K L I M A S O F T W A R E - MODUL 1
==========================================
PROGRAM "CODIS" - W8, Ver.4.1, 2013.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
K O E F I C I J E N T I P R O L A Z A T O P L O T E
PROJEKAT :DEMO
OBJEKAT :DEMO
KOEFICIJENTI PROLAZA TOPLOTE KLIMA Software - NU str. 1
RB SIFRA K K-DOZ NAZIV ELEMENTA A-U A-S DEB LAMB M NAZIV SLOJA
W/m2K W/m2K W/m2K cm W/mK
--------------------------------------------------------------------------
1 EW 1 0.53 0.80 EXTERNAL WALL 8 23 1.50 1.40 CEMENTNI MALTER
25.00 0.640 TERMOBLOKOVI
1.50 0.190 IZOLAC. MALTER
0.10 0.170 BITUM. PREMAZ
5.00 0.041*MINERALNA VUNA
0.05 203.0 ALU-FOLIJA
2.00 0.920 FASADNE PLOCE
KOEFICIJENTI PROLAZA TOPLOTE KLIMA Software - NU str. 2
L E G E N D A :
===============
RB = redni broj elementa konstrukcije
SIFRA = sifra elementa
K = koeficijent prolaza toplote (W/m2K)
K-DOZ = dozvoljeni koeficijent prolaza toplote (W/m2K)
NAZIV ELEMENTA = opis elementa konstrukcije
A-U = koeficijent prelaza toplote - unutrasnji (W/m2K)
A-S = koeficijent prelaza toplote - spoljasnji (W/m2K)
DEB = debljina sloja (cm)
LAMB = koeficijent provodjenja toplote (W/mK)
M = marker sloja predvidjenog za izmenu po potrebi
NAZIV SLOJA = opis sloja prema datoteci "TERMAT"
==========================================
K L I M A S O F T W A R E - MODUL 1
==========================================
PROGRAM "CODIS" - W8, Ver.4.1, 2013.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
D I F U Z I J A V O D E N E P A R E
PROJEKAT :DEMO
OBJEKAT :DEMO
DIFUZIJA VODENE PARE KLIMA Software - NU str. 1
RB SIFRA NAZIV ELEMENTA
---- -------- ----------------
1 EW 1 EXTERNAL WALL
TABELA 1 - PRORACUNSKI USLOVI
-----------------------------------------
VARIJANTA: 1 | V L A Z E N J E | S U S E N J E |
|-------------------|-------------------|
| UNUTRA | SPOLJA | UNUTRA | SPOLJA |
------------------------------|---------|---------|---------|---------|
| TEMPERATURA VAZDUHA | 22.0 C | 35.0 C | 18.0 C | 18.0 C |
|-----------------------------|---------|---------|---------|---------|
| RELATIVNA VLAZNOST VAZDUHA | 50.0 % | 95.0 % | 65.0 % | 65.0 % |
|-----------------------------|---------|---------|---------|---------|
| PRIT. ZASICENJA VODENE PARE | 2643 Pa | 5623 Pa | 2064 Pa | 2064 Pa |
|-----------------------------|---------|---------|---------|---------|
| PARCIJALNI PRIT. VOD. PARE | 1322 Pa | 5341 Pa | 1342 Pa | 1342 Pa |
|-----------------------------|-------------------|-------------------|
| RACUNSKO TRAJANJE PROCESA | 60.0 dana | 60.0 dana |
-----------------------------------------------------------------------
DIFUZIJA VODENE PARE KLIMA Software - NU str. 2
RB SIFRA NAZIV ELEMENTA
---- -------- ----------------
1 EW 1 EXTERNAL WALL
TABELA 2 - PRORACUN VLAZENJA
RB NAZIV SLOJA DEB MI RD LAMB R TEMP PS PP MK
cm - m W/mK m2K/W C Pa Pa
-------------------------------------------------------------------------
- UNUTRASNJOST 22.00 2643 1322
- PRELAZ TOPLOTE U 0.13 22.89 2790 1322
1 CEMENTNI MALTER 1.50 30.0 0.45 1.40 0.01
22.96 2802 1327
2 TERMOBLOKOVI 25.00 4.0 1.00 0.640 0.39
25.64 3289 1337
3 IZOLAC. MALTER 1.50 6.0 0.09 0.190 0.08
26.18 3396 1338
4 BITUM. PREMAZ 0.10 10000.0 10.00 0.170 0.01
26.22 3404 1448
5 MINERALNA VUNA 5.00 1.0 0.05 0.041 1.22
34.58 5492 1448
6 ALU-FOLIJA 0.05700000.0 350.00 203.0 0.00
34.58 5492 5276
7 FASADNE PLOCE 2.00 300.0 6.00 0.920 0.02
- PRELAZ TOPLOTE S 0.04 34.73 5538 5341
- SPOLJASNJOST 35.00 5623 5341
-------------------------------------------------------------------------
NEMA KONDENZACIJE U KONSTRUKCIJI
KONSTRUKCIJA ZADOVOLJAVA JUS U.J5.600
DIFUZIJA VODENE PARE KLIMA Software - NU str. 3
L E G E N D A :
===============
OPISI VAZE ZA TABELE 2 I 3 :
RB = redni broj sloja (od unutra ka spolja)
NAZIV SLOJA = opis sloja prema datoteci "TERMAT"
DEB = debljina sloja (cm)
MI = faktor otpora difuziji vodene pare (-)
RD = relativni otpor difuziji vodene pare (m)
LAMB = koeficijent provodjenja toplote (W/mK)
R = toplotni otpor sloja (m2K/W)
TEMP = temperatura na granici slojeva (step. C)
PS = pritisak zasicenja vodene pare na datoj temp. (Pa)
PP = parcijalni pritisak vodene pare na datoj temp. (Pa)
MK = marker koji oznacava kondenzaciju na datom mestu
==========================================
K L I M A S O F T W A R E - MODUL 1
==========================================
PROGRAM "CODIS" - W8, Ver.4.1, 2013.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
T O P L O T N A S T A B I L N O S T K O N S T R U K C I J A
PROJEKAT :DEMO
OBJEKAT :DEMO
TOPLOTNA STABILNOST KONSTRUKCIJA KLIMA Software - NU str. 1
RB SIFRA K K-DOZ NAZIV ELEMENTA SP.MASA FP FP M VP VP M OR JUS
W/m2K kg/m2 MIN MIN
-------------------------------------------------------------------------
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** SI DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** II DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** JI DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** JJ DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** JZ DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** ZZ DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** SZ DA
1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 10 12.7 ** SS DA
-------------------------------------------------------------------------
KONSTRUKCIJA :
--------------
RB NAZIV SLOJA DEB LAMB R S D U
cm W/mK m2K/W W/m2K W/m2K
---------------------------------------------------------
1 CEMENTNI MALTER 1.500 1.400 0.01 14.93 0.16 9.57
2 TERMOBLOKOVI 25.000 0.640 0.39 8.25 3.22 8.25
3 IZOLAC. MALTER 1.500 0.190 0.08 2.75 0.22 5.36
4 BITUM. PREMAZ 0.100 0.170 0.01 4.44 0.03 5.31
5 MINERALNA VUNA 5.000 0.041 1.22 0.59 0.72 0.77
6 ALU-FOLIJA 0.050203.000 0.00192.94 0.00 0.86
7 FASADNE PLOCE 2.000 0.920 0.02 10.49 0.23 3.19
---------------------------------------------------------
TOPLOTNA STABILNOST KONSTRUKCIJA KLIMA Software - NU str. 2
L E G E N D A :
===============
TABELA 1 :
RB = redni broj elementa
SIFRA = sifra elementa
K = koeficijent prolaza toplote (W/m2K)
K-DOZ = dozvoljeni koeficijent prolaza toplote (W/m2K)
NAZIV ELEMENTA = opis elementa konstrukcije
SP.MASA = specificna masa elementa konstrukcije (kg/m2)
FP = faktor prigusenja amplitude temperaturske oscilacije
FPMIN = minimalni dozvoljeni faktor prigusenja amplitude
M = marker koji pokazuje da li je FP>FPMIN
VP = vremenski pomak faze temperaturske oscilacije
VPMIN = minimalni dozvoljeni vremenski pomak faze
M = marker koji pokazuje da li je VP>VPMIN
OR = oznaka orijentacije, npr. JI=jugoistok, JJ=jug, itd.
JUS = marker da li zadovoljava (DA) ili ne (NE) JUS U.J5.600
TABELA 2:
RB = redni broj sloja (od unutra ka spolja)
NAZIV SLOJA = opis sloja prema datoteci "TERMAT"
DEB = debljina sloja (cm)
LAMB = koeficijent toplotne provodljivosti mater. sloja (W/mK)
R = toplotni otpor sloja (m2K/W)
S = koefic. upijanja toplote mater. sloja za 24 h (W/m2K)
D = karakteristika toplotne inercije sloja (-)
U = koefic. upijanja toplote povrsine konstrukcije (W/m2K)
==========================================
K L I M A S O F T W A R E - MODUL 2B
==========================================
PROGRAM "CLOAD" - W8, Ver.4.1, 2013.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
P R O R A C U N T O P L O T N I H D O B I T A K A
PROJEKAT : DEMO
OBJEKAT : DEMO
PRORACUN TOPLOTNIH DOBITAKA KLIMA Software - NU str. 1
--------------------------------------------------------------------------
PROJEKAT : OBJEKAT :
PROJEKTNI USLOVI :
----------------
METODA : CARRIER
ZAMUCENOST ATMOSFERE : 10.0 %
GEOGRAFSKA SIRINA : 44.0
VISINA : 15 m
TEMPERATURA-LETO,15 SATI : 33.0 C
RASPON DNEVNE TEMPERATURE : 12.8 C
RASPON GODISNJE TEMPERATURE: 48.0 C
OBJEKAT:BLD1- MAKSIMALNO JEDNOVREMENO OPTERECENJE
--------------------------------------------------------------------------
MESEC: 9 VREME:18 POVRSINA: 100.0 m2 ZAPREMINA: 500.0 m3
BROJ LJUDI: 10 SVEZ VAZDUH: 0.0 m3/h
Qsenzibilno = 3565.0 W Qlatentno = 760.0 W Qinsolacija = 1261.0 W
Qtransmisija= 716.0 W Qinfiltrac. = 28.0 W Qventilacija= 0.0 W
Qljudi sen. = 760.0 W Qljudi lat. = 560.0 W Qsvetlo = 500.0 W
Qoprema sen.= 300.0 W Qoprema lat.= 200.0 W Qsvez vazduh= 0.0 W
PRORACUN TOPLOTNIH DOBITAKA KLIMA Software - NU str. 2
--------------------------------------------------------------------------
PROJEKAT : OBJEKAT :
GRUPA: S1 - SPRAT 1 - MAKSIMALNO JEDNOVREMENO OPTERECENJE
--------------------------------------------------------------------------
MESEC: 9 VREME:18 POVRSINA: 100.0 m2 ZAPREMINA: 500.0 m3
BROJ LJUDI: 10 SVEZ VAZDUH: 0.0 m3/h
Qsenzibilno = 3565.0 W Qlatentno = 760.0 W Qinsolacija = 1261.0 W
Qtransmisija= 716.0 W Qinfiltrac. = 28.0 W Qventilacija= 0.0 W
Qljudi sen. = 760.0 W Qljudi lat. = 560.0 W Qsvetlo = 500.0 W
Qoprema sen.= 300.0 W Qoprema lat.= 200.0 W Qsvez vazduh= 0.0 W
PRORACUN TOPLOTNIH DOBITAKA KLIMA Software - NU str. 3
--------------------------------------------------------------------------
PROJEKAT : OBJEKAT :
==========================================================================
GRUPA: S1-SPRAT 1 PROSTORIJA: PR1 -PROSTORIJA 1 - MAKSIMUM
--------------------------------------------------------------------------
MESEC: 9 VREME:18 POVRSINA: 100.0 m2 ZAPREMINA: 500.0 m3
BROJ LJUDI: 10 UNUTRASNJA TEMPERATURA: 23.0 C
Qsenzibilno = 3565.0 W Qlatentno = 760.0 W Qinsolacija = 1261.0 W
Qtransmisija= 716.0 W Qinfiltrac. = 28.0 W Qventilacija= 0.0 W
Qljudi sen. = 760.0 W Qljudi lat. = 560.0 W Qsvetlo = 500.0 W
Qoprema sen.= 300.0 W Qoprema lat.= 200.0 W
OZN. OR. SIR VIS POVRS. SEN. K SOL.F. DEL-T Q-SENZIB.
m m m2 % W/m2k C W
--------------------------------------------------------------------------
. PS Z 5.00 2.50 12.5 0 2.10 0.35 4.7 1412.0
. ZS Z 10.00 5.00 37.5 0.50 5.9 111.0
. KR KR 10.00 10.00 100.0 0.40 12.1 482.0
==========================================
K L I M A S O F T W A R E - MODUL 3B
==========================================
PROGRAM "FCU-s" - W8, Ver.4.1, 2014.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
I Z B O R F A N - C O I L-a
PROJEKAT : DEMO
OBJEKAT : DEMO
F A N C O I L U N I T S KLIMA Software - NU str. 1
-------------------------------------------------------------------------
PROJEKAT : OBJEKAT :
-------------------------------------------------------------------------
PROSTORIJA tu V q Q-d KOM T I P DUZ Q-sen A-fl W-fl Q-inst
C m3 W/m3 W m W L/s L/s W
-------------------------------------------------------------------------
DEMO
............................SPRAT 1 .............................
BLD1S1PR1 23 500 9 4325 1-42JW009 0.93 4325 411 0.21 4325
BLD1S1PR2 23 500 9 4325 1-42JW009 0.93 4325 411 0.21 4325
BLD1S1 GRUPA UKUPNO: 8650 8650
2-42JW009
-------------------------------------------------------------------------
-------------------------------------------------------------------------
BLD1 OBJEKAT UKUPNO: 8650 8650
2-42JW009
=========================================================================
F A N C O I L U N I T S KLIMA Software - NU str. 2
-------------------------------------------------------------------------
PROJEKAT : OBJEKAT :
-------------------------------------------------------------------------
PROSTORIJA tu V q Q-d KOM T I P DUZ Q-sen A-fl W-fl Q-inst
C m3 W/m3 W m W L/s L/s W
-------------------------------------------------------------------------
-------------------------------------------------------------------------
-------------------------------------------------------------------------
: 8650 8650
2-42JW009
*************************************************************************
PROJEKTNI USLOVI :
1. TEMPERATURA RAZVODNE VODE : 7. C
2. TEMPERATURA POVRATNE VODE : 12. C
*************************************************************************
F A N C O I L U N I T S KLIMA Software - NU str. 3
-------------------------------------------------------------------------
PROJEKAT : OBJEKAT :
L E G E N D A :
===============
T A B E L A Z A F A N C O I L - e
---------------------------------------
PROSTORIJA = oznaka prostorije u objektu
tu = unutrasnja temperatura prostorije (C)
V = zapremina prostorije (m3)
q = specificno toplotno opterecenje (W/m3)
Q-d = proracunsko toplotno opterecenje (W)
KOM = broj Fan Coil Uredjaja - FCU-a (kom)
T I P = tip Fan Coil Uredjaja prema datoteci
DUZ = instalisana duzina Fan Coil Uredjaja (m)
Q-sen = instalisani Senzibilni kapacitet FCU-a (W)
A-fl = protok vazduha na "HIGH" brzini FCU-a (L/s)
W-fl = protok vode kroz FCU (L/s)
Q-inst = instalisani Totalni rashladni kapac. FCU-a (W)
PRIMENJENI TIPOVI FAN COIL UREDJAJA :
*
42JW005 * Carrier - ducted FCU
42JW009 * Carrier - ducted FCU
42JW016 * Carrier - ducted FCU
==========================================
K L I M A S O F T W A R E - MODUL 4
==========================================
PROGRAM "ACPIPE" - W8, Ver.4.1, 2014.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
