Sustainable water resources management is one of our biggest concerns for the future. Environmental regulations are getting stronger, strive to lower our water consumption with an increasing cost of make-up water for the systems and process, and for the discharge treatments. Water reclamation is a priority of Kurita’s Corporate social responsibility for sharing value with our customers. Kurita proposes to combine all its expertise in cooling water treatments, equipment, and monitoring with remote control. Through patented technologies, Kurita’s blowdown recovery system leads to stable operation, reduction of running costs and better performance of the cooling system without investment for the user.
3. 3
Water Scarcity
• By 2050 one in four people is likely
to live in a country facing either
chronic or recurring shortages of
fresh water.
(Source: The United Nations 2018)
• Global Water Demand is projected
to increase by 55% due to growing
demand from manufacturing,
thermal electricity generation and
domestic use.
55%
Growing
Demand
4. 4
KURITA solutions help to
achieve sustainable
operations
• Complete water cycle world
• Total solutions for
industries and society
Water
preparation
Cooling water
treatment
Domestic &
district
Water
reclamation
Agriculture
Source or water
reuse
Our goal: A Water-Secure World
Process & production
application
5. 5
Kurita´s Core Solutions
Water Supply
Water Refining
Water Reclamation
IoT Solutions
Facility Solutions
• Membrane systems
• Ultra pure water
• Pre-filters
• MF, UF systems
Chemical solutions
• Boiler&Cooling
• Wastewater
• Membrane treatment
• Cleaning
Monitoring & Controlling
solutions
• S.Sensing systems
• My Kurita Portal
• Big data analysis
• Data utilization
Kurita offers the total
solutions for water supply
6. Kurita offers water reclamation solutions to save up to 40% in make up water
with no capital investment
Kurita’s Cooling Tower Blowdown Recovery System
6
How water is used efficiently and effectively?
7. Kurita’s Cooling Tower Blowdown Recovery System
Biocide Treatment
KuriverterTM IK-110*
*CW & Membrane compatible
Scale Inhibitor
• CW treatment
• Scaling prevention on RO
• membranes
My Kurita Portal
Kurita’s
Difference
S. Sensing MX
Control
7
8. 8
Benefits
Zero investment and saving water
Extended limits by using several technologies
and managing limited water resourcing cases
Reduction of products used
Higher utilization of water treatment products
Creating value for the customers through Sustainable Development Goals
(SDG), (Corporate Social Responsibility)
Decrease in environmental load and complying with regulations
Water quality improvement
9. Supporting Technologies: S.sensing & My Kurita Portal
Flexible item selection
Detection of active chemicals
Tough fouling resistant structure
User friendly maintenance
7/24
Online
Visualisation
Notification
9
10. Case study @ petrochemical plant
10
Kurita’s Cooling Tower Blowdown Recovery System
Standard Unit
Feed water rate: 15 m3/h
RO treated water: 12 m3/h
Size: 5,750 mm×1,700 mm×2,100 mm
Unit weight: 2,500 kg
Operating weight : 3,000 kg ※Not including chemical weight
11. Case study @ petrochemical plant: Before installation
11
Kurita’s Cooling Tower Blowdown Recovery System
Makeup water
275m3/h
Blowdown
60m3/h
Circulating water
16,000 m3/h
Fresh makeup water
275 m3/h
Blowdown
wastewater
121 m3/h
Makeup Water Cl-:130 mg/L
Circulating Water Cl-: 300 mg/L (criteria)
Cycle of Concentration (CoC): 2.3
12. Case study @ petrochemical plant: After installation
12
Kurita’s Cooling Tower Blowdown Recovery System
Makeup water
275m3/h
Circulating water
16,000m3/h
Circulating water
16,000 m3/h
IK
SI
Recovery unit
MF RO
Treated water
48 m3/h
Concentrate
wastewater
12 m3/h
Fresh makeup water
165 m3/h
Recovered
Blowdown
60 m3/hMakeup Water Cl-:130 mg/L + RO Cl-,15 mg/L = 105 mg/L
Circulating Water Cl-: 300 mg/L (criteria)
Cycle of Concentration (CoC): 2.8
Blowdown
and loses
15 m3/h
13. Case study @ petrochemical plant: Summary
13
Kurita’s Cooling Tower Blowdown Recovery System
Before recovery After recovery Improvement
Water cost 40,000 €/month 16,000 €/month -62%
Fresh makeup water 275 m3/h 165 m3/h -40%
Wastewater 121 m3/h 27 m3/h -80%
Cl- level 130 mg/L 105 mg/L -27%
CoC 2.3 2.8 +22%
-40%
R e d u c e d m a k e u p w a t e r
-62%
L e s s w a t e r c o s t
-80%
D e c r e a s e d w a s t e w a t e r
14. Environmental • Complying with strict environmental regulations
• Decrease in environmental load by improved water quality and less
waste
Technical
• Increase in water quality and CoC
• Lower corrosion rates and biofouling
• Improved heat transfer efficiency
• Reliable plant operation
Economical • Increased CoC and so fresh makeup related savings
• Lower wastewater treatment cost
• Decrease in water cost
Kurita’s innovative technology at a glance
14
15. 15
Summary
Total system for cooling tower and
blowdown recovery system
Stable operation + reduction of running
costs
maximum chemical utilization
Recycling of wastewater and effective use
of water resources
17. 17
TWITTER Follow us
LinkedIn Follow us
YouTube Follow us
www.kurita.eu
This document is proprietary. Any kind of reproduction, change, transfer to a third party or disclosure of this document, even extracts, requires the prior written consent of Kurita Europe GmbH.
Contact information