SlideShare a Scribd company logo
1 of 4
Jorge Antonio Duarte
107, Divino Salvador Avenue, 42 Apt – Planalto Paulista – Zip Code: 04078-010 – São Paulo/SP - Brazil.
Phones: +55 11 8444-3958 – Mobile
+55 11 3637-3414 – Home
E-mail: jad240662@hotmail.com
Objective: Business Consulting
Professional Skills
Certificate - SAP Module CO – Version 4.0 - ID S0008253886
Deployment of ERP SAP R/3 – Senior CO consultant – since 1998
Knowledge in SAP R/3: CO-CCA, CO-PC, CO-PA, CO-OI, EC-PCA, Material Ledger(CKMLCP and
CKMLCPVAR); Result Analysis, Report Writer, Report Painter and Presales (Solution design).
Knowledge in the modules: SD, PP, MM, PS, PM, FI (New- GL) and AM
Knowledge the functionality of BW and Cognos
Design of Management Reports
Design and accomplishment of Business Budgetary Estimate
Procedures Design for Department Integration.
Arrangement and Structure of the Controlling Area
Design and Execution of Physical Inventories and their accounting adjustments
Knowledge of routines in Financial, Fiscal and Accounting areas.
Fixed assets control
Costs and Expenses Analysis
Arrangement of RKW, Sales Price, COGS.
Determination of Product Costs under Design
Knowledge of the manufacturing process of Textile, Metallurgic and Paper companies;
Accomplishment and Checking of Fiscal Books Templates 3 and 7
Interpretation of Mechanical Drawings
Knowledge of Just-in Time production system and ISO 9000
Knowledge of Windows, Excel and Word
Knowledge and deployment of the systems BPCS - AS400
Training of MRP and ERP Management System
Scholarship
Post graduation in Financial Management - 1995
USF - Universidade São Francisco - Itatiba
Economical Science - 1991
Faculdades Padre Anchieta de Jundiaí
Languages
English and Spanish advanced level
Additional Courses
SAP : FI/CO – 7º Academia
SAP : Profits analysis – AC605 (Abril/00)
Aspen Procwork : Consultants Development Program
Aspen Procwork : Cognos
Aspen Procwork : Strategic Planning, Design and Businesses
SENAI : Maintenance electrician
DATAPRO : Lotus123, Word, MS DOS
SCHEDULE : Just in Time
BAN/ORANGE : MRPII - (TRITON)
Workshop
CT- Associated Consultants Concepts of MRPII - (ISO 9000)
SSA BPCS - INV, CCO, CST, MDM e MRPII
Participating and deployment of the system ERP SAP R/3
Costumer Implementation Version Period
Roche Enhancement and small specific projects 6.0
01.04.2015
Even
current
Manitowoc CAP Brazil – Improvements project 6.0
07.07.2015
Even
12.30.2015
BR Foods Repetitive Manufacturing and CO developments adjustments 6.0
01.05.2015
Even
05.08.2015
Grupo Fleury QAS procedure in FASE II - Business Blueprint 6.0
12.09.2014
Even
12.17.2014
ThyssenKrupp
Elevadores
Implementation of FCI solution and Material Ledger 6.0
07.21.2014
Even
12.05.2014
Rockwell Automation Rollout – Brazil localization (Material Ledger) 6.0
06.09.2014
Even
07.11.2014
Lear Improvements Projects 6.0
04.10.2014
Even
05.30.2014
Stefanini
FI and CO leader from Share Service Center (Braskem, Thyssen
Krupp, Gerdau, Bombril, Presta). I’m currently supporting the presales
area.
---
11.01.2012
Even
03.28.2014
Rolls Royce Rollout Rolls Royce – HP Project – Material Ledger 6.0
06.11.2012
Even
10.31.2012
GRAVIA
Implementation of Brazil Location - Material Ledger with Project
Manager activities.
6.0
01.11.2012
Even
05.31.2012
CYRELA Improvements project in the Result Analysis 6.0
03.14.2011
Even
10.31.2012
KHS Germany rollout project for Brazil 6.0
01.10.2011
Even
03.11.2011
VALE
Project Adviser at Vale do Rio Doce (DIOD and DICT), while
preparing for the project One Vale
6.0
11.05.2010
Even
12.30.2010
BROOKFIELD
CO – CCA , EC-PCA Implementation and New GL with PS solution in
the realty process and integration New GL and Result Analysis
6.0
11.05.2009
Even
10.30.2010
CYRELA
CO – CCA , EC-PCA Implementation and New GL with PS solution in
the realty process and integration New GL, Join Venture Accounting
(JVA) and Result Analysis
6.0
02.19.2008
Even
11.04.2009
CEBRACE Profitability Analysis Implementation (CO-PA) 6.0
01.11.2007
even
02.08.2008
ERICSSON MERGE EDB with EBS Implementation 6.0
08.14.2007
Even
01.31.2008
Nestlé
Support after Go Live for all the countries of Americas, directly to the