P R O R A C U N C E V N E M R E Z E
PROJEKAT : DEMO
SISTEM : DEMO
PRORACUN CEVNE MREZE KLIMA Software - NU str. 1
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
PROJEKTNI USLOVI :
----------------
1. UKUPAN INSTALISANI KAPACITET : 18200. W
2. TEMPERATURA RAZVODNE VODE : 90. C
3. TEMPERATURA POVRATNE VODE : 70. C
4. NAJNEPOVOLJNIJI STRUJNI KRUG - NNSK : V2 4
5. JEDINICNI PAD PRITISKA R U NNSK : 60. Pa/m
6. ZADAT PRITISAK ZA DIMENZIONISANJE : Pa
7. UTICAJ GRAVITACIONOG NAPORA : 0. %
8. SISTEMSKI PODATAK ZA APS. HRAP. CEVI : 0.045 mm
9. SISTEMSKI PODATAK ZA MAX. REDUKC. BV : 0
10. SISTEMSKI PODATAK ZA TACNOST REG. BV : 0.10
PODACI O MREZI :
--------------
1. UKUPAN BROJ VERTIKALA : 2
2. UKUPAN BROJ DEONICA : 10
3. BROJ DEONICA U HOR. MREZI : 2
4. BROJ DEONICA SA BAL. VENT. : 6
5. BROJ DEONICA SA GR. TELIMA : 4
GLAVNI REZULTATI :
----------------
1. UKUPAN PROTOK U SISTEMU : 805. l/h
2. POTREBAN PRITISAK PUMPE : 22430. Pa
PRORACUN CEVNE MREZE KLIMA Software - NU str. 2
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
STANDARDNE CEVI
----------------
----------------------------------------------------------------------------
RED NAMENA DN OZN DSP DEB DUN MASA W-MIN W-MAX
BR C R mm CEVI mm mm mm kg/m m/s m/s
----------------------------------------------------------------------------
1 10 3/8 17.10 2.30 12.50 0.850 0.001 0.250
2 * 15 1/2 21.30 2.80 15.70 1.260 0.001 0.400
3 * 20 3/4 26.70 2.90 20.90 1.680 0.005 0.550
4 * 25 1" 33.40 3.40 26.60 2.500 0.018 0.650
5 * 32 11/4 42.20 3.60 35.00 3.380 0.020 0.750
6 * 40 11/2 48.30 3.70 40.90 4.050 0.030 0.850
7 * 50 2 60.30 3.90 52.50 5.430 0.040 0.950
8 * 65 21/2 73.00 5.20 62.60 8.620 0.050 1.050
9 * 80 3" 88.90 5.50 77.90 11.280 0.050 1.150
10 * 100 4" 114.30 6.00 102.30 16.060 0.050 1.250
11 * 125 5" 141.30 6.60 128.10 21.760 0.050 1.400
12 * 150 6" 168.30 7.10 154.10 28.230 0.050 1.550
13 * 200 8" 219.10 8.20 202.70 42.490 0.050 1.700
14 * 250 10" 273.00 9.30 254.40 60.240 0.050 1.850
15 * 300 12" 323.80 10.30 303.20 79.650 0.050 2.100
----------------------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 3
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
VEZE I LOKALNI OTPORI
---------------------
----------------------------------------------------------------------------
RB SIF V L CETA DP DODL NAZIV CETA = F(DN)
Pa m VEZE - LOKO REDOSLED STANDARDNIH CEVI
----------------------------------------------------------------------------
1 NC * 0.0 0. 0.0 Neutral Connect.
2 TS * 3.0 0. 0.0 T, Supply
3 TR * 3.0 0. 0.0 T, Return
4 BS * 1.5 0. 0.0 Branch, Supply
5 BR * 1.0 0. 0.0 Branch, Return
6 RD * 0.0 0. 0.0 Reduction
7 EN * 0.5 0. 0.0 Enlargement
8 9S * 0.5 0. 0.0 90 bend, sharp
9 9L * 0.3 0. 0.0 90 bend, long
10 4S * 0.3 0. 0.0 45 bend, sharp
11 4L * 0.1 0. 0.0 45 bend,round.l.
12 CP * 2.0 0. 0.0 Compensator
13 PF * 0.0 6000. 0.0 Pipe Filter
14 HW * 0.0 6000. 0.0 Heater, Water
15 HE * 0.0 6000. 0.0 Heater, Electric
16 GV * 2.0 0. 0.0 Gate Valve
17 GL * 4.0 0. 0.0 Globe Valve
18 BV * 1.0 0. 0.0 Ball Valve
19 NV * 4.0 0. 0.0 Non return Valve
20 ST * 10.0 0. 0.0 Strainer
21 PS * 20.0 0. 0.0 Pump ar. Supply
PRORACUN CEVNE MREZE KLIMA Software - NU str. 4
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
RB SIF V L CETA DP DODL NAZIV CETA = F(DN)
Pa m VEZE - LOKO REDOSLED STANDARDNIH CEVI
----------------------------------------------------------------------------
22 PR * 10.0 0. 0.0 Pump ar. Return
23 SC * 15.0 0. 0.0 Sup.Colector ar.
24 RC * 15.0 0. 0.0 Ret.Colector ar.
25 EX * 0.0 8000. 0.0 Heat Exchanger
26 HB * 0.0 9000. 0.0 Hot Water Boiler
27 V1 * 15.0 0. 0.0 Valves ar. No. 1
28 V2 * 20.0 0. 0.0 Valves ar. No. 2
29 NG * 3.0 0. 0.0 Nkno. Glob.Valve
30 NI * 6.0 0. 0.0 Nkno. Bala.IPCV
31 NB * 4.0 0. 0.0 Nkno. Bala.Valve
32 NM * 4.0 0. 0.0 Nkno. Moto.Valve
33 RA * 2.5 0. 0.0 Radiator
34 CO * 2.0 0. 0.0 Convector
35 F1 * 0.0 6440. 0.0 FCU No. 1
36 F2 * 0.0 6880. 0.0 FCU No. 2
37 F3 * 0.0 9240. 0.0 FCU No. 3
38 F4 * 0.0 13200. 0.0 FCU No. 4
39 A1 * 0.0 15000. 0.0 AHU No. 1
40 A2 * 0.0 17000. 0.0 AHU No. 2
41 A3 * 0.0 19000. 0.0 AHU No. 3
42 A4 * 0.0 21000. 0.0 AHU No. 4
----------------------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 5
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
BALANSNI VENTILI
----------------
----------------------------------------------------------------------------
PRECNICI BV : 10 15 20 25 32 40 50
65 80 100 125 150 200 250
300
RB TIP-BV NP --- SIFRE BV ---
----------------------------------------------------------------------------
1 TIP-1 SVK.KS SVK.KS SVK.KS SVK.KS SVK.KS SVK.KS SVK.KS
2 TIP-2 RVK.RV RVK.RV RVK.RV
3 TIP-3 RVK.UG RVK.UG RVK.UG
4 TIP-4 RNK.RV RNK.RV RNK.RV
5 TIP-5 RNK.UG RNK.UG RNK.UG
6 TIP-6 DM830 DM830 DM830 DM830 DM830 DM830 DM830
DM830 DM831 DM831 DM831 DM831
7 NGLOBV NG NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV
NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV
NGLOBV
8 NIPCV NI NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV
NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV
NIPCV
9 NBALV NB NBALV NBALV NBALV NBALV NBALV NBALV NBALV
NBALV NBALV NBALV NBALV NBALV NBALV NBALV
NBALV
10 NMOTV NM NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV
NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV
NMOTV
----------------------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 6
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
HORIZONTALNA MREZA
------------------
----------------------------------------------------------------------------
DEONICA Q DN-N BRZ DUZ R DPTR DPL LK TIP DN POZ DPBV OTV
W mm m/s m Pa/m Pa Pa BV BV BV BV Pa %
----------------------------------------------------------------------------
H1 18200 25 0.40 10.0 81 815 9574
H1A 18200 25 0.40 2.0 81 163 2754
----------------------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 7
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
VERTIKALA : V1
------------------
----------------------------------------------------------------------------
DE Q DN-N BRZ DUZ R DPTR DPL LK TIP DN POZ DPBV OTV GRV VISAK
W mm m/s m Pa/m Pa Pa BV BV BV BV Pa % Pa Pa
----------------------------------------------------------------------------
1 8220 20 0.29 20.0 62 1245 1753 P TIP-1 20 3.20 1626 53
2 3610 15 0.23 4.0 57 228 5748 R TIP-3 15 3.00 3050 37 0 152
P TIP-5 15 4.40 2544 88
3 4610 15 0.29 6.0 89 533 21
4 4610 15 0.29 4.0 89 356 5199 R TIP-3 15 8.00 2632 100 0 19
P TIP-5 15 5.00 2318 100
----------------------------------------------------------------------------
VERTIKALA : V2
------------------
----------------------------------------------------------------------------
DE Q DN-N BRZ DUZ R DPTR DPL LK TIP DN POZ DPBV OTV GRV VISAK
W mm m/s m Pa/m Pa Pa BV BV BV BV Pa % Pa Pa
----------------------------------------------------------------------------
1 9980 20 0.36 20.0 89 1779 641 P TIP-1 20 6.00 455 100
2 4610 15 0.29 4.0 89 356 6204 R TIP-3 15 4.00 3399 50 0 145
P TIP-5 15 4.90 2555 98
3 5370 20 0.19 6.0 29 172 9
4 5370 20 0.19 4.0 29 115 6409 R TIP-3 20 8.00 4130 100 0 0
P TIP-5 20 5.00 2170 100
----------------------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 8
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
SPECIFIKACIJA MATERIJALA
=========================
STANDARDNE CEVI
----------------
-------------------------------------------
DN OZN DSP DEB DUZINA MASA
mm CEVI mm mm m kg
-------------------------------------------
15 1/2 21.30 2.80 18.0 22.7
20 3/4 26.70 2.90 50.0 84.0
25 1" 33.40 3.40 12.0 30.0
-------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 9
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
LOKALNI OTPORI
--------------
----------------------------------------------------------------------------
SIF NAZIV LOKO PRECNICI STANDARDNIH CEVI
10 15 20 25 32 40 50 65 80 100 125 150 200 250
300
----------------------------------------------------------------------------
9S 90 bend, sharp 0 6 6 0 0 0 0 0 0 0 0 0 0 0
0
GV Gate Valve 0 0 2 0 0 0 0 0 0 0 0 0 0 0
0
PS Pump ar. Supply 0 0 0 1 0 0 0 0 0 0 0 0 0 0
0
EX Heat Exchanger 0 0 0 1 0 0 0 0 0 0 0 0 0 0
0
V1 Valves ar. No. 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0
0
V2 Valves ar. No. 2 0 0 0 1 0 0 0 0 0 0 0 0 0 0
0
RA Radiator 0 3 1 0 0 0 0 0 0 0 0 0 0 0
0
----------------------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 10
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
BALANSNI VENTILI
----------------
-----------------------------------------------------------------------
DN BV : 10 15 20 25 32 40 50
65 80 100 125 150 200 250
300
TIP-BV NP --- komada ---
-----------------------------------------------------------------------
TIP-1 0 0 2 0 0 0 0
0 0 0 0 0 0 0
0
TIP-3 0 3 1 0 0 0 0
0 0 0 0 0 0 0
0
TIP-5 0 3 1 0 0 0 0
0 0 0 0 0 0 0
0
-----------------------------------------------------------------------
POVRSINE - ZAPREMINE
--------------------
------------------------------------------------------------
BOJENJE IZOLACIJA UKUPNO ZAPREMINA
m2 m2 m2 l
------------------------------------------------------------
CEVNA MREZA 5.4 3.1 8.5 27.3
REGISTRI 0.0 0.0 0.0 0.0
GREJNA TELA 0.0 0.0 37.3 149080.0
------------------------------------------------------------
UKUPNO : 5.4 3.1 45.8 149107.3
------------------------------------------------------------
PRORACUN CEVNE MREZE KLIMA Software - NU str. 11
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
L E G E N D A
=============
HORIZONTALNA MREZA / VERTIKALE
------------------------------
DEONICA/DE = OZNAKA DEONICE U HOR-VER MREZI
Q = TOPLOTNO OPTERECENJE DEONICE (W)
DN = NAZIVNI PRECNIK CEVI (mm)
N = REDNI BROJ CEVI AKO IMA VISE ISTIH DN
BRZ = BRZINA VODE U DEONICI (m/s)
DUZ = UKUPNA DUZINA DEONICE (RAZ+POV) (m)
R = JEDINICNI PAD PRITISKA OD TRENJA (Pa/m)
DPT = PAD PRITISKA OD TRENJA (Pa)
DPL = PAD PRITISKA OD LOKALNIH OTPORA (Pa)
LK BV = LOKACIJA BV : R-RAZVOD, P-POVRAT
TIP BV = TIP BV - PREMA DATOTECI BALVENT
DN BV = NAZIVNI PRECNIK BV (mm)
POZ BV = POZICIJA REGULACIJE BV
DPBV = PAD PRITISKA U BV SA DATOM POZICIJOM (Pa)
OTV = OTVORENOST BV 0 - 100 (%)
GRV = UTICAJ GRAVITACIJE ZA STRUJNI KRUG (Pa)
VISAK = VISAK PRITISKA POSLE BALANSIRANJA (Pa)
==========================================
K L I M A S O F T W A R E - MODUL 5
==========================================
PROGRAM "ACDUCT" - W8, Ver.4.1, 2014.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
P R O R A C U N V A Z D U S N I H K A N A L A
PROJEKAT : DEMO
SISTEM : DEMO
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 1
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
PROJEKTNI USLOVI :
----------------
1. UKUPAN INSTALISANI PROTOK : 500. L/s
2. TEMPERATURA VAZDUHA U KANALU : 13. C
3. TEMPERATURA PROSTORIJE/OKOLINE : 23. C
4. NAJNEPOVOLJNIJI STRUJNI KRUG - NNSK : V1 2
5. JEDINICNI PAD PRITISKA R U NNSK : 0.50 Pa/m
6. ZADAT PRITISAK ZA DIMENZIONISANJE : Pa
7. UTICAJ GRAVITACIONOG NAPORA : 0. %
8. SISTEMSKI PODATAK ZA APS.HRAP.KANALA : 0.045 mm
9. SISTEMSKI PODATAK ZA MAX. REDUKC. CD : 0
10. SISTEMSKI PODATAK ZA TACNOST REG. CD : 0.10
PODACI O MREZI :
--------------
1. UKUPAN BROJ VERTIKALA : 1
2. UKUPAN BROJ DEONICA : 4
3. BROJ DEONICA U HOR. MREZI : 1
4. BROJ DEONICA SA CONT. DAMP. : 3
5. BROJ DEONICA SA DIFUZORIMA : 2
GLAVNI REZULTATI :
----------------
1. UKUPAN PROTOK U SISTEMU : 500. L/s
2. POTREBAN PRITISAK VENTILATORA : 144. Pa
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 2
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
STANDARDNI KANALI
-----------------
----------------------------------------------------------------------------
RED NAMENA DN OZN DSP DEB DUN MASA W-MIN W-MAX
BR C R mm mm mm mm kg/m m/s m/s
----------------------------------------------------------------------------
1 75 3" 76.00 0.50 75.00 1.000 0.500 2.850
2 100 4" 101.00 0.50 100.00 1.560 0.500 3.300
3 * 125 5" 126.00 0.50 125.00 1.960 0.500 3.750
4 * 150 6" 151.00 0.50 150.00 2.340 0.500 4.050
5 * 175 7" 176.20 0.60 175.00 3.380 0.500 4.500
6 * 200 8" 201.20 0.60 200.00 3.750 0.500 4.800
7 * 225 9" 226.20 0.60 225.00 4.200 0.500 5.100
8 * 250 10" 251.20 0.60 250.00 4.690 0.500 5.250
9 * 275 11" 276.20 0.60 275.00 5.260 0.500 5.550
10 * 300 12" 301.20 0.60 300.00 5.630 0.500 5.850
11 * 325 13" 326.60 0.80 325.00 6.670 0.500 6.000
12 * 350 14" 351.60 0.80 350.00 8.880 0.500 6.300
13 * 375 15" 376.60 0.80 375.00 9.530 0.500 6.450
14 * 400 16" 401.60 0.80 400.00 10.010 0.500 6.750
15 * 425 17" 426.60 0.80 425.00 10.800 0.500 6.900
16 * 450 18" 451.60 0.80 450.00 11.250 0.500 7.200
17 * 475 19" 476.60 0.80 475.00 12.010 0.500 7.350
18 * 500 20" 501.60 0.80 500.00 12.500 0.500 7.500
19 * 550 22" 551.60 0.80 550.00 14.000 0.500 7.950
20 * 600 24" 601.60 0.80 600.00 15.000 0.500 8.250
21 * 650 26" 651.60 0.80 650.00 16.500 0.500 8.550
