Rocket Engine Development
Advisor: Professor Feng Liu
Team Leads: Lakshan Peiris, Wendy Liu, Vishnu Maharaj, Victor Chen, Paul De Mesa, Danny Zarour, Jolie Bellegarde
Project Lead: Lakshan Peiris
Contact Information: (714) 933 8092
ypeiris@uci.edu
Background & Goals:
Getting inspiration from Stanford’s Advanced Rocket Propulsion class, our team set goals
to build a hybrid rocket engine that can achieve higher thrust for a longer duration.The
goal is to attain 1000 lbf of thrust for a burn time of 20 seconds.The budget is limited to
$4500 to assess the feasibility of achieving these goals at a reasonable cost.The success of
this project will highlight future iterations for the project, to achieve higher thrust for
longer burn times.
Injector
Material: Steel 1008/1018
Cost: $300
Dome
Material: Steel 1008/1018
Cost: $50
Solid Propellant
Composition: 56% Paraffin Wax
36% Aluminum Powder
4.5% HTPB
3% Carbon Black
0.5% IDP
Cost: $450
Combustion Chamber
Material: A 106 Seamless Carbon Steel
Cost: $165
Nozzle
Material: Isomolded Grade Graphite
Cost: $420
The graph is a three dimensional representation of the
temperature inside the nozzle as a function of time and
length.
Max Temperature: 3200 K
Snap Ring
Material: Steel
Cost: $7
Achievements:
• Finalize rocket design.
• Rocket stand built.
• Rocket components
ordered.
• Manufacture and testing of
solid propellant.
Stand, 12.10%
Rocket
Components, 44%
Propellents, 29%
Apparatus, 4.90%
Ignition System, 2%
Labor & Services , 8%
BUDGET
Total Budget = $4500
Oxidizer Tanks
Nitrous Oxide Gas (N2O)
Cost: $430
Flow Rate: 3.2 lbs/s Rocket Stand
Material:ASTM A36 Steel
Force Measuring Apparatus: Arduino + Load Cells
Nonlinear Dynamic Simulation: A force of 1500 lbs applied for 20
seconds after an exponential thrust increase from 0 to 3 seconds.
Factor of Safety: 8
Timeline:
Team Members: Edgar Delgado, Paul De Mesa, Danny Zarour,
Anthony Long, Jianan Qu, John Huynh, Jim Faber, Lakshan Peiris,
Jolie Bellegarde, Bryan Orozco, JoshuaYang, Daniel Cho,Tiffany
Quach, Jodie Loo,Wendy Liu, Alex LaVelle,Victor Chen,Vishnu
Maharaj, Jason Moeller, Calvin Li, Itzetl Frausto.

More Related Content

Viewers also liked

Geoffrey-Recommendation Letter.PDF
Geoffrey-Recommendation Letter.PDFGeoffrey-Recommendation Letter.PDF
Geoffrey-Recommendation Letter.PDF
Rakan Mousli
 
Estadística
EstadísticaEstadística
Estadística
mbalag27
 
Chad Minichillo Slattery Sales
Chad Minichillo Slattery SalesChad Minichillo Slattery Sales
Chad Minichillo Slattery Sales
Chad Minichillo
 

Viewers also liked (14)

Conférence diablo valley college
Conférence diablo valley collegeConférence diablo valley college
Conférence diablo valley college
 
Reference - Master
Reference - MasterReference - Master
Reference - Master
 
Geoffrey-Recommendation Letter.PDF
Geoffrey-Recommendation Letter.PDFGeoffrey-Recommendation Letter.PDF
Geoffrey-Recommendation Letter.PDF
 
Análisis del Control de Maquinaria del Taller de Equipo Especial del Departam...
Análisis del Control de Maquinaria del Taller de Equipo Especial del Departam...Análisis del Control de Maquinaria del Taller de Equipo Especial del Departam...
Análisis del Control de Maquinaria del Taller de Equipo Especial del Departam...
 
Estadística
EstadísticaEstadística
Estadística
 
Treball estadistica
Treball estadistica Treball estadistica
Treball estadistica
 
Graficsvegeta
GraficsvegetaGraficsvegeta
Graficsvegeta
 
THE USE OF LUDIC ACTIVITIES TO ENCOURAGE ENGLISH LEARNING AT THE HIGH SCHOOL...
THE USE OF LUDIC ACTIVITIES TO ENCOURAGE  ENGLISH LEARNING AT THE HIGH SCHOOL...THE USE OF LUDIC ACTIVITIES TO ENCOURAGE  ENGLISH LEARNING AT THE HIGH SCHOOL...
THE USE OF LUDIC ACTIVITIES TO ENCOURAGE ENGLISH LEARNING AT THE HIGH SCHOOL...
 
