpromotion
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 
Windchill 11 - Smart Connected PLM
Windchill 11 - Smart Connected PLMWindchill 11 - Smart Connected PLM
Windchill 11 - Smart Connected PLMDedagroup
 
AMIA Systems, Layout Design, Planning & Scheduling, Appliance
AMIA Systems, Layout Design, Planning & Scheduling, ApplianceAMIA Systems, Layout Design, Planning & Scheduling, Appliance
AMIA Systems, Layout Design, Planning & Scheduling, ApplianceAbdelkrim Boujraf
 
Programmable Logic Controller (plc)
Programmable Logic Controller (plc)Programmable Logic Controller (plc)
Programmable Logic Controller (plc)Dhruv Shah
 
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4Abdelkrim Boujraf
 
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4Abdelkrim Boujraf
 
Functional verification techniques EW16 session
Functional verification techniques  EW16 sessionFunctional verification techniques  EW16 session
Functional verification techniques EW16 sessionSameh El-Ashry
 
Clobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi
 
What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...Dawn Collins
 
Global C4IR-1 Masterclass Bowyer - McLaren 2017
Global C4IR-1 Masterclass Bowyer - McLaren 2017Global C4IR-1 Masterclass Bowyer - McLaren 2017
Global C4IR-1 Masterclass Bowyer - McLaren 2017Justin Hayward
 
Making Sense of DevOps Tools: Open Source to Enterprise Solutions
Making Sense of DevOps Tools: Open Source to Enterprise SolutionsMaking Sense of DevOps Tools: Open Source to Enterprise Solutions
Making Sense of DevOps Tools: Open Source to Enterprise SolutionsIBM DevOps
 

Similar to Solar Turbines Increases Productivity and Flexibility with Associative Process Planning and Intelligent Production Execution (20)

What Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsWhat Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problems
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019
 
Real-Time Engineering Simulators
Real-Time Engineering SimulatorsReal-Time Engineering Simulators
Real-Time Engineering Simulators
 
Realize 2022 MINO 7 year of implementation v0.1.pptx
Realize 2022 MINO 7 year of implementation v0.1.pptxRealize 2022 MINO 7 year of implementation v0.1.pptx
Realize 2022 MINO 7 year of implementation v0.1.pptx
 
The road to plm
The road to plmThe road to plm
The road to plm
 
The Road to PLM
The Road to PLMThe Road to PLM
The Road to PLM
 
Manish engg ppt 26.04.16
Manish engg ppt 26.04.16Manish engg ppt 26.04.16
Manish engg ppt 26.04.16
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
Windchill 11 - Smart Connected PLM
Windchill 11 - Smart Connected PLMWindchill 11 - Smart Connected PLM
Windchill 11 - Smart Connected PLM
 
AMIA Systems, Layout Design, Planning & Scheduling, Appliance
AMIA Systems, Layout Design, Planning & Scheduling, ApplianceAMIA Systems, Layout Design, Planning & Scheduling, Appliance
AMIA Systems, Layout Design, Planning & Scheduling, Appliance
 
Programmable Logic Controller (plc)
Programmable Logic Controller (plc)Programmable Logic Controller (plc)
Programmable Logic Controller (plc)
 
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
 
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
_AMIA_Systems-Layout_Design-Planner-Appliance-ERP-MES-APS-EN-v1.4.4
 
Functional verification techniques EW16 session
Functional verification techniques  EW16 sessionFunctional verification techniques  EW16 session
Functional verification techniques EW16 session
 
The benefits of ALM and PLM Integration
The benefits of ALM and PLM IntegrationThe benefits of ALM and PLM Integration
The benefits of ALM and PLM Integration
 
Control Room of the Future
Control Room of the FutureControl Room of the Future
Control Room of the Future
 
Clobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solution
 
What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...What Is Your PLM Challenge - Manage configurable products and maintain produc...
What Is Your PLM Challenge - Manage configurable products and maintain produc...
 
Global C4IR-1 Masterclass Bowyer - McLaren 2017
Global C4IR-1 Masterclass Bowyer - McLaren 2017Global C4IR-1 Masterclass Bowyer - McLaren 2017
Global C4IR-1 Masterclass Bowyer - McLaren 2017
 
Making Sense of DevOps Tools: Open Source to Enterprise Solutions
Making Sense of DevOps Tools: Open Source to Enterprise SolutionsMaking Sense of DevOps Tools: Open Source to Enterprise Solutions
Making Sense of DevOps Tools: Open Source to Enterprise Solutions
 

Recently uploaded

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

Solar Turbines Increases Productivity and Flexibility with Associative Process Planning and Intelligent Production Execution

