Finance Strategy for a 202 MWp Solar Power Plant
Executive Summary
Main Project Features
 Project Location: Republic Of Trinidad and Tobago.
 Solar Power Plant Ownership and Operation: wholly owned and operated by Neoen, France’s
leading independent producer of renewable energy (IPP).
 Total investment: US$224 million, including borrowing costs.
 Annual Electricity Exported to Grid: 254,718 MWh.
 Power Purchase Agreement (PPA): Electricity will be sold to Trinidad and Tobago Electricity
Commission (T&TEC) via 20 year PPA. T&TEC is a state-owned, vertically integrated electricity
company, responsible for all levels of power generation and supply. T&TEC is the sole transmission
and distribution company serving Trinidad and Tobago.
Project Local Environment
Trinidad and Tobago (T&T) has significant oil and natural gas reserves and is a net exporter of these fuels. In
T&T all electricity is produced using natural gas making this twin island state the second nation in the world
to achieve this feat (the first being Qatar).
Electricity rates in much of the Caribbean typically lies in the range of 300 - 400 $/MWh and fluctuates with
prevailing oil prices. In comparison the electricity rate in Trinidad & Tobago is steady at around 50 $/MWh.
Many attribute this large discrepancy to T&T having cheap and abundant gas resources, and to an extent this
is true. However, the bulk of the benefit comes in the form of a subsidy on electricity.1
Electricity subsidy have created a fiscal burden on the government and is considered one of the major barriers
to the uptake of renewable energy penetration in T&T.2
The Government of the Republic of Trinidad and Tobago (GoRTT) is looking at introducing Renewables Energy
generation technologies, which could potentially provide 16% of the electricity generated by 2032. The
measures introduced in this scenario require an average of 101,000 MWh per year of solar photovoltaic
generation capacity to be installed during the next 10 years.3
A key and innovative concept in the base of the present finance strategy is the low social and political impact
Renewable Energy Subsidy Reduction (RESR), which demonstrates that the electricity subsidy could be one of
the major drivers to the uptake of renewable energy penetration in T&T.
Financial Viability
It is assumed that the "hurdle rate," or minimum acceptable post-tax Modified Internal Rate of Return (MIRR)
on equity, should be at least 14.5% in order to provide sufficient incentive to private developers, investors
and financial entities, to engage in the process. To comply with this imposed restriction the main parameter
to be negotiated is the price of electricity $/MWh sold by NEON to T&TEC.
From our simulation the required rate to comply the minimum acceptable MIRR is: 105 $/MWh.
Renewable Energy Subsidy Reduction (RESR)
While the citizens of the country benefit from low cost electricity, they are also foregoing an opportunity to
generate additional revenues from increased gas sales from higher valued natural gas based derivatives. While
low cost electricity is a benefit to any population, the extremely low cost of electricity in Trinidad and Tobago
results in wasteful practices and a nonchalant attitude to energy efficiency.1
There are essentially two main ways to reduce the level of the electricity subsidy. Naturally the first is to raise
the cost of electricity, but as we all know this presents many social and political challenges. The second is to
increase the level of energy efficiency at existing power plants and/or reduce the amount of gas that is used
for power generation through the implementation of renewable energy technologies. The value of the
electricity subsidy can be estimated as follows:4
Fully loaded cost of electricity = Cost of natural gas (unsubsidized) + Cost of conversion + Cost of distribution
Fully loaded cost of electricity = 55 $/MWh + 45 $/MWh + 20 $/MWh
Fully loaded cost of electricity = 120 $/kWh
Subsidized T&T electricity rate: 50 $/kWh
T&T electricity subsidy: 65 $/kWh
Financing Scheme
The 202 MWp power plant wholly-owned by Neoen will be funded by two tranches of non-recourse senior
debt, one provided by development banks Proparco, DEG and ICCF and the other by Société Générale and
KfW
The tranche made available by Société Générale and KfW, which accounts for over half of the financing, carries
a buyer credit guarantee from Bpifrance Assurance Export (“BPIAE”). In addition, the project will be covered
by a US$73 million guarantee from the World Bank. It is one of the first solar power plants in the world to
qualify for the benefit of this type of financing, and the first with BPIAE.
The power plant will be built under a turnkey agreement with T&T Solar GenSun TSK, a Franco-Spanish
consortium formed by GenSun and TSK. The cables and high-voltage equipment for the power plant will be
supplied by French partners. The power plant will also make use of components and services supplied by T&T’s
companies.
References
1. https://energynow.tt/blog/understanding-the-electricity-subsidy-in-tt
2. https://www.nrel.gov/docs/fy15osti/64117.pdf
3. http://www.energy.gov.tt/wp-content/uploads/2016/08/A-Unique-Approach-for-Sustainable-
Energy-in-Trinidad-and-Tobago.pdf
4. https://energynow.tt/blog/pt-2-how-much-do-we-lose-on-the-electricity-subsidy

