SlideShare a Scribd company logo
1 of 3
CURRICULUM VITAE
Lakshman singh Mob: +917080498145, +917894463701
Vill- Safedpura, PO- Sadhu Email: l.saini04@gmail.com
Ashram, Dist- Aligarh
U.P-202125
Objective:
I intend to build a career with a leading corporate of healthy environment with a committed
and dedicated people where my skills and knowledge can be utilized efficiently.
Professional Qualification:
 B.TECH-Electrical & Electronics Engineering (EEE) from Uttar Pradesh technical university
(UPTU) united college of engineering & research Gr.Noida, with 72% in 2010.
 DIPLOMA-Electrical Engg.(I.C) from B.T.E.U.P, Lukhnow with 70% in 2007.
Academic Qualification:
 10+2(Science) from A.I.C Harduaganj, Aligarh U.P Board in 2004 with 1st
division.
 10th from A.I.C Harduaganj, Aligarh, U.P Board in 2002 with 2nd
division.
Snapshot:-
 Working as an Electrical Engineer in Energy Infratech (Beas Infrastructure Pvt. Ltd.) in Rural Electrification
& Substation Installation project, (RE Projects) under supervision of PGCIL. from July 2010 to July 2011.
 Experience in Turnkey Projects, 80 MVAR Reactors and 500 MVA Transformer installation in 765/400
kv Power Grid Corporation of India Ltd, substations, Total switchyard construction in 33/11KV Sub–
Stations, Augmentation, 11KV, LT Over–Head for Distribution lines.
 Worked As A site-Manager at Jharsuguda, Orisaa PGCIL Substation, 800KV, 7x500 MVA Transformer &
13x80 MVAR Reactor. In Presently at Varanasi PGCIL Substation also a Site-Manager in M/s TBEA.
 Works includes the project management support in Materials Handling, erection & Commissioning activity,
client dealing, contractors dealing, detail engineering, Invoicing and bill processing.
 Knowledge in Procurement Activities, Material Supply Chain Management, Material Inspection.
Present Employment :-
Organisation : TBEA Energy India Pvt. Ltd (TBEA Shenyang Transformer group Co. Ltd, China)
Designation : Sr. Engineer (Electrical)
Duration : From February 2012 to till date
 Installation of Single Phase 500 MVA Transformer & 80 MVAR Reactors in 765/400 KV Substations for
PGCIL like as Agra, Jatikara,Delhi & Jharsuguda.
 Currently looking after the project Manager of 800 KV, 6x80 MVAR Rectors in 765/400 KV PGCIL GIS
substation at Varanasi, UP.
Responsibilities:-
 The Projects includes the all engineering activity and construction work of 80 MVAR Reactors and
500 MVA transformer in 765 KV grid substation .
 Support to Project management Team and Engineering Team.
 Drawing certification with co-ordination to site and client.
 Monitoring project schedule and construction work.
 Materials procurement and storage.
 Cable laying and termination.
 Co-ordination with client and head office.
 Contractor billing and resolving Engineering issues.
 Materials inspection at site and vendors billing
Previous Employment:-
Organisation : SEPCO-1 (Shandong Electric power construction company no.1).
Plant Capacity : 4X660 MW, At Talwandi Sabo, Panjab
Designation : Engineer-Electrical
Duration : From July’2011 to Feb’2012.
Responsibilities
 Erection of towers and equipment structure
 Installation CTs, breakers, PTs, Isolators and accessories for construction of 220/440 KV Grid
substation.
 Supervise The Earthing work and its Billing to sub- vendors
 Member of “Electrical Quality Inspection” Team of whole Power Plant.
Training:-
 One month 765kv (Transformers & Reactors) assembling Training in TBEA Shenyang
Transformer Group Co. Ltd at Shenyang city in CHINA.
 One month training from the N.T.P.C Dadri in thermal department in 2008
 One month training from the Thermal Power Plant, Kasimpur, Aligarh in 2006.
Personal Profile:
Father’s Name : Shri Dev Saini
Date of birth : 15 may 1986
Sex : Male
Martial Status : Married
Nationality : Indian
Languages Known : Hindi & English
Declaration:
I hereby declare that the above written particulars are true to the best of my knowledge and beliefs.
Date: 20/10/2014
Place: Varanasi (INDIA) (Lakshman singh)
LAKSHMAN SINGH CV