22 * 700 28" 701.60 0.80 700.00 17.760 0.500 8.850
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 3
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
RED NAMENA DN OZN DSP DEB DUN MASA W-MIN W-MAX
BR C R mm mm mm mm kg/m m/s m/s
----------------------------------------------------------------------------
23 * 750 30" 751.60 0.80 750.00 19.050 0.500 9.150
24 * 800 32" 801.60 0.80 800.00 23.820 0.500 9.450
25 * 850 34" 852.00 1.00 850.00 27.040 0.500 9.750
26 * 900 36" 902.00 1.00 900.00 28.160 0.500 10.050
27 * 950 38" 952.00 1.00 950.00 30.200 0.500 10.350
28 * 1000 40" 1002.00 1.00 1000.00 30.920 0.500 10.650
29 * 1050 42" 1052.40 1.20 1050.00 38.140 0.500 10.950
30 * 1100 44" 1102.40 1.20 1100.00 44.810 0.500 11.100
31 * 1150 46" 1152.40 1.20 1150.00 46.730 0.500 11.400
32 * 1200 48" 1202.40 1.20 1200.00 48.760 0.500 11.700
33 * 1250 50" 1252.40 1.20 1250.00 50.100 0.500 12.640
34 * 1300 52" 1302.40 1.20 1300.00 52.840 0.500 12.960
35 * 1350 54" 1352.40 1.20 1350.00 54.300 0.500 13.120
36 * 1400 56" 1402.40 1.20 1400.00 55.860 0.500 13.280
37 * 1450 58" 1452.40 1.20 1450.00 58.300 0.500 13.440
38 * 1500 60" 1502.40 1.20 1500.00 60.850 0.500 13.920
----------------------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 4
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
VEZE I LOKALNI OTPORI
---------------------
----------------------------------------------------------------------------
RB SIF V L CETA DP DODL NAZIV CETA = F(DN)
Pa m VEZE - LOKO REDOSLED STAND. KANALA
----------------------------------------------------------------------------
1 NC * 0.0 0. 0.0 Neutral Connect.
2 TS * 0.3 0. 0.0 T, Supply
3 TR * 0.3 0. 0.0 T, Return
4 BS * 0.5 0. 0.0 Branch, Supply
5 BR * 0.5 0. 0.0 Branch, Return
6 RD * 0.0 0. 0.0 Reduction
7 EN * 0.4 0. 0.0 Enlargement
8 9S * 1.3 0. 0.0 90 bend, sharp
9 9V * 0.7 0. 0.0 90 bend, w.vanes
10 9R * 0.5 0. 0.0 90 bend,round.s.
11 9L * 0.2 0. 0.0 90 bend,round.l.
12 4S * 0.5 0. 0.0 45 bend, sharp
13 4R * 0.2 0. 0.0 45 bend,round.s.
14 4L * 0.1 0. 0.0 45 bend,round.l.
15 FD * 0.5 0. 0.0 Flexible Duct
16 DS * 4.0 0. 0.0 Diffuser, Supply
17 DR * 3.0 0. 0.0 Diffuser, Return
18 GS * 4.0 0. 0.0 Grill, Supply
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 5
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
RB SIF V L CETA DP DODL NAZIV CETA = F(DN)
Pa m VEZE - LOKO REDOSLED STAND. KANALA
----------------------------------------------------------------------------
19 GR * 3.0 0. 0.0 Grill, Return
20 SA * 0.0 60. 0.0 Sound Attenuator
21 FF * 0.0 40. 0.0 Filter, Flat
22 HW * 0.0 30. 0.0 Heater, Water
23 HE * 0.0 20. 0.0 Heater, Electric
24 ND * 0.0 30. 0.0 Non return Damer
25 CD * 1.5 0. 0.0 Control Damper
26 VV * 1.5 0. 0.0 VAV box
27 CV * 2.0 0. 0.0 CAV box
----------------------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 6
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
CONTROL. DAMPERI
----------------
----------------------------------------------------------------------------
PRECNICI CD : 75 100 125 150 175 200 225
250 275 300 325 350 375 400
425 450 475 500 550 600 650
700 750 800 850 900 950 1000
1050 1100 1150 1200 1250 1300 1350
1400 1450 1500
RB TIP-CD NP --- SIFRE CD ---
----------------------------------------------------------------------------
1 VCD CD VCD VCD VCD VCD VCD VCD VCD
VCD VCD VCD VCD VCD VCD VCD
VCD VCD VCD VCD VCD VCD VCD
VCD VCD VCD VCD VCD VCD VCD
VCD VCD VCD VCD VCD VCD VCD
VCD VCD VCD
2 VAV VV VAV VAV VAV VAV VAV VAV VAV
VAV VAV VAV VAV VAV VAV VAV
VAV VAV VAV VAV VAV VAV VAV
VAV VAV VAV VAV VAV VAV VAV
VAV VAV VAV VAV VAV VAV VAV
VAV VAV VAV
3 CAV CV CAV CAV CAV CAV CAV CAV CAV
CAV CAV CAV CAV CAV CAV CAV
CAV CAV CAV CAV CAV CAV CAV
CAV CAV CAV CAV CAV CAV CAV
CAV CAV CAV CAV CAV CAV CAV
CAV CAV CAV
----------------------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 7
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
HORIZONTALNA MREZA
------------------
----------------------------------------------------------------------------
DEONICA V DN BRZ DUZ R DPTR DPL LK TIP DN POZ DPCD OTV
L/s mm m/s m Pa/m Pa Pa CD CD CD CD Pa %
----------------------------------------------------------------------------
H1 500 400 4.0 5.0 0.44 2 65
----------------------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 8
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
VERTIKALA : V1
------------------
----------------------------------------------------------------------------
DE V DN BRZ DUZ R DPTR DPL LK TIP DN POZ DPCD OTV GRV VISAK
L/s mm m/s m Pa/m Pa Pa CD CD CD CD Pa % Pa Pa
----------------------------------------------------------------------------
1 500 400 4.0 10.0 0.44 4 24 R VAV 400 REG 14
2 250 300 3.5 5.0 0.51 3 46 R VCD 300 REG 11 0 0
3 250 325 3.0 5.0 0.34 2 46 R VCD 325 REG 22 0 0
----------------------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 9
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
SPECIFIKACIJA MATERIJALA
=========================
STANDARDNI KANALI
-----------------
------------------------------------------------------------------
SPIRO-DN INCH RECT-EQVIV. DSP DEB DUZINA MASA
mm mm X mm mm mm m kg
------------------------------------------------------------------
300 12" 300 X 250 301.20 0.60 5.0 28.2
325 13" 350 X 250 326.60 0.80 5.0 33.3
400 16" 450 X 300 401.60 0.80 15.0 150.2
------------------------------------------------------------------
LOKALNI OTPORI
--------------
----------------------------------------------------------------------------
SIF NAZIV LOKO PRECNICI STANDARD. KANALA
75 100 125 150 175 200 225 250 275 300 325 350 375 400
425 450 475 500 550 600 650 700 750 800 850 900 9501000
1050110011501200125013001350140014501500
----------------------------------------------------------------------------
9R 90 bend,round.s. 0 0 0 0 0 0 0 0 0 0 1 0 0 3
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
DS Diffuser, Supply 0 0 0 0 0 0 0 0 0 1 1 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
SA Sound Attenuator 0 0 0 0 0 0 0 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
----------------------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 10
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
CONTROL. DAMPERI
----------------
-----------------------------------------------------------------------
DN CD : 75 100 125 150 175 200 225
250 275 300 325 350 375 400
425 450 475 500 550 600 650
700 750 800 850 900 950 1000
1050 1100 1150 1200 1250 1300 1350
1400 1450 1500
TIP-CD NP --- komada ---
-----------------------------------------------------------------------
VCD CD 0 0 0 0 0 0 0
0 0 1 1 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0
VAV VV 0 0 0 0 0 0 0
0 0 0 0 0 0 1
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0
-----------------------------------------------------------------------
POVRSINE - ZAPREMINE
--------------------
------------------------------------------------------------
BOJENJE IZOLACIJA UKUPNO ZAPREMINA
m2 m2 m2 l
------------------------------------------------------------
SPIRO KANALI 28.8 0.0 28.8 2653.2
------------------------------------------------------------
UKUPNO : 28.8 0.0 28.8 2653.2
------------------------------------------------------------
PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 11
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
L E G E N D A
=============
KANALSKA - HORIZONTALNA MREZA / VERTIKALE
-----------------------------------------
DEONICA/DE = OZNAKA DEONICE U HOR-VER KANALSKOJ MREZI
V = VAZDUSNI PROTOK U DEONICI (L/s)
DN = NAZIVNI PRECNIK KANALA (mm)
BRZ = BRZINA VAZDUHA U DEONICI (m/s)
DUZ = UKUPNA DUZINA DEONICE (m)
R = JEDINICNI PAD PRITISKA OD TRENJA (Pa/m)
DPTR = PAD PRITISKA OD TRENJA (Pa)
DPL = PAD PRITISKA OD LOKALNIH OTPORA (Pa)
LK CD = LOKACIJA CD : R-RAZVOD, P-POVRAT
TIP CD = TIP CD - PREMA DATOTECI CONTROL. DAMPERI
DN CD = NAZIVNI PRECNIK CD (mm)
POZ CD = POZICIJA REGULACIJE CD
DPCD = PAD PRITISKA U CD SA DATOM POZICIJOM (Pa)
OTV = OTVORENOST CD 0 - 100 (%)
GRV = UTICAJ GRAVITACIJE ZA STRUJNI KRUG (Pa)
VISAK = VISAK PRITISKA POSLE BALANSIRANJA (Pa)
==========================================
K L I M A S O F T W A R E - MODUL 6
==========================================
PROGRAM "ACBOQ" - W8, Ver.4.1, 2013.
==========================================
VL.KOPIJE: KLIMA Software - NU
==========================================
P R E D M E R I P R E D R A C U N - B O Q
PROJEKAT : DEMO
SISTEM : DEMO
PREDMER I PREDRACUN KLIMA Software - NU str. 1
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
1. G R E J N A T E L A
========================
1.1. RADIJATORI
---------------
GRUPA: TK TERMIK-ZRENJANIN - Supply and Installation of
Heating Bodies (radiators) as per drawings and
specifications requirements.
TK-600/160 7.2 m2 X 10.0 USD /m2 = 72.0
TK-800/160 30.1 m2 X 10.0 USD /m2 = 301.0
--------------------------
SUBTOTAL: 373.0 USD
1.2. KONZOLE
------------
CONSOLES - Supply and Installation
16 Pcs X 1.0 USD /Pcs= 16.0
1.3. DRZACI
-----------
SUPPORTS - Supply and Installation
12 Pcs X 1.0 USD /Pcs= 12.0
==========================================
GREJNA TELA UKUPNO : 401.0 USD
2. C E V N A M R E Z A
========================
2.1. CEVI - VODA
----------------
STANDARD PIPES - Supply and Installation of
black steel seemless pipes SCH 40 complete
as per drawings and specification requirements.
DN 15 21.30 X 2.80 18.0 m X 10.0 USD /m = 180.0
DN 20 26.70 X 2.90 50.0 m X 10.0 USD /m = 500.0
DN 25 33.40 X 3.40 12.0 m X 10.0 USD /m = 120.0
--------------------------
SUBTOTAL: 800.0 USD
2.2. CEVI - ODZRAKA
-------------------
STANDARD PIPES - Supply and Installation of
black steel seemless pipes SCH 40 complete
as per drawings and specification requirements.
DN 20 26.70 X 2.90 100.0 m X 10.0 USD /m = 1000.0
2.3. MATERIJAL
--------------
Other materials related to the Installation of
Pipes system (pipes storage, cleaning, welding,
supporting, etc.).
800.0USD X 50.0 %/poz= 400.0
==========================================
CEVNA MREZA UKUPNO : 2200.0 USD
PREDMER I PREDRACUN KLIMA Software - NU str. 2
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
3. B A L A N S N I V E N T I L I
==================================
3.1. SIFRA: SVK.KS BALANCING VALVE - Supply and Installation
DN 20 2 Pcs X 10.0 USD /Pcs= 20.0
3.2. SIFRA: RVK.UG BALANCING VALVE - Supply and Installation
DN 15 3 Pcs X 10.0 USD /Pcs= 30.0
DN 20 1 Pcs X 10.0 USD /Pcs= 10.0
-----------------
40.0 USD
3.3. SIFRA: RNK.UG BALANCING VALVE - Supply and Installation
DN 15 3 Pcs X 10.0 USD /Pcs= 30.0
DN 20 1 Pcs X 10.0 USD /Pcs= 10.0
-----------------
40.0 USD
==========================================
BALANSNI VENTILI UKUPNO : 100.0 USD
4. O D Z R A K A
==================
4.1. ODZRACNI VENTILI
---------------------
Supply and Installation of Air Release Valves
DN 15 2 Pcs X 10.0 USD /Pcs= 20.0
4.2. ODZRACNI SUDOVI
--------------------
SIF:AIRVESSEL Supply and Installation of Air Vessels complete
with all required materials for installation and
successful operation.
2 Pcs X 100.0 USD /Pcs= 200.0
==========================================
ODZRAKA UKUPNO : 220.0 USD
5. P O V R S I N S K A O B R A D A
====================================
5.1. IZOLACIJA
--------------
SIFRA: AI Supply and Installation of Insulation complete
with all required materials in accordance with
specifications.
DEB: 25.0 3.1 m2 X 10.0 USD /m2 = 31.0
5.2. BOJENJE
------------
Supply and application of all required materials
for pipes cleaning, priming and final painting
in accordance with specifications.
CEVNA MREZA 5.4 m2 X 10.0 USD /m2 = 54.0
PREDMER I PREDRACUN KLIMA Software - NU str. 3
----------------------------------------------------------------------------
PROJEKAT : SISTEM :
----------------------------------------------------------------------------
==========================================
POVRSINSKA OBRADA UKUPNO: 85.0 USD
6. O S T A L I R A D O V I
============================
6.1. PUMPS Supply and Installation of Pumps.
100.0 USD /tot= 100.0
6.2. HEADERS Supply and Installation of Headers.
100.0 USD /tot= 100.0
6.3. H-EXCHANGE Supply and Installation of HEAT EXCHANGERS
100.0 USD /tot= 100.0
6.4. CHEMICALS Supply and Installation of Chemical dosing
equipment, complete with Chemicals required for
1 year (for warranty period) as per the drawings
and specification requirements.
10.0 USD /tot= 10.0
6.5. BMS Supply and Installation of BMS system.
100.0 USD /tot= 100.0
6.6. TESTING TESTING, BALANCING AND COMISSIONING
100.0 USD /tot= 100.0
==========================================
OSTALI RADOVI UKUPNO : 510.0 USD
============================================================================
SVE POZICIJE UKUPNO : 3515.9 USD
============================================================================