More Related Content

What's hot

Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...alex regado
 
Biogas energy development in nigeria and potential partners
Biogas energy development in nigeria and potential partnersBiogas energy development in nigeria and potential partners
Biogas energy development in nigeria and potential partnersAlex Tagbo
 
Status of renewable energy in nigeria one sky - ikuponisi f-s
Status of renewable energy in nigeria   one sky - ikuponisi f-sStatus of renewable energy in nigeria   one sky - ikuponisi f-s
Status of renewable energy in nigeria one sky - ikuponisi f-sFrancis S. IKUPONISI
 
Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus: Update ...
Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus:Update ...Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus:Update ...
Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus: Update ...Alliance To Save Energy
 
Kashi - Energy Generation and Renewables
Kashi - Energy Generation and RenewablesKashi - Energy Generation and Renewables
Kashi - Energy Generation and RenewablesCopenhagen_Consensus
 
Bnef neo2015 executive-summary
Bnef neo2015 executive-summaryBnef neo2015 executive-summary
Bnef neo2015 executive-summaryDmitry Tseitlin
 
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...Dr. Oliver Massmann
 
The Evolution Of The Australian Electricity Market
The Evolution Of The Australian Electricity MarketThe Evolution Of The Australian Electricity Market
The Evolution Of The Australian Electricity MarketIan McLeod
 
Captured by a broken market
Captured by a broken marketCaptured by a broken market
Captured by a broken marketIan McLeod
 
Energy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeEnergy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeRCREEE
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09msciortino
 
Sustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseSustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseUNDPhr
 
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...OECD Environment
 
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...Louie Mark Quizon
 
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Worldwatch Institute
 
1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios
1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios
1312 CSIRO Future Grid Forum - Summary of 2050 ScenariosMark Paterson
 
Transition through gas em
Transition through gas emTransition through gas em
Transition through gas emChrisJCook
 

What's hot (20)

Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
Energy generation report. final 10 oct 14pptx...Philippine Energy Plan 2012 -...
 
Biogas energy development in nigeria and potential partners
Biogas energy development in nigeria and potential partnersBiogas energy development in nigeria and potential partners
Biogas energy development in nigeria and potential partners
 
Status of renewable energy in nigeria one sky - ikuponisi f-s
Status of renewable energy in nigeria   one sky - ikuponisi f-sStatus of renewable energy in nigeria   one sky - ikuponisi f-s
Status of renewable energy in nigeria one sky - ikuponisi f-s
 
Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus: Update ...
Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus:Update ...Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus:Update ...
Energy Efficiency in Energy Legislation, Waxman-Markey, and Stimulus: Update ...
 
Reaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy OutlookReaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy Outlook
 
Kashi - Energy Generation and Renewables
Kashi - Energy Generation and RenewablesKashi - Energy Generation and Renewables
Kashi - Energy Generation and Renewables
 
Clean Energy Australia Report
Clean Energy Australia ReportClean Energy Australia Report
Clean Energy Australia Report
 
Kashi - Off Grid
Kashi - Off GridKashi - Off Grid
Kashi - Off Grid
 
Bnef neo2015 executive-summary
Bnef neo2015 executive-summaryBnef neo2015 executive-summary
Bnef neo2015 executive-summary
 
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
VIETNAM: DIRECT POWER PURCHASE AGREEMENTS (DPPA) AND SOLAR ROOFTOP- UPDATING ...
 
The Evolution Of The Australian Electricity Market
The Evolution Of The Australian Electricity MarketThe Evolution Of The Australian Electricity Market
The Evolution Of The Australian Electricity Market
 
Captured by a broken market
Captured by a broken marketCaptured by a broken market
Captured by a broken market
 
Energy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeEnergy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco aderee
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09
 
Sustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseSustainable Energy - Martin Krause
Sustainable Energy - Martin Krause
 
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
 
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
The Economics of Electric Energy: IPPs, the PPA, and the Electric Power Indus...
 