More Related Content

What's hot (20)

Jude_Resume_Technical
Jude_Resume_TechnicalJude_Resume_Technical
Jude_Resume_Technical
 
Nawaz Ahmad
Nawaz AhmadNawaz Ahmad
Nawaz Ahmad
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
nk resume
nk resumenk resume
nk resume
 
Project Engineer1
Project Engineer1Project Engineer1
Project Engineer1
 
Randolf-resume
Randolf-resume Randolf-resume
Randolf-resume
 
resume
resumeresume
resume
 
Electrical Engineer cv
Electrical Engineer cvElectrical Engineer cv
Electrical Engineer cv
 
Ashwani Resume
Ashwani ResumeAshwani Resume
Ashwani Resume
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 
Resume
ResumeResume
Resume
 
Aizaz Ahmad Qatar
Aizaz Ahmad QatarAizaz Ahmad Qatar
Aizaz Ahmad Qatar
 
Navnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CV
 
Profile Sept 2016
Profile Sept 2016Profile Sept 2016
Profile Sept 2016
 
girish_cv
girish_cvgirish_cv
girish_cv
 
Resume new
Resume newResume new
Resume new
 
hari shankar4
hari shankar4hari shankar4
hari shankar4
 
Electrical engg 3 year
Electrical engg 3 yearElectrical engg 3 year
Electrical engg 3 year
 
Weekly report template (2)
Weekly report template (2)Weekly report template (2)
Weekly report template (2)
 
c.v. SURAJ CHANDANGIRIWAR new -NCC
c.v. SURAJ CHANDANGIRIWAR new -NCCc.v. SURAJ CHANDANGIRIWAR new -NCC
c.v. SURAJ CHANDANGIRIWAR new -NCC
 

Viewers also liked

T&D India (December 2016): The Need for Real Transformation
T&D India (December 2016): The Need for Real TransformationT&D India (December 2016): The Need for Real Transformation
T&D India (December 2016): The Need for Real TransformationT&D India
 
MLongari_AcademicResearchCV
MLongari_AcademicResearchCVMLongari_AcademicResearchCV
MLongari_AcademicResearchCVMaurizio Longari
 
فالنار أولى به آثار أكل الحرام
فالنار أولى به آثار أكل الحرامفالنار أولى به آثار أكل الحرام
فالنار أولى به آثار أكل الحراممبارك الدوسري
 
Accounting 0137 chapter 9 lecture 03
Accounting 0137 chapter 9 lecture 03Accounting 0137 chapter 9 lecture 03
Accounting 0137 chapter 9 lecture 03Cambriannews
 
Common Core in the SS Classroom 4-5
Common Core in the SS Classroom 4-5Common Core in the SS Classroom 4-5
Common Core in the SS Classroom 4-5Glenn Wiebe
 
Tablas de retencion de renta 2016
Tablas de retencion de renta 2016Tablas de retencion de renta 2016
Tablas de retencion de renta 2016aygauditores
 
Rpt pemulihan khas_bm
Rpt pemulihan khas_bmRpt pemulihan khas_bm
Rpt pemulihan khas_bmshahidah Azim
 
Diversified Power Point Slide Show 2016
Diversified Power Point Slide Show 2016Diversified Power Point Slide Show 2016
Diversified Power Point Slide Show 2016Raymond Harris
 
T&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in TransmissionT&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in TransmissionT&D India
 
NCHE 2016: Google Mapping Tools: Easy, Effective, Engaging
NCHE 2016: Google Mapping Tools: Easy, Effective, EngagingNCHE 2016: Google Mapping Tools: Easy, Effective, Engaging
NCHE 2016: Google Mapping Tools: Easy, Effective, EngagingGlenn Wiebe
 
Acetone and butanol fermentation
Acetone and butanol fermentationAcetone and butanol fermentation
Acetone and butanol fermentationNOUFAL NUJUM
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission LineSURESH GOPAL
 
T&D India (January 2017): INTELECT 2017 Special
T&D India (January 2017): INTELECT 2017 SpecialT&D India (January 2017): INTELECT 2017 Special
T&D India (January 2017): INTELECT 2017 SpecialT&D India
 

Viewers also liked (19)

