SlideShare a Scribd company logo
1 of 12
Download to read offline
APRIL 2014
1
RESEARCH & OPINION
1
1. We reaffirm our investment belief in the Athabasca Basin, as a low-cost producer,
to be uniquely well-positioned to provide significant value despite an uncertain
uranium prices environment. Page 6
2. Japan’s central government has officially announced its desire to restart idled
nuclear reactors. Decreasing reliance on fossil fuel imports is crucial for the
success of Abenomics. However, politics can, and routinely does, trump
economics. Page 2
3. The outlook for the US nuclear industry is improving due to potential upcoming
shortfalls in gas and coal electricity generation. Page 4
4. LK has completed a second round financing, raising gross proceeds of
C$2,830,536. The results were impressive, raising more than 2.5 times LK’s first
round of financing only 5 months ago. Page 8
RESEARCH & OPINION
DEREK HAMILL
Research & Communications
Zimtu Capital Corp.
dhamill@zimtu.com
0
200
400
600
800
1000
1200
0
0.05
0.1
0.15
0.2
0.25
0.3
Mar-13 May-13 Jul-13 Sep-13 Nov-13 Jan-14 Mar-14
Volume(thousands)
Price($)
Lakeland Resources Inc (TSXv: LK) (FSE:6LL) Update
Athabasca Basin Uranium Exploration | Outlook: Remains Positive
SUMMARY:
APRIL 2014
2
RESEARCH & OPINION
Uranium Market Overview – 2014 Q1
There is renewed optimism for uranium equities following a three year
bear market sparked by the infamous Fukushima Daiichi nuclear
accident (Chart 1). On Feb 25
th
the Japanese government, led by
Shinzo Abe, reversed the previous governments’ decision to phase out
nuclear energy. Instead, nuclear is set to regain its former stature as
an integral component of Japan’s electricity generation; although no
timetable for reactor restarts was given (Map 1). The use of Nuclear
remains a heated topic with the Japanese public, as recent polls show
the majority of respondents continue to oppose reactor restarts and a
large majority harbour some degree of concern over reactor safety.
2
Therefore, restarting idled Japanese reactors is likely to be contested,
indicating the industry-wide completion of the process will be gradual
with reactors restarting in stages. Depending on the enforcement of
new safety regulations and the degree of compromise from the Abe led
government, a sizable contingent of reactors may never restart (Chart
2).
Japan Reactor Restarts – return of the Jedi
Our model suggests a base case scenario of 28 eventual reactors
restarting; though the confidence range is wide reflecting the uncertain
political environment. Alternatively, Cameco (TSX: CCO) had predicted
35 to 40 reactors would eventually restart.
3
This seems optimistic as
we assume no BWR (boiling water reactor) with Mark 1 containment
built in the 70’s will restart. This was the model in operation at
Fukushima Daiichi. Though utilities operating these reactors had made
improvements prior to 2011, the design appears inadequate to deal
with Japan’s seismic threats (earthquakes, volcanic activity, and
tsunamis) post Fukushima.
4
Even BWRs with Mark 2 containment may
have a tough time receiving approval to restart without massive capital
expenditure (Capex) improvements depending on their geographic
location. Japan has three BWRs with Mark 1 containment still listed as
operational, and eleven BWRs with Mark 2 containment.
5
It should be noted that the unlike its predecessor, Japan’s National
Regulatory Authority (NRA) has the legal authority to “back-fit” new
rules and regulations onto existing nuclear power plants (NPPs). This
has left the future of NPPs located at Tsuruga, Ohi, Higashidori,
Mihama, and Shika up in the air due to their proximity to potentially
active faults. New rules incorporating multi-layered protective
measures will also increase one-time costs for NPPs exposed to
tsunami risk along Japan’s eastern seaboard and NPP’s with active
2
The ASAHI SHIMBUN, “ASAHI POLL: 59% oppose restart of nuclear reactors”, Mar 18, 2014
3
Cameco Corp Presentation at the Canaccord Resource Conference, Oct 2013
4
Reuters, Japan reactor design caused GE engineer to quit, Mar 15, 2011
5
Hitachi-GE Nuclear Energy, “Advanced Boiling Water Reactor”, page 4
-10%
0%
10%
20%
30%
40%
50%
60%
2-Jan 16-Jan 30-Jan 13-Feb 27-Feb 13-Mar 27-Mar
Chart 1. Athabasca Basin Sample
Performances for 2014
DML CCO LK
US, 100
France, 58
Japan*, 48
Russia, 33
Other, 196
Chart 2. Operational Reactor. Regional
Breakdown
Source: Yahoo Finance
Source: IAEA|PRIS
APRIL 2014
3
RESEARCH & OPINION
volcanoes within 160km radius.
6
There are numerous potentially active
faults and volcanoes in Japan, such that the definition of what is or
should be considered active will have a material impact on utilities that
own idled reactors. Regulatory uncertainty – and the subsequent costs
– mixed with significant anti-nuclear public support makes predicting
reactor restarts difficult and the timing next to impossible.
Due to the large amount of uncertainty we use an ordinal ranking
methodology based on an assigned score using the independent
variables:
1. Seismic safety
2. Reactor age and model
3. Proximity to major population densities
4. Reputation of the operating utility
5. Exposure to tsunami potential
6. Concentration of reactors
7. Access to consumer base
To determine seismic risk, we used mapping from Japan Seismic
Hazard Information Station (j-SHIS) which included information
regarding:
Probability of major seismic hazards within 30 years
Major active fault zones
Major subduction-zone earthquakes
Occurrence region of subduction-zone earthquakes
We believe both reactors currently under construction will be
completed as both scored well and are modern third generation
advanced reactors. Japan’s referenced nuclear output under our best
case scenario could approach 32 GW of capacity representing 75% of
the Country’s currently listed operable net generating capacity.
The results of the model are encouraging as the Sendai-2 and to
lesser extent Sendai-1 reactors were estimated to be amongst the first
group to restart. The Sendai NPP has been short-listed by the
Japanese NRA clearing the way for the first potential NPP restart
(Appendix B).
We use the 10-year average load factor for reactors world-wide prior to
the Fukushima accident to determine what the expected load is for
Japanese reactor restarts (Table 1). Interestingly, it appears in
aggregate Japan’s NPPs utilization was below the world average in
2010. Economically, Japan’s nuclear industry, though not necessarily
individual utilities, should be healthier with fewer operating reactors
6
Japanese NRA, “Enforcement of the New Regulatory Requirements for Commercial Nuclear Power
Reactors", Jul 8, 2013
Table 1. Japan 2020 U3O8 Requirements Scenario Analysis
Operable
Reactors
Number of
reactors
Reference
Unit
Power (MW)
Annual U3O8
Demand
(thousands of lbs)
Current as at
March 2014
48 42,388 951.52
2020 Bear Case 20 18,450 8,925.25
2020 Base Case 28 25,873 12,516.15
2020 Best Case 34 31,976 15,468.50
Map 1. Location of Japanese NPPs
Acknowledgment of Japan’s direct and
indirect seismic risks, plus broader and
stronger enforcement powers for the
NRA creates significant uncertainty in
forecasting the quantity and timing of
reactor restarts.
Source: National Report of Japan for the Fifth Review Meeting of the
Convention on Nuclear Safety, Sep 2010, Government of Japan
Source: IAEA|PRIS, WNA (World Nuclear Association), and ZC
estimates
APRIL 2014
4
RESEARCH & OPINION
running with increased efficiency once necessary write-downs are
taken.
USA – the empire strikes back
In the US, the commercial nuclear industry may soon be able to arrest
the recent declines experienced. Nuclear power consumption peaked
in 2010 before declining year-on-year (YoY) in 2011 and 2012. Last
year saw four reactors close prior to the expiration of their operating
licences and EDF announce its withdrawal from the US nuclear market
due to unfavourable economics (Chart 3).
7
Exelon, the largest US
utility of NPPs has indicated possible closures of some reactors. And
while there are four new reactors under construction in the US – the
first to have broken ground in over thirty years – the expected
completion dates are anything but certain. Construction of the Watts
Bar-1 reactor, which was connected to the power grid in 1996, took
over twenty-three years to complete; while construction of Watts Bar-2,
expected to be commercially operable in 2016, started in 1972 before
being suspended for almost twenty-two years in 1985. Therefore, little
faith should be placed behind either project – Summer or Vogtle –
reactor construction schedules. Both appear to be facing cost overruns
and difficulties honouring their respective timetables.
8
However, a combination of factors should help the US commercial
nuclear industry through 2015 to 2020:
1. Coal – Routinely represents more than 40% of the annual US
electricity generation and was relied upon this winter due to
consistently frigid temperatures.
9
However, new environmental
regulations will have a material impact on US coal
consumption. The US Energy Information Administration (US
eia) estimates coal consumption to decrease by 3.1% in 2015
ahead of the implementation of the EPA’s Mercury and Air
Toxics Standards (MATS) in 2016. Further, the US eia
reference case projects the retirement of 60 GW of capacity by
2020 which was approximately 20% of the total US electricity
generating capacity from coal in 2012.
2. Gas – Represents approx. 27% of US electricity generation.
Unlike, NPPs whose cost structure when operating is largely
fixed, electricity generation from natural gas has significant
variable costs. Any prolonged material increase in the price of
natural gas from the mid-U$4/MMBtu range should cause the
wholesale price of electricity to rise, improving the
7
Reuters, “UPDATE 3-EDF exits US nuclear, ups earnings outlook”, Jul 30, 2013
8
Direct Testimony of Steven C. Prenovitz on behalf of Nuclear Watch South | Docket 29849
9
US eia, “US Coal Consumption”, Short-Term Energy Outlook, Mar 11, 2014
“Let your reason serve to make the truth
appear where it seems hid, and hide the
false seems true”
-Shakespeare, Measure for Measure
US, 32
UK, 29
Germany,
27
France, 12
Other, 49
Chart 3. Reactors in Permanent
Shutdown Breakdown by Country
China, 28
Russia, 10India, 6
Korea, 5
Other, 23
Chart 4. Reactors Under Construction,
Regional Breakdown
Source: IAEA|PRIS
Source: IAEA|PRIS
APRIL 2014
5
RESEARCH & OPINION
competitiveness of nuclear generation. Reasons for natural
gas prices to likely rise in the US over the medium term are: (i)
increased demand from utilities as coal plants retire, (ii) the
adequacy of the natural gas transportation and storage
network to handle greater than expected demand.
10
Anecdotally, the Keystone XL application was filed 5.5-years
ago, leading to the conclusion that lobbying by special interest
groups will stifle necessary infrastructure investment. (iii)
Potential relaxation of the rules surrounding the export of
liquefied natural gas (LNG), which could lead to increased
domestic natural gas prices.
3. Wind – The recent expiry of the Production Tax Credit (PTC),
which historically has had massive positive impacts on wind
infrastructure investment dollars.
11
A recent PwC global survey
showed the majority of utilities expect onshore wind to be
economic by 2030. However, without the ongoing renewal of