More Related Content

What's hot

Hyundai r55 w 9 wheel excavator service repair manual
Hyundai r55 w 9 wheel excavator service repair manualHyundai r55 w 9 wheel excavator service repair manual
Hyundai r55 w 9 wheel excavator service repair manualsoeldksejdksem
 
Using SQL to process hierarchies
Using SQL to process hierarchiesUsing SQL to process hierarchies
Using SQL to process hierarchiesConnor McDonald
 
pstack, truss etc to understand deeper issues in Oracle database
pstack, truss etc to understand deeper issues in Oracle databasepstack, truss etc to understand deeper issues in Oracle database
pstack, truss etc to understand deeper issues in Oracle databaseRiyaj Shamsudeen
 
Connor McDonald Partitioning
Connor McDonald PartitioningConnor McDonald Partitioning
Connor McDonald PartitioningInSync Conference
 
E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...
E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...
E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...Hiroshi Sekiguchi
 
SQLチューニング総合診療Oracle CloudWorld出張所
SQLチューニング総合診療Oracle CloudWorld出張所SQLチューニング総合診療Oracle CloudWorld出張所
SQLチューニング総合診療Oracle CloudWorld出張所Hiroshi Sekiguchi
 

What's hot (7)

Autoextend
AutoextendAutoextend
Autoextend
 
Hyundai r55 w 9 wheel excavator service repair manual
Hyundai r55 w 9 wheel excavator service repair manualHyundai r55 w 9 wheel excavator service repair manual
Hyundai r55 w 9 wheel excavator service repair manual
 
Using SQL to process hierarchies
Using SQL to process hierarchiesUsing SQL to process hierarchies
Using SQL to process hierarchies
 
pstack, truss etc to understand deeper issues in Oracle database
pstack, truss etc to understand deeper issues in Oracle databasepstack, truss etc to understand deeper issues in Oracle database
pstack, truss etc to understand deeper issues in Oracle database
 
Connor McDonald Partitioning
Connor McDonald PartitioningConnor McDonald Partitioning
Connor McDonald Partitioning
 
E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...
E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...
E34 : [JPOUG Presents] Oracle Database の隠されている様々な謎を解くセッション「なーんでだ?」再び @ db tec...
 