Análisis del Sistema de Control de Inventarios del Taller de Soldadura La Ami...
Análisis del Sistema de Control de Inventarios del Taller de Soldadura La Ami...Análisis del Sistema de Control de Inventarios del Taller de Soldadura La Ami...
Análisis del Sistema de Control de Inventarios del Taller de Soldadura La Ami...
 
F-collecte
F-collecteF-collecte
F-collecte
 
ERROR CORRECTION IMPLEMENTATION IN THE CLASSROOM AT COLEGIO CANADIENSE
ERROR CORRECTION IMPLEMENTATION IN THE CLASSROOM AT COLEGIO CANADIENSEERROR CORRECTION IMPLEMENTATION IN THE CLASSROOM AT COLEGIO CANADIENSE
ERROR CORRECTION IMPLEMENTATION IN THE CLASSROOM AT COLEGIO CANADIENSE
 
Quand Les Marques Se Mettent Au Service De Notre Quotidien
Quand Les Marques Se Mettent Au Service De Notre QuotidienQuand Les Marques Se Mettent Au Service De Notre Quotidien
Quand Les Marques Se Mettent Au Service De Notre Quotidien
 
Toi uu hoa he thong 30 trieu nguoi dung
Toi uu hoa he thong 30 trieu nguoi dungToi uu hoa he thong 30 trieu nguoi dung
Toi uu hoa he thong 30 trieu nguoi dung
 
Chad Minichillo Slattery Sales
Chad Minichillo Slattery SalesChad Minichillo Slattery Sales
Chad Minichillo Slattery Sales
 

RED Winter Design Review

  • 1. Rocket Engine Development Advisor: Professor Feng Liu Team Leads: Lakshan Peiris, Wendy Liu, Vishnu Maharaj, Victor Chen, Paul De Mesa, Danny Zarour, Jolie Bellegarde Project Lead: Lakshan Peiris Contact Information: (714) 933 8092 ypeiris@uci.edu Background & Goals: Getting inspiration from Stanford’s Advanced Rocket Propulsion class, our team set goals to build a hybrid rocket engine that can achieve higher thrust for a longer duration.The goal is to attain 1000 lbf of thrust for a burn time of 20 seconds.The budget is limited to $4500 to assess the feasibility of achieving these goals at a reasonable cost.The success of this project will highlight future iterations for the project, to achieve higher thrust for longer burn times. Injector Material: Steel 1008/1018 Cost: $300 Dome Material: Steel 1008/1018 Cost: $50 Solid Propellant Composition: 56% Paraffin Wax 36% Aluminum Powder 4.5% HTPB 3% Carbon Black 0.5% IDP Cost: $450 Combustion Chamber Material: A 106 Seamless Carbon Steel Cost: $165 Nozzle Material: Isomolded Grade Graphite Cost: $420 The graph is a three dimensional representation of the temperature inside the nozzle as a function of time and length. Max Temperature: 3200 K Snap Ring Material: Steel Cost: $7 Achievements: • Finalize rocket design. • Rocket stand built. • Rocket components ordered. • Manufacture and testing of solid propellant. Stand, 12.10% Rocket Components, 44% Propellents, 29% Apparatus, 4.90% Ignition System, 2% Labor & Services , 8% BUDGET Total Budget = $4500 Oxidizer Tanks Nitrous Oxide Gas (N2O) Cost: $430 Flow Rate: 3.2 lbs/s Rocket Stand Material:ASTM A36 Steel Force Measuring Apparatus: Arduino + Load Cells Nonlinear Dynamic Simulation: A force of 1500 lbs applied for 20 seconds after an exponential thrust increase from 0 to 3 seconds. Factor of Safety: 8 Timeline: Team Members: Edgar Delgado, Paul De Mesa, Danny Zarour, Anthony Long, Jianan Qu, John Huynh, Jim Faber, Lakshan Peiris, Jolie Bellegarde, Bryan Orozco, JoshuaYang, Daniel Cho,Tiffany Quach, Jodie Loo,Wendy Liu, Alex LaVelle,Victor Chen,Vishnu Maharaj, Jason Moeller, Calvin Li, Itzetl Frausto.