the PTC it is difficult to see how the US will achieve the
administrations renewable energy targets by 2020.
Therefore, a reasonable case can be made for fewer reactor
retirements throughout the forecast period than would otherwise be
expected. Currently there are no operational reactors older than 45
years in the US. Reactor retirements are likely to occur after the initial
operating licence has been extended and before large fixed capital
expenditures are incurred (Chart 5). During this stage, Capex
requirements are more likely to be greater than the expected net
present value (NPV) of future cash flows due to much shorter time
horizons. In the base case scenario, we expect five BWRs with Mark 1
containment vessels to be retired along with the three oldest PWR
reactors by 2020. The US currently has 23 BWRs with Mark 1
containment. However, none are situated along the pacific coast and
the US does not face the same hazardous seismic risks as Japan. We
discount the probability of current reactors under construction being
commercially operational within the forecast period, anticipating only
the Watts Bar-2 reactor to be connected to the grid. Our base case
leads to the conclusion of 93 operational reactors by 2020.
It is important to note there are risks to the US commercial nuclear
industry. Domestic natural gas prices remaining at current levels over
the forecast period due to consistently mild weather and continued
economic malaise would keep wholesale electricity prices low,
10
North AmericanNaturalGas Midstream Infrastructure Through 2035: A Secure Energy Future
11
“Global Trends in Renewable Energy Investment 2013” Frankfurt School UNEP Centre & Bloomberg New
Energy Finance
0
2
4
6
8
10
12
0
2
4
6
8
10
12
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45
GWofNetCapacity
NumberofReactors
Age (years)
Chart 5. USA Reactor Age and Net Capacity
Reactors, number
GW of Capacity
0
5
10
15
20
25
30
35
0
5
10
15
20
25
30
35
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45
GWofNetCapacity
NumberofReactors
Age (years)
Chart 6. Worldwide Reactor Age
Number of Reactors
GW of Net Capacity
The weighted average age for US
reactors is 34.4 years. However, a
combination of consistently higher gas
prices and renewable energy growth that
is below lofty expectations will mean
fewer reactor retirements than would
otherwise be expected.
Source: IAEA|PRIS
Source: IAEA|PRIS
APRIL 2014
6
RESEARCH & OPINION
hindering the competitiveness of NPPs. As well, increased scrutiny by
the Nuclear Regulatory Commission (NRC), though unlikely, of older
reactors could potentially increase capital and maintenance costs for
utilities. The combination of these risks would lead to a rash of reactor
retirements and our bear case assumption of 82 operational reactors
by 2020. For reasons listed above we do not believe this scenario will
come to fruition (Table 2).
China – a new hope
China is a markedly different and refreshing story. Though the China
General Nuclear Corporation (CGN) and China National Nuclear
Corporation (CNNC) secured a large minority stake in the recently
announced multibillion dollar Hinkley C project in the UK, the real
growth market for nuclear is in China (Chart 4). Given China’s
favourable nuclear power performance since 1996 and continued
commitments we anticipate 23.6 GW of capacity additional capacity by
2020 (Table 3). With air quality becoming a serious concern within
China and less opposition to the politburo policies, there is no reason
to expect growth of nuclear generating capacity in China to slow. Even
with more modest growth for Chinese electricity generation, the
forecast total net 40.5-44.7 GW of nuclear capacity will likely represent
approximately only 4% of total electricity generated in 2020.
Conclusion
Due to continued headwinds for the commercial nuclear industry
throughout the OECD (Organisation for Economic Co-operation and
Development), representing 79% of total nuclear consumption in 2012,
we have revised down our future spot price estimates (Table 4).
Prodigious Chinese nuclear growth and Japanese reactor restarts will
be partly offset by declining demand out of the US (Chart 6).
Therefore, our base case growth forecast for aggregate annual NPP
requirements from China, Japan, and the US is an additional 20.7
million pounds of U3O8 in 2020 (Table 5). Meanwhile, Cameco expects
production from Cigar Lake to be at optimal capacity of close to 18
million pounds of U3O8 by 2018.
We believe the current spot price of U$34.70/lbs U3O8 continuing to
languish under our 2014 bear case annual average price target of
U$40.72/lbs is telling (Table 4). The percentage of spot market
transactions over the period 2011 to 2013 remains above the long-term
trend.
12
This situation is unlikely to reverse, and alleviate downward
pressure on the spot price, until Japanese reactors officially begin to
restart. We continue to believe the Athabasca Basin (Basin), as a low-
12
Ux Weekly, “2013 Uranium Spot Market Review”, Feb 3, 2014
“This wine is too good for toast-drinking,
my dear. You don't want to mix emotions
up with a wine like that. You lose the
taste.”
- Ernest Hemmingway, The Sun Also
Rises
Table 2. USA 2020 U3O8 Requirements Scenario Analysis
Operable
Reactors
Number of
reactors
Reference
Unit
Power (MW)
Annual U3O8
Demand (thousands
of lbs)
Current as at
March 2014
100 98560 48,917.39
2020 Bear Case 82 84219 40,741.24
2020 Base Case 93 94262 45,599.57
2020 Best Case 97 98730 47,760.99
Table 3. China 2020 Base Case Annual U3O8 Demand
Operable
Reactors
Number of
reactors
Reference
Unit
Power (MW)
Annual U3O8
Demand
(thousands of lbs)
Current as at
March 2014
21 16,914 10,978.63
2020 completed
constructions
23 23,576 15,206.63
Total 44 40,490 23,440.60
Table 4. ZC U3O8 spot price estimates
Annual mean
Current
Base Case Bear Case
2013 39.74 N/A
2014 44.73 40.72
2015 49.33 44.63
2016 53.96 48.07
2017 59.00 52.26
2018 63.48 57.06
Source: IAEA|PRIS, WNA, ZC estimates
Source: IAEA|PRIS, WNA, ZC estimates
Source: ZC estimates
APRIL 2014
7
RESEARCH & OPINION
cost producer, provides a certain measure of prolonged downside price
risk while offering significant upside potential. Given the uncertainty
surrounding global uranium requirement for NPPs and the likely
scenario that most utilities have probably accumulated significant of
fuel due to the heavy discount between the spot and long-term price,
there is tremendous value in being a low cost producer (Chart 7).
The Athabasca Basin – update on our investment thesis
We have and continue to believe that the Athabasca Basin region is
the best place to explore for, and mine, uranium. Grade is the number-
one reason. Additionally, Saskatchewan is an attractive place to build a
mine, ranking 12 out of 112 jurisdictions worldwide in the recent Fraser
Institute Global Mining Survey.
13
There is necessary infrastructure
(roads, power, mills, etc.) in much of the region, especially in the
eastern side of the Basin where CCO’s McArthur River and Cigar Lake
mines are situated. Infrastructure is a major factor that influences the
economics of a potential mine; the less material that you have to
physically mine, truck and process, the more lucrative your operation.
The main risk in the Basin continues to be the inherent uncertainty in
exploration, which can be compounded as depth increases. However,
given uncertainty surrounding the future uranium price environment,
the potential rewards for finding premium deposits will continue to
further incentivise exploration in the Basin. Many believe that a long-
term price of $60/lbs U3O8 is needed to properly incentivise investment
and maintain production for close to 33% of the world's high cost
production; though our own analysis indicates this is closer to 25%. I
believe the fact that Paladin Energy Ltd. (TSX: PDN) is placing
operations at its Kayelekera mine in Malawi on care and maintenance
(after continued operating losses) illustrates the material difference in
cost structures that exist for producers outside the Basin and a few
pockets in the US. Recent business developments from Denison Mines
(TSX: DML) – spinning off its African operations, bolstering the 2014
Basin exploration budget, and planning to acquire Enexco Limited –
upholds our investment thesis. Exploration companies focused in the
Basin hold a lottery ticket to a massive deposit. Hathor Exploration is
an excellent example of a company that in 2006 had a market cap of
about $6M, discovered the world-class Roughrider deposit in 2008,
and was bought by Rio Tinto in 2012 for $654M. As a low-cost
producer, if the uranium price remains under distress, the Basin should
attract both domestic and foreign exploration dollars (Appendix A).
Within Zimtu Capital’s portfolio (TSXv: ZC), two uranium exploration
companies focused in the Basin recently were able to raise capital in
13
Fraser Institute, “ Survey of Mining Companies: 2013”, Cervantes, Miguel et al, Mar 3, 2014
$0
$20
$40
$60
$80
$100
$120
$140
Chart 7. Spot vs Long-Term Monthly
Average Price, USD per pound U3O8
Spot
Long-term
Table 5. Summation: 2020 Scenario Analysis
Annual U3O8 demand (thousands of lbs) U3O8 spot
price est.
(U$/lbs)Japan China USA
Added
demand
2014 952 10,979 48,917 - 44.73
Base 12,516 23,441 45,600 20,709 63.99
Bear 8,925 19,074 40,741 7,893 50.63
Best 15,469 26,137 47,761 28,519 69.89
Uranium exploration companies focused
in the Athabasca Basin hold a lottery
ticket to a massive deposit.
Source: IAEA|PRIS, WNA, ZC estimates
Source: CCO
APRIL 2014
8
RESEARCH & OPINION
short order, both exercising the full over allotment option. NexGen
Energy (TSXv: NXE) announced a C$10 million bought deal on March
4, which closed on March 26 for gross proceeds of C$11.5 million to
advance on-going exploration efforts. Lakeland Resources (TSXv: LK)
announced a C$2 million brokered private placement on Feb 24 which
closed on March 20 for gross proceeds of C$2.8 million. Using a small
sample size to extrapolate over a much larger market is risky, and yet
these financings do indicate increased investor risk appetite and
optimism in the Basin.
Lakeland Update
Recapping our previous note on Lakeland Resources (TSXv: LK), the
Company has a strong technical team with a clearly defined business
strategy, and has added professional uranium and nuclear expertise to
the advisory board. LK has a large land package with historic data.
LK’s focus has been to enhance this historical data with modern at-
surface geological and geophysical techniques before partnering the
individual projects for drilling. In this way, LK is able to diversify some
of the exploration risk by working on multiple targets. The large land
package also allows LK the freedom to act as a property vendor.
Gibbon’s Creek is the first target identified by the Company. The target
property is in the north of the Basin, totals 12,711 hectares, and is less
than 3 km from the closest community (Stoney Rapids).
Significant Corporate Updates - Timeline
Dec. 4 – LK announced a joint venture with Declan Resources (TSXv:
LAN) on their Gibbon’s Creek target whereby, LAN can earn up to 70%
interest in the property given certain obligations are met, including
annual cash and share payments, and exploration expenditures (Table
8). The recent appointment of Mr. David Miller, the former head of
Strathmore Minerals Corp, to president, director, and CEO brings