  • 1. liveworx.com # L I V E W O R X SOLAR TURBINES INCREASES PRODUCTIVITY AND FLEXIBILITY WITH ASSOCIATIVE PROCESS PLANNING AND INTELLIGENT PRODUCT EXECUTION Eric Horn PLM Solution Architect – Solar Turbines June 8th, 2016 JP Provencher VP, Manufacturing Strategy and Solutions - PTC
  • 2. 2# L I V E W O R X  Speakers  PTC – IOT Manufacturing  Solar Turbines Manufacturing Journey AGENDA
  • 3. 3# L I V E W O R X JP Provencher VP, IoT Manufacturing Solutions PTC Eric Horn PLM Solution Architect Solar Turbines Incorporated PLM Projects – Options and Variants – MPMLink – Publishing CAD Visuals – Linked Data SPEAKERS
  • 4. 4# L I V E W O R X  Speakers  PTC – IOT Manufacturing  Solar Turbines Manufacturing Journey – Now – Coming Soon – Future AGENDA
  • 5. 5# L I V E W O R X Smart Manufacturing A WAVE OF TRANSFORMATION IS COMING TO MANUFACTURING Industrie 4.0 Made in China 2025
  • 6. 6# L I V E W O R X Tuesday, June 7 4:00 – 4:45 p.m. 5:00 – 5:45 p.m. IN THE WORDS OF LEADING MANUFACTURERS Wednesday, June 8 10:45 – 11:45 a.m. 3:30 – 4:15 p.m. 3:30 – 4:15 p.m. 3:30 – 4:15 p.m. Thursday, June 9 9:30 – 10:15 a.m. Aerospace OEM 10:30 – 11:15 a.m. * A subset of the IoT for Manufacturing sessions at LiveWorx
  • 7. 7# L I V E W O R X STAGE ONE: UNDERSTAND Make decisions quickly by connecting and unifying different sources and structures of internal and external data in real-time
  • 8. 8# L I V E W O R X STAGE TWO: ADVANCE Streamline your operations and continuously innovate through digital processes, predictive analytics and a guided workforce
  • 9. 9# L I V E W O R X STAGE TWO: ADVANCE Streamline your operations and continuously innovate through digital processes, predictive analytics and a guided workforce windchill MPMLink ptc navigate
  • 10. 10# L I V E W O R X# L I V E W O R X WINDCHILL MPMLINK BENEFITS CAPABILITIES • Manufacturing BOM Management • Process Plan Management • Manufacturing Change Management • Integration to Operations • Integral Work Instruction Management • Control Characteristic Management Validate Process Plan in 3D Leverage 3D for mBOM DMU Associative mBOM definition, restructuring and reconciliation Enable Engineering & Manufacturing Collaboration Increased production quality and performance Reduce product development cost Shorten time to production (and to Market) • Manufacturing change control and propagation to mBOM, process plans, resources, instructions and documents.
  • 11. 11# L I V E W O R X# L I V E W O R X PTC NAVIGATE FOR OPERATOR EFFICIENCY Improved operator productivity Improved quality Higher flexibility with specific unified screen per process /work cell BENEFITS Lower TCO and higher value from existing systems CAPABILITIES • One unified screen for the operator with contextual, order specific, information from all sources • Bi-directional integrations • 3D, Augmented Reality delivery • Automated and manual data capture to build quality genealogy • Support for smart tools • Real-time quality check to error proof execution
  • 12. 12# L I V E W O R X# L I V E W O R X AUGMENTED REALITY GUIDED WORKERS Augmented Reality3D Illustrations3D Animations
  • 13. 13# L I V E W O R X  Speakers  PTC – IOT Manufacturing  Solar Turbines Manufacturing Journey – Now – Coming Soon – Future AGENDA
  • 14. 14# L I V E W O R X • Low Volume • High Complexity • Highly Customized • Paramount Reliability PROBLEM
  • 16. Driving Question Why put so much automation / upfront definition for assembling a unique product every time Time to Market ---- Time to Customer Need • Custom Designed • Custom Manufacturing Planned • Assembled / Tested / Delivered on Time • World Class Product Quality • Built Safely with No Injuries
  • 17. 17# L I V E W O R X MANUFACTURING JOURNEY
  • 18. # L I V E W O R X 18 NOW
  • 22. # L I V E W O R X 22 COMING SOON
  • 23. 23# L I V E W O R X • Problem: – mBOM in ERP Produces Flat BOM by Manufactured Item – Running MRP is Difficult and Time Consuming – Hours Spent to Reconcile • Solution: – Send the Operation Label as Part of the mBOM – ERP to Use Operation Label for MRP Reports mBOM Op10 Phantom Hardware Kit Bolt Nut WasherBracket Support Op20 Phantom Module Hardware Kit Bolt Nut WasherMotor PARTS LIST BY OPERATION
  • 24. 24# L I V E W O R X • MPMLink mBOM Released to ERP • Vertical Lift Module (VLM) – Integrated into ERP – Receives Advice File from ERP – Sends Advice Back to ERP • Organizes by Assembly Operation • Saves Time & Reduce Error • Parts Consumed by Operation from Work instruction SMART WAREHOUSE
  • 25. # L I V E W O R X 25 FUTURE
  • 26. 26# L I V E W O R X • 2 Projector System • Display Assembly Instructions • Validation Done On-The-Fly LIGHT GUIDED WORK INSTRUCTIONS
  • 27. 27# L I V E W O R X LIGHT GUIDED DEMO
  • 28. 28# L I V E W O R X EBOM MBOM Process Plan AUGMENTED REALITY Virtual Reality Augmented Reality EXPERIENCE IT IN THE XTROPOLIS
  • 29. 29# L I V E W O R X Windchill ERPMES BIDIRECTIONAL MANUFACTURING DATA FLOOR • Execution System Enablers – Paperless Documentation – Complete Definition for Operator – Fully Illustrated Work Instructions – Operational Flow – Linked to PLM and ERP • Problem Reports Back to Engineering • Capture Operation Completeness to ERP • Data Collection
  • 30. 30# L I V E W O R X • 3D Shop Floor Design • Movement of Product • Efficiency of Layout FACTORY DESIGN
  • 31. 31# L I V E W O R X SUMMARY
  • 32. # L I V E W O R X 32 PLEASE VOTE FOR THIS PRESENTATION