end users and/or the IT users of each region. Project of COPA
Performance, where the goal was to improve the performance of the
COPA.
4.7
06.06.2006
Even
08.13.2007
Petrobrás
Test for migration to R/3 Version ECC 6.0, with and without new GL
activation
6.0
03.20.2006
Even
06.03.2006
Cooper Cameron Implementation of Brazil Location - Material Ledger 4.6C
09.19.2005
Even
03.17.2005
B Braun Implementation of the Material Overhead Cost (COPC and COPA) 4.6C
05.2005
Even
09.09.2005
L’Oréal do Brasil
Implementation template deployment France (COPA, CO-CCA and
CO-OPA)
4.6C
06.2004
Even
05.2005
BHPBILLITON Template deployment 4.6C
10.2003
Even
11.2003
SONY do Brasil
Implementation template deployment SONY Latino America - CCA,
IO, PA, PCA, PC e ML.
4.6B
11.2003
Even
06.2004
FILTROS MAN Phase II Deployment of the modules CO-PC, CO-CCA and CO-PCA 3.0F
03.1998
Even
07.1998
Ideal Standard SAP Implementation – Controlling 3.0F
08.1998
Even
08.1999
AÇOS VILLARES Adjustments in the costs location process 3.0F
ERICSSON
Changes in the control process and follow-up of production orders,
making automatic the operational process in and providing reliability
to costs data. Design of the program and creation of the reposition
cost determination process of products bought and manufactured. Due
to several corrections in the processes it was possible the decrease of
the company’s month closing deadline. Training to the production
areas about availability checking in relation to the product’s cost
application
3.0F
09.1999
Even
10.2001
MATARAZZO Definition of processes belonging to business during SAP deployment 3.0F
WABCO
Migration of the version 3.0 to 4.6, applying correction of the pointing
process and closing of the product orders
4.6C
SARA LEE
Help to consultants in the deployment of cost system to the company
during the fusion process of the companies
4.5B
CBL
Deployment to all the Organization’s companies, aiming to
enhancements of business process.
3.0F
FERTIMPORT Structure for planning in CCA and PCA using COGNOS. 4.6C
SONOPRESS
Cost structure to enhance the productive costs’ determination format],
PA and PCA Deployment.
4.0B
SONOPRESS Orientation the costumer in the migration of the version 4.0 to 4.6C 4.6C
BMK Management in deploying new plants and closing troubleshooting 4.6C
LAUFEN INCEPA Incorporation of several companies for branches 4.0B
BRASLO Migration of the version 3.0 to 4.6C 4.6C
OTHER PUNCTUAL PARTICIPATIONS TO SAP R/3 MANAGEMENT SYSTEM:
SAMITRI, SÃO JOAQUIM, EMEPE, FUNDAÇÃO RUBENS BERTA, POSITRON, NORSA, SPAIPA,
BRASILIT, CEBRACE
Companies worked like employee. Currently preferably, work like contractor
COMPANY : Business Organization em Informática Ltda
PERIOD : Since 06.01.1999
DIVISION : Consulting in Implementation Management Systems
FUNCTION : Owner
COMPANY : Plaut System Solution
PERIOD : 19.09.2005 even 03.06.2006
DIVISION : Consulting in Management Systems Deployment
FUNCTION : Business consultant - Controlling
COMPANY : P.W. I. Procwork Informática Ltda.
PERIOD : 05.01.1998 even 05.01.1999
DIVISION : Consulting in Management Systems Deployment
FUNCTION : Business consultant - Controlling
COMPANY : FILOBEL Indústrias Têxteis do Brasil Ltda.
ADDRESS : Rua Bom Jesus de Pirapora, 2960 - Vila Rami
DIVISION : Spinning and Weaving
FUNCTION : Costs and Budgets Coordinator
COMPANY : Indústria de Papel Gordinho Braune Ltda.
ADDRESS : Rodovia D. Gabriel Paulino Couto Km 69,5
DIVISION : Paper Industry
FUNCTION : Costs and Fiscal Coordinator
COMPANY : KHS S/A Indústria de Máquinas
ADDRESS : Estrada Faustino Bizetto, 60 - Campo Limpo Pta.
DIVISION : Metallurgic
FUNCTION : Costs and Budgets Assistant
COMPANY : EMPG-Eletro Mec. Pniewski Gimenez Ltda.
DIVISION : Metallurgic
FUNCTION : Accounting Assistant
COMPANY : TEBAS Com. de Materiais Elétricos Ltda.
DIVISION : Electric Material Trade
FUNCTION : Sales Promoter
COMPANY : KOPPERSCHMIDT_MULLER Industrial Ltda.
DIVISION : Metallurgic
FUNCTION : Technical Assistant
COMPANY : VOITH S/A Máquinas e Equipamentos
DIVISION : Metallurgic
FUNCTION : Technician in calculation
: Auxiliary Technician of Calculation