credibility and Athabasca Basin uranium focus to LAN. We believe
LAN will be able to meet annual exploration requirements for Gibbon’s
Creek.
Jan 8 – Update on recent at-surface exploration work at Gibbons
Creek. Both boulder prospecting and DC-Resistivity support historic
data (Table 7). Notably, RadonEx results were extremely positive
helping to define high priority drill targets.
Mar 18 – JV partners announce of a modern electromagnetic ground
survey to confirm historical data. The phase one drill program is
expected to include up to 15 holes totalling 2500 meters. Permits have
been received to drill up to 52 holes on the property.
Table. 6 Share Information
Symbols: TSX-V: LK
FSE: 6LL
Shares Outstanding: 48.96 M
Options: 3.02 M
Warrants: 18.04 M
Fully Diluted: 70.02 M
Market Cap (as at closing bid on
11/11/13): C$8.81 M
Table 7. Historic and Current Exploration Efforts for
Otherside & Riou Lake Properties
Company Exploration Activities
Assay (best
result)
Eldorado
Nuclear
Boulder Prospecting 4.9% U3O8
Soil Geochemical surveys 5-10 ppm U
Ground
Geophysics:
DC
resistivity identified
3x1 km
gravity low
Horizontal
loop EM
Gravity
Drilling 0.18% U3O8
UEX
Corp
Airborne
Geophysics: MegaTEM Eldorado
and UEX
exploration
efforts costs
upwards of
$3M
Gravity
Magnetic
RadioMetric
LK
Boulder Prospecting 4.28% U3O8
RadonEx soil survey
9.93
pCi/m2
/sec
38 line-km DC Resistivity
east-west
resistivity
low
Drilling
start
expected
2Q14
Within Zimtu Capital’s portfolio (TSXv:
ZC), two uranium exploration
companies focused in the Basin
recently were able to raise capital both
timely and efficiently – and were
oversubscribed.
Source: LK
Source: LK
APRIL 2014
9
RESEARCH & OPINION
Mar 20 – LK closed a brokered and non-brokered private placement
for gross proceeds of C$2.83 million. The Company issues 5.885
million flow-through (FT) units and approximately 6.47 million ordinary
shares (Table 6). The use of proceeds from the FT units will be used to
cover qualified Canadian exploration expenses, while the proceeds
from ordinary shares issued (“hard dollars”) will be used for exploration
of the Company’s properties in the Basin.
Conclusion
Over the last twelve months LK has successfully transition into a junior
uranium explorer focused in the Athabasca Basin. The company
building process was executed in measured increments including the
addition of a diverse group of professional to the advisory board,
changes to the board of directors, acquiring an impressive land
package, and completing two successful financings. With the expected
exploratory drilling set to begin in the near future on the Gibbons Creek
property, LK has shown successful skill at proving up potential uranium
targets. If LK can replicate their business model on additional
properties they will be well positioned to offer a diverse portfolio of
uranium exploration targets and provide shareholders with value.
Appendix A
Table 8. LAN Future Commitments for Gibbon's Creek
JV
Term
(months)
Interest
Earned
(%)
Cash
Consideration
(CAD)
Share
Consideration
Exploration
Commitment
(CAD)
12 50 100,000 2,000,000 1,250,000
24 10 100,000 2,000,000 1,250,000
36 5 300,000 2,000,000 2,000,000
48 5 1,000,000 5,000,000 2,000,000
Total 70 1,500,000 11,000,000 6,500,000
Source: LK
Source: Luke Schuss
APRIL 2014
10
RESEARCH & OPINION
Appendix B
Table 9. Scenario Analysis for Japanese Nuclear Reactors by 2020
Tiers (most to
least likely)
Reactor units (alphabetical
within each tier)
Reference
Unit
Power (MW)
Expected
Load (MW)
2020 annual U3O8
Demand
(thousands of lbs)
Tier 1
GENKAI-4 1,127 914 545.19
KASHIWAZAKI KARIWA-6 1,315 1,066 636.14
KASHIWAZAKI KARIWA-7 1,315 1,066 636.14
SENDAI-2 846 686 409.26
TOMARI-3 866 702 418.93
Tier 2
GENKAI-3 1,127 914 545.19
KASHIWAZAKI KARIWA-4 1,067 865 516.17
SENDAI-1 846 686 409.26
SHIMANE-2 789 640 381.68
TOMARI-1 550 446 266.06
TOMARI-2 550 446 266.06
Tier 3
GENKAI-2 529 429 255.91
HIGASHI DORI-1
(TOHOKU)
1,067 865 516.17
KASHIWAZAKI KARIWA-3 1,067 865 516.17
KASHIWAZAKI KARIWA-5 1,067 865 516.17
SHIKA-2 1,108 899 536.00
Tier 4
IKATA-3 846 686 409.26
KASHIWAZAKI KARIWA-2 1,067 865 516.17
ONAGAWA-3 796 646 385.07
SHIKA-1 505 410 244.30
Bear Case 20 total reactors restarted with annual required U3O8 = 8,925.25
Tier 5
KASHIWAZAKI KARIWA-1 1,067 865 516.17
OHI-3 1,127 914 545.19
OHI-4 1,127 914 545.19
ONAGAWA-2 796 646 385.07
TAKAHAMA-3 830 673 401.52
TAKAHAMA-4 830 673 401.52
TSURUGA-2 1,108 899 536.00
Tier 6 IKATA-2 538 436 260.26
Base Case 28 total reactors restarted with annual required U3O8 = 12,516.15
Under
Construction
OHMA 1,325 1,075 640.97
SHIMANE-3 1,325 1,075 640.97
Tier 7
HAMAOKA-5 1,325 1,075 640.97
IKATA-1 538 436 260.26
ONAGAWA-1 498 404 240.91
Tier 8 HAMAOKA-4 1,092 886 528.26
Best Case 34 reactors (32 restarts + 2 completed), annual required U3O8 = 15,468.50
Probabilistic Seismic Hazard Map
Category 1 (Blue) – mega earthquakes
with reoccurrence interval estimate of
hundreds of years
Category 2 (Green) – mega
earthquakes with unknown
reoccurrence
Category 3 (Yellow) – shallow
earthquakes with reoccurrence interval
estimate of thousands of years.
Source: j-SHIS
APRIL 2014
11
RESEARCH & OPINION
DISCLAIMER AND INFORMATION ON FORWARD LOOKING STATEMENTS:
All statements in this newsletter, other than statements of historical fact should be considered forward-looking statements. These statements
relate to future events or future performance. Forward looking statements in this document include that discoveries in the Athabasca Basin
should command a premium; that Lakeland can become a low cost producer of uranium; that the Radon Ex results are expected shortly and
positive news would bring market awareness to Lakeland’s stock; that Lakeland can drill 1700 meters and retain sufficient G&A capital, and
that Lakeland will be able to raise additional cash at prices above $0.10. These statements involve known and unknown risks, uncertainties
and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements.
Risks include misinterpretation of data, inability to attract and retain qualified people, inability to raise sufficient funds to carry out our plans
or even to continue operations, among other risks. Risks and uncertainties respecting mineral exploration companies and Lakeland in
particular are disclosed in the annual financial or other filing documents of Lakeland and other junior mineral exploration companies as filed
with the relevant securities commissions, and should be reviewed by any reader of this article. Despite encouraging results, there may be no
commercially viable minerals on Lakeland’s property, and even if there were, Lakeland may not be able to commercialize them.
About Zimtu Capital Corp. and this Newsletter
This newsletter is an online financial newsletter published by Zimtu Capital Corp. We are focused on researching and marketing resource
public companies where we have a pre-existing relationship (almost always as shareholder and a provider of services). Nothing in this article
should be construed as a solicitation to buy or sell any securities mentioned anywhere in this newsletter. This article is intended for
informational and entertainment purposes only. The author of this article and its publishers bear no liability for losses and/or damages
arising from the use of this article.
Be advised, Zimtu Capital Corp. and its employees are not registered broker-dealers or financial advisors. Before investing in any securities,
you should consult with your financial advisor or a registered broker-dealer.
Never make an investment based solely on what you read in an online newsletter, including Zimtu's online newsletter, especially if the
investment involves a small, thinly-traded company that isn't well known.
Most companies featured in our newsletter, and on our website, are paying clients of Zimtu (including Lakeland - details in this disclaimer).
In many cases we own shares in the companies we feature. For those reasons, please be aware that we are extremely biased in regards to the
companies we write about and feature in our newsletter and on our website. Because our featured companies pay fees to us for our
administration and public relations services and rent and we almost always own shares in the companies we feature, you must recognize the
inherent conflict of interest involved that may influence our perspective on these companies. This is why we stress that you conduct
extensive due diligence as well as seek the advice of your financial advisor and a registered broker-dealer before investing in any securities.
When investing in speculative stocks of this nature, it is possible to lose your entire investment.
Information in this report has been obtained from sources considered to be reliable, but we do not guarantee that it is accurate or complete.
Our views and opinions regarding the companies we feature on in our newsletter are our own views and are based on information that we
have received, which we assumed to be reliable. We do not guarantee that any of the companies mentioned in this newsletter will perform as
we expect, and any comparisons we have made to other companies may not be valid or come into effect.
Cautionary Note Concerning Estimates of Inferred Resources:
This report may use the term "Inferred Resources". U.S. investors are advised that while this term is recognized and required
by Canadian regulations, the Securities and Exchange Commission does not recognize it. "Inferred Resources" have a great
amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be
assumed that all or any part of an Inferred Resource will ever be upgraded to a higher category. Under Canadian rules,
estimates of "Inferred Resources" may not form the basis of feasibility or other economic studies. U.S. investors are also
cautioned not to assume that all or any part of an "Inferred Mineral Resource" exists, or is economically or legally mineable.
APRIL 2014
12
RESEARCH & OPINION
Questions? Contact Us.
VANCOUVER, CANADA
DAVE HODGE
President & Director
PH. +1.604.681.1568
dhodge@zimtu.com
STUTTGART, GERMANY
SVEN OLSSON
Director
PH. +49 7161 290 967
solsson@zimtu.com
TORONTO, CANADA
SEAN CHARLAND
Director
PH. +1.647.926.7326
scharland@zimtu.com
VANCOUVER, CANADA
DEREK HAMILL
Research & Communications
PH. +1.604.681.1568
dhamill@zimtu.com
VANCOUVER, CANADA
MATT SROKA
Corporate Communications
PH. +1.604.681.1568
msroka@zimtu.com
VANCOUVER, CANADA
RYAN FLETCHER
Director & Property Transactions
PH. +1.604.681.1568
rflectcher@zimtu.com
DISCLAIMER
Zimtu Capital Corp. is an investment issuer. We are focused on investing in, researching and marketing resource public companies. Nothing in
this article should be construed as a solicitation to buy or sell any securities mentioned anywhere in this newsletter. This article is intended for
informational and entertainment purposes only. The author of this article and its publishers bear no liability for losses and/or damages arising
from the use of this article. In all cases we own shares in the companies we feature. For those reasons, please be aware that we are extremely
biased in regards to the companies we write about and feature in our newsletter and on our website.
Be advised, Zimtu Capital Corp. and its employees are not a registered broker-dealer or financial advisor. Before investing in any securities, you
should consult with your financial advisor and a registered broker-dealer.

