November2014- April 2015 Offshore SubstationforwindfarmGoodewind 1+2: Site IntegrationTestof
HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV
GIS switchgearbays,2 180 MW transformersand20 34 kV switchgearbayson
bothplatforms.BuildatFabricom, Antwerp,Belgium.
November2014 RenoNord districtheatingplant:Faultfindingingeneratorprotection,and
installation,testandcommissioningof new temporarygeneratorprotection.8
MW
September-Oktober2014 Energinet.dk,TSOinDenmark. Testof 18 150 kV distance relays.
September2014 Aars districtheatingplant:5kV insulationresistancetestof generator.7MW
September2014 Aars districtheatingplant:Replacementof new synchronizer.Engineering,
testand commissioning
September2014 Thy-MorsEnergi:Faultfindingandtestof 2 60 kV distance relays.
August2014 TopDanmarkInsurance company:Reportconcerningoperationof 60 kV grid
system.
June-July2014 Onshore SubstationforWestermostRough,Hull England.Assistance for
finishingSite integrationtest.
January-May2014 Offshore SubstationforwindfarmWestermostRough:Site IntegrationTestof
HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV
GIS switchgearbays,2 160 MW transformersand14 34 kV switchgearbays.
Buildat STX,SaintNazaire,France.
December2013 Kyndbyturbine 2PowerPlant:Testof generatorprotection.250MW
Oktober-December2013 Koege districtheatingplantturbine8.Installationandcommissioningof new
generatorprotection.
Oktober2013 Avedore PowerPlant:Faultfindingongasturbine 522 generatorprotection.xx
MW
September2013 Dong EnergyBorkumRiffgrundI:Meteringreporttogrid operatorTenneT
(TSOin NL andpart of Germany)
September2013 Aars districtheatingplant.Replacementof syncrocheckrelayandtestof
generatorprotection.7MW
September2013 Hirtshalsdistrictheatingplant:5kV insulationresistance testof generator,
testof generatorprotectionandreplacementandtestof new 10 kV
overcurrentrelay.18 MW.
May 2013 Offshore SubstationWalney:Reportconcerningprimarytestof relays.
April 2013 Aars districtheatingplant.5kV generatorinsulationresistance test.7MW
Marts-July2013 Offshore SubstationforwindfarmBorkumRiffgrundI:Site IntegrationTestof
HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV
GIS switchgearbays,2 140 MW transformersand20 34 kV switchgearbays.
Buildat BladtIndustries,Aalborg,Denmark.
January2013 Investigationof Bangui Baywindfarmfor faultyfull loadoperation.Evaluation
of the presence of necessaryinbuildwindturbinecapacitorinstallation.34
MW
December2012 Hjorringdistrictheatingplant.5kV insulationresistancetestof generator.60
MW
September2012 Koege districtheatingplantturbine7:5 kV insulationresistance testof
generator, testof generatorprotectionandreplacementandtestof new
synchronizingcheckrelay.
September2012 Frederikshavndistrictheatingplant:Testof generatorprotection.18 MW
September2012 MaabjergvaerketDistrictheatingplant:Replacementandtest of new df/dt
relay.28 MW
June 2012 AsnaesPowerPlant:Programmingof new settingsinexistinggenerator
protection,andtestof the new settings.280 MW
May 2012 MaabjergvaerketDistrictheatingplant:Faultfindingindf/dtprotection.28
MW
April 2012 Kyndbyturbine 1+2 PowerPlant:Programmingof new settingsinexisting
generatorprotection,andtestof the new settings.2x250 MW
April 2012 Thisteddistrictheatingplant.Testof generatorprotection.4MW
February2012 RenoNorddistrict heatingplant.Testof generatorprotection.8MW
February2012 Investigationof Bangui Baywindfarmfor faultyfull loadoperation.
Installationof distance relaysforfaultdiagnosis.34MW
October2011 Hanstholmdistrictheatingplant.Faultfindingin 1 generatorprotectionand
overall testof generatorprotectionfor4gas engines.4x 1,6 MW
October2011 Hjorringdistrictheatingplant.Testof generatorprotection,10kV overcurrent
relays,andgeneratorcircuitbreakertest.60 MW
July2011 Investigationof Bangui Baywindfarmin the Phillipinesforfaultyfull load
operation.Preliminarystudies.34MW
June 2011 KyndbyPowerPlant.Testandcommissioningof new generatorprotection.for
gasturbine blackstartunit.3.7 MW