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
 
1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios
1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios
1312 CSIRO Future Grid Forum - Summary of 2050 Scenarios
 
Transition through gas em
Transition through gas emTransition through gas em
Transition through gas em
 

Similar to Final project jrrm

Session 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupSession 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupOECD Environment
 
Evaluating the Development and Impact of Feed-In Tariffs
Evaluating the Development and Impact of Feed-In TariffsEvaluating the Development and Impact of Feed-In Tariffs
Evaluating the Development and Impact of Feed-In TariffsDirk Volkmann
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterFernando Penarroyo
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...OECD Environment
 
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...OECD Environment
 
Reducing emissions at a lower cost with new business models
Reducing emissions at a lower cost with new business modelsReducing emissions at a lower cost with new business models
Reducing emissions at a lower cost with new business modelsClimate Policy Initiative
 
New Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's SpeechNew Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's SpeechEDAMA
 
Island states - Renewable Energy Policy Pioneers
Island states - Renewable Energy Policy PioneersIsland states - Renewable Energy Policy Pioneers
Island states - Renewable Energy Policy PioneersLeonardo ENERGY
 
Fringe carillion energy services2
Fringe   carillion energy services2Fringe   carillion energy services2
Fringe carillion energy services2lgconf11
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.Paul Derwin
 
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...EricPROUST3
 
Towards a more sustainable energy economy
Towards a more sustainable energy economyTowards a more sustainable energy economy
Towards a more sustainable energy economyRCREEE
 
Transformation In Utilities and Energy
Transformation In Utilities and Energy Transformation In Utilities and Energy
Transformation In Utilities and Energy REV Partners
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy OverviewJustin Bean
 
Implementing Net Metering in the Developing World
Implementing Net Metering in the Developing WorldImplementing Net Metering in the Developing World
Implementing Net Metering in the Developing WorldRuchir Punjabi
 

Similar to Final project jrrm (20)

Session 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupSession 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial Group
 
Evaluating the Development and Impact of Feed-In Tariffs
Evaluating the Development and Impact of Feed-In TariffsEvaluating the Development and Impact of Feed-In Tariffs
Evaluating the Development and Impact of Feed-In Tariffs
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years After
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
 
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
 
GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014
 
Reducing emissions at a lower cost with new business models
Reducing emissions at a lower cost with new business modelsReducing emissions at a lower cost with new business models
Reducing emissions at a lower cost with new business models
 
New Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's SpeechNew Energy Conference-Haitham Kamhiyeh's Speech
New Energy Conference-Haitham Kamhiyeh's Speech
 
Island states - Renewable Energy Policy Pioneers
Island states - Renewable Energy Policy PioneersIsland states - Renewable Energy Policy Pioneers
Island states - Renewable Energy Policy Pioneers
 
Fringe carillion energy services2
Fringe   carillion energy services2Fringe   carillion energy services2
Fringe carillion energy services2
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.
 
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
 
Towards a more sustainable energy economy
Towards a more sustainable energy economyTowards a more sustainable energy economy
Towards a more sustainable energy economy
 
Sostenibilidad Energética y Regulación renovable
Sostenibilidad Energética y Regulación renovableSostenibilidad Energética y Regulación renovable
Sostenibilidad Energética y Regulación renovable
 
Transformation In Utilities and Energy
Transformation In Utilities and Energy Transformation In Utilities and Energy
Transformation In Utilities and Energy
 
Renewable Energy Policy Overview
Renewable Energy Policy OverviewRenewable Energy Policy Overview
Renewable Energy Policy Overview
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Implementing Net Metering in the Developing World
Implementing Net Metering in the Developing WorldImplementing Net Metering in the Developing World
Implementing Net Metering in the Developing World
 
CAPSTONE FINAL VERSION
CAPSTONE FINAL VERSIONCAPSTONE FINAL VERSION
CAPSTONE FINAL VERSION
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
 

Recently uploaded

Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Sapana Sha
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...First NO1 World Amil baba in Faisalabad
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithAdamYassin2
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...Avanish Goel
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 

Recently uploaded (20)

Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam Smith
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...Financial institutions facilitate financing, economic transactions, issue fun...
Financial institutions facilitate financing, economic transactions, issue fun...
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 

