SlideShare a Scribd company logo
1 of 17
Escalations and Other Service-Based
Points of Feedback:
Onshore Data Consolidation
Updated: 8/3/15
08/04/15 1
Agenda
• Kickoff and Overview – Tom
• Outline of the Team’s Effort – Chase
• Overview of Observations – Sam
• Learning Opportunities/Process Recommendations – Jason
• Project Benefits to the Individual Team Members – Julia
• Closing Comments/Our Next Steps - Tom
08/04/15 2
Scenario Overview
What are “Escalations and Other Service-Based Concerns”?
Escalation – A service request that indicates the desire for enhanced attention. This discussion
will group Escalations into two categories:
•RUSH request – Any service request that is ONLY indicating the need for faster than SLA handling
– First request to issue an endorsement, agent needs done by EOD
•Service-Based Concerns – any feedback/request indicating that expected service was not met on
a prior actionable item by CL Ops
– Incomplete processing of a prior request
– Incorrect processing of a prior request
– Missed SLA on a prior request
What is the Problem?
Commercial Lines Service Operations currently has over 8 intake platforms for agency/UW/Field
escalations. Within these escalations are service-based concerns which reflect the pain points of
our customers. In our current state, these potential data points are not consistently analyzed,
trended, nor action planned for. As a result, CL Ops does not have a method for base-lining these
service-based concerns and solutioning accordingly.
08/04/15 3
Escalation Data Flow: Current State
08/04/15 4
5
Project Outline
We have the opportunity to research
and analyze Hanover owned escalations
in order to better identify the voice of
our customers, action plan accordingly,
and ultimately tie such a data source
into our overall Operational Planning
 Identify transactional scope and
timeframe of valid data set
 Train and mentor resources on
analytics and data set
 1x1 sessions to validate individual
findings
 Team regroups to combine
findings and determine next steps
 Validate the need/opportunity to
research Hanover owned escalations
going forward
 Identify any interim opportunities
for improvement
Sponsor: Rachael Hogg
Project Leader: Tom Morelli
Team Members: Jason Benedict, Julia Gianoulis, Chase Heller, Sam
Huber
Additional Support: Angie Miller
 Incoming escalations thru the Escalation Tool
 Escalations received 6/1 – 6/30
 Non EXL performers/teams
 Subsequent transaction tasks (excluding endtquote); renewal tasks
Project Team Project Scope
5
Opportunity Statement Approach Goal Statements
 Root cause analysis should identify learning opportunities to action plan for; ultimately resulting in enhanced service
 Utilization of excess capacity to validate the benefit of researching the aforementioned data set (or lack of a benefit)
 Growth, exposure, and learning opportunities for our Interns
Potential Benefits
The Process
• Training
– June 16th
– 25th
– A couple weeks of training via. WebEx, additional one on one
• Procedure:
– Search for the policy in IPS
– Select the image closest to the escalation request date
– Analyze the image to determine if the investigation needs to move to
earlier or newer images
– Record our findings in the Information Tracker spreadsheet
• Located in the shared drive
– Reached out to the other interns when in doubt
– Provided feedback to the team members who needed help
08/04/15 6
Total Percentage of Transaction Type
08/04/15 7
Rush versus Service Concern
08/04/15 8
Rush: 164
Service Concern:87
Not Enough Documentation: 16
Duplicate: 12
Agency Feedback: 10
Grand Total: 302
Service
Concern’s
Escalation
Reason
Summarized UW Comments Explanation/
Root Cause
Incorrect Processing by a
rater
Pls process the polchg in IPS (create date 06/16/15) asap. The original request was to
increase sales at loc 1-1 from $450,000 to $470,000. However, the endorsement
increased the sales to $4,700,000. This needs to be corrected asap as it could affect
the Billing to the insured. Thanks, Mike
Typo resulted in a
significant variation in
processing
Incorrect workflow
followed
Effective 06/16/2015 delete 233 Water St. Please process as soon as possible, and