More Related Content

What's hot

FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...aeijjournal
 
General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011Rameez Shaikh
 
Wind Energy: Analysis and Application-Crimson Publishers
Wind Energy: Analysis and Application-Crimson PublishersWind Energy: Analysis and Application-Crimson Publishers
Wind Energy: Analysis and Application-Crimson PublishersCrimsonpublishersPRSP
 
Energy Analysis of Nigeria
Energy Analysis of NigeriaEnergy Analysis of Nigeria
Energy Analysis of NigeriaSatya Sahoo
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanOECDGlobalRelations
 
WG Nuclear Energy Presentation
WG Nuclear Energy PresentationWG Nuclear Energy Presentation
WG Nuclear Energy PresentationWilliam Gaskell
 
MI-GE Whitepaper
MI-GE WhitepaperMI-GE Whitepaper
MI-GE WhitepaperYousif Abd
 
MI-GE Whitepaper
MI-GE WhitepaperMI-GE Whitepaper
MI-GE WhitepaperOmar Saif
 
ENSURING AFFORDABLE FUEL SECURITY FOR NTPC
ENSURING AFFORDABLE FUEL SECURITY FOR NTPCENSURING AFFORDABLE FUEL SECURITY FOR NTPC
ENSURING AFFORDABLE FUEL SECURITY FOR NTPCSantosh Verma
 
ORBIT The Nuclear Renaissance
ORBIT The Nuclear RenaissanceORBIT The Nuclear Renaissance
ORBIT The Nuclear RenaissanceBetsy Mauchley
 
2012 06 13 EDK NERA USA executive summit with notes
2012 06 13 EDK NERA USA executive summit with notes2012 06 13 EDK NERA USA executive summit with notes
2012 06 13 EDK NERA USA executive summit with notesEdward Kee
 
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013RCREEE
 

What's hot (17)

FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
 
Psmp 2010
Psmp 2010Psmp 2010
Psmp 2010
 
General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011General Carbon Newsletter - November 2011
General Carbon Newsletter - November 2011
 
America’s Electricity Generation Capacity
America’s Electricity Generation CapacityAmerica’s Electricity Generation Capacity
America’s Electricity Generation Capacity
 
Wind Energy: Analysis and Application-Crimson Publishers
Wind Energy: Analysis and Application-Crimson PublishersWind Energy: Analysis and Application-Crimson Publishers
Wind Energy: Analysis and Application-Crimson Publishers
 
Energy Analysis of Nigeria
Energy Analysis of NigeriaEnergy Analysis of Nigeria
Energy Analysis of Nigeria
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programs
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
WG Nuclear Energy Presentation
WG Nuclear Energy PresentationWG Nuclear Energy Presentation
WG Nuclear Energy Presentation
 
MI-GE Whitepaper
MI-GE WhitepaperMI-GE Whitepaper
MI-GE Whitepaper
 
MI-GE Whitepaper
MI-GE WhitepaperMI-GE Whitepaper
MI-GE Whitepaper
 
ENSURING AFFORDABLE FUEL SECURITY FOR NTPC
ENSURING AFFORDABLE FUEL SECURITY FOR NTPCENSURING AFFORDABLE FUEL SECURITY FOR NTPC
ENSURING AFFORDABLE FUEL SECURITY FOR NTPC
 
Rnpp najmul
Rnpp najmulRnpp najmul
Rnpp najmul
 
L010437380
L010437380L010437380
L010437380
 
ORBIT The Nuclear Renaissance
ORBIT The Nuclear RenaissanceORBIT The Nuclear Renaissance
ORBIT The Nuclear Renaissance
 
2012 06 13 EDK NERA USA executive summit with notes
2012 06 13 EDK NERA USA executive summit with notes2012 06 13 EDK NERA USA executive summit with notes
2012 06 13 EDK NERA USA executive summit with notes
 
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
RCREEE-enerMENA_sudan renewable energy projects-21.08.2013
 

Similar to Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Exploration

Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...theijes
 
20110922 versant on uranium
20110922 versant on uranium20110922 versant on uranium
20110922 versant on uraniumAndrew Fleischer
 
World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015WEC Italia
 
Decommissioning Renaissance HPS News vol43no06 June 2015
Decommissioning Renaissance HPS News vol43no06 June 2015Decommissioning Renaissance HPS News vol43no06 June 2015
Decommissioning Renaissance HPS News vol43no06 June 2015Eric Abelquist
 
Fukushima Nuclear Disaster Impact on Global LNG Prices
Fukushima Nuclear Disaster Impact on Global LNG PricesFukushima Nuclear Disaster Impact on Global LNG Prices
Fukushima Nuclear Disaster Impact on Global LNG PricesEce Dincaslan
 
Japan solar power sector analysis
Japan solar power sector analysisJapan solar power sector analysis
Japan solar power sector analysisRajesh Sarma
 
CASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdf
CASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdfCASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdf
CASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdfaonetelecompune
 
An Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor RestartsAn Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor RestartsJoe Bacchus
 
IJSRED-V2I1P7
IJSRED-V2I1P7IJSRED-V2I1P7
IJSRED-V2I1P7IJSRED
 
Japan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy PolicyJapan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy PolicyJoe Bacchus
 
Lattice energy LLC - Climate change can reduce wind and solar power output - ...
Lattice energy LLC - Climate change can reduce wind and solar power output - ...Lattice energy LLC - Climate change can reduce wind and solar power output - ...
Lattice energy LLC - Climate change can reduce wind and solar power output - ...Lewis Larsen
 
ICONE-17, Paper75648, ANS Award Version
ICONE-17, Paper75648, ANS Award VersionICONE-17, Paper75648, ANS Award Version
ICONE-17, Paper75648, ANS Award Versiontokuhiro
 
Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...
Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...
Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...Bienvenido "Nonoy" Oplas, Jr.
 
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONALIMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONALJoe Miller
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate PresentationDev Randhawa
 
Nuclear Energy Myths and Realities by Soumya Dutta
Nuclear Energy Myths and Realities by Soumya DuttaNuclear Energy Myths and Realities by Soumya Dutta
Nuclear Energy Myths and Realities by Soumya Duttasambhaavnaa
 

Similar to Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Exploration (20)

Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...
 
20110922 versant on uranium
20110922 versant on uranium20110922 versant on uranium
20110922 versant on uranium
 
World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015
 
Decommissioning Renaissance HPS News vol43no06 June 2015
Decommissioning Renaissance HPS News vol43no06 June 2015Decommissioning Renaissance HPS News vol43no06 June 2015
Decommissioning Renaissance HPS News vol43no06 June 2015
 
After Fukushima, Quo Vadis Re
After Fukushima, Quo Vadis ReAfter Fukushima, Quo Vadis Re
After Fukushima, Quo Vadis Re
 
Fukushima Nuclear Disaster Impact on Global LNG Prices
Fukushima Nuclear Disaster Impact on Global LNG PricesFukushima Nuclear Disaster Impact on Global LNG Prices
Fukushima Nuclear Disaster Impact on Global LNG Prices
 
Japan solar power sector analysis
Japan solar power sector analysisJapan solar power sector analysis
Japan solar power sector analysis
 
CASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdf
CASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdfCASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdf
CASE STUDY 14-1 Prescriptive and emergent strategies- profits from the.pdf
 
Nuclear technology
Nuclear technologyNuclear technology
Nuclear technology
 
JAPAN (6)
JAPAN (6)JAPAN (6)
JAPAN (6)
 
An Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor RestartsAn Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor Restarts
 
IJSRED-V2I1P7
IJSRED-V2I1P7IJSRED-V2I1P7
IJSRED-V2I1P7
 
Japan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy PolicyJapan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy Policy
 
Lattice energy LLC - Climate change can reduce wind and solar power output - ...
Lattice energy LLC - Climate change can reduce wind and solar power output - ...Lattice energy LLC - Climate change can reduce wind and solar power output - ...
Lattice energy LLC - Climate change can reduce wind and solar power output - ...
 