SQLチューニング総合診療Oracle CloudWorld出張所
SQLチューニング総合診療Oracle CloudWorld出張所SQLチューニング総合診療Oracle CloudWorld出張所
SQLチューニング総合診療Oracle CloudWorld出張所
 

Similar to KLIMA Software - Some DEMO Results Outputs in SERBIAN Language

All keys and codes
All keys and codesAll keys and codes
All keys and codesdom_cruse
 
3.8. reporte de la estructura de acero (armadura)
3.8. reporte de la estructura de acero (armadura)3.8. reporte de la estructura de acero (armadura)
3.8. reporte de la estructura de acero (armadura)Arturo Belmont Salvador
 
Tank700kl 150530040421-lva1-app6891
Tank700kl 150530040421-lva1-app6891Tank700kl 150530040421-lva1-app6891
Tank700kl 150530040421-lva1-app6891Tanmay Majhi
 
Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...
Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...
Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...AUTHELECTRONIC
 
Example residential project
Example residential projectExample residential project
Example residential projectSolarDesigns
 
T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...
T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...
T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...Julio Banks
 
hfe_sony_dvp-s9_service_en.pdf
hfe_sony_dvp-s9_service_en.pdfhfe_sony_dvp-s9_service_en.pdf
hfe_sony_dvp-s9_service_en.pdfssuseraec097
 
App E3 - Monorail System Calc - B.pdf
App E3 - Monorail System Calc - B.pdfApp E3 - Monorail System Calc - B.pdf
App E3 - Monorail System Calc - B.pdfpingu111
 
COBOL DB2 BATCH EXAMPLE-RPR6520
COBOL DB2 BATCH EXAMPLE-RPR6520COBOL DB2 BATCH EXAMPLE-RPR6520
COBOL DB2 BATCH EXAMPLE-RPR6520Jon Fortman
 
bomb manuals (9_c_5000_ctrl_p2_12_m).pdf
bomb manuals (9_c_5000_ctrl_p2_12_m).pdfbomb manuals (9_c_5000_ctrl_p2_12_m).pdf
bomb manuals (9_c_5000_ctrl_p2_12_m).pdfmunawar hussain
 

Similar to KLIMA Software - Some DEMO Results Outputs in SERBIAN Language (20)

final403
final403final403
final403
 
Sa ak280-panasonic
Sa ak280-panasonicSa ak280-panasonic
Sa ak280-panasonic
 
Casnewb
CasnewbCasnewb
Casnewb
 
All keys and codes
All keys and codesAll keys and codes
All keys and codes
 
3.8. reporte de la estructura de acero (armadura)
3.8. reporte de la estructura de acero (armadura)3.8. reporte de la estructura de acero (armadura)
3.8. reporte de la estructura de acero (armadura)
 
ZFINDALLZPROGAM
ZFINDALLZPROGAMZFINDALLZPROGAM
ZFINDALLZPROGAM
 
Tank700kl 150530040421-lva1-app6891
Tank700kl 150530040421-lva1-app6891Tank700kl 150530040421-lva1-app6891
Tank700kl 150530040421-lva1-app6891
 
Tank 700 kl
Tank 700 klTank 700 kl
Tank 700 kl
 
New microsoft word document
New microsoft word documentNew microsoft word document
New microsoft word document
 
Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...
Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...
Original Off-Line Quasi-Resonant Switching Regulators Mosfet STRY-6753 STRY67...
 
Report zalv
Report  zalvReport  zalv
Report zalv
 
Oracle 11g caracteristicas poco documentadas 3 en 1
Oracle 11g caracteristicas poco documentadas 3 en 1Oracle 11g caracteristicas poco documentadas 3 en 1
Oracle 11g caracteristicas poco documentadas 3 en 1
 
Example residential project
Example residential projectExample residential project
Example residential project
 
T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...
T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...
T liner simulation parametric study of a thermal-liner by Julio c. banks, MSM...
 
hfe_sony_dvp-s9_service_en.pdf
hfe_sony_dvp-s9_service_en.pdfhfe_sony_dvp-s9_service_en.pdf
hfe_sony_dvp-s9_service_en.pdf
 
IBC Non Structural
IBC Non StructuralIBC Non Structural
IBC Non Structural
 
App E3 - Monorail System Calc - B.pdf
App E3 - Monorail System Calc - B.pdfApp E3 - Monorail System Calc - B.pdf
App E3 - Monorail System Calc - B.pdf
 
COBOL DB2 BATCH EXAMPLE-RPR6520
COBOL DB2 BATCH EXAMPLE-RPR6520COBOL DB2 BATCH EXAMPLE-RPR6520
COBOL DB2 BATCH EXAMPLE-RPR6520
 
bomb manuals (9_c_5000_ctrl_p2_12_m).pdf
bomb manuals (9_c_5000_ctrl_p2_12_m).pdfbomb manuals (9_c_5000_ctrl_p2_12_m).pdf
bomb manuals (9_c_5000_ctrl_p2_12_m).pdf
 