RAMA SUBRAMANIAN
RAMA SUBRAMANIANRAMA SUBRAMANIAN
RAMA SUBRAMANIAN
 
Amartya Sarkar
Amartya SarkarAmartya Sarkar
Amartya Sarkar
 
T&D India (December 2016): The Need for Real Transformation
T&D India (December 2016): The Need for Real TransformationT&D India (December 2016): The Need for Real Transformation
T&D India (December 2016): The Need for Real Transformation
 
MLongari_AcademicResearchCV
MLongari_AcademicResearchCVMLongari_AcademicResearchCV
MLongari_AcademicResearchCV
 
فالنار أولى به آثار أكل الحرام
فالنار أولى به آثار أكل الحرامفالنار أولى به آثار أكل الحرام
فالنار أولى به آثار أكل الحرام
 
60023607 cases
60023607 cases60023607 cases
60023607 cases
 
Accounting 0137 chapter 9 lecture 03
Accounting 0137 chapter 9 lecture 03Accounting 0137 chapter 9 lecture 03
Accounting 0137 chapter 9 lecture 03
 
Common Core in the SS Classroom 4-5
Common Core in the SS Classroom 4-5Common Core in the SS Classroom 4-5
Common Core in the SS Classroom 4-5
 
Tablas de retencion de renta 2016
Tablas de retencion de renta 2016Tablas de retencion de renta 2016
Tablas de retencion de renta 2016
 
Rpt pemulihan khas_bm
Rpt pemulihan khas_bmRpt pemulihan khas_bm
Rpt pemulihan khas_bm
 
aniprezentaciq
aniprezentaciqaniprezentaciq
aniprezentaciq
 
Diversified Power Point Slide Show 2016
Diversified Power Point Slide Show 2016Diversified Power Point Slide Show 2016
Diversified Power Point Slide Show 2016
 
T&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in TransmissionT&D India (February 2017) – Transition in Transmission
T&D India (February 2017) – Transition in Transmission
 
Rinofaringitis
RinofaringitisRinofaringitis
Rinofaringitis
 
Gauss seidel
Gauss seidelGauss seidel
Gauss seidel
 
NCHE 2016: Google Mapping Tools: Easy, Effective, Engaging
NCHE 2016: Google Mapping Tools: Easy, Effective, EngagingNCHE 2016: Google Mapping Tools: Easy, Effective, Engaging
NCHE 2016: Google Mapping Tools: Easy, Effective, Engaging
 
Acetone and butanol fermentation
Acetone and butanol fermentationAcetone and butanol fermentation
Acetone and butanol fermentation
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
T&D India (January 2017): INTELECT 2017 Special
T&D India (January 2017): INTELECT 2017 SpecialT&D India (January 2017): INTELECT 2017 Special
T&D India (January 2017): INTELECT 2017 Special
 

Similar to LAKSHMAN SINGH CV (20)

Pawan CV
Pawan CVPawan CV
Pawan CV
 
Updated resume.pdf
Updated resume.pdfUpdated resume.pdf
Updated resume.pdf
 
AMITAVA RESUME (2)
AMITAVA RESUME (2)AMITAVA RESUME (2)
AMITAVA RESUME (2)
 
Rita Thakur Resume
Rita Thakur ResumeRita Thakur Resume
Rita Thakur Resume
 
New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Pritom_Ghosh_Curriculum_Vitae
Pritom_Ghosh_Curriculum_VitaePritom_Ghosh_Curriculum_Vitae
Pritom_Ghosh_Curriculum_Vitae
 
LATEST resume
LATEST resumeLATEST resume
LATEST resume
 
RAMURESUME
RAMURESUMERAMURESUME
RAMURESUME
 
akhilesh C.V
akhilesh C.Vakhilesh C.V
akhilesh C.V
 
Vishnu Resume
Vishnu ResumeVishnu Resume
Vishnu Resume
 
Vinay_Gavade_resume_-_
Vinay_Gavade_resume_-_Vinay_Gavade_resume_-_
Vinay_Gavade_resume_-_
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 
CV Solar
CV SolarCV Solar
CV Solar
 
SSG_RESUME_DEC2015.R0
SSG_RESUME_DEC2015.R0SSG_RESUME_DEC2015.R0
SSG_RESUME_DEC2015.R0
 
CV_JOBIN(new)
CV_JOBIN(new)CV_JOBIN(new)
CV_JOBIN(new)
 