ICONE-17, Paper75648, ANS Award Version
ICONE-17, Paper75648, ANS Award VersionICONE-17, Paper75648, ANS Award Version
ICONE-17, Paper75648, ANS Award Version
 
Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...
Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...
Energy and Rice Deficiency: Reform Challenges for the Last Quarter of the Aqu...
 
51664
5166451664
51664
 
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONALIMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
IMPROVING NUCLEAR POWER PLANT\'S OPERATIONAL
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate Presentation
 
Nuclear Energy Myths and Realities by Soumya Dutta
Nuclear Energy Myths and Realities by Soumya DuttaNuclear Energy Myths and Realities by Soumya Dutta
Nuclear Energy Myths and Realities by Soumya Dutta
 

More from Lakeland Resources Inc. (TSXv: LK)

News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...
News Release:  Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...News Release:  Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...
News Release: Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Options Fond du Lac Property
News Release:  Lakeland Resources Inc. Options Fond du Lac PropertyNews Release:  Lakeland Resources Inc. Options Fond du Lac Property
News Release: Lakeland Resources Inc. Options Fond du Lac PropertyLakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Closes Additional $400,000 Private Pla...
News Release:  Lakeland Resources Inc. Closes Additional $400,000 Private Pla...News Release:  Lakeland Resources Inc. Closes Additional $400,000 Private Pla...
News Release: Lakeland Resources Inc. Closes Additional $400,000 Private Pla...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Closes $1.8 Million Private Placement
News Release:  Lakeland Resources Closes $1.8 Million Private PlacementNews Release:  Lakeland Resources Closes $1.8 Million Private Placement
News Release: Lakeland Resources Closes $1.8 Million Private PlacementLakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Announces $1.8 Million Private Placeme...
News Release:  Lakeland Resources Inc. Announces $1.8 Million Private Placeme...News Release:  Lakeland Resources Inc. Announces $1.8 Million Private Placeme...
News Release: Lakeland Resources Inc. Announces $1.8 Million Private Placeme...Lakeland Resources Inc. (TSXv: LK)
 
Corporate Profile: Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...
Corporate Profile:  Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...Corporate Profile:  Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...
Corporate Profile: Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...
News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...
News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...
News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...
News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...Lakeland Resources Inc. (TSXv: LK)
 
Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)
Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)
Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Acquires Newnham Lake Property
News Release:  Lakeland Resources Acquires Newnham Lake PropertyNews Release:  Lakeland Resources Acquires Newnham Lake Property
News Release: Lakeland Resources Acquires Newnham Lake PropertyLakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Provides Update on 2014 Exploration for the...
News Release:  Lakeland Resources Provides Update on 2014 Exploration for the...News Release:  Lakeland Resources Provides Update on 2014 Exploration for the...
News Release: Lakeland Resources Provides Update on 2014 Exploration for the...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...
News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...
News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...Lakeland Resources Inc. (TSXv: LK)
 
Russ Dratwa Newsletter: Uranium - Tom Drolet, Lakeland Advisor
Russ Dratwa Newsletter: Uranium - Tom Drolet, Lakeland AdvisorRuss Dratwa Newsletter: Uranium - Tom Drolet, Lakeland Advisor
Russ Dratwa Newsletter: Uranium - Tom Drolet, Lakeland AdvisorLakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...
News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...
News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...
News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...
News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...Lakeland Resources Inc. (TSXv: LK)
 
News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...
News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...
News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...Lakeland Resources Inc. (TSXv: LK)
 
Zimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca Basin
Zimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca BasinZimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca Basin
Zimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca BasinLakeland Resources Inc. (TSXv: LK)
 

More from Lakeland Resources Inc. (TSXv: LK) (20)

News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...News Release:  Lakeland Resources Reports Uranium Values at the Gibbons Creek...
News Release: Lakeland Resources Reports Uranium Values at the Gibbons Creek...
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
 
News Release: Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...
News Release:  Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...News Release:  Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...
News Release: Lakeland Resource Inc. Commences Drilling at Star/Gibbons Cree...
 
News Release: Lakeland Resources Inc. Options Fond du Lac Property
News Release:  Lakeland Resources Inc. Options Fond du Lac PropertyNews Release:  Lakeland Resources Inc. Options Fond du Lac Property
News Release: Lakeland Resources Inc. Options Fond du Lac Property
 
News Release: Lakeland Resources Inc. Closes Additional $400,000 Private Pla...
News Release:  Lakeland Resources Inc. Closes Additional $400,000 Private Pla...News Release:  Lakeland Resources Inc. Closes Additional $400,000 Private Pla...
News Release: Lakeland Resources Inc. Closes Additional $400,000 Private Pla...
 
News Release: Lakeland Resources Closes $1.8 Million Private Placement
News Release:  Lakeland Resources Closes $1.8 Million Private PlacementNews Release:  Lakeland Resources Closes $1.8 Million Private Placement
News Release: Lakeland Resources Closes $1.8 Million Private Placement
 
News Release: Lakeland Resources Inc. Announces $1.8 Million Private Placeme...
News Release:  Lakeland Resources Inc. Announces $1.8 Million Private Placeme...News Release:  Lakeland Resources Inc. Announces $1.8 Million Private Placeme...
News Release: Lakeland Resources Inc. Announces $1.8 Million Private Placeme...
 
Corporate Profile: Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...
Corporate Profile:  Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...Corporate Profile:  Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...
Corporate Profile: Uranium Explorer Lakeland Resources Inc. (TSXv: LK) (Octo...
 
News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...
News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...
News Release: Lakeland Resources Inc. Discovers Radioactive Springs at Lazy E...
 
News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...
News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...
News Release: Lakeland Resources Inc. Discovers Gold - PGE Mineralization at ...
 
Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)
Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)
Map of the Athabasca Basin Uranium Projects of Lakeland Resources (July 2014)
 
News Release: Lakeland Resources Acquires Newnham Lake Property
News Release:  Lakeland Resources Acquires Newnham Lake PropertyNews Release:  Lakeland Resources Acquires Newnham Lake Property
News Release: Lakeland Resources Acquires Newnham Lake Property
 
News Release: Lakeland Resources Provides Update on 2014 Exploration for the...
News Release:  Lakeland Resources Provides Update on 2014 Exploration for the...News Release:  Lakeland Resources Provides Update on 2014 Exploration for the...
News Release: Lakeland Resources Provides Update on 2014 Exploration for the...
 
News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...
News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...
News Release: Lakeland Resources Inc. Expands High Priority Lazy Edward Bay U...
 
Russ Dratwa Newsletter: Uranium - Tom Drolet, Lakeland Advisor
Russ Dratwa Newsletter: Uranium - Tom Drolet, Lakeland AdvisorRuss Dratwa Newsletter: Uranium - Tom Drolet, Lakeland Advisor
Russ Dratwa Newsletter: Uranium - Tom Drolet, Lakeland Advisor
 
News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...
News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...
News Release: Lakeland Resources Inc. (TSXv: LK) Acquires 5 New Uranium Prope...
 
News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...
News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...
News Release: Lakeland Resources Inc. Announces Private Placement Over-Subscr...
 
News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...
News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...
News Release: Lakeland Resources Inc. (TSXv: LK) and Declan Plan Further Expl...
 
Zimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca Basin
Zimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca BasinZimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca Basin
Zimtu Capital Corp.: Canadian Uranium Exploration & The Athabasca Basin
 
Lakeland Resources Inc. (TSXv: LK) Shareholder Letter Q1 2014
Lakeland Resources Inc. (TSXv: LK) Shareholder Letter Q1 2014Lakeland Resources Inc. (TSXv: LK) Shareholder Letter Q1 2014
Lakeland Resources Inc. (TSXv: LK) Shareholder Letter Q1 2014
 

Recently uploaded

The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书Fis s
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...aditipandeya
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书Fir La
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 

Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Exploration

  • 1. APRIL 2014 1 RESEARCH & OPINION 1 1. We reaffirm our investment belief in the Athabasca Basin, as a low-cost producer, to be uniquely well-positioned to provide significant value despite an uncertain uranium prices environment. Page 6 2. Japan’s central government has officially announced its desire to restart idled nuclear reactors. Decreasing reliance on fossil fuel imports is crucial for the success of Abenomics. However, politics can, and routinely does, trump economics. Page 2 3. The outlook for the US nuclear industry is improving due to potential upcoming shortfalls in gas and coal electricity generation. Page 4 4. LK has completed a second round financing, raising gross proceeds of C$2,830,536. The results were impressive, raising more than 2.5 times LK’s first round of financing only 5 months ago. Page 8 RESEARCH & OPINION DEREK HAMILL Research & Communications Zimtu Capital Corp. dhamill@zimtu.com 0 200 400 600 800 1000 1200 0 0.05 0.1 0.15 0.2 0.25 0.3 Mar-13 May-13 Jul-13 Sep-13 Nov-13 Jan-14 Mar-14 Volume(thousands) Price($) Lakeland Resources Inc (TSXv: LK) (FSE:6LL) Update Athabasca Basin Uranium Exploration | Outlook: Remains Positive SUMMARY:
  • 2. APRIL 2014 2 RESEARCH & OPINION Uranium Market Overview – 2014 Q1 There is renewed optimism for uranium equities following a three year bear market sparked by the infamous Fukushima Daiichi nuclear accident (Chart 1). On Feb 25 th the Japanese government, led by Shinzo Abe, reversed the previous governments’ decision to phase out nuclear energy. Instead, nuclear is set to regain its former stature as an integral component of Japan’s electricity generation; although no timetable for reactor restarts was given (Map 1). The use of Nuclear remains a heated topic with the Japanese public, as recent polls show the majority of respondents continue to oppose reactor restarts and a large majority harbour some degree of concern over reactor safety. 2 Therefore, restarting idled Japanese reactors is likely to be contested, indicating the industry-wide completion of the process will be gradual with reactors restarting in stages. Depending on the enforcement of new safety regulations and the degree of compromise from the Abe led government, a sizable contingent of reactors may never restart (Chart 2). Japan Reactor Restarts – return of the Jedi Our model suggests a base case scenario of 28 eventual reactors restarting; though the confidence range is wide reflecting the uncertain political environment. Alternatively, Cameco (TSX: CCO) had predicted 35 to 40 reactors would eventually restart. 3 This seems optimistic as we assume no BWR (boiling water reactor) with Mark 1 containment built in the 70’s will restart. This was the model in operation at Fukushima Daiichi. Though utilities operating these reactors had made improvements prior to 2011, the design appears inadequate to deal with Japan’s seismic threats (earthquakes, volcanic activity, and tsunamis) post Fukushima. 4 Even BWRs with Mark 2 containment may have a tough time receiving approval to restart without massive capital expenditure (Capex) improvements depending on their geographic location. Japan has three BWRs with Mark 1 containment still listed as operational, and eleven BWRs with Mark 2 containment. 5 It should be noted that the unlike its predecessor, Japan’s National Regulatory Authority (NRA) has the legal authority to “back-fit” new rules and regulations onto existing nuclear power plants (NPPs). This has left the future of NPPs located at Tsuruga, Ohi, Higashidori, Mihama, and Shika up in the air due to their proximity to potentially active faults. New rules incorporating multi-layered protective measures will also increase one-time costs for NPPs exposed to tsunami risk along Japan’s eastern seaboard and NPP’s with active 2 The ASAHI SHIMBUN, “ASAHI POLL: 59% oppose restart of nuclear reactors”, Mar 18, 2014 3 Cameco Corp Presentation at the Canaccord Resource Conference, Oct 2013 4 Reuters, Japan reactor design caused GE engineer to quit, Mar 15, 2011 5 Hitachi-GE Nuclear Energy, “Advanced Boiling Water Reactor”, page 4 -10% 0% 10% 20% 30% 40% 50% 60% 2-Jan 16-Jan 30-Jan 13-Feb 27-Feb 13-Mar 27-Mar Chart 1. Athabasca Basin Sample Performances for 2014 DML CCO LK US, 100 France, 58 Japan*, 48 Russia, 33 Other, 196 Chart 2. Operational Reactor. Regional Breakdown Source: Yahoo Finance Source: IAEA|PRIS
  • 3. APRIL 2014 3 RESEARCH & OPINION volcanoes within 160km radius. 6 There are numerous potentially active faults and volcanoes in Japan, such that the definition of what is or should be considered active will have a material impact on utilities that own idled reactors. Regulatory uncertainty – and the subsequent costs – mixed with significant anti-nuclear public support makes predicting reactor restarts difficult and the timing next to impossible. Due to the large amount of uncertainty we use an ordinal ranking methodology based on an assigned score using the independent variables: 1. Seismic safety 2. Reactor age and model 3. Proximity to major population densities 4. Reputation of the operating utility 5. Exposure to tsunami potential 6. Concentration of reactors 7. Access to consumer base To determine seismic risk, we used mapping from Japan Seismic Hazard Information Station (j-SHIS) which included information regarding: Probability of major seismic hazards within 30 years Major active fault zones Major subduction-zone earthquakes Occurrence region of subduction-zone earthquakes We believe both reactors currently under construction will be completed as both scored well and are modern third generation advanced reactors. Japan’s referenced nuclear output under our best case scenario could approach 32 GW of capacity representing 75% of the Country’s currently listed operable net generating capacity. The results of the model are encouraging as the Sendai-2 and to lesser extent Sendai-1 reactors were estimated to be amongst the first group to restart. The Sendai NPP has been short-listed by the Japanese NRA clearing the way for the first potential NPP restart (Appendix B). We use the 10-year average load factor for reactors world-wide prior to the Fukushima accident to determine what the expected load is for Japanese reactor restarts (Table 1). Interestingly, it appears in aggregate Japan’s NPPs utilization was below the world average in 2010. Economically, Japan’s nuclear industry, though not necessarily individual utilities, should be healthier with fewer operating reactors 6 Japanese NRA, “Enforcement of the New Regulatory Requirements for Commercial Nuclear Power Reactors", Jul 8, 2013 Table 1. Japan 2020 U3O8 Requirements Scenario Analysis Operable Reactors Number of reactors Reference Unit Power (MW) Annual U3O8 Demand (thousands of lbs) Current as at March 2014 48 42,388 951.52 2020 Bear Case 20 18,450 8,925.25 2020 Base Case 28 25,873 12,516.15 2020 Best Case 34 31,976 15,468.50 Map 1. Location of Japanese NPPs Acknowledgment of Japan’s direct and indirect seismic risks, plus broader and stronger enforcement powers for the NRA creates significant uncertainty in forecasting the quantity and timing of reactor restarts. Source: National Report of Japan for the Fifth Review Meeting of the Convention on Nuclear Safety, Sep 2010, Government of Japan Source: IAEA|PRIS, WNA (World Nuclear Association), and ZC estimates
  • 4. APRIL 2014 4 RESEARCH & OPINION running with increased efficiency once necessary write-downs are taken. USA – the empire strikes back In the US, the commercial nuclear industry may soon be able to arrest the recent declines experienced. Nuclear power consumption peaked in 2010 before declining year-on-year (YoY) in 2011 and 2012. Last year saw four reactors close prior to the expiration of their operating licences and EDF announce its withdrawal from the US nuclear market due to unfavourable economics (Chart 3). 7 Exelon, the largest US utility of NPPs has indicated possible closures of some reactors. And while there are four new reactors under construction in the US – the first to have broken ground in over thirty years – the expected completion dates are anything but certain. Construction of the Watts Bar-1 reactor, which was connected to the power grid in 1996, took over twenty-three years to complete; while construction of Watts Bar-2, expected to be commercially operable in 2016, started in 1972 before being suspended for almost twenty-two years in 1985. Therefore, little faith should be placed behind either project – Summer or Vogtle – reactor construction schedules. Both appear to be facing cost overruns and difficulties honouring their respective timetables. 8 However, a combination of factors should help the US commercial nuclear industry through 2015 to 2020: 1. Coal – Routinely represents more than 40% of the annual US electricity generation and was relied upon this winter due to consistently frigid temperatures. 9 However, new environmental regulations will have a material impact on US coal consumption. The US Energy Information Administration (US eia) estimates coal consumption to decrease by 3.1% in 2015 ahead of the implementation of the EPA’s Mercury and Air Toxics Standards (MATS) in 2016. Further, the US eia reference case projects the retirement of 60 GW of capacity by 2020 which was approximately 20% of the total US electricity generating capacity from coal in 2012. 2. Gas – Represents approx. 27% of US electricity generation. Unlike, NPPs whose cost structure when operating is largely fixed, electricity generation from natural gas has significant variable costs. Any prolonged material increase in the price of natural gas from the mid-U$4/MMBtu range should cause the wholesale price of electricity to rise, improving the 7 Reuters, “UPDATE 3-EDF exits US nuclear, ups earnings outlook”, Jul 30, 2013 8 Direct Testimony of Steven C. Prenovitz on behalf of Nuclear Watch South | Docket 29849 9 US eia, “US Coal Consumption”, Short-Term Energy Outlook, Mar 11, 2014 “Let your reason serve to make the truth appear where it seems hid, and hide the false seems true” -Shakespeare, Measure for Measure US, 32 UK, 29 Germany, 27 France, 12 Other, 49 Chart 3. Reactors in Permanent Shutdown Breakdown by Country China, 28 Russia, 10India, 6 Korea, 5 Other, 23 Chart 4. Reactors Under Construction, Regional Breakdown Source: IAEA|PRIS Source: IAEA|PRIS