More Related Content

What's hot

Tecnotion tbw series_specsheet
Tecnotion tbw series_specsheetTecnotion tbw series_specsheet
Tecnotion tbw series_specsheetElectromate
 
Space Qualified Resistors From Vishay Foil Resistors A VPG Brand
Space Qualified Resistors From Vishay Foil Resistors A VPG BrandSpace Qualified Resistors From Vishay Foil Resistors A VPG Brand
Space Qualified Resistors From Vishay Foil Resistors A VPG BrandRick Grigalunas
 
SPICE MODEL of CUS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CUS05S40 (Professional Model) in SPICE PARKSPICE MODEL of CUS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CUS05S40 (Professional Model) in SPICE PARKTsuyoshi Horigome
 
Polemounted gas insulated load break switch
Polemounted gas insulated load break switchPolemounted gas insulated load break switch
Polemounted gas insulated load break switchJoeChueng
 
Mark Wilkinson - Company presentation
Mark Wilkinson - Company presentationMark Wilkinson - Company presentation
Mark Wilkinson - Company presentationDutch Power
 
Ernest Houtzager - Betrouwbaar meten van transformator verliezen
Ernest Houtzager - Betrouwbaar meten van transformator verliezen Ernest Houtzager - Betrouwbaar meten van transformator verliezen
Ernest Houtzager - Betrouwbaar meten van transformator verliezen Dutch Power
 
Thermal Reliability for FinFET based Designs
Thermal Reliability for FinFET based DesignsThermal Reliability for FinFET based Designs
Thermal Reliability for FinFET based DesignsAnsys
 
SPICE MODEL of CTS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CTS05S40 (Professional Model) in SPICE PARKSPICE MODEL of CTS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CTS05S40 (Professional Model) in SPICE PARKTsuyoshi Horigome
 
How Small Can You Detect with DAS: A Case Study in the Bōsō Peninsula
How Small Can You Detect with DAS: A Case Study in the Bōsō PeninsulaHow Small Can You Detect with DAS: A Case Study in the Bōsō Peninsula
How Small Can You Detect with DAS: A Case Study in the Bōsō PeninsulaYohanes Nuwara
 
Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...
Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...
Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...AUTHELECTRONIC
 
Reference List (Overseas Market)
Reference List (Overseas Market)Reference List (Overseas Market)
Reference List (Overseas Market)Johnny Chan
 
SPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARK
SPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARKSPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARK
SPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARKTsuyoshi Horigome
 
Introduction of transfromer
Introduction of transfromerIntroduction of transfromer
Introduction of transfromerpretty gurna
 
SPICE MODEL of CTS521 (Professional Model) in SPICE PARK
SPICE MODEL of CTS521 (Professional Model) in SPICE PARKSPICE MODEL of CTS521 (Professional Model) in SPICE PARK
SPICE MODEL of CTS521 (Professional Model) in SPICE PARKTsuyoshi Horigome
 
A VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMME
A VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMMEA VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMME
A VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMMEAM Publications
 
Photovoltaic Training Course - Module 2.6 - Safety and labor risks
Photovoltaic Training Course - Module 2.6 - Safety and labor risksPhotovoltaic Training Course - Module 2.6 - Safety and labor risks
Photovoltaic Training Course - Module 2.6 - Safety and labor risksLeonardo ENERGY
 

What's hot (20)

Progress Report (Nov. 10, 2009)
Progress Report (Nov. 10, 2009)Progress Report (Nov. 10, 2009)
Progress Report (Nov. 10, 2009)
 
Tecnotion tbw series_specsheet
Tecnotion tbw series_specsheetTecnotion tbw series_specsheet
Tecnotion tbw series_specsheet
 
Space Qualified Resistors From Vishay Foil Resistors A VPG Brand
Space Qualified Resistors From Vishay Foil Resistors A VPG BrandSpace Qualified Resistors From Vishay Foil Resistors A VPG Brand
Space Qualified Resistors From Vishay Foil Resistors A VPG Brand
 
5 van aken - ecn ok
5   van aken - ecn ok5   van aken - ecn ok
5 van aken - ecn ok
 
2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...
2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...
2014 PV Performance Modeling Workshop: Isis Power Plant Energy Simulation Too...
 