More Related Content

Similar to JORGE - English

L4_De la Torre_Mendez_Baltazar_Resume_221116-English
L4_De la Torre_Mendez_Baltazar_Resume_221116-EnglishL4_De la Torre_Mendez_Baltazar_Resume_221116-English
L4_De la Torre_Mendez_Baltazar_Resume_221116-EnglishBaltazar De la Torre Méndez
 
Ben Hogan - Extending scrum adoption with visual managment
Ben Hogan - Extending scrum adoption with visual managmentBen Hogan - Extending scrum adoption with visual managment
Ben Hogan - Extending scrum adoption with visual managmentScrum Australia Pty Ltd
 
Cv Wlacaze
Cv WlacazeCv Wlacaze
Cv Wlacazewlacaze
 
Résumé_Tarun Pant gen aug16
Résumé_Tarun Pant gen aug16Résumé_Tarun Pant gen aug16
Résumé_Tarun Pant gen aug16tarun_slide
 
Stvartak_Pavol_CV_EN.DOC
Stvartak_Pavol_CV_EN.DOCStvartak_Pavol_CV_EN.DOC
Stvartak_Pavol_CV_EN.DOCPavol Stvartak
 
Vivek - FICO Consultant - Trainer
Vivek - FICO Consultant - TrainerVivek - FICO Consultant - Trainer
Vivek - FICO Consultant - TrainerVivek Pandit
 
Vivek fico consultant - trainer
Vivek   fico consultant - trainerVivek   fico consultant - trainer
Vivek fico consultant - trainerVivek Pandit
 
Oracle ERP Implementation_Genpact_V7.pptx
Oracle ERP Implementation_Genpact_V7.pptxOracle ERP Implementation_Genpact_V7.pptx
Oracle ERP Implementation_Genpact_V7.pptxAshokKumar705948
 
ISABEL CRISTINA de OLIVEIRA-Ingles
ISABEL CRISTINA de OLIVEIRA-InglesISABEL CRISTINA de OLIVEIRA-Ingles
ISABEL CRISTINA de OLIVEIRA-InglesIsabel Oliveira
 
Gaining efficiency at Barco with SAP Vendor Invoice Management
Gaining efficiency at Barco with SAP Vendor Invoice Management Gaining efficiency at Barco with SAP Vendor Invoice Management
Gaining efficiency at Barco with SAP Vendor Invoice Management delaware BeLux
 
Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...
Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...
Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...Sebastien Goiffon
 
Updated CV - Devendra Gaware
Updated CV - Devendra GawareUpdated CV - Devendra Gaware
Updated CV - Devendra GawareDevendra Gaware
 
Sap Net Weaver Ourview
Sap Net Weaver OurviewSap Net Weaver Ourview
Sap Net Weaver Ourviewguest2e979d
 

Similar to JORGE - English (20)