Alto macro series
Alto macro seriesAlto macro series
Alto macro series
 

KLIMA Software - Some DEMO Results Outputs in SERBIAN Language

  • 1. ========================================== K L I M A S O F T W A R E - MODUL 1 ========================================== PROGRAM "CODIS" - W8, Ver.4.1, 2013. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== K O E F I C I J E N T I P R O L A Z A T O P L O T E PROJEKAT :DEMO OBJEKAT :DEMO
  • 2. KOEFICIJENTI PROLAZA TOPLOTE KLIMA Software - NU str. 1 RB SIFRA K K-DOZ NAZIV ELEMENTA A-U A-S DEB LAMB M NAZIV SLOJA W/m2K W/m2K W/m2K cm W/mK -------------------------------------------------------------------------- 1 EW 1 0.53 0.80 EXTERNAL WALL 8 23 1.50 1.40 CEMENTNI MALTER 25.00 0.640 TERMOBLOKOVI 1.50 0.190 IZOLAC. MALTER 0.10 0.170 BITUM. PREMAZ 5.00 0.041*MINERALNA VUNA 0.05 203.0 ALU-FOLIJA 2.00 0.920 FASADNE PLOCE
  • 3. KOEFICIJENTI PROLAZA TOPLOTE KLIMA Software - NU str. 2 L E G E N D A : =============== RB = redni broj elementa konstrukcije SIFRA = sifra elementa K = koeficijent prolaza toplote (W/m2K) K-DOZ = dozvoljeni koeficijent prolaza toplote (W/m2K) NAZIV ELEMENTA = opis elementa konstrukcije A-U = koeficijent prelaza toplote - unutrasnji (W/m2K) A-S = koeficijent prelaza toplote - spoljasnji (W/m2K) DEB = debljina sloja (cm) LAMB = koeficijent provodjenja toplote (W/mK) M = marker sloja predvidjenog za izmenu po potrebi NAZIV SLOJA = opis sloja prema datoteci "TERMAT"
  • 4. ========================================== K L I M A S O F T W A R E - MODUL 1 ========================================== PROGRAM "CODIS" - W8, Ver.4.1, 2013. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== D I F U Z I J A V O D E N E P A R E PROJEKAT :DEMO OBJEKAT :DEMO
  • 5. DIFUZIJA VODENE PARE KLIMA Software - NU str. 1 RB SIFRA NAZIV ELEMENTA ---- -------- ---------------- 1 EW 1 EXTERNAL WALL TABELA 1 - PRORACUNSKI USLOVI ----------------------------------------- VARIJANTA: 1 | V L A Z E N J E | S U S E N J E | |-------------------|-------------------| | UNUTRA | SPOLJA | UNUTRA | SPOLJA | ------------------------------|---------|---------|---------|---------| | TEMPERATURA VAZDUHA | 22.0 C | 35.0 C | 18.0 C | 18.0 C | |-----------------------------|---------|---------|---------|---------| | RELATIVNA VLAZNOST VAZDUHA | 50.0 % | 95.0 % | 65.0 % | 65.0 % | |-----------------------------|---------|---------|---------|---------| | PRIT. ZASICENJA VODENE PARE | 2643 Pa | 5623 Pa | 2064 Pa | 2064 Pa | |-----------------------------|---------|---------|---------|---------| | PARCIJALNI PRIT. VOD. PARE | 1322 Pa | 5341 Pa | 1342 Pa | 1342 Pa | |-----------------------------|-------------------|-------------------| | RACUNSKO TRAJANJE PROCESA | 60.0 dana | 60.0 dana | -----------------------------------------------------------------------
  • 6. DIFUZIJA VODENE PARE KLIMA Software - NU str. 2 RB SIFRA NAZIV ELEMENTA ---- -------- ---------------- 1 EW 1 EXTERNAL WALL TABELA 2 - PRORACUN VLAZENJA RB NAZIV SLOJA DEB MI RD LAMB R TEMP PS PP MK cm - m W/mK m2K/W C Pa Pa ------------------------------------------------------------------------- - UNUTRASNJOST 22.00 2643 1322 - PRELAZ TOPLOTE U 0.13 22.89 2790 1322 1 CEMENTNI MALTER 1.50 30.0 0.45 1.40 0.01 22.96 2802 1327 2 TERMOBLOKOVI 25.00 4.0 1.00 0.640 0.39 25.64 3289 1337 3 IZOLAC. MALTER 1.50 6.0 0.09 0.190 0.08 26.18 3396 1338 4 BITUM. PREMAZ 0.10 10000.0 10.00 0.170 0.01 26.22 3404 1448 5 MINERALNA VUNA 5.00 1.0 0.05 0.041 1.22 34.58 5492 1448 6 ALU-FOLIJA 0.05700000.0 350.00 203.0 0.00 34.58 5492 5276 7 FASADNE PLOCE 2.00 300.0 6.00 0.920 0.02 - PRELAZ TOPLOTE S 0.04 34.73 5538 5341 - SPOLJASNJOST 35.00 5623 5341 ------------------------------------------------------------------------- NEMA KONDENZACIJE U KONSTRUKCIJI KONSTRUKCIJA ZADOVOLJAVA JUS U.J5.600
  • 7. DIFUZIJA VODENE PARE KLIMA Software - NU str. 3 L E G E N D A : =============== OPISI VAZE ZA TABELE 2 I 3 : RB = redni broj sloja (od unutra ka spolja) NAZIV SLOJA = opis sloja prema datoteci "TERMAT" DEB = debljina sloja (cm) MI = faktor otpora difuziji vodene pare (-) RD = relativni otpor difuziji vodene pare (m) LAMB = koeficijent provodjenja toplote (W/mK) R = toplotni otpor sloja (m2K/W) TEMP = temperatura na granici slojeva (step. C) PS = pritisak zasicenja vodene pare na datoj temp. (Pa) PP = parcijalni pritisak vodene pare na datoj temp. (Pa) MK = marker koji oznacava kondenzaciju na datom mestu
  • 8. ========================================== K L I M A S O F T W A R E - MODUL 1 ========================================== PROGRAM "CODIS" - W8, Ver.4.1, 2013. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== T O P L O T N A S T A B I L N O S T K O N S T R U K C I J A PROJEKAT :DEMO OBJEKAT :DEMO
  • 9. TOPLOTNA STABILNOST KONSTRUKCIJA KLIMA Software - NU str. 1 RB SIFRA K K-DOZ NAZIV ELEMENTA SP.MASA FP FP M VP VP M OR JUS W/m2K kg/m2 MIN MIN ------------------------------------------------------------------------- 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** SI DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** II DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** JI DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** JJ DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** JZ DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** ZZ DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 15 12.7 ** SZ DA 1 EW 1 0.53 0.80 EXTERNAL WALL 486.0 106.4 10 12.7 ** SS DA ------------------------------------------------------------------------- KONSTRUKCIJA : -------------- RB NAZIV SLOJA DEB LAMB R S D U cm W/mK m2K/W W/m2K W/m2K --------------------------------------------------------- 1 CEMENTNI MALTER 1.500 1.400 0.01 14.93 0.16 9.57 2 TERMOBLOKOVI 25.000 0.640 0.39 8.25 3.22 8.25 3 IZOLAC. MALTER 1.500 0.190 0.08 2.75 0.22 5.36 4 BITUM. PREMAZ 0.100 0.170 0.01 4.44 0.03 5.31 5 MINERALNA VUNA 5.000 0.041 1.22 0.59 0.72 0.77 6 ALU-FOLIJA 0.050203.000 0.00192.94 0.00 0.86 7 FASADNE PLOCE 2.000 0.920 0.02 10.49 0.23 3.19 ---------------------------------------------------------
  • 10. TOPLOTNA STABILNOST KONSTRUKCIJA KLIMA Software - NU str. 2 L E G E N D A : =============== TABELA 1 : RB = redni broj elementa SIFRA = sifra elementa K = koeficijent prolaza toplote (W/m2K) K-DOZ = dozvoljeni koeficijent prolaza toplote (W/m2K) NAZIV ELEMENTA = opis elementa konstrukcije SP.MASA = specificna masa elementa konstrukcije (kg/m2) FP = faktor prigusenja amplitude temperaturske oscilacije FPMIN = minimalni dozvoljeni faktor prigusenja amplitude M = marker koji pokazuje da li je FP>FPMIN VP = vremenski pomak faze temperaturske oscilacije VPMIN = minimalni dozvoljeni vremenski pomak faze M = marker koji pokazuje da li je VP>VPMIN OR = oznaka orijentacije, npr. JI=jugoistok, JJ=jug, itd. JUS = marker da li zadovoljava (DA) ili ne (NE) JUS U.J5.600 TABELA 2: RB = redni broj sloja (od unutra ka spolja) NAZIV SLOJA = opis sloja prema datoteci "TERMAT" DEB = debljina sloja (cm) LAMB = koeficijent toplotne provodljivosti mater. sloja (W/mK) R = toplotni otpor sloja (m2K/W) S = koefic. upijanja toplote mater. sloja za 24 h (W/m2K) D = karakteristika toplotne inercije sloja (-) U = koefic. upijanja toplote povrsine konstrukcije (W/m2K)
  • 11. ========================================== K L I M A S O F T W A R E - MODUL 2B ========================================== PROGRAM "CLOAD" - W8, Ver.4.1, 2013. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== P R O R A C U N T O P L O T N I H D O B I T A K A PROJEKAT : DEMO OBJEKAT : DEMO
  • 12. PRORACUN TOPLOTNIH DOBITAKA KLIMA Software - NU str. 1 -------------------------------------------------------------------------- PROJEKAT : OBJEKAT : PROJEKTNI USLOVI : ---------------- METODA : CARRIER ZAMUCENOST ATMOSFERE : 10.0 % GEOGRAFSKA SIRINA : 44.0 VISINA : 15 m TEMPERATURA-LETO,15 SATI : 33.0 C RASPON DNEVNE TEMPERATURE : 12.8 C RASPON GODISNJE TEMPERATURE: 48.0 C OBJEKAT:BLD1- MAKSIMALNO JEDNOVREMENO OPTERECENJE -------------------------------------------------------------------------- MESEC: 9 VREME:18 POVRSINA: 100.0 m2 ZAPREMINA: 500.0 m3 BROJ LJUDI: 10 SVEZ VAZDUH: 0.0 m3/h Qsenzibilno = 3565.0 W Qlatentno = 760.0 W Qinsolacija = 1261.0 W Qtransmisija= 716.0 W Qinfiltrac. = 28.0 W Qventilacija= 0.0 W Qljudi sen. = 760.0 W Qljudi lat. = 560.0 W Qsvetlo = 500.0 W Qoprema sen.= 300.0 W Qoprema lat.= 200.0 W Qsvez vazduh= 0.0 W
  • 13. PRORACUN TOPLOTNIH DOBITAKA KLIMA Software - NU str. 2 -------------------------------------------------------------------------- PROJEKAT : OBJEKAT : GRUPA: S1 - SPRAT 1 - MAKSIMALNO JEDNOVREMENO OPTERECENJE -------------------------------------------------------------------------- MESEC: 9 VREME:18 POVRSINA: 100.0 m2 ZAPREMINA: 500.0 m3 BROJ LJUDI: 10 SVEZ VAZDUH: 0.0 m3/h Qsenzibilno = 3565.0 W Qlatentno = 760.0 W Qinsolacija = 1261.0 W Qtransmisija= 716.0 W Qinfiltrac. = 28.0 W Qventilacija= 0.0 W Qljudi sen. = 760.0 W Qljudi lat. = 560.0 W Qsvetlo = 500.0 W Qoprema sen.= 300.0 W Qoprema lat.= 200.0 W Qsvez vazduh= 0.0 W
  • 14. PRORACUN TOPLOTNIH DOBITAKA KLIMA Software - NU str. 3 -------------------------------------------------------------------------- PROJEKAT : OBJEKAT : ========================================================================== GRUPA: S1-SPRAT 1 PROSTORIJA: PR1 -PROSTORIJA 1 - MAKSIMUM -------------------------------------------------------------------------- MESEC: 9 VREME:18 POVRSINA: 100.0 m2 ZAPREMINA: 500.0 m3 BROJ LJUDI: 10 UNUTRASNJA TEMPERATURA: 23.0 C Qsenzibilno = 3565.0 W Qlatentno = 760.0 W Qinsolacija = 1261.0 W Qtransmisija= 716.0 W Qinfiltrac. = 28.0 W Qventilacija= 0.0 W Qljudi sen. = 760.0 W Qljudi lat. = 560.0 W Qsvetlo = 500.0 W Qoprema sen.= 300.0 W Qoprema lat.= 200.0 W OZN. OR. SIR VIS POVRS. SEN. K SOL.F. DEL-T Q-SENZIB. m m m2 % W/m2k C W -------------------------------------------------------------------------- . PS Z 5.00 2.50 12.5 0 2.10 0.35 4.7 1412.0 . ZS Z 10.00 5.00 37.5 0.50 5.9 111.0 . KR KR 10.00 10.00 100.0 0.40 12.1 482.0
  • 15. ========================================== K L I M A S O F T W A R E - MODUL 3B ========================================== PROGRAM "FCU-s" - W8, Ver.4.1, 2014. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== I Z B O R F A N - C O I L-a PROJEKAT : DEMO OBJEKAT : DEMO
  • 16. F A N C O I L U N I T S KLIMA Software - NU str. 1 ------------------------------------------------------------------------- PROJEKAT : OBJEKAT : ------------------------------------------------------------------------- PROSTORIJA tu V q Q-d KOM T I P DUZ Q-sen A-fl W-fl Q-inst C m3 W/m3 W m W L/s L/s W ------------------------------------------------------------------------- DEMO ............................SPRAT 1 ............................. BLD1S1PR1 23 500 9 4325 1-42JW009 0.93 4325 411 0.21 4325 BLD1S1PR2 23 500 9 4325 1-42JW009 0.93 4325 411 0.21 4325 BLD1S1 GRUPA UKUPNO: 8650 8650 2-42JW009 ------------------------------------------------------------------------- ------------------------------------------------------------------------- BLD1 OBJEKAT UKUPNO: 8650 8650 2-42JW009 =========================================================================
  • 17. F A N C O I L U N I T S KLIMA Software - NU str. 2 ------------------------------------------------------------------------- PROJEKAT : OBJEKAT : ------------------------------------------------------------------------- PROSTORIJA tu V q Q-d KOM T I P DUZ Q-sen A-fl W-fl Q-inst C m3 W/m3 W m W L/s L/s W ------------------------------------------------------------------------- ------------------------------------------------------------------------- ------------------------------------------------------------------------- : 8650 8650 2-42JW009 ************************************************************************* PROJEKTNI USLOVI : 1. TEMPERATURA RAZVODNE VODE : 7. C 2. TEMPERATURA POVRATNE VODE : 12. C *************************************************************************
  • 18. F A N C O I L U N I T S KLIMA Software - NU str. 3 ------------------------------------------------------------------------- PROJEKAT : OBJEKAT : L E G E N D A : =============== T A B E L A Z A F A N C O I L - e --------------------------------------- PROSTORIJA = oznaka prostorije u objektu tu = unutrasnja temperatura prostorije (C) V = zapremina prostorije (m3) q = specificno toplotno opterecenje (W/m3) Q-d = proracunsko toplotno opterecenje (W) KOM = broj Fan Coil Uredjaja - FCU-a (kom) T I P = tip Fan Coil Uredjaja prema datoteci DUZ = instalisana duzina Fan Coil Uredjaja (m) Q-sen = instalisani Senzibilni kapacitet FCU-a (W) A-fl = protok vazduha na "HIGH" brzini FCU-a (L/s) W-fl = protok vode kroz FCU (L/s) Q-inst = instalisani Totalni rashladni kapac. FCU-a (W) PRIMENJENI TIPOVI FAN COIL UREDJAJA : * 42JW005 * Carrier - ducted FCU 42JW009 * Carrier - ducted FCU 42JW016 * Carrier - ducted FCU