SPICE MODEL of CUS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CUS05S40 (Professional Model) in SPICE PARKSPICE MODEL of CUS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CUS05S40 (Professional Model) in SPICE PARK
 
Polemounted gas insulated load break switch
Polemounted gas insulated load break switchPolemounted gas insulated load break switch
Polemounted gas insulated load break switch
 
Mark Wilkinson - Company presentation
Mark Wilkinson - Company presentationMark Wilkinson - Company presentation
Mark Wilkinson - Company presentation
 
Ernest Houtzager - Betrouwbaar meten van transformator verliezen
Ernest Houtzager - Betrouwbaar meten van transformator verliezen Ernest Houtzager - Betrouwbaar meten van transformator verliezen
Ernest Houtzager - Betrouwbaar meten van transformator verliezen
 
Thermal Reliability for FinFET based Designs
Thermal Reliability for FinFET based DesignsThermal Reliability for FinFET based Designs
Thermal Reliability for FinFET based Designs
 
Feature iqswap
Feature iqswapFeature iqswap
Feature iqswap
 
SPICE MODEL of CTS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CTS05S40 (Professional Model) in SPICE PARKSPICE MODEL of CTS05S40 (Professional Model) in SPICE PARK
SPICE MODEL of CTS05S40 (Professional Model) in SPICE PARK
 
How Small Can You Detect with DAS: A Case Study in the Bōsō Peninsula
How Small Can You Detect with DAS: A Case Study in the Bōsō PeninsulaHow Small Can You Detect with DAS: A Case Study in the Bōsō Peninsula
How Small Can You Detect with DAS: A Case Study in the Bōsō Peninsula
 
Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...
Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...
Original N-channel MOSFET MMF70R900P 70R900P 70R900 750V 5A TO-220 New MagnaC...
 
Reference List (Overseas Market)
Reference List (Overseas Market)Reference List (Overseas Market)
Reference List (Overseas Market)
 
SPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARK
SPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARKSPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARK
SPICE MODEL of SCS230KE2 (Professional Model) in SPICE PARK
 
Introduction of transfromer
Introduction of transfromerIntroduction of transfromer
Introduction of transfromer
 
SPICE MODEL of CTS521 (Professional Model) in SPICE PARK
SPICE MODEL of CTS521 (Professional Model) in SPICE PARKSPICE MODEL of CTS521 (Professional Model) in SPICE PARK
SPICE MODEL of CTS521 (Professional Model) in SPICE PARK
 
A VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMME
A VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMMEA VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMME
A VSAT LINK MARGIN CALCULATION A TURBO-C PROGRAMME
 
Photovoltaic Training Course - Module 2.6 - Safety and labor risks
Photovoltaic Training Course - Module 2.6 - Safety and labor risksPhotovoltaic Training Course - Module 2.6 - Safety and labor risks
Photovoltaic Training Course - Module 2.6 - Safety and labor risks
 

Viewers also liked (17)

Stage 2 ppt
Stage 2 pptStage 2 ppt
Stage 2 ppt
 
Romblon travel app
Romblon travel appRomblon travel app
Romblon travel app
 
Anshul Sharma Resume
Anshul Sharma ResumeAnshul Sharma Resume
Anshul Sharma Resume
 
Proline Phils (company profile)
Proline Phils (company profile)Proline Phils (company profile)
Proline Phils (company profile)
 