advise of new premium for renewal.
Initial request was
processed but renewal was
not updated with change
Delay in Service
The agent would like to know when the change request he submitted on May 20 will
be completed . EXL has sent this on shore to be handled.
Work item was assigned to
a non-CL Ops performer in
IPS and item subsequently
aged (see slide 10)
Archived w/out Processing
Eff. 4/3/15-16 please add 461-0500, no charge, fill in: “Blanket as required by
written contract.”
Request not completed the
first time
Escalation Examples and Explanations
08/04/15 9
IPS Report Finding
08/04/15 10
Master Mkt SYM POL_NBR MOD RTR_NM MgrId
CS W2R A155475 02 Laramore, Allison xxx
IPS Report as of 6/15
Who has sight to this MgrId?
Personal Lines Employee
(would not access IPS)
Escalation Examples and Explanations
08/04/15 11
Rush’s
Escalation
Reason
Summarized UW Comments Explanation/ Root Cause
Appears to be
Agency driven
escalation need
PLEASE EXPEDITE THE ENDORSEMENT CREATED ON
5/21/2015 IN IPS PER AGENT REQUEST.
Original request was referred and triaged
but was still within service (10 days old) but
the agent wanted it done ASAP.
Unclear as to why
request needed to
be escalated
Please amend named insured: 1. Effective 09/01/2014 ADD
Joseph Trading Inc to named insured
The agent simply wanted to add a
Named Insured.
Escalation Examples and Explanations
08/04/15 12
Other
Escalation
Reasons
Summarized UW Comments Explanation/ Root Cause
System Issue
Good afternoon, I sent an endorsement request on 3.13.15
to add NOC, Waiver of Subrogation and Loss Payee effective
4.1.15, everything was completed but the Loss Payee, the
form FKB is 441-0138, but I do not see one for Maryland, if a
Loss Payee is not available for Maryland, please add
manuscript with the following entity: M&T Bank, Its
successors and assigns, PO Box 1358, Buffalo, New York,
14240-1358. This should be added effective 4.1.15. Please
see me with any questions. Thanks, Steve
System was dropping manual forms off
at issuance
Not enough
Information/
documentation
This is the third request to have policy W22-A338697
cancelled eff. 1/9/2015. LPR is attached, let me know if you
need anything. This would be pro-rata.
Could not be determined due to
insufficient documentation in IPS
Learning Opportunity
• Utilize Efficient data gathering
– Receive insight on the proportion of escalation requests
that are submitted accurately
– Provide ability to share accuracy feedback to the work
flow stakeholders
• Reexamine tool utility
– The Escalation Tool is often used to achieve a faster
service level
– The parameters of its use may need to be reestablished
08/04/15 13
Learning Opportunity
• Bi-weekly UW-Agent Meetings
– Discuss future policy changes and possible escalation
needs
– Improve communication with our agents
– Reestablish our service precedent
• Reexamine communication channels
– Identify which documents, information, and feedback
should be included in each stage of the work flow
– Determine how documents, information, and feedback
should be channeled through the work flow
08/04/15 14
Benefits of Project
08/04/15 15
• Exposure to multiple applications within CL Operations
(CAAMS, IPS, Underwriting workstation, PMS, Excel).
• Determined root causes of escalations
• Understanding of the end to end process and downstream
impact of service issues
• Analysis of tagged items which suggests the need for some
clarification of instruction
• Worked as a team to make sure that we were cohesive in
our understanding of the project
• Provided an understanding of staff roles and insurance
terminology
Next Steps
• Hold off from additional research of Hanover Escalation Data at this time
• Regroup on Intern recommendations/learnings/opportunities
• Further map and understand how we can efficiently gather information
from the various points of customer feedback
– Non-RUSH IPS, Escalation Tool, etc. (referring back to slide 4)
• Conversations to better understand how the learnings from these data
sets can supplement the findings from our Quality research
08/04/15 16
Last but not least…
Sam, Julia, Chase, and Jason:
THANK YOU!!!
08/04/15 17