  • 19. ========================================== K L I M A S O F T W A R E - MODUL 4 ========================================== PROGRAM "ACPIPE" - W8, Ver.4.1, 2014. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== P R O R A C U N C E V N E M R E Z E PROJEKAT : DEMO SISTEM : DEMO
  • 20. PRORACUN CEVNE MREZE KLIMA Software - NU str. 1 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- PROJEKTNI USLOVI : ---------------- 1. UKUPAN INSTALISANI KAPACITET : 18200. W 2. TEMPERATURA RAZVODNE VODE : 90. C 3. TEMPERATURA POVRATNE VODE : 70. C 4. NAJNEPOVOLJNIJI STRUJNI KRUG - NNSK : V2 4 5. JEDINICNI PAD PRITISKA R U NNSK : 60. Pa/m 6. ZADAT PRITISAK ZA DIMENZIONISANJE : Pa 7. UTICAJ GRAVITACIONOG NAPORA : 0. % 8. SISTEMSKI PODATAK ZA APS. HRAP. CEVI : 0.045 mm 9. SISTEMSKI PODATAK ZA MAX. REDUKC. BV : 0 10. SISTEMSKI PODATAK ZA TACNOST REG. BV : 0.10 PODACI O MREZI : -------------- 1. UKUPAN BROJ VERTIKALA : 2 2. UKUPAN BROJ DEONICA : 10 3. BROJ DEONICA U HOR. MREZI : 2 4. BROJ DEONICA SA BAL. VENT. : 6 5. BROJ DEONICA SA GR. TELIMA : 4 GLAVNI REZULTATI : ---------------- 1. UKUPAN PROTOK U SISTEMU : 805. l/h 2. POTREBAN PRITISAK PUMPE : 22430. Pa
  • 21. PRORACUN CEVNE MREZE KLIMA Software - NU str. 2 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- STANDARDNE CEVI ---------------- ---------------------------------------------------------------------------- RED NAMENA DN OZN DSP DEB DUN MASA W-MIN W-MAX BR C R mm CEVI mm mm mm kg/m m/s m/s ---------------------------------------------------------------------------- 1 10 3/8 17.10 2.30 12.50 0.850 0.001 0.250 2 * 15 1/2 21.30 2.80 15.70 1.260 0.001 0.400 3 * 20 3/4 26.70 2.90 20.90 1.680 0.005 0.550 4 * 25 1" 33.40 3.40 26.60 2.500 0.018 0.650 5 * 32 11/4 42.20 3.60 35.00 3.380 0.020 0.750 6 * 40 11/2 48.30 3.70 40.90 4.050 0.030 0.850 7 * 50 2 60.30 3.90 52.50 5.430 0.040 0.950 8 * 65 21/2 73.00 5.20 62.60 8.620 0.050 1.050 9 * 80 3" 88.90 5.50 77.90 11.280 0.050 1.150 10 * 100 4" 114.30 6.00 102.30 16.060 0.050 1.250 11 * 125 5" 141.30 6.60 128.10 21.760 0.050 1.400 12 * 150 6" 168.30 7.10 154.10 28.230 0.050 1.550 13 * 200 8" 219.10 8.20 202.70 42.490 0.050 1.700 14 * 250 10" 273.00 9.30 254.40 60.240 0.050 1.850 15 * 300 12" 323.80 10.30 303.20 79.650 0.050 2.100 ----------------------------------------------------------------------------
  • 22. PRORACUN CEVNE MREZE KLIMA Software - NU str. 3 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- VEZE I LOKALNI OTPORI --------------------- ---------------------------------------------------------------------------- RB SIF V L CETA DP DODL NAZIV CETA = F(DN) Pa m VEZE - LOKO REDOSLED STANDARDNIH CEVI ---------------------------------------------------------------------------- 1 NC * 0.0 0. 0.0 Neutral Connect. 2 TS * 3.0 0. 0.0 T, Supply 3 TR * 3.0 0. 0.0 T, Return 4 BS * 1.5 0. 0.0 Branch, Supply 5 BR * 1.0 0. 0.0 Branch, Return 6 RD * 0.0 0. 0.0 Reduction 7 EN * 0.5 0. 0.0 Enlargement 8 9S * 0.5 0. 0.0 90 bend, sharp 9 9L * 0.3 0. 0.0 90 bend, long 10 4S * 0.3 0. 0.0 45 bend, sharp 11 4L * 0.1 0. 0.0 45 bend,round.l. 12 CP * 2.0 0. 0.0 Compensator 13 PF * 0.0 6000. 0.0 Pipe Filter 14 HW * 0.0 6000. 0.0 Heater, Water 15 HE * 0.0 6000. 0.0 Heater, Electric 16 GV * 2.0 0. 0.0 Gate Valve 17 GL * 4.0 0. 0.0 Globe Valve 18 BV * 1.0 0. 0.0 Ball Valve 19 NV * 4.0 0. 0.0 Non return Valve 20 ST * 10.0 0. 0.0 Strainer 21 PS * 20.0 0. 0.0 Pump ar. Supply
  • 23. PRORACUN CEVNE MREZE KLIMA Software - NU str. 4 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- RB SIF V L CETA DP DODL NAZIV CETA = F(DN) Pa m VEZE - LOKO REDOSLED STANDARDNIH CEVI ---------------------------------------------------------------------------- 22 PR * 10.0 0. 0.0 Pump ar. Return 23 SC * 15.0 0. 0.0 Sup.Colector ar. 24 RC * 15.0 0. 0.0 Ret.Colector ar. 25 EX * 0.0 8000. 0.0 Heat Exchanger 26 HB * 0.0 9000. 0.0 Hot Water Boiler 27 V1 * 15.0 0. 0.0 Valves ar. No. 1 28 V2 * 20.0 0. 0.0 Valves ar. No. 2 29 NG * 3.0 0. 0.0 Nkno. Glob.Valve 30 NI * 6.0 0. 0.0 Nkno. Bala.IPCV 31 NB * 4.0 0. 0.0 Nkno. Bala.Valve 32 NM * 4.0 0. 0.0 Nkno. Moto.Valve 33 RA * 2.5 0. 0.0 Radiator 34 CO * 2.0 0. 0.0 Convector 35 F1 * 0.0 6440. 0.0 FCU No. 1 36 F2 * 0.0 6880. 0.0 FCU No. 2 37 F3 * 0.0 9240. 0.0 FCU No. 3 38 F4 * 0.0 13200. 0.0 FCU No. 4 39 A1 * 0.0 15000. 0.0 AHU No. 1 40 A2 * 0.0 17000. 0.0 AHU No. 2 41 A3 * 0.0 19000. 0.0 AHU No. 3 42 A4 * 0.0 21000. 0.0 AHU No. 4 ----------------------------------------------------------------------------
  • 24. PRORACUN CEVNE MREZE KLIMA Software - NU str. 5 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- BALANSNI VENTILI ---------------- ---------------------------------------------------------------------------- PRECNICI BV : 10 15 20 25 32 40 50 65 80 100 125 150 200 250 300 RB TIP-BV NP --- SIFRE BV --- ---------------------------------------------------------------------------- 1 TIP-1 SVK.KS SVK.KS SVK.KS SVK.KS SVK.KS SVK.KS SVK.KS 2 TIP-2 RVK.RV RVK.RV RVK.RV 3 TIP-3 RVK.UG RVK.UG RVK.UG 4 TIP-4 RNK.RV RNK.RV RNK.RV 5 TIP-5 RNK.UG RNK.UG RNK.UG 6 TIP-6 DM830 DM830 DM830 DM830 DM830 DM830 DM830 DM830 DM831 DM831 DM831 DM831 7 NGLOBV NG NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV NGLOBV 8 NIPCV NI NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV NIPCV 9 NBALV NB NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV NBALV 10 NMOTV NM NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV NMOTV ----------------------------------------------------------------------------
  • 25. PRORACUN CEVNE MREZE KLIMA Software - NU str. 6 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- HORIZONTALNA MREZA ------------------ ---------------------------------------------------------------------------- DEONICA Q DN-N BRZ DUZ R DPTR DPL LK TIP DN POZ DPBV OTV W mm m/s m Pa/m Pa Pa BV BV BV BV Pa % ---------------------------------------------------------------------------- H1 18200 25 0.40 10.0 81 815 9574 H1A 18200 25 0.40 2.0 81 163 2754 ----------------------------------------------------------------------------
  • 26. PRORACUN CEVNE MREZE KLIMA Software - NU str. 7 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- VERTIKALA : V1 ------------------ ---------------------------------------------------------------------------- DE Q DN-N BRZ DUZ R DPTR DPL LK TIP DN POZ DPBV OTV GRV VISAK W mm m/s m Pa/m Pa Pa BV BV BV BV Pa % Pa Pa ---------------------------------------------------------------------------- 1 8220 20 0.29 20.0 62 1245 1753 P TIP-1 20 3.20 1626 53 2 3610 15 0.23 4.0 57 228 5748 R TIP-3 15 3.00 3050 37 0 152 P TIP-5 15 4.40 2544 88 3 4610 15 0.29 6.0 89 533 21 4 4610 15 0.29 4.0 89 356 5199 R TIP-3 15 8.00 2632 100 0 19 P TIP-5 15 5.00 2318 100 ---------------------------------------------------------------------------- VERTIKALA : V2 ------------------ ---------------------------------------------------------------------------- DE Q DN-N BRZ DUZ R DPTR DPL LK TIP DN POZ DPBV OTV GRV VISAK W mm m/s m Pa/m Pa Pa BV BV BV BV Pa % Pa Pa ---------------------------------------------------------------------------- 1 9980 20 0.36 20.0 89 1779 641 P TIP-1 20 6.00 455 100 2 4610 15 0.29 4.0 89 356 6204 R TIP-3 15 4.00 3399 50 0 145 P TIP-5 15 4.90 2555 98 3 5370 20 0.19 6.0 29 172 9 4 5370 20 0.19 4.0 29 115 6409 R TIP-3 20 8.00 4130 100 0 0 P TIP-5 20 5.00 2170 100 ----------------------------------------------------------------------------
  • 27. PRORACUN CEVNE MREZE KLIMA Software - NU str. 8 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- SPECIFIKACIJA MATERIJALA ========================= STANDARDNE CEVI ---------------- ------------------------------------------- DN OZN DSP DEB DUZINA MASA mm CEVI mm mm m kg ------------------------------------------- 15 1/2 21.30 2.80 18.0 22.7 20 3/4 26.70 2.90 50.0 84.0 25 1" 33.40 3.40 12.0 30.0 -------------------------------------------
  • 28. PRORACUN CEVNE MREZE KLIMA Software - NU str. 9 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- LOKALNI OTPORI -------------- ---------------------------------------------------------------------------- SIF NAZIV LOKO PRECNICI STANDARDNIH CEVI 10 15 20 25 32 40 50 65 80 100 125 150 200 250 300 ---------------------------------------------------------------------------- 9S 90 bend, sharp 0 6 6 0 0 0 0 0 0 0 0 0 0 0 0 GV Gate Valve 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 PS Pump ar. Supply 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 EX Heat Exchanger 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 V1 Valves ar. No. 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 V2 Valves ar. No. 2 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 RA Radiator 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 ----------------------------------------------------------------------------
  • 29. PRORACUN CEVNE MREZE KLIMA Software - NU str. 10 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- BALANSNI VENTILI ---------------- ----------------------------------------------------------------------- DN BV : 10 15 20 25 32 40 50 65 80 100 125 150 200 250 300 TIP-BV NP --- komada --- ----------------------------------------------------------------------- TIP-1 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 TIP-3 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 TIP-5 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 ----------------------------------------------------------------------- POVRSINE - ZAPREMINE -------------------- ------------------------------------------------------------ BOJENJE IZOLACIJA UKUPNO ZAPREMINA m2 m2 m2 l ------------------------------------------------------------ CEVNA MREZA 5.4 3.1 8.5 27.3 REGISTRI 0.0 0.0 0.0 0.0 GREJNA TELA 0.0 0.0 37.3 149080.0 ------------------------------------------------------------ UKUPNO : 5.4 3.1 45.8 149107.3 ------------------------------------------------------------
  • 30. PRORACUN CEVNE MREZE KLIMA Software - NU str. 11 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- L E G E N D A ============= HORIZONTALNA MREZA / VERTIKALE ------------------------------ DEONICA/DE = OZNAKA DEONICE U HOR-VER MREZI Q = TOPLOTNO OPTERECENJE DEONICE (W) DN = NAZIVNI PRECNIK CEVI (mm) N = REDNI BROJ CEVI AKO IMA VISE ISTIH DN BRZ = BRZINA VODE U DEONICI (m/s) DUZ = UKUPNA DUZINA DEONICE (RAZ+POV) (m) R = JEDINICNI PAD PRITISKA OD TRENJA (Pa/m) DPT = PAD PRITISKA OD TRENJA (Pa) DPL = PAD PRITISKA OD LOKALNIH OTPORA (Pa) LK BV = LOKACIJA BV : R-RAZVOD, P-POVRAT TIP BV = TIP BV - PREMA DATOTECI BALVENT DN BV = NAZIVNI PRECNIK BV (mm) POZ BV = POZICIJA REGULACIJE BV DPBV = PAD PRITISKA U BV SA DATOM POZICIJOM (Pa) OTV = OTVORENOST BV 0 - 100 (%) GRV = UTICAJ GRAVITACIJE ZA STRUJNI KRUG (Pa) VISAK = VISAK PRITISKA POSLE BALANSIRANJA (Pa)
  • 31. ========================================== K L I M A S O F T W A R E - MODUL 5 ========================================== PROGRAM "ACDUCT" - W8, Ver.4.1, 2014. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== P R O R A C U N V A Z D U S N I H K A N A L A PROJEKAT : DEMO SISTEM : DEMO
  • 32. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 1 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- PROJEKTNI USLOVI : ---------------- 1. UKUPAN INSTALISANI PROTOK : 500. L/s 2. TEMPERATURA VAZDUHA U KANALU : 13. C 3. TEMPERATURA PROSTORIJE/OKOLINE : 23. C 4. NAJNEPOVOLJNIJI STRUJNI KRUG - NNSK : V1 2 5. JEDINICNI PAD PRITISKA R U NNSK : 0.50 Pa/m 6. ZADAT PRITISAK ZA DIMENZIONISANJE : Pa 7. UTICAJ GRAVITACIONOG NAPORA : 0. % 8. SISTEMSKI PODATAK ZA APS.HRAP.KANALA : 0.045 mm 9. SISTEMSKI PODATAK ZA MAX. REDUKC. CD : 0 10. SISTEMSKI PODATAK ZA TACNOST REG. CD : 0.10 PODACI O MREZI : -------------- 1. UKUPAN BROJ VERTIKALA : 1 2. UKUPAN BROJ DEONICA : 4 3. BROJ DEONICA U HOR. MREZI : 1 4. BROJ DEONICA SA CONT. DAMP. : 3 5. BROJ DEONICA SA DIFUZORIMA : 2 GLAVNI REZULTATI : ---------------- 1. UKUPAN PROTOK U SISTEMU : 500. L/s 2. POTREBAN PRITISAK VENTILATORA : 144. Pa
  • 33. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 2 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- STANDARDNI KANALI ----------------- ---------------------------------------------------------------------------- RED NAMENA DN OZN DSP DEB DUN MASA W-MIN W-MAX BR C R mm mm mm mm kg/m m/s m/s ---------------------------------------------------------------------------- 1 75 3" 76.00 0.50 75.00 1.000 0.500 2.850 2 100 4" 101.00 0.50 100.00 1.560 0.500 3.300 3 * 125 5" 126.00 0.50 125.00 1.960 0.500 3.750 4 * 150 6" 151.00 0.50 150.00 2.340 0.500 4.050 5 * 175 7" 176.20 0.60 175.00 3.380 0.500 4.500 6 * 200 8" 201.20 0.60 200.00 3.750 0.500 4.800 7 * 225 9" 226.20 0.60 225.00 4.200 0.500 5.100 8 * 250 10" 251.20 0.60 250.00 4.690 0.500 5.250 9 * 275 11" 276.20 0.60 275.00 5.260 0.500 5.550 10 * 300 12" 301.20 0.60 300.00 5.630 0.500 5.850 11 * 325 13" 326.60 0.80 325.00 6.670 0.500 6.000 12 * 350 14" 351.60 0.80 350.00 8.880 0.500 6.300 13 * 375 15" 376.60 0.80 375.00 9.530 0.500 6.450 14 * 400 16" 401.60 0.80 400.00 10.010 0.500 6.750 15 * 425 17" 426.60 0.80 425.00 10.800 0.500 6.900 16 * 450 18" 451.60 0.80 450.00 11.250 0.500 7.200 17 * 475 19" 476.60 0.80 475.00 12.010 0.500 7.350 18 * 500 20" 501.60 0.80 500.00 12.500 0.500 7.500 19 * 550 22" 551.60 0.80 550.00 14.000 0.500 7.950 20 * 600 24" 601.60 0.80 600.00 15.000 0.500 8.250 21 * 650 26" 651.60 0.80 650.00 16.500 0.500 8.550 22 * 700 28" 701.60 0.80 700.00 17.760 0.500 8.850