430_2008_Article_81
430_2008_Article_81430_2008_Article_81
430_2008_Article_81
 
event posters
event postersevent posters
event posters
 
Todo primaria
Todo primariaTodo primaria
Todo primaria
 
Rajat Resume latest
Rajat Resume latestRajat Resume latest
Rajat Resume latest
 
Tappy the Tapir game app
Tappy the Tapir game appTappy the Tapir game app
Tappy the Tapir game app
 
Kingdom Magazine
Kingdom MagazineKingdom Magazine
Kingdom Magazine
 
1475-2875-11-231
1475-2875-11-2311475-2875-11-231
1475-2875-11-231
 
Stage 2 ppt
Stage 2 pptStage 2 ppt
Stage 2 ppt
 
iiiiiiiiiiiiii
iiiiiiiiiiiiiiiiiiiiiiiiiiii
iiiiiiiiiiiiii
 
The 8 brochure
The 8 brochureThe 8 brochure
The 8 brochure
 
ad campaigns
ad campaignsad campaigns
ad campaigns
 
PNAS-2013-Gonçalves-19531-6
PNAS-2013-Gonçalves-19531-6PNAS-2013-Gonçalves-19531-6
PNAS-2013-Gonçalves-19531-6
 
Curriculum Vitae norsk_2015 april
Curriculum Vitae norsk_2015 aprilCurriculum Vitae norsk_2015 april
Curriculum Vitae norsk_2015 april
 

Similar to Projects done by Stokholm Engineering

resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Nidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec Corporation
 
Local manifacturing
Local manifacturingLocal manifacturing
Local manifacturingRCREEE
 
Wind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyWind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyRadu Oleniuc
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
Extra High Voltage Underground Power Cable
Extra High Voltage Underground Power CableExtra High Voltage Underground Power Cable
Extra High Voltage Underground Power CableLeonardo ENERGY
 
Nidec asi electric power solutions for marine applications
Nidec asi electric power solutions for marine applicationsNidec asi electric power solutions for marine applications
Nidec asi electric power solutions for marine applicationsNidec Corporation
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_TemplateAlan Simon
 
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...ATIF HUSSAIN
 
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature SensorsDereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature SensorsDerek Murray
 

Similar to Projects done by Stokholm Engineering (20)

resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Nidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deff
 
V O Keeffe
V O KeeffeV O Keeffe
V O Keeffe
 
Yin Sun - Shell
Yin Sun - ShellYin Sun - Shell
Yin Sun - Shell
 
CV-Sven Petersen
CV-Sven PetersenCV-Sven Petersen
CV-Sven Petersen
 
Local manifacturing
Local manifacturingLocal manifacturing
Local manifacturing
 
Wind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyWind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, Germany
 
Innovación tecnológica en Energías Renovables
Innovación tecnológica en Energías RenovablesInnovación tecnológica en Energías Renovables
Innovación tecnológica en Energías Renovables
 
CV 07.12.2015
CV 07.12.2015CV 07.12.2015
CV 07.12.2015
 
Az Zour EPP08
Az Zour EPP08Az Zour EPP08
Az Zour EPP08
 
resume
resumeresume
resume
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
Extra High Voltage Underground Power Cable
Extra High Voltage Underground Power CableExtra High Voltage Underground Power Cable
Extra High Voltage Underground Power Cable
 
Resume Francis
Resume FrancisResume Francis
Resume Francis
 
Nidec asi electric power solutions for marine applications
Nidec asi electric power solutions for marine applicationsNidec asi electric power solutions for marine applications
Nidec asi electric power solutions for marine applications
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_Template
 
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
 
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature SensorsDereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
DereMurray - APEC 2014 - Noise Susceptibility of delta-Vbe Temperature Sensors
 