  • 5. APRIL 2014 5 RESEARCH & OPINION competitiveness of nuclear generation. Reasons for natural gas prices to likely rise in the US over the medium term are: (i) increased demand from utilities as coal plants retire, (ii) the adequacy of the natural gas transportation and storage network to handle greater than expected demand. 10 Anecdotally, the Keystone XL application was filed 5.5-years ago, leading to the conclusion that lobbying by special interest groups will stifle necessary infrastructure investment. (iii) Potential relaxation of the rules surrounding the export of liquefied natural gas (LNG), which could lead to increased domestic natural gas prices. 3. Wind – The recent expiry of the Production Tax Credit (PTC), which historically has had massive positive impacts on wind infrastructure investment dollars. 11 A recent PwC global survey showed the majority of utilities expect onshore wind to be economic by 2030. However, without the ongoing renewal of the PTC it is difficult to see how the US will achieve the administrations renewable energy targets by 2020. Therefore, a reasonable case can be made for fewer reactor retirements throughout the forecast period than would otherwise be expected. Currently there are no operational reactors older than 45 years in the US. Reactor retirements are likely to occur after the initial operating licence has been extended and before large fixed capital expenditures are incurred (Chart 5). During this stage, Capex requirements are more likely to be greater than the expected net present value (NPV) of future cash flows due to much shorter time horizons. In the base case scenario, we expect five BWRs with Mark 1 containment vessels to be retired along with the three oldest PWR reactors by 2020. The US currently has 23 BWRs with Mark 1 containment. However, none are situated along the pacific coast and the US does not face the same hazardous seismic risks as Japan. We discount the probability of current reactors under construction being commercially operational within the forecast period, anticipating only the Watts Bar-2 reactor to be connected to the grid. Our base case leads to the conclusion of 93 operational reactors by 2020. It is important to note there are risks to the US commercial nuclear industry. Domestic natural gas prices remaining at current levels over the forecast period due to consistently mild weather and continued economic malaise would keep wholesale electricity prices low, 10 North AmericanNaturalGas Midstream Infrastructure Through 2035: A Secure Energy Future 11 “Global Trends in Renewable Energy Investment 2013” Frankfurt School UNEP Centre & Bloomberg New Energy Finance 0 2 4 6 8 10 12 0 2 4 6 8 10 12 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 GWofNetCapacity NumberofReactors Age (years) Chart 5. USA Reactor Age and Net Capacity Reactors, number GW of Capacity 0 5 10 15 20 25 30 35 0 5 10 15 20 25 30 35 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 GWofNetCapacity NumberofReactors Age (years) Chart 6. Worldwide Reactor Age Number of Reactors GW of Net Capacity The weighted average age for US reactors is 34.4 years. However, a combination of consistently higher gas prices and renewable energy growth that is below lofty expectations will mean fewer reactor retirements than would otherwise be expected. Source: IAEA|PRIS Source: IAEA|PRIS
  • 6. APRIL 2014 6 RESEARCH & OPINION hindering the competitiveness of NPPs. As well, increased scrutiny by the Nuclear Regulatory Commission (NRC), though unlikely, of older reactors could potentially increase capital and maintenance costs for utilities. The combination of these risks would lead to a rash of reactor retirements and our bear case assumption of 82 operational reactors by 2020. For reasons listed above we do not believe this scenario will come to fruition (Table 2). China – a new hope China is a markedly different and refreshing story. Though the China General Nuclear Corporation (CGN) and China National Nuclear Corporation (CNNC) secured a large minority stake in the recently announced multibillion dollar Hinkley C project in the UK, the real growth market for nuclear is in China (Chart 4). Given China’s favourable nuclear power performance since 1996 and continued commitments we anticipate 23.6 GW of capacity additional capacity by 2020 (Table 3). With air quality becoming a serious concern within China and less opposition to the politburo policies, there is no reason to expect growth of nuclear generating capacity in China to slow. Even with more modest growth for Chinese electricity generation, the forecast total net 40.5-44.7 GW of nuclear capacity will likely represent approximately only 4% of total electricity generated in 2020. Conclusion Due to continued headwinds for the commercial nuclear industry throughout the OECD (Organisation for Economic Co-operation and Development), representing 79% of total nuclear consumption in 2012, we have revised down our future spot price estimates (Table 4). Prodigious Chinese nuclear growth and Japanese reactor restarts will be partly offset by declining demand out of the US (Chart 6). Therefore, our base case growth forecast for aggregate annual NPP requirements from China, Japan, and the US is an additional 20.7 million pounds of U3O8 in 2020 (Table 5). Meanwhile, Cameco expects production from Cigar Lake to be at optimal capacity of close to 18 million pounds of U3O8 by 2018. We believe the current spot price of U$34.70/lbs U3O8 continuing to languish under our 2014 bear case annual average price target of U$40.72/lbs is telling (Table 4). The percentage of spot market transactions over the period 2011 to 2013 remains above the long-term trend. 12 This situation is unlikely to reverse, and alleviate downward pressure on the spot price, until Japanese reactors officially begin to restart. We continue to believe the Athabasca Basin (Basin), as a low- 12 Ux Weekly, “2013 Uranium Spot Market Review”, Feb 3, 2014 “This wine is too good for toast-drinking, my dear. You don't want to mix emotions up with a wine like that. You lose the taste.” - Ernest Hemmingway, The Sun Also Rises Table 2. USA 2020 U3O8 Requirements Scenario Analysis Operable Reactors Number of reactors Reference Unit Power (MW) Annual U3O8 Demand (thousands of lbs) Current as at March 2014 100 98560 48,917.39 2020 Bear Case 82 84219 40,741.24 2020 Base Case 93 94262 45,599.57 2020 Best Case 97 98730 47,760.99 Table 3. China 2020 Base Case Annual U3O8 Demand Operable Reactors Number of reactors Reference Unit Power (MW) Annual U3O8 Demand (thousands of lbs) Current as at March 2014 21 16,914 10,978.63 2020 completed constructions 23 23,576 15,206.63 Total 44 40,490 23,440.60 Table 4. ZC U3O8 spot price estimates Annual mean Current Base Case Bear Case 2013 39.74 N/A 2014 44.73 40.72 2015 49.33 44.63 2016 53.96 48.07 2017 59.00 52.26 2018 63.48 57.06 Source: IAEA|PRIS, WNA, ZC estimates Source: IAEA|PRIS, WNA, ZC estimates Source: ZC estimates
  • 7. APRIL 2014 7 RESEARCH & OPINION cost producer, provides a certain measure of prolonged downside price risk while offering significant upside potential. Given the uncertainty surrounding global uranium requirement for NPPs and the likely scenario that most utilities have probably accumulated significant of fuel due to the heavy discount between the spot and long-term price, there is tremendous value in being a low cost producer (Chart 7). The Athabasca Basin – update on our investment thesis We have and continue to believe that the Athabasca Basin region is the best place to explore for, and mine, uranium. Grade is the number- one reason. Additionally, Saskatchewan is an attractive place to build a mine, ranking 12 out of 112 jurisdictions worldwide in the recent Fraser Institute Global Mining Survey. 13 There is necessary infrastructure (roads, power, mills, etc.) in much of the region, especially in the eastern side of the Basin where CCO’s McArthur River and Cigar Lake mines are situated. Infrastructure is a major factor that influences the economics of a potential mine; the less material that you have to physically mine, truck and process, the more lucrative your operation. The main risk in the Basin continues to be the inherent uncertainty in exploration, which can be compounded as depth increases. However, given uncertainty surrounding the future uranium price environment, the potential rewards for finding premium deposits will continue to further incentivise exploration in the Basin. Many believe that a long- term price of $60/lbs U3O8 is needed to properly incentivise investment and maintain production for close to 33% of the world's high cost production; though our own analysis indicates this is closer to 25%. I believe the fact that Paladin Energy Ltd. (TSX: PDN) is placing operations at its Kayelekera mine in Malawi on care and maintenance (after continued operating losses) illustrates the material difference in cost structures that exist for producers outside the Basin and a few pockets in the US. Recent business developments from Denison Mines (TSX: DML) – spinning off its African operations, bolstering the 2014 Basin exploration budget, and planning to acquire Enexco Limited – upholds our investment thesis. Exploration companies focused in the Basin hold a lottery ticket to a massive deposit. Hathor Exploration is an excellent example of a company that in 2006 had a market cap of about $6M, discovered the world-class Roughrider deposit in 2008, and was bought by Rio Tinto in 2012 for $654M. As a low-cost producer, if the uranium price remains under distress, the Basin should attract both domestic and foreign exploration dollars (Appendix A). Within Zimtu Capital’s portfolio (TSXv: ZC), two uranium exploration companies focused in the Basin recently were able to raise capital in 13 Fraser Institute, “ Survey of Mining Companies: 2013”, Cervantes, Miguel et al, Mar 3, 2014 $0 $20 $40 $60 $80 $100 $120 $140 Chart 7. Spot vs Long-Term Monthly Average Price, USD per pound U3O8 Spot Long-term Table 5. Summation: 2020 Scenario Analysis Annual U3O8 demand (thousands of lbs) U3O8 spot price est. (U$/lbs)Japan China USA Added demand 2014 952 10,979 48,917 - 44.73 Base 12,516 23,441 45,600 20,709 63.99 Bear 8,925 19,074 40,741 7,893 50.63 Best 15,469 26,137 47,761 28,519 69.89 Uranium exploration companies focused in the Athabasca Basin hold a lottery ticket to a massive deposit. Source: IAEA|PRIS, WNA, ZC estimates Source: CCO
  • 8. APRIL 2014 8 RESEARCH & OPINION short order, both exercising the full over allotment option. NexGen Energy (TSXv: NXE) announced a C$10 million bought deal on March 4, which closed on March 26 for gross proceeds of C$11.5 million to advance on-going exploration efforts. Lakeland Resources (TSXv: LK) announced a C$2 million brokered private placement on Feb 24 which closed on March 20 for gross proceeds of C$2.8 million. Using a small sample size to extrapolate over a much larger market is risky, and yet these financings do indicate increased investor risk appetite and optimism in the Basin. Lakeland Update Recapping our previous note on Lakeland Resources (TSXv: LK), the Company has a strong technical team with a clearly defined business strategy, and has added professional uranium and nuclear expertise to the advisory board. LK has a large land package with historic data. LK’s focus has been to enhance this historical data with modern at- surface geological and geophysical techniques before partnering the individual projects for drilling. In this way, LK is able to diversify some of the exploration risk by working on multiple targets. The large land package also allows LK the freedom to act as a property vendor. Gibbon’s Creek is the first target identified by the Company. The target property is in the north of the Basin, totals 12,711 hectares, and is less than 3 km from the closest community (Stoney Rapids). Significant Corporate Updates - Timeline Dec. 4 – LK announced a joint venture with Declan Resources (TSXv: LAN) on their Gibbon’s Creek target whereby, LAN can earn up to 70% interest in the property given certain obligations are met, including annual cash and share payments, and exploration expenditures (Table 8). The recent appointment of Mr. David Miller, the former head of Strathmore Minerals Corp, to president, director, and CEO brings credibility and Athabasca Basin uranium focus to LAN. We believe LAN will be able to meet annual exploration requirements for Gibbon’s Creek. Jan 8 – Update on recent at-surface exploration work at Gibbons Creek. Both boulder prospecting and DC-Resistivity support historic data (Table 7). Notably, RadonEx results were extremely positive helping to define high priority drill targets. Mar 18 – JV partners announce of a modern electromagnetic ground survey to confirm historical data. The phase one drill program is expected to include up to 15 holes totalling 2500 meters. Permits have been received to drill up to 52 holes on the property. Table. 