Sap perfiles
Sap perfilesSap perfiles
Sap perfiles
 
L4_De la Torre_Mendez_Baltazar_Resume_221116-English
L4_De la Torre_Mendez_Baltazar_Resume_221116-EnglishL4_De la Torre_Mendez_Baltazar_Resume_221116-English
L4_De la Torre_Mendez_Baltazar_Resume_221116-English
 
Ali_Resume_new
Ali_Resume_newAli_Resume_new
Ali_Resume_new
 
Ali_Resume_new
Ali_Resume_newAli_Resume_new
Ali_Resume_new
 
Sap erp
Sap erpSap erp
Sap erp
 
BPC Article original
BPC Article originalBPC Article original
BPC Article original
 
Ben Hogan - Extending scrum adoption with visual managment
Ben Hogan - Extending scrum adoption with visual managmentBen Hogan - Extending scrum adoption with visual managment
Ben Hogan - Extending scrum adoption with visual managment
 
Cv Wlacaze
Cv WlacazeCv Wlacaze
Cv Wlacaze
 
Résumé_Tarun Pant gen aug16
Résumé_Tarun Pant gen aug16Résumé_Tarun Pant gen aug16
Résumé_Tarun Pant gen aug16
 
Nitin_CV
Nitin_CVNitin_CV
Nitin_CV
 
Stvartak_Pavol_CV_EN.DOC
Stvartak_Pavol_CV_EN.DOCStvartak_Pavol_CV_EN.DOC
Stvartak_Pavol_CV_EN.DOC
 
Vivek - FICO Consultant - Trainer
Vivek - FICO Consultant - TrainerVivek - FICO Consultant - Trainer
Vivek - FICO Consultant - Trainer
 
Vivek fico consultant - trainer
Vivek   fico consultant - trainerVivek   fico consultant - trainer
Vivek fico consultant - trainer
 
Oracle ERP Implementation_Genpact_V7.pptx
Oracle ERP Implementation_Genpact_V7.pptxOracle ERP Implementation_Genpact_V7.pptx
Oracle ERP Implementation_Genpact_V7.pptx
 
ISABEL CRISTINA de OLIVEIRA-Ingles
ISABEL CRISTINA de OLIVEIRA-InglesISABEL CRISTINA de OLIVEIRA-Ingles
ISABEL CRISTINA de OLIVEIRA-Ingles
 
Gaining efficiency at Barco with SAP Vendor Invoice Management
Gaining efficiency at Barco with SAP Vendor Invoice Management Gaining efficiency at Barco with SAP Vendor Invoice Management
Gaining efficiency at Barco with SAP Vendor Invoice Management
 
Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...
Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...
Reduce timeline and budget for sap businessobjects bi4.2 migration and upgrad...
 
Updated CV - Devendra Gaware
Updated CV - Devendra GawareUpdated CV - Devendra Gaware
Updated CV - Devendra Gaware
 
Sap Net Weaver Ourview
Sap Net Weaver OurviewSap Net Weaver Ourview
Sap Net Weaver Ourview
 