More Related Content

Similar to Hanover Escalation Data Review - Final

08Jun_Res_Admin_Meeting_Slides.pptx
08Jun_Res_Admin_Meeting_Slides.pptx08Jun_Res_Admin_Meeting_Slides.pptx
08Jun_Res_Admin_Meeting_Slides.pptxJOPHUONG
 
Puneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptxPuneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptxPuneet Gupta
 
OCASE1
OCASE1OCASE1
OCASE1hadaf1
 
OCASE1
OCASE1OCASE1
OCASE1hadaf1
 
Kapten Case Study April 2019 for HR presentation
Kapten Case Study April 2019 for HR presentationKapten Case Study April 2019 for HR presentation
Kapten Case Study April 2019 for HR presentationDiogoCerqueira16
 
Outsourcing Challenges
Outsourcing ChallengesOutsourcing Challenges
Outsourcing ChallengesJoann Martin
 
IRS, DOL (and PBGC) Audits and Other Matters
IRS, DOL (and PBGC) Audits and Other MattersIRS, DOL (and PBGC) Audits and Other Matters
IRS, DOL (and PBGC) Audits and Other MattersHarvey Katz
 
LoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessLoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessJoseph Horwedel
 
Jm voc 12 jan 17 ver1.0
Jm voc 12 jan 17  ver1.0Jm voc 12 jan 17  ver1.0
Jm voc 12 jan 17 ver1.0Swati Mathur
 
Why should internal reporting be as efficiently written as external reporting?
Why should internal reporting be as efficiently written as external reporting?Why should internal reporting be as efficiently written as external reporting?
Why should internal reporting be as efficiently written as external reporting?AROSA Consultancy and Training P/L
 
Canada CS Training Refresh Project
Canada CS Training Refresh ProjectCanada CS Training Refresh Project
Canada CS Training Refresh ProjectEverett Diemer
 
Customer Satisfaction in Shared Services
Customer Satisfaction in Shared ServicesCustomer Satisfaction in Shared Services
Customer Satisfaction in Shared ServicesScottMadden, Inc.
 
PMG TAG BPM_presentation
PMG TAG BPM_presentationPMG TAG BPM_presentation
PMG TAG BPM_presentationMelanie Brandt
 
Temp management measure & analyze tollgate presentation final
Temp management measure & analyze tollgate presentation finalTemp management measure & analyze tollgate presentation final
Temp management measure & analyze tollgate presentation finalAshley Lucci-Vaughn
 
Case Study of Service Transformation : Leading Indian Bank
Case Study of Service Transformation : Leading Indian BankCase Study of Service Transformation : Leading Indian Bank
Case Study of Service Transformation : Leading Indian Bankmastersunconsulting
 

Similar to Hanover Escalation Data Review - Final (20)

1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
 
08Jun_Res_Admin_Meeting_Slides.pptx
08Jun_Res_Admin_Meeting_Slides.pptx08Jun_Res_Admin_Meeting_Slides.pptx
08Jun_Res_Admin_Meeting_Slides.pptx
 
Puneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptxPuneet Green Belt(13th feb).pptx
Puneet Green Belt(13th feb).pptx
 
OCASE1
OCASE1OCASE1
OCASE1
 
OCASE1
OCASE1OCASE1
OCASE1
 
Kapten Case Study April 2019 for HR presentation
Kapten Case Study April 2019 for HR presentationKapten Case Study April 2019 for HR presentation
Kapten Case Study April 2019 for HR presentation
 
HR Shared Service Expansion
HR Shared Service ExpansionHR Shared Service Expansion
HR Shared Service Expansion
 
Outsourcing Challenges
Outsourcing ChallengesOutsourcing Challenges
Outsourcing Challenges
 
OFCCP Audits - 5 Reasons They Fail
OFCCP Audits - 5 Reasons They FailOFCCP Audits - 5 Reasons They Fail
OFCCP Audits - 5 Reasons They Fail
 
IRS, DOL (and PBGC) Audits and Other Matters
IRS, DOL (and PBGC) Audits and Other MattersIRS, DOL (and PBGC) Audits and Other Matters
IRS, DOL (and PBGC) Audits and Other Matters
 
LoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessLoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development Process
 
Jm voc 12 jan 17 ver1.0
Jm voc 12 jan 17  ver1.0Jm voc 12 jan 17  ver1.0
Jm voc 12 jan 17 ver1.0
 
Why should internal reporting be as efficiently written as external reporting?
Why should internal reporting be as efficiently written as external reporting?Why should internal reporting be as efficiently written as external reporting?
Why should internal reporting be as efficiently written as external reporting?
 
Canada CS Training Refresh Project
Canada CS Training Refresh ProjectCanada CS Training Refresh Project
Canada CS Training Refresh Project
 
Customer Satisfaction in Shared Services
Customer Satisfaction in Shared ServicesCustomer Satisfaction in Shared Services
Customer Satisfaction in Shared Services
 
PMG TAG BPM_presentation
PMG TAG BPM_presentationPMG TAG BPM_presentation
PMG TAG BPM_presentation
 
Temp management measure & analyze tollgate presentation final
Temp management measure & analyze tollgate presentation finalTemp management measure & analyze tollgate presentation final
Temp management measure & analyze tollgate presentation final
 
Applying for the AME Excellence Award
Applying for the AME Excellence Award Applying for the AME Excellence Award
Applying for the AME Excellence Award
 