6 Share Information Symbols: TSX-V: LK FSE: 6LL Shares Outstanding: 48.96 M Options: 3.02 M Warrants: 18.04 M Fully Diluted: 70.02 M Market Cap (as at closing bid on 11/11/13): C$8.81 M Table 7. Historic and Current Exploration Efforts for Otherside & Riou Lake Properties Company Exploration Activities Assay (best result) Eldorado Nuclear Boulder Prospecting 4.9% U3O8 Soil Geochemical surveys 5-10 ppm U Ground Geophysics: DC resistivity identified 3x1 km gravity low Horizontal loop EM Gravity Drilling 0.18% U3O8 UEX Corp Airborne Geophysics: MegaTEM Eldorado and UEX exploration efforts costs upwards of $3M Gravity Magnetic RadioMetric LK Boulder Prospecting 4.28% U3O8 RadonEx soil survey 9.93 pCi/m2 /sec 38 line-km DC Resistivity east-west resistivity low Drilling start expected 2Q14 Within Zimtu Capital’s portfolio (TSXv: ZC), two uranium exploration companies focused in the Basin recently were able to raise capital both timely and efficiently – and were oversubscribed. Source: LK Source: LK
  • 9. APRIL 2014 9 RESEARCH & OPINION Mar 20 – LK closed a brokered and non-brokered private placement for gross proceeds of C$2.83 million. The Company issues 5.885 million flow-through (FT) units and approximately 6.47 million ordinary shares (Table 6). The use of proceeds from the FT units will be used to cover qualified Canadian exploration expenses, while the proceeds from ordinary shares issued (“hard dollars”) will be used for exploration of the Company’s properties in the Basin. Conclusion Over the last twelve months LK has successfully transition into a junior uranium explorer focused in the Athabasca Basin. The company building process was executed in measured increments including the addition of a diverse group of professional to the advisory board, changes to the board of directors, acquiring an impressive land package, and completing two successful financings. With the expected exploratory drilling set to begin in the near future on the Gibbons Creek property, LK has shown successful skill at proving up potential uranium targets. If LK can replicate their business model on additional properties they will be well positioned to offer a diverse portfolio of uranium exploration targets and provide shareholders with value. Appendix A Table 8. LAN Future Commitments for Gibbon's Creek JV Term (months) Interest Earned (%) Cash Consideration (CAD) Share Consideration Exploration Commitment (CAD) 12 50 100,000 2,000,000 1,250,000 24 10 100,000 2,000,000 1,250,000 36 5 300,000 2,000,000 2,000,000 48 5 1,000,000 5,000,000 2,000,000 Total 70 1,500,000 11,000,000 6,500,000 Source: LK Source: Luke Schuss
  • 10. APRIL 2014 10 RESEARCH & OPINION Appendix B Table 9. Scenario Analysis for Japanese Nuclear Reactors by 2020 Tiers (most to least likely) Reactor units (alphabetical within each tier) Reference Unit Power (MW) Expected Load (MW) 2020 annual U3O8 Demand (thousands of lbs) Tier 1 GENKAI-4 1,127 914 545.19 KASHIWAZAKI KARIWA-6 1,315 1,066 636.14 KASHIWAZAKI KARIWA-7 1,315 1,066 636.14 SENDAI-2 846 686 409.26 TOMARI-3 866 702 418.93 Tier 2 GENKAI-3 1,127 914 545.19 KASHIWAZAKI KARIWA-4 1,067 865 516.17 SENDAI-1 846 686 409.26 SHIMANE-2 789 640 381.68 TOMARI-1 550 446 266.06 TOMARI-2 550 446 266.06 Tier 3 GENKAI-2 529 429 255.91 HIGASHI DORI-1 (TOHOKU) 1,067 865 516.17 KASHIWAZAKI KARIWA-3 1,067 865 516.17 KASHIWAZAKI KARIWA-5 1,067 865 516.17 SHIKA-2 1,108 899 536.00 Tier 4 IKATA-3 846 686 409.26 KASHIWAZAKI KARIWA-2 1,067 865 516.17 ONAGAWA-3 796 646 385.07 SHIKA-1 505 410 244.30 Bear Case 20 total reactors restarted with annual required U3O8 = 8,925.25 Tier 5 KASHIWAZAKI KARIWA-1 1,067 865 516.17 OHI-3 1,127 914 545.19 OHI-4 1,127 914 545.19 ONAGAWA-2 796 646 385.07 TAKAHAMA-3 830 673 401.52 TAKAHAMA-4 830 673 401.52 TSURUGA-2 1,108 899 536.00 Tier 6 IKATA-2 538 436 260.26 Base Case 28 total reactors restarted with annual required U3O8 = 12,516.15 Under Construction OHMA 1,325 1,075 640.97 SHIMANE-3 1,325 1,075 640.97 Tier 7 HAMAOKA-5 1,325 1,075 640.97 IKATA-1 538 436 260.26 ONAGAWA-1 498 404 240.91 Tier 8 HAMAOKA-4 1,092 886 528.26 Best Case 34 reactors (32 restarts + 2 completed), annual required U3O8 = 15,468.50 Probabilistic Seismic Hazard Map Category 1 (Blue) – mega earthquakes with reoccurrence interval estimate of hundreds of years Category 2 (Green) – mega earthquakes with unknown reoccurrence Category 3 (Yellow) – shallow earthquakes with reoccurrence interval estimate of thousands of years. Source: j-SHIS
  • 11. APRIL 2014 11 RESEARCH & OPINION DISCLAIMER AND INFORMATION ON FORWARD LOOKING STATEMENTS: All statements in this newsletter, other than statements of historical fact should be considered forward-looking statements. These statements relate to future events or future performance. Forward looking statements in this document include that discoveries in the Athabasca Basin should command a premium; that Lakeland can become a low cost producer of uranium; that the Radon Ex results are expected shortly and positive news would bring market awareness to Lakeland’s stock; that Lakeland can drill 1700 meters and retain sufficient G&A capital, and that Lakeland will be able to raise additional cash at prices above $0.10. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. Risks include misinterpretation of data, inability to attract and retain qualified people, inability to raise sufficient funds to carry out our plans or even to continue operations, among other risks. Risks and uncertainties respecting mineral exploration companies and Lakeland in particular are disclosed in the annual financial or other filing documents of Lakeland and other junior mineral exploration companies as filed with the relevant securities commissions, and should be reviewed by any reader of this article. Despite encouraging results, there may be no commercially viable minerals on Lakeland’s property, and even if there were, Lakeland may not be able to commercialize them. About Zimtu Capital Corp. and this Newsletter This newsletter is an online financial newsletter published by Zimtu Capital Corp. We are focused on researching and marketing resource public companies where we have a pre-existing relationship (almost always as shareholder and a provider of services). Nothing in this article should be construed as a solicitation to buy or sell any securities mentioned anywhere in this newsletter. This article is intended for informational and entertainment purposes only. The author of this article and its publishers bear no liability for losses and/or damages arising from the use of this article. Be advised, Zimtu Capital Corp. and its employees are not registered broker-dealers or financial advisors. Before investing in any securities, you should consult with your financial advisor or a registered broker-dealer. Never make an investment based solely on what you read in an online newsletter, including Zimtu's online newsletter, especially if the investment involves a small, thinly-traded company that isn't well known. Most companies featured in our newsletter, and on our website, are paying clients of Zimtu (including Lakeland - details in this disclaimer). In many cases we own shares in the companies we feature. For those reasons, please be aware that we are extremely biased in regards to the companies we write about and feature in our newsletter and on our website. Because our featured companies pay fees to us for our administration and public relations services and rent and we almost always own shares in the companies we feature, you must recognize the inherent conflict of interest involved that may influence our perspective on these companies. This is why we stress that you conduct extensive due diligence as well as seek the advice of your financial advisor and a registered broker-dealer before investing in any securities. When investing in speculative stocks of this nature, it is possible to lose your entire investment. Information in this report has been obtained from sources considered to be reliable, but we do not guarantee that it is accurate or complete. Our views and opinions regarding the companies we feature on in our newsletter are our own views and are based on information that we have received, which we assumed to be reliable. We do not guarantee that any of the companies mentioned in this newsletter will perform as we expect, and any comparisons we have made to other companies may not be valid or come into effect. Cautionary Note Concerning Estimates of Inferred Resources: This report may use the term "Inferred Resources". U.S. investors are advised that while this term is recognized and required by Canadian regulations, the Securities and Exchange Commission does not recognize it. "Inferred Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of "Inferred Resources" may not form the basis of feasibility or other economic studies. U.S. investors are also cautioned not to assume that all or any part of an "Inferred Mineral Resource" exists, or is economically or legally mineable.
  • 12. APRIL 2014 12 RESEARCH & OPINION Questions? Contact Us. VANCOUVER, CANADA DAVE HODGE President & Director PH. +1.604.681.1568 dhodge@zimtu.com STUTTGART, GERMANY SVEN OLSSON Director PH. +49 7161 290 967 solsson@zimtu.com TORONTO, CANADA SEAN CHARLAND Director PH. +1.647.926.7326 scharland@zimtu.com VANCOUVER, CANADA DEREK HAMILL Research & Communications PH. +1.604.681.1568 dhamill@zimtu.com VANCOUVER, CANADA MATT SROKA Corporate Communications PH. +1.604.681.1568 msroka@zimtu.com VANCOUVER, CANADA RYAN FLETCHER Director & Property Transactions PH. +1.604.681.1568 rflectcher@zimtu.com DISCLAIMER Zimtu Capital Corp. is an investment issuer. We are focused on investing in, researching and marketing resource public companies. Nothing in this article should be construed as a solicitation to buy or sell any securities mentioned anywhere in this newsletter. This article is intended for informational and entertainment purposes only. The author of this article and its publishers bear no liability for losses and/or damages arising from the use of this article. In all cases we own shares in the companies we feature. For those reasons, please be aware that we are extremely biased in regards to the companies we write about and feature in our newsletter and on our website. Be advised, Zimtu Capital Corp. and its employees are not a registered broker-dealer or financial advisor. Before investing in any securities, you should consult with your financial advisor and a registered broker-dealer.