Faizan khalil
Faizan khalilFaizan khalil
Faizan khalil
 

JORGE - English

  • 1. Jorge Antonio Duarte 107, Divino Salvador Avenue, 42 Apt – Planalto Paulista – Zip Code: 04078-010 – São Paulo/SP - Brazil. Phones: +55 11 8444-3958 – Mobile +55 11 3637-3414 – Home E-mail: jad240662@hotmail.com Objective: Business Consulting Professional Skills Certificate - SAP Module CO – Version 4.0 - ID S0008253886 Deployment of ERP SAP R/3 – Senior CO consultant – since 1998 Knowledge in SAP R/3: CO-CCA, CO-PC, CO-PA, CO-OI, EC-PCA, Material Ledger(CKMLCP and CKMLCPVAR); Result Analysis, Report Writer, Report Painter and Presales (Solution design). Knowledge in the modules: SD, PP, MM, PS, PM, FI (New- GL) and AM Knowledge the functionality of BW and Cognos Design of Management Reports Design and accomplishment of Business Budgetary Estimate Procedures Design for Department Integration. Arrangement and Structure of the Controlling Area Design and Execution of Physical Inventories and their accounting adjustments Knowledge of routines in Financial, Fiscal and Accounting areas. Fixed assets control Costs and Expenses Analysis Arrangement of RKW, Sales Price, COGS. Determination of Product Costs under Design Knowledge of the manufacturing process of Textile, Metallurgic and Paper companies; Accomplishment and Checking of Fiscal Books Templates 3 and 7 Interpretation of Mechanical Drawings Knowledge of Just-in Time production system and ISO 9000 Knowledge of Windows, Excel and Word Knowledge and deployment of the systems BPCS - AS400 Training of MRP and ERP Management System Scholarship Post graduation in Financial Management - 1995 USF - Universidade São Francisco - Itatiba Economical Science - 1991 Faculdades Padre Anchieta de Jundiaí Languages English and Spanish advanced level Additional Courses SAP : FI/CO – 7º Academia SAP : Profits analysis – AC605 (Abril/00) Aspen Procwork : Consultants Development Program Aspen Procwork : Cognos Aspen Procwork : Strategic Planning, Design and Businesses SENAI : Maintenance electrician DATAPRO : Lotus123, Word, MS DOS SCHEDULE : Just in Time BAN/ORANGE : MRPII - (TRITON)
  • 2. Workshop CT- Associated Consultants Concepts of MRPII - (ISO 9000) SSA BPCS - INV, CCO, CST, MDM e MRPII Participating and deployment of the system ERP SAP R/3 Costumer Implementation Version Period Roche Enhancement and small specific projects 6.0 01.04.2015 Even current Manitowoc CAP Brazil – Improvements project 6.0 07.07.2015 Even 12.30.2015 BR Foods Repetitive Manufacturing and CO developments adjustments 6.0 01.05.2015 Even 05.08.2015 Grupo Fleury QAS procedure in FASE II - Business Blueprint 6.0 12.09.2014 Even 12.17.2014 ThyssenKrupp Elevadores Implementation of FCI solution and Material Ledger 6.0 07.21.2014 Even 12.05.2014 Rockwell Automation Rollout – Brazil localization (Material Ledger) 6.0 06.09.2014 Even 07.11.2014 Lear Improvements Projects 6.0 04.10.2014 Even 05.30.2014 Stefanini FI and CO leader from Share Service Center (Braskem, Thyssen Krupp, Gerdau, Bombril, Presta). I’m currently supporting the presales area. --- 11.01.2012 Even 03.28.2014 Rolls Royce Rollout Rolls Royce – HP Project – Material Ledger 6.0 06.11.2012 Even 10.31.2012 GRAVIA Implementation of Brazil Location - Material Ledger with Project Manager activities. 6.0 01.11.2012 Even 05.31.2012 CYRELA Improvements project in the Result Analysis 6.0 03.14.2011 Even 10.31.2012 KHS Germany rollout project for Brazil 6.0 01.10.2011 Even 03.11.2011 VALE Project Adviser at Vale do Rio Doce (DIOD and DICT), while preparing for the project One Vale 6.0 11.05.2010 Even 12.30.2010 BROOKFIELD CO – CCA , EC-PCA Implementation and New GL with PS solution in the realty process and integration New GL and Result Analysis 6.0 11.05.2009 Even 10.30.2010 CYRELA CO – CCA , EC-PCA Implementation and New GL with PS solution in the realty process and integration New GL, Join Venture Accounting (JVA) and Result Analysis 6.0 02.19.2008 Even 11.04.2009 CEBRACE Profitability Analysis Implementation (CO-PA) 6.0 01.11.2007 even 02.08.2008 ERICSSON MERGE EDB with EBS Implementation 6.0 08.14.2007 Even 01.31.2008 Nestlé Support after Go Live for all the countries of Americas, directly to the end users and/or the IT users of each region. Project of COPA Performance, where the goal was to improve the performance of the COPA. 4.7 06.06.2006 Even 08.13.2007 Petrobrás Test for migration to R/3 Version ECC 6.0, with and without new GL activation 6.0 03.20.2006 Even 06.03.2006 Cooper Cameron Implementation of Brazil Location - Material Ledger 4.6C 09.19.2005 Even 03.17.2005 B Braun Implementation of the Material Overhead Cost (COPC and COPA) 4.6C 05.2005 Even 09.09.2005