Final project jrrm

  • 1. Finance Strategy for a 202 MWp Solar Power Plant Executive Summary Main Project Features  Project Location: Republic Of Trinidad and Tobago.  Solar Power Plant Ownership and Operation: wholly owned and operated by Neoen, France’s leading independent producer of renewable energy (IPP).  Total investment: US$224 million, including borrowing costs.  Annual Electricity Exported to Grid: 254,718 MWh.  Power Purchase Agreement (PPA): Electricity will be sold to Trinidad and Tobago Electricity Commission (T&TEC) via 20 year PPA. T&TEC is a state-owned, vertically integrated electricity company, responsible for all levels of power generation and supply. T&TEC is the sole transmission and distribution company serving Trinidad and Tobago. Project Local Environment Trinidad and Tobago (T&T) has significant oil and natural gas reserves and is a net exporter of these fuels. In T&T all electricity is produced using natural gas making this twin island state the second nation in the world to achieve this feat (the first being Qatar). Electricity rates in much of the Caribbean typically lies in the range of 300 - 400 $/MWh and fluctuates with prevailing oil prices. In comparison the electricity rate in Trinidad & Tobago is steady at around 50 $/MWh. Many attribute this large discrepancy to T&T having cheap and abundant gas resources, and to an extent this is true. However, the bulk of the benefit comes in the form of a subsidy on electricity.1 Electricity subsidy have created a fiscal burden on the government and is considered one of the major barriers to the uptake of renewable energy penetration in T&T.2 The Government of the Republic of Trinidad and Tobago (GoRTT) is looking at introducing Renewables Energy generation technologies, which could potentially provide 16% of the electricity generated by 2032. The measures introduced in this scenario require an average of 101,000 MWh per year of solar photovoltaic generation capacity to be installed during the next 10 years.3 A key and innovative concept in the base of the present finance strategy is the low social and political impact Renewable Energy Subsidy Reduction (RESR), which demonstrates that the electricity subsidy could be one of the major drivers to the uptake of renewable energy penetration in T&T. Financial Viability It is assumed that the "hurdle rate," or minimum acceptable post-tax Modified Internal Rate of Return (MIRR) on equity, should be at least 14.5% in order to provide sufficient incentive to private developers, investors and financial entities, to engage in the process. To comply with this imposed restriction the main parameter to be negotiated is the price of electricity $/MWh sold by NEON to T&TEC. From our simulation the required rate to comply the minimum acceptable MIRR is: 105 $/MWh. Renewable Energy Subsidy Reduction (RESR) While the citizens of the country benefit from low cost electricity, they are also foregoing an opportunity to generate additional revenues from increased gas sales from higher valued natural gas based derivatives. While
  • 2. low cost electricity is a benefit to any population, the extremely low cost of electricity in Trinidad and Tobago results in wasteful practices and a nonchalant attitude to energy efficiency.1 There are essentially two main ways to reduce the level of the electricity subsidy. Naturally the first is to raise the cost of electricity, but as we all know this presents many social and political challenges. The second is to increase the level of energy efficiency at existing power plants and/or reduce the amount of gas that is used for power generation through the implementation of renewable energy technologies. The value of the electricity subsidy can be estimated as follows:4 Fully loaded cost of electricity = Cost of natural gas (unsubsidized) + Cost of conversion + Cost of distribution Fully loaded cost of electricity = 55 $/MWh + 45 $/MWh + 20 $/MWh Fully loaded cost of electricity = 120 $/kWh Subsidized T&T electricity rate: 50 $/kWh T&T electricity subsidy: 65 $/kWh Financing Scheme The 202 MWp power plant wholly-owned by Neoen will be funded by two tranches of non-recourse senior debt, one provided by development banks Proparco, DEG and ICCF and the other by Société Générale and KfW The tranche made available by Société Générale and KfW, which accounts for over half of the financing, carries a buyer credit guarantee from Bpifrance Assurance Export (“BPIAE”). In addition, the project will be covered by a US$73 million guarantee from the World Bank. It is one of the first solar power plants in the world to qualify for the benefit of this type of financing, and the first with BPIAE. The power plant will be built under a turnkey agreement with T&T Solar GenSun TSK, a Franco-Spanish consortium formed by GenSun and TSK. The cables and high-voltage equipment for the power plant will be supplied by French partners. The power plant will also make use of components and services supplied by T&T’s companies. References 1. https://energynow.tt/blog/understanding-the-electricity-subsidy-in-tt 2. https://www.nrel.gov/docs/fy15osti/64117.pdf 3. http://www.energy.gov.tt/wp-content/uploads/2016/08/A-Unique-Approach-for-Sustainable- Energy-in-Trinidad-and-Tobago.pdf 4. https://energynow.tt/blog/pt-2-how-much-do-we-lose-on-the-electricity-subsidy