  • 34. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 3 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- RED NAMENA DN OZN DSP DEB DUN MASA W-MIN W-MAX BR C R mm mm mm mm kg/m m/s m/s ---------------------------------------------------------------------------- 23 * 750 30" 751.60 0.80 750.00 19.050 0.500 9.150 24 * 800 32" 801.60 0.80 800.00 23.820 0.500 9.450 25 * 850 34" 852.00 1.00 850.00 27.040 0.500 9.750 26 * 900 36" 902.00 1.00 900.00 28.160 0.500 10.050 27 * 950 38" 952.00 1.00 950.00 30.200 0.500 10.350 28 * 1000 40" 1002.00 1.00 1000.00 30.920 0.500 10.650 29 * 1050 42" 1052.40 1.20 1050.00 38.140 0.500 10.950 30 * 1100 44" 1102.40 1.20 1100.00 44.810 0.500 11.100 31 * 1150 46" 1152.40 1.20 1150.00 46.730 0.500 11.400 32 * 1200 48" 1202.40 1.20 1200.00 48.760 0.500 11.700 33 * 1250 50" 1252.40 1.20 1250.00 50.100 0.500 12.640 34 * 1300 52" 1302.40 1.20 1300.00 52.840 0.500 12.960 35 * 1350 54" 1352.40 1.20 1350.00 54.300 0.500 13.120 36 * 1400 56" 1402.40 1.20 1400.00 55.860 0.500 13.280 37 * 1450 58" 1452.40 1.20 1450.00 58.300 0.500 13.440 38 * 1500 60" 1502.40 1.20 1500.00 60.850 0.500 13.920 ----------------------------------------------------------------------------
  • 35. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 4 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- VEZE I LOKALNI OTPORI --------------------- ---------------------------------------------------------------------------- RB SIF V L CETA DP DODL NAZIV CETA = F(DN) Pa m VEZE - LOKO REDOSLED STAND. KANALA ---------------------------------------------------------------------------- 1 NC * 0.0 0. 0.0 Neutral Connect. 2 TS * 0.3 0. 0.0 T, Supply 3 TR * 0.3 0. 0.0 T, Return 4 BS * 0.5 0. 0.0 Branch, Supply 5 BR * 0.5 0. 0.0 Branch, Return 6 RD * 0.0 0. 0.0 Reduction 7 EN * 0.4 0. 0.0 Enlargement 8 9S * 1.3 0. 0.0 90 bend, sharp 9 9V * 0.7 0. 0.0 90 bend, w.vanes 10 9R * 0.5 0. 0.0 90 bend,round.s. 11 9L * 0.2 0. 0.0 90 bend,round.l. 12 4S * 0.5 0. 0.0 45 bend, sharp 13 4R * 0.2 0. 0.0 45 bend,round.s. 14 4L * 0.1 0. 0.0 45 bend,round.l. 15 FD * 0.5 0. 0.0 Flexible Duct 16 DS * 4.0 0. 0.0 Diffuser, Supply 17 DR * 3.0 0. 0.0 Diffuser, Return 18 GS * 4.0 0. 0.0 Grill, Supply
  • 36. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 5 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- RB SIF V L CETA DP DODL NAZIV CETA = F(DN) Pa m VEZE - LOKO REDOSLED STAND. KANALA ---------------------------------------------------------------------------- 19 GR * 3.0 0. 0.0 Grill, Return 20 SA * 0.0 60. 0.0 Sound Attenuator 21 FF * 0.0 40. 0.0 Filter, Flat 22 HW * 0.0 30. 0.0 Heater, Water 23 HE * 0.0 20. 0.0 Heater, Electric 24 ND * 0.0 30. 0.0 Non return Damer 25 CD * 1.5 0. 0.0 Control Damper 26 VV * 1.5 0. 0.0 VAV box 27 CV * 2.0 0. 0.0 CAV box ----------------------------------------------------------------------------
  • 37. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 6 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- CONTROL. DAMPERI ---------------- ---------------------------------------------------------------------------- PRECNICI CD : 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 RB TIP-CD NP --- SIFRE CD --- ---------------------------------------------------------------------------- 1 VCD CD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD VCD 2 VAV VV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV VAV 3 CAV CV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV ----------------------------------------------------------------------------
  • 38. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 7 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- HORIZONTALNA MREZA ------------------ ---------------------------------------------------------------------------- DEONICA V DN BRZ DUZ R DPTR DPL LK TIP DN POZ DPCD OTV L/s mm m/s m Pa/m Pa Pa CD CD CD CD Pa % ---------------------------------------------------------------------------- H1 500 400 4.0 5.0 0.44 2 65 ----------------------------------------------------------------------------
  • 39. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 8 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- VERTIKALA : V1 ------------------ ---------------------------------------------------------------------------- DE V DN BRZ DUZ R DPTR DPL LK TIP DN POZ DPCD OTV GRV VISAK L/s mm m/s m Pa/m Pa Pa CD CD CD CD Pa % Pa Pa ---------------------------------------------------------------------------- 1 500 400 4.0 10.0 0.44 4 24 R VAV 400 REG 14 2 250 300 3.5 5.0 0.51 3 46 R VCD 300 REG 11 0 0 3 250 325 3.0 5.0 0.34 2 46 R VCD 325 REG 22 0 0 ----------------------------------------------------------------------------
  • 40. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 9 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- SPECIFIKACIJA MATERIJALA ========================= STANDARDNI KANALI ----------------- ------------------------------------------------------------------ SPIRO-DN INCH RECT-EQVIV. DSP DEB DUZINA MASA mm mm X mm mm mm m kg ------------------------------------------------------------------ 300 12" 300 X 250 301.20 0.60 5.0 28.2 325 13" 350 X 250 326.60 0.80 5.0 33.3 400 16" 450 X 300 401.60 0.80 15.0 150.2 ------------------------------------------------------------------ LOKALNI OTPORI -------------- ---------------------------------------------------------------------------- SIF NAZIV LOKO PRECNICI STANDARD. KANALA 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 550 600 650 700 750 800 850 900 9501000 1050110011501200125013001350140014501500 ---------------------------------------------------------------------------- 9R 90 bend,round.s. 0 0 0 0 0 0 0 0 0 0 1 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DS Diffuser, Supply 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Sound Attenuator 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ----------------------------------------------------------------------------
  • 41. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 10 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- CONTROL. DAMPERI ---------------- ----------------------------------------------------------------------- DN CD : 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 TIP-CD NP --- komada --- ----------------------------------------------------------------------- VCD CD 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 VAV VV 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ----------------------------------------------------------------------- POVRSINE - ZAPREMINE -------------------- ------------------------------------------------------------ BOJENJE IZOLACIJA UKUPNO ZAPREMINA m2 m2 m2 l ------------------------------------------------------------ SPIRO KANALI 28.8 0.0 28.8 2653.2 ------------------------------------------------------------ UKUPNO : 28.8 0.0 28.8 2653.2 ------------------------------------------------------------
  • 42. PRORACUN VAZDUSNIH KANALA KLIMA Software - NU str. 11 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- L E G E N D A ============= KANALSKA - HORIZONTALNA MREZA / VERTIKALE ----------------------------------------- DEONICA/DE = OZNAKA DEONICE U HOR-VER KANALSKOJ MREZI V = VAZDUSNI PROTOK U DEONICI (L/s) DN = NAZIVNI PRECNIK KANALA (mm) BRZ = BRZINA VAZDUHA U DEONICI (m/s) DUZ = UKUPNA DUZINA DEONICE (m) R = JEDINICNI PAD PRITISKA OD TRENJA (Pa/m) DPTR = PAD PRITISKA OD TRENJA (Pa) DPL = PAD PRITISKA OD LOKALNIH OTPORA (Pa) LK CD = LOKACIJA CD : R-RAZVOD, P-POVRAT TIP CD = TIP CD - PREMA DATOTECI CONTROL. DAMPERI DN CD = NAZIVNI PRECNIK CD (mm) POZ CD = POZICIJA REGULACIJE CD DPCD = PAD PRITISKA U CD SA DATOM POZICIJOM (Pa) OTV = OTVORENOST CD 0 - 100 (%) GRV = UTICAJ GRAVITACIJE ZA STRUJNI KRUG (Pa) VISAK = VISAK PRITISKA POSLE BALANSIRANJA (Pa)
  • 43. ========================================== K L I M A S O F T W A R E - MODUL 6 ========================================== PROGRAM "ACBOQ" - W8, Ver.4.1, 2013. ========================================== VL.KOPIJE: KLIMA Software - NU ========================================== P R E D M E R I P R E D R A C U N - B O Q PROJEKAT : DEMO SISTEM : DEMO
  • 44. PREDMER I PREDRACUN KLIMA Software - NU str. 1 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- 1. G R E J N A T E L A ======================== 1.1. RADIJATORI --------------- GRUPA: TK TERMIK-ZRENJANIN - Supply and Installation of Heating Bodies (radiators) as per drawings and specifications requirements. TK-600/160 7.2 m2 X 10.0 USD /m2 = 72.0 TK-800/160 30.1 m2 X 10.0 USD /m2 = 301.0 -------------------------- SUBTOTAL: 373.0 USD 1.2. KONZOLE ------------ CONSOLES - Supply and Installation 16 Pcs X 1.0 USD /Pcs= 16.0 1.3. DRZACI ----------- SUPPORTS - Supply and Installation 12 Pcs X 1.0 USD /Pcs= 12.0 ========================================== GREJNA TELA UKUPNO : 401.0 USD 2. C E V N A M R E Z A ======================== 2.1. CEVI - VODA ---------------- STANDARD PIPES - Supply and Installation of black steel seemless pipes SCH 40 complete as per drawings and specification requirements. DN 15 21.30 X 2.80 18.0 m X 10.0 USD /m = 180.0 DN 20 26.70 X 2.90 50.0 m X 10.0 USD /m = 500.0 DN 25 33.40 X 3.40 12.0 m X 10.0 USD /m = 120.0 -------------------------- SUBTOTAL: 800.0 USD 2.2. CEVI - ODZRAKA ------------------- STANDARD PIPES - Supply and Installation of black steel seemless pipes SCH 40 complete as per drawings and specification requirements. DN 20 26.70 X 2.90 100.0 m X 10.0 USD /m = 1000.0 2.3. MATERIJAL -------------- Other materials related to the Installation of Pipes system (pipes storage, cleaning, welding, supporting, etc.). 800.0USD X 50.0 %/poz= 400.0 ========================================== CEVNA MREZA UKUPNO : 2200.0 USD
  • 45. PREDMER I PREDRACUN KLIMA Software - NU str. 2 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- 3. B A L A N S N I V E N T I L I ================================== 3.1. SIFRA: SVK.KS BALANCING VALVE - Supply and Installation DN 20 2 Pcs X 10.0 USD /Pcs= 20.0 3.2. SIFRA: RVK.UG BALANCING VALVE - Supply and Installation DN 15 3 Pcs X 10.0 USD /Pcs= 30.0 DN 20 1 Pcs X 10.0 USD /Pcs= 10.0 ----------------- 40.0 USD 3.3. SIFRA: RNK.UG BALANCING VALVE - Supply and Installation DN 15 3 Pcs X 10.0 USD /Pcs= 30.0 DN 20 1 Pcs X 10.0 USD /Pcs= 10.0 ----------------- 40.0 USD ========================================== BALANSNI VENTILI UKUPNO : 100.0 USD 4. O D Z R A K A ================== 4.1. ODZRACNI VENTILI --------------------- Supply and Installation of Air Release Valves DN 15 2 Pcs X 10.0 USD /Pcs= 20.0 4.2. ODZRACNI SUDOVI -------------------- SIF:AIRVESSEL Supply and Installation of Air Vessels complete with all required materials for installation and successful operation. 2 Pcs X 100.0 USD /Pcs= 200.0 ========================================== ODZRAKA UKUPNO : 220.0 USD 5. P O V R S I N S K A O B R A D A ==================================== 5.1. IZOLACIJA -------------- SIFRA: AI Supply and Installation of Insulation complete with all required materials in accordance with specifications. DEB: 25.0 3.1 m2 X 10.0 USD /m2 = 31.0 5.2. BOJENJE ------------ Supply and application of all required materials for pipes cleaning, priming and final painting in accordance with specifications. CEVNA MREZA 5.4 m2 X 10.0 USD /m2 = 54.0
  • 46. PREDMER I PREDRACUN KLIMA Software - NU str. 3 ---------------------------------------------------------------------------- PROJEKAT : SISTEM : ---------------------------------------------------------------------------- ========================================== POVRSINSKA OBRADA UKUPNO: 85.0 USD 6. O S T A L I R A D O V I ============================ 6.1. PUMPS Supply and Installation of Pumps. 100.0 USD /tot= 100.0 6.2. HEADERS Supply and Installation of Headers. 100.0 USD /tot= 100.0 6.3. H-EXCHANGE Supply and Installation of HEAT EXCHANGERS 100.0 USD /tot= 100.0 6.4. CHEMICALS Supply and Installation of Chemical dosing equipment, complete with Chemicals required for 1 year (for warranty period) as per the drawings and specification requirements. 10.0 USD /tot= 10.0 6.5. BMS Supply and Installation of BMS system. 100.0 USD /tot= 100.0 6.6. TESTING TESTING, BALANCING AND COMISSIONING 100.0 USD /tot= 100.0 ========================================== OSTALI RADOVI UKUPNO : 510.0 USD ============================================================================ SVE POZICIJE UKUPNO : 3515.9 USD ============================================================================