Projects done by Stokholm Engineering

  • 1. Projects done by Stokholm Engineering November2014- April 2015 Offshore SubstationforwindfarmGoodewind 1+2: Site IntegrationTestof HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV GIS switchgearbays,2 180 MW transformersand20 34 kV switchgearbayson bothplatforms.BuildatFabricom, Antwerp,Belgium. November2014 RenoNord districtheatingplant:Faultfindingingeneratorprotection,and installation,testandcommissioningof new temporarygeneratorprotection.8 MW September-Oktober2014 Energinet.dk,TSOinDenmark. Testof 18 150 kV distance relays. September2014 Aars districtheatingplant:5kV insulationresistancetestof generator.7MW September2014 Aars districtheatingplant:Replacementof new synchronizer.Engineering, testand commissioning September2014 Thy-MorsEnergi:Faultfindingandtestof 2 60 kV distance relays. August2014 TopDanmarkInsurance company:Reportconcerningoperationof 60 kV grid system. June-July2014 Onshore SubstationforWestermostRough,Hull England.Assistance for finishingSite integrationtest. January-May2014 Offshore SubstationforwindfarmWestermostRough:Site IntegrationTestof HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV GIS switchgearbays,2 160 MW transformersand14 34 kV switchgearbays. Buildat STX,SaintNazaire,France. December2013 Kyndbyturbine 2PowerPlant:Testof generatorprotection.250MW Oktober-December2013 Koege districtheatingplantturbine8.Installationandcommissioningof new generatorprotection. Oktober2013 Avedore PowerPlant:Faultfindingongasturbine 522 generatorprotection.xx MW September2013 Dong EnergyBorkumRiffgrundI:Meteringreporttogrid operatorTenneT (TSOin NL andpart of Germany)
  • 2. September2013 Aars districtheatingplant.Replacementof syncrocheckrelayandtestof generatorprotection.7MW September2013 Hirtshalsdistrictheatingplant:5kV insulationresistance testof generator, testof generatorprotectionandreplacementandtestof new 10 kV overcurrentrelay.18 MW. May 2013 Offshore SubstationWalney:Reportconcerningprimarytestof relays. April 2013 Aars districtheatingplant.5kV generatorinsulationresistance test.7MW Marts-July2013 Offshore SubstationforwindfarmBorkumRiffgrundI:Site IntegrationTestof HighVoltage (HV) andMediumVoltage (MV) systemsconsistingof 2 150 kV GIS switchgearbays,2 140 MW transformersand20 34 kV switchgearbays. Buildat BladtIndustries,Aalborg,Denmark. January2013 Investigationof Bangui Baywindfarmfor faultyfull loadoperation.Evaluation of the presence of necessaryinbuildwindturbinecapacitorinstallation.34 MW December2012 Hjorringdistrictheatingplant.5kV insulationresistancetestof generator.60 MW September2012 Koege districtheatingplantturbine7:5 kV insulationresistance testof generator, testof generatorprotectionandreplacementandtestof new synchronizingcheckrelay. September2012 Frederikshavndistrictheatingplant:Testof generatorprotection.18 MW September2012 MaabjergvaerketDistrictheatingplant:Replacementandtest of new df/dt relay.28 MW June 2012 AsnaesPowerPlant:Programmingof new settingsinexistinggenerator protection,andtestof the new settings.280 MW May 2012 MaabjergvaerketDistrictheatingplant:Faultfindingindf/dtprotection.28 MW April 2012 Kyndbyturbine 1+2 PowerPlant:Programmingof new settingsinexisting generatorprotection,andtestof the new settings.2x250 MW April 2012 Thisteddistrictheatingplant.Testof generatorprotection.4MW February2012 RenoNorddistrict heatingplant.Testof generatorprotection.8MW February2012 Investigationof Bangui Baywindfarmfor faultyfull loadoperation. Installationof distance relaysforfaultdiagnosis.34MW October2011 Hanstholmdistrictheatingplant.Faultfindingin 1 generatorprotectionand overall testof generatorprotectionfor4gas engines.4x 1,6 MW
  • 3. October2011 Hjorringdistrictheatingplant.Testof generatorprotection,10kV overcurrent relays,andgeneratorcircuitbreakertest.60 MW July2011 Investigationof Bangui Baywindfarmin the Phillipinesforfaultyfull load operation.Preliminarystudies.34MW June 2011 KyndbyPowerPlant.Testandcommissioningof new generatorprotection.for gasturbine blackstartunit.3.7 MW