SlideShare a Scribd company logo
1 of 2
John Marler
118 Downing St
House Springs, MO 63051
PH: (573)701-5839
jmrlr@yahoo.com
Experience
The Harlan Company– St Louis, MO
Warehouse Manager 5/2016 – Present
• Track, Maintain Equipment and supplies
• Schedule pick up & deliveries both at warehouse and job sites
• Schedule equipment maintenance
ConAgra Foods 6/2009 – 4/2016
Production Manager - St Louis, MO 3/2015 – 4/2016
• 24 Hour responsibility of plant operations
• Accountable for SQPDCE results for entire plant
• Manage 4 supervisors and 60 hourly employees
1st
Shift Supervisor - St Louis, MO 5/2013 – 3/2015
• 24 hour accountability for performance of 3 pasteurization processes. Leveraged TPM tools to
reduce 81% losses of sterility, 57% reduction in rate loss to the production lines, 7mm gal per
yr. reduction in water usage, 86% reduction in demurrage cost per CSU, and 81% reduction in
process related downtime.
• Responsible for Continuous Improvement and Focused Improvement lead. Lead and train
cross functional teams using TPM principals, focused improvement tools. Accountable to
develop and implement Daily Direction Setting tools.
• Leveraged TPM principles to deliver 6.5% increase in shift OEE.
3rd Shift Supervisor - St Louis, MO 7/2011 – 5/2013
• Leveraged TPM principles to deliver 8% increase in shift OEE
• Developed operator cross-training rotation program
• 24 hour accountability for performance of 3 pasteurization processes. Developed ownership
culture among operators driving improved focus on resolving leading losses.
Maintenance Technician - St Louis, MO 6/2009 – 7/2011
• Owner of EQ5 production line. Utilized Autonomous Maintenance tools to deliver 80%
decrease in minor stops and 15% OEE improvement
• Facilitated focused improvement processes to develop sustainable countermeasures to deliver
annual savings of $375m and 30% reduction in weekly ramp up time
• Early Management team member utilized tools such as FMECA and Vendor Acceptance
Testing to deliver vertical start-up of a $2MM capital project
• Worked with Preventative Maintenance Pillar Team to develop and improve preventative
maintenance schedules
Pressline Services– St Louis, MO
Field Service Technician 2008 – 2009
• Travel to customer press sites to rebuild components and to perform equipment modifications
to change paper web width
• Read blue prints and mechanical drawings to rebuild equipment to manufacturer specifications
• Use of precision measuring devices as well as hand and power tools to set up machinery
Coca-Cola – Dallas, TX
Maintenance Mechanic II 2006 – 2008
• Maintaining and troubleshooting equipment
• Production line support and maintenance
• Machinery and equipment rebuild and upgrades
Ouellette Machinery – Fenton, MO
Field Service Technician 2000 – 2006
• Travel to client sites to install, setup, modify, and repair palletizing and conveying equipment
• Manage safety committee to ensure safe practices in accordance with OSHA regulations
• Manage tool/part room, maintain inventories and order parts and supplies as needed
• Schedule jobs in order to ensure projected delivery of machines to customers
Therma Tron – X – Sturgeon Bay, WI
Welder/Fitter 2000 – 2000
• Read blue prints and mechanical drawings to build equipment to specifications
• Use of welding machines, precision measuring devices as well as hand and power tools build
industrial finishing equipment
Huffy Bicycle – Farmington, MO
Team Leader, Paint and Powder coat Dept. 1994 – 2000
• Facilitated line and department start up (new plant)
• Oversee production, quality, and scheduling (3 production lines and 75 employees)
• Developed SOP’s for safety procedures, inventory/production tracking
• Worked with vendors, design team, marketing to develop new/custom colors/designs
References available upon request

More Related Content

What's hot (20)

TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
 
Erik Kaufman ELCT resume
Erik Kaufman ELCT resumeErik Kaufman ELCT resume
Erik Kaufman ELCT resume
 
CVLR
CVLRCVLR
CVLR
 
Resume2015
Resume2015Resume2015
Resume2015
 
Edwin Chikamba CV
Edwin Chikamba CVEdwin Chikamba CV
Edwin Chikamba CV
 
John cv revised
John cv revisedJohn cv revised
John cv revised
 
VPD_RESUME
VPD_RESUMEVPD_RESUME
VPD_RESUME
 
33 maintenance objective & philosphy
33 maintenance objective & philosphy33 maintenance objective & philosphy
33 maintenance objective & philosphy
 
Ng onga Mazimba CV
Ng onga Mazimba CVNg onga Mazimba CV
Ng onga Mazimba CV
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
mdg
mdgmdg
mdg
 
Chris M Sutton Resume
Chris M Sutton ResumeChris M Sutton Resume
Chris M Sutton Resume
 
Type of work undertaken
Type of work undertakenType of work undertaken