BPR case study
BPR case study BPR case study
BPR case study
 
Case Study of Service Transformation : Leading Indian Bank
Case Study of Service Transformation : Leading Indian BankCase Study of Service Transformation : Leading Indian Bank
Case Study of Service Transformation : Leading Indian Bank
 

Hanover Escalation Data Review - Final

  • 1. Escalations and Other Service-Based Points of Feedback: Onshore Data Consolidation Updated: 8/3/15 08/04/15 1
  • 2. Agenda • Kickoff and Overview – Tom • Outline of the Team’s Effort – Chase • Overview of Observations – Sam • Learning Opportunities/Process Recommendations – Jason • Project Benefits to the Individual Team Members – Julia • Closing Comments/Our Next Steps - Tom 08/04/15 2
  • 3. Scenario Overview What are “Escalations and Other Service-Based Concerns”? Escalation – A service request that indicates the desire for enhanced attention. This discussion will group Escalations into two categories: •RUSH request – Any service request that is ONLY indicating the need for faster than SLA handling – First request to issue an endorsement, agent needs done by EOD •Service-Based Concerns – any feedback/request indicating that expected service was not met on a prior actionable item by CL Ops – Incomplete processing of a prior request – Incorrect processing of a prior request – Missed SLA on a prior request What is the Problem? Commercial Lines Service Operations currently has over 8 intake platforms for agency/UW/Field escalations. Within these escalations are service-based concerns which reflect the pain points of our customers. In our current state, these potential data points are not consistently analyzed, trended, nor action planned for. As a result, CL Ops does not have a method for base-lining these service-based concerns and solutioning accordingly. 08/04/15 3
  • 4. Escalation Data Flow: Current State 08/04/15 4
  • 5. 5 Project Outline We have the opportunity to research and analyze Hanover owned escalations in order to better identify the voice of our customers, action plan accordingly, and ultimately tie such a data source into our overall Operational Planning  Identify transactional scope and timeframe of valid data set  Train and mentor resources on analytics and data set  1x1 sessions to validate individual findings  Team regroups to combine findings and determine next steps  Validate the need/opportunity to research Hanover owned escalations going forward  Identify any interim opportunities for improvement Sponsor: Rachael Hogg Project Leader: Tom Morelli Team Members: Jason Benedict, Julia Gianoulis, Chase Heller, Sam Huber Additional Support: Angie Miller  Incoming escalations thru the Escalation Tool  Escalations received 6/1 – 6/30  Non EXL performers/teams  Subsequent transaction tasks (excluding endtquote); renewal tasks Project Team Project Scope 5 Opportunity Statement Approach Goal Statements  Root cause analysis should identify learning opportunities to action plan for; ultimately resulting in enhanced service  Utilization of excess capacity to validate the benefit of researching the aforementioned data set (or lack of a benefit)  Growth, exposure, and learning opportunities for our Interns Potential Benefits
  • 6. The Process • Training – June 16th – 25th – A couple weeks of training via. WebEx, additional one on one • Procedure: – Search for the policy in IPS – Select the image closest to the escalation request date – Analyze the image to determine if the investigation needs to move to earlier or newer images – Record our findings in the Information Tracker spreadsheet • Located in the shared drive – Reached out to the other interns when in doubt – Provided feedback to the team members who needed help 08/04/15 6
  • 7. Total Percentage of Transaction Type 08/04/15 7
  • 8. Rush versus Service Concern 08/04/15 8 Rush: 164 Service Concern:87 Not Enough Documentation: 16 Duplicate: 12 Agency Feedback: 10 Grand Total: 302
  • 9. Service Concern’s Escalation Reason Summarized UW Comments Explanation/ Root Cause Incorrect Processing by a rater Pls process the polchg in IPS (create date 06/16/15) asap. The original request was to increase sales at loc 1-1 from $450,000 to $470,000. However, the endorsement increased the sales to $4,700,000. This needs to be corrected asap as it could affect the Billing to the insured. Thanks, Mike Typo resulted in a significant variation in processing Incorrect workflow followed Effective 06/16/2015 delete 233 Water St. Please process as soon as possible, and advise of new premium for renewal. Initial request was processed but renewal was not updated with change Delay in Service The agent would like to know when the change request he submitted on May 20 will be completed . EXL has sent this on shore to be handled. Work item was assigned to a non-CL Ops performer in IPS and item subsequently aged (see slide 10) Archived w/out Processing Eff. 4/3/15-16 please add 461-0500, no charge, fill in: “Blanket as required by written contract.” Request not completed the first time Escalation Examples and Explanations 08/04/15 9