SUBHENDU SAHU RESUME
SUBHENDU SAHU RESUMESUBHENDU SAHU RESUME
SUBHENDU SAHU RESUME
 

LAKSHMAN SINGH CV

  • 1. CURRICULUM VITAE Lakshman singh Mob: +917080498145, +917894463701 Vill- Safedpura, PO- Sadhu Email: l.saini04@gmail.com Ashram, Dist- Aligarh U.P-202125 Objective: I intend to build a career with a leading corporate of healthy environment with a committed and dedicated people where my skills and knowledge can be utilized efficiently. Professional Qualification:  B.TECH-Electrical & Electronics Engineering (EEE) from Uttar Pradesh technical university (UPTU) united college of engineering & research Gr.Noida, with 72% in 2010.  DIPLOMA-Electrical Engg.(I.C) from B.T.E.U.P, Lukhnow with 70% in 2007. Academic Qualification:  10+2(Science) from A.I.C Harduaganj, Aligarh U.P Board in 2004 with 1st division.  10th from A.I.C Harduaganj, Aligarh, U.P Board in 2002 with 2nd division. Snapshot:-  Working as an Electrical Engineer in Energy Infratech (Beas Infrastructure Pvt. Ltd.) in Rural Electrification & Substation Installation project, (RE Projects) under supervision of PGCIL. from July 2010 to July 2011.  Experience in Turnkey Projects, 80 MVAR Reactors and 500 MVA Transformer installation in 765/400 kv Power Grid Corporation of India Ltd, substations, Total switchyard construction in 33/11KV Sub– Stations, Augmentation, 11KV, LT Over–Head for Distribution lines.  Worked As A site-Manager at Jharsuguda, Orisaa PGCIL Substation, 800KV, 7x500 MVA Transformer & 13x80 MVAR Reactor. In Presently at Varanasi PGCIL Substation also a Site-Manager in M/s TBEA.  Works includes the project management support in Materials Handling, erection & Commissioning activity, client dealing, contractors dealing, detail engineering, Invoicing and bill processing.  Knowledge in Procurement Activities, Material Supply Chain Management, Material Inspection. Present Employment :- Organisation : TBEA Energy India Pvt. Ltd (TBEA Shenyang Transformer group Co. Ltd, China) Designation : Sr. Engineer (Electrical) Duration : From February 2012 to till date  Installation of Single Phase 500 MVA Transformer & 80 MVAR Reactors in 765/400 KV Substations for PGCIL like as Agra, Jatikara,Delhi & Jharsuguda.  Currently looking after the project Manager of 800 KV, 6x80 MVAR Rectors in 765/400 KV PGCIL GIS substation at Varanasi, UP. Responsibilities:-  The Projects includes the all engineering activity and construction work of 80 MVAR Reactors and 500 MVA transformer in 765 KV grid substation .  Support to Project management Team and Engineering Team.  Drawing certification with co-ordination to site and client.  Monitoring project schedule and construction work.  Materials procurement and storage.  Cable laying and termination.  Co-ordination with client and head office.  Contractor billing and resolving Engineering issues.
  • 2.  Materials inspection at site and vendors billing Previous Employment:- Organisation : SEPCO-1 (Shandong Electric power construction company no.1). Plant Capacity : 4X660 MW, At Talwandi Sabo, Panjab Designation : Engineer-Electrical Duration : From July’2011 to Feb’2012. Responsibilities  Erection of towers and equipment structure  Installation CTs, breakers, PTs, Isolators and accessories for construction of 220/440 KV Grid substation.  Supervise The Earthing work and its Billing to sub- vendors  Member of “Electrical Quality Inspection” Team of whole Power Plant. Training:-  One month 765kv (Transformers & Reactors) assembling Training in TBEA Shenyang Transformer Group Co. Ltd at Shenyang city in CHINA.  One month training from the N.T.P.C Dadri in thermal department in 2008  One month training from the Thermal Power Plant, Kasimpur, Aligarh in 2006. Personal Profile: Father’s Name : Shri Dev Saini Date of birth : 15 may 1986 Sex : Male Martial Status : Married Nationality : Indian Languages Known : Hindi & English Declaration: I hereby declare that the above written particulars are true to the best of my knowledge and beliefs. Date: 20/10/2014 Place: Varanasi (INDIA) (Lakshman singh)