November2014- April 2015 Offshore SubstationforwindfarmGoodewind 1+2: Site IntegrationTestof
HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV
GIS switchgearbays,2 180 MW transformersand20 34 kV switchgearbayson
bothplatforms.BuildatFabricom, Antwerp,Belgium.
November2014 RenoNord districtheatingplant:Faultfindingingeneratorprotection,and
installation,testandcommissioningof new temporarygeneratorprotection.8
MW
September-Oktober2014 Energinet.dk,TSOinDenmark. Testof 18 150 kV distance relays.
September2014 Aars districtheatingplant:5kV insulationresistancetestof generator.7MW
September2014 Aars districtheatingplant:Replacementof new synchronizer.Engineering,
testand commissioning
September2014 Thy-MorsEnergi:Faultfindingandtestof 2 60 kV distance relays.
August2014 TopDanmarkInsurance company:Reportconcerningoperationof 60 kV grid
system.
June-July2014 Onshore SubstationforWestermostRough,Hull England.Assistance for
finishingSite integrationtest.
January-May2014 Offshore SubstationforwindfarmWestermostRough:Site IntegrationTestof
HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV
GIS switchgearbays,2 160 MW transformersand14 34 kV switchgearbays.
Buildat STX,SaintNazaire,France.
December2013 Kyndbyturbine 2PowerPlant:Testof generatorprotection.250MW
Oktober-December2013 Koege districtheatingplantturbine8.Installationandcommissioningof new
generatorprotection.
Oktober2013 Avedore PowerPlant:Faultfindingongasturbine 522 generatorprotection.xx
MW
September2013 Dong EnergyBorkumRiffgrundI:Meteringreporttogrid operatorTenneT
(TSOin NL andpart of Germany)
- 2. September2013 Aars districtheatingplant.Replacementof syncrocheckrelayandtestof
generatorprotection.7MW
September2013 Hirtshalsdistrictheatingplant:5kV insulationresistance testof generator,
testof generatorprotectionandreplacementandtestof new 10 kV
overcurrentrelay.18 MW.
May 2013 Offshore SubstationWalney:Reportconcerningprimarytestof relays.
April 2013 Aars districtheatingplant.5kV generatorinsulationresistance test.7MW
Marts-July2013 Offshore SubstationforwindfarmBorkumRiffgrundI:Site IntegrationTestof
HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV
GIS switchgearbays,2 140 MW transformersand20 34 kV switchgearbays.
Buildat BladtIndustries,Aalborg,Denmark.
January2013 Investigationof Bangui Baywindfarmfor faultyfull loadoperation.Evaluation
of the presence of necessaryinbuildwindturbinecapacitorinstallation.34
MW
December2012 Hjorringdistrictheatingplant.5kV insulationresistancetestof generator.60
MW
September2012 Koege districtheatingplantturbine7:5 kV insulationresistance testof
generator, testof generatorprotectionandreplacementandtestof new
synchronizingcheckrelay.
September2012 Frederikshavndistrictheatingplant:Testof generatorprotection.18 MW
September2012 MaabjergvaerketDistrictheatingplant:Replacementandtest of new df/dt
relay.28 MW
June 2012 AsnaesPowerPlant:Programmingof new settingsinexistinggenerator
protection,andtestof the new settings.280 MW
May 2012 MaabjergvaerketDistrictheatingplant:Faultfindingindf/dtprotection.28
MW
April 2012 Kyndbyturbine 1+2 PowerPlant:Programmingof new settingsinexisting
generatorprotection,andtestof the new settings.2x250 MW
April 2012 Thisteddistrictheatingplant.Testof generatorprotection.4MW
February2012 RenoNorddistrict heatingplant.Testof generatorprotection.8MW
February2012 Investigationof Bangui Baywindfarmfor faultyfull loadoperation.
Installationof distance relaysforfaultdiagnosis.34MW
October2011 Hanstholmdistrictheatingplant.Faultfindingin 1 generatorprotectionand
overall testof generatorprotectionfor4gas engines.4x 1,6 MW