  • 10. IPS Report Finding 08/04/15 10 Master Mkt SYM POL_NBR MOD RTR_NM MgrId CS W2R A155475 02 Laramore, Allison xxx IPS Report as of 6/15 Who has sight to this MgrId? Personal Lines Employee (would not access IPS)
  • 11. Escalation Examples and Explanations 08/04/15 11 Rush’s Escalation Reason Summarized UW Comments Explanation/ Root Cause Appears to be Agency driven escalation need PLEASE EXPEDITE THE ENDORSEMENT CREATED ON 5/21/2015 IN IPS PER AGENT REQUEST. Original request was referred and triaged but was still within service (10 days old) but the agent wanted it done ASAP. Unclear as to why request needed to be escalated Please amend named insured: 1. Effective 09/01/2014 ADD Joseph Trading Inc to named insured The agent simply wanted to add a Named Insured.
  • 12. Escalation Examples and Explanations 08/04/15 12 Other Escalation Reasons Summarized UW Comments Explanation/ Root Cause System Issue Good afternoon, I sent an endorsement request on 3.13.15 to add NOC, Waiver of Subrogation and Loss Payee effective 4.1.15, everything was completed but the Loss Payee, the form FKB is 441-0138, but I do not see one for Maryland, if a Loss Payee is not available for Maryland, please add manuscript with the following entity: M&T Bank, Its successors and assigns, PO Box 1358, Buffalo, New York, 14240-1358. This should be added effective 4.1.15. Please see me with any questions. Thanks, Steve System was dropping manual forms off at issuance Not enough Information/ documentation This is the third request to have policy W22-A338697 cancelled eff. 1/9/2015. LPR is attached, let me know if you need anything. This would be pro-rata. Could not be determined due to insufficient documentation in IPS
  • 13. Learning Opportunity • Utilize Efficient data gathering – Receive insight on the proportion of escalation requests that are submitted accurately – Provide ability to share accuracy feedback to the work flow stakeholders • Reexamine tool utility – The Escalation Tool is often used to achieve a faster service level – The parameters of its use may need to be reestablished 08/04/15 13
  • 14. Learning Opportunity • Bi-weekly UW-Agent Meetings – Discuss future policy changes and possible escalation needs – Improve communication with our agents – Reestablish our service precedent • Reexamine communication channels – Identify which documents, information, and feedback should be included in each stage of the work flow – Determine how documents, information, and feedback should be channeled through the work flow 08/04/15 14
  • 15. Benefits of Project 08/04/15 15 • Exposure to multiple applications within CL Operations (CAAMS, IPS, Underwriting workstation, PMS, Excel). • Determined root causes of escalations • Understanding of the end to end process and downstream impact of service issues • Analysis of tagged items which suggests the need for some clarification of instruction • Worked as a team to make sure that we were cohesive in our understanding of the project • Provided an understanding of staff roles and insurance terminology
  • 16. Next Steps • Hold off from additional research of Hanover Escalation Data at this time • Regroup on Intern recommendations/learnings/opportunities • Further map and understand how we can efficiently gather information from the various points of customer feedback – Non-RUSH IPS, Escalation Tool, etc. (referring back to slide 4) • Conversations to better understand how the learnings from these data sets can supplement the findings from our Quality research 08/04/15 16
  • 17. Last but not least… Sam, Julia, Chase, and Jason: THANK YOU!!! 08/04/15 17

Editor's Notes

  1. Effect the rate?? Effects reputation & quality Original request: delete location, add new master location and assign payroll on May 21, was finished a month later , Effects reputation, quality,
  2. Probably can delete this slide
  3. Utilize efficient data gathering Consistently utilizing a data gathering process similar to this project will provide a significant benefit to ops management as well as the users of the tool in the form of feedback. Reexamine tool utility Data gathering will give ops the ability to analyze the tools use, effectiveness, and efficiency
  4. Bi-weekly UW-Agent Meetings An effort to drive efficiency and decrease the occurrence of surprise changes Establishes heightened communication with our agents Reexamine Communication Channels An effort to drive efficiency and encourage the proper allocation of the tools resources
  5. Julia to build out - understanding of the end to end process; downstream impact of service issues - shows how small problems can turn into large issues if not proactively addressed - Did have some difficulties in researching (maybe a separate lessons learned slide) – can tie into the recommendation around best practices on documentation/information storage -