SlideShare a Scribd company logo
1 of 1
Download to read offline
11
A
75.600 m
LEVEL 4.0
76086
40160
960
1573
A
75.600 m
LEVEL 4.0
40160760
810
303100 1365
A
75.600 m
LEVEL 4.0
760
96040
3377
692
A
75.600 m
LEVEL 4.0
40160760
1207
1654
810
2575
2197
3377
100
3347
910
335
2400
A
75.600 m
LEVEL 4.0
4016080680
A
75.600 m
LEVEL 4.0
40160760
674
A
75.600 m
LEVEL 4.0
760079
155
40160
920
810
2197
3377
100
3347
910
2400
1103
23
93
471
401
40
1573
AHR Architects Ltd
Parsonage Chambers
3 The Parsonage
Manchester
M3 2HW
United Kingdom
T +44(0)161 8287900
F +44(0)161 8287930
E manchester@ahr-global.com
www.ahr-global.com
original by
client name
project
drawing
computer file plot date
project number scale
drawing number rev issue status
This drawing is to be read in conjunction with all related drawings. All dimensions must
be checked and verified on site before commencing any work or producing shop
drawings. The originator should be notified immediately of any discrepancy.
This drawing is copyright and remains the property of AHR.
@A0
date created Approved by
As indicated
C:LauraHuddersfield.rvt
Unnamed
2014.00008.006
Shorehead Building
Huddersfield University
Author
Reception Desk 3
Approver08/14/15
Rev Description Date Dr by App by
1 : 100
1. Floor Plan 3
1 : 20
7. North Elevation 2
1 : 20
8. East Elevation 2
1 : 20
9. South Elevation 2
1 : 20
10. West Elevation 2
1 : 20
2. Reception Plan 3
1 : 20
4. Section E-E
1 : 20
5. Section F-F
1 : 20
6. Section G-G
1 : 20
3. Base Plan 3
11. Rendered View

More Related Content

What's hot

07773 Smiths Precision Pullup TOPRINT (1)
07773 Smiths Precision Pullup TOPRINT (1)07773 Smiths Precision Pullup TOPRINT (1)
07773 Smiths Precision Pullup TOPRINT (1)
Darwin Smith
 
transcript_2014-5_rt13074
transcript_2014-5_rt13074transcript_2014-5_rt13074
transcript_2014-5_rt13074
Robert Tanner
 
Description 13
Description 13Description 13
Description 13
Shiva20feb
 

What's hot (13)

A
AA
A
 
PNSB
PNSBPNSB
PNSB
 
Bulletpro Workshop Press
Bulletpro Workshop PressBulletpro Workshop Press
Bulletpro Workshop Press
 
UGT LOCATION PLAN(1)
UGT LOCATION PLAN(1)UGT LOCATION PLAN(1)
UGT LOCATION PLAN(1)
 
07773 Smiths Precision Pullup TOPRINT (1)
07773 Smiths Precision Pullup TOPRINT (1)07773 Smiths Precision Pullup TOPRINT (1)
07773 Smiths Precision Pullup TOPRINT (1)
 
shamim feed mill
shamim feed millshamim feed mill
shamim feed mill
 
portfolio small 73
portfolio small 73portfolio small 73
portfolio small 73
 
transcript_2014-5_rt13074
transcript_2014-5_rt13074transcript_2014-5_rt13074
transcript_2014-5_rt13074
 
Kế hoạch thị trường
Kế hoạch thị trườngKế hoạch thị trường
Kế hoạch thị trường
 
Design of Vernier Calipers
Design of Vernier CalipersDesign of Vernier Calipers
Design of Vernier Calipers
 
MN05A
MN05AMN05A
MN05A
 
Description 13
Description 13Description 13
Description 13
 
Krea 2019 sh
Krea 2019 shKrea 2019 sh
Krea 2019 sh
 

Viewers also liked (7)

bidirectional visitor counter using MC-AT89C52
bidirectional visitor counter using MC-AT89C52bidirectional visitor counter using MC-AT89C52
bidirectional visitor counter using MC-AT89C52
 
Hotel front office management 3rd edition
Hotel front office management 3rd editionHotel front office management 3rd edition
Hotel front office management 3rd edition
 
Hotel operation front office
Hotel operation front officeHotel operation front office
Hotel operation front office
 
Sections of front office department in hotels
Sections of front office department in hotelsSections of front office department in hotels
Sections of front office department in hotels
 
Introduction to Hotel Front Office
Introduction to Hotel Front Office Introduction to Hotel Front Office
Introduction to Hotel Front Office
 
Front office SOP
Front office SOPFront office SOP
Front office SOP
 
INTRODUCTION TO FRONT OFFICE
INTRODUCTION TO FRONT OFFICEINTRODUCTION TO FRONT OFFICE
INTRODUCTION TO FRONT OFFICE
 

Final Reception Desk Option 3

  • 1. 11 A 75.600 m LEVEL 4.0 76086 40160 960 1573 A 75.600 m LEVEL 4.0 40160760 810 303100 1365 A 75.600 m LEVEL 4.0 760 96040 3377 692 A 75.600 m LEVEL 4.0 40160760 1207 1654 810 2575 2197 3377 100 3347 910 335 2400 A 75.600 m LEVEL 4.0 4016080680 A 75.600 m LEVEL 4.0 40160760 674 A 75.600 m LEVEL 4.0 760079 155 40160 920 810 2197 3377 100 3347 910 2400 1103 23 93 471 401 40 1573 AHR Architects Ltd Parsonage Chambers 3 The Parsonage Manchester M3 2HW United Kingdom T +44(0)161 8287900 F +44(0)161 8287930 E manchester@ahr-global.com www.ahr-global.com original by client name project drawing computer file plot date project number scale drawing number rev issue status This drawing is to be read in conjunction with all related drawings. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of AHR. @A0 date created Approved by As indicated C:LauraHuddersfield.rvt Unnamed 2014.00008.006 Shorehead Building Huddersfield University Author Reception Desk 3 Approver08/14/15 Rev Description Date Dr by App by 1 : 100 1. Floor Plan 3 1 : 20 7. North Elevation 2 1 : 20 8. East Elevation 2 1 : 20 9. South Elevation 2 1 : 20 10. West Elevation 2 1 : 20 2. Reception Plan 3 1 : 20 4. Section E-E 1 : 20 5. Section F-F 1 : 20 6. Section G-G 1 : 20 3. Base Plan 3 11. Rendered View