  • 3. L’Oréal do Brasil Implementation template deployment France (COPA, CO-CCA and CO-OPA) 4.6C 06.2004 Even 05.2005 BHPBILLITON Template deployment 4.6C 10.2003 Even 11.2003 SONY do Brasil Implementation template deployment SONY Latino America - CCA, IO, PA, PCA, PC e ML. 4.6B 11.2003 Even 06.2004 FILTROS MAN Phase II Deployment of the modules CO-PC, CO-CCA and CO-PCA 3.0F 03.1998 Even 07.1998 Ideal Standard SAP Implementation – Controlling 3.0F 08.1998 Even 08.1999 AÇOS VILLARES Adjustments in the costs location process 3.0F ERICSSON Changes in the control process and follow-up of production orders, making automatic the operational process in and providing reliability to costs data. Design of the program and creation of the reposition cost determination process of products bought and manufactured. Due to several corrections in the processes it was possible the decrease of the company’s month closing deadline. Training to the production areas about availability checking in relation to the product’s cost application 3.0F 09.1999 Even 10.2001 MATARAZZO Definition of processes belonging to business during SAP deployment 3.0F WABCO Migration of the version 3.0 to 4.6, applying correction of the pointing process and closing of the product orders 4.6C SARA LEE Help to consultants in the deployment of cost system to the company during the fusion process of the companies 4.5B CBL Deployment to all the Organization’s companies, aiming to enhancements of business process. 3.0F FERTIMPORT Structure for planning in CCA and PCA using COGNOS. 4.6C SONOPRESS Cost structure to enhance the productive costs’ determination format], PA and PCA Deployment. 4.0B SONOPRESS Orientation the costumer in the migration of the version 4.0 to 4.6C 4.6C BMK Management in deploying new plants and closing troubleshooting 4.6C LAUFEN INCEPA Incorporation of several companies for branches 4.0B BRASLO Migration of the version 3.0 to 4.6C 4.6C OTHER PUNCTUAL PARTICIPATIONS TO SAP R/3 MANAGEMENT SYSTEM: SAMITRI, SÃO JOAQUIM, EMEPE, FUNDAÇÃO RUBENS BERTA, POSITRON, NORSA, SPAIPA, BRASILIT, CEBRACE Companies worked like employee. Currently preferably, work like contractor COMPANY : Business Organization em Informática Ltda PERIOD : Since 06.01.1999 DIVISION : Consulting in Implementation Management Systems FUNCTION : Owner COMPANY : Plaut System Solution PERIOD : 19.09.2005 even 03.06.2006 DIVISION : Consulting in Management Systems Deployment FUNCTION : Business consultant - Controlling
  • 4. COMPANY : P.W. I. Procwork Informática Ltda. PERIOD : 05.01.1998 even 05.01.1999 DIVISION : Consulting in Management Systems Deployment FUNCTION : Business consultant - Controlling COMPANY : FILOBEL Indústrias Têxteis do Brasil Ltda. ADDRESS : Rua Bom Jesus de Pirapora, 2960 - Vila Rami DIVISION : Spinning and Weaving FUNCTION : Costs and Budgets Coordinator COMPANY : Indústria de Papel Gordinho Braune Ltda. ADDRESS : Rodovia D. Gabriel Paulino Couto Km 69,5 DIVISION : Paper Industry FUNCTION : Costs and Fiscal Coordinator COMPANY : KHS S/A Indústria de Máquinas ADDRESS : Estrada Faustino Bizetto, 60 - Campo Limpo Pta. DIVISION : Metallurgic FUNCTION : Costs and Budgets Assistant COMPANY : EMPG-Eletro Mec. Pniewski Gimenez Ltda. DIVISION : Metallurgic FUNCTION : Accounting Assistant COMPANY : TEBAS Com. de Materiais Elétricos Ltda. DIVISION : Electric Material Trade FUNCTION : Sales Promoter COMPANY : KOPPERSCHMIDT_MULLER Industrial Ltda. DIVISION : Metallurgic FUNCTION : Technical Assistant COMPANY : VOITH S/A Máquinas e Equipamentos DIVISION : Metallurgic FUNCTION : Technician in calculation : Auxiliary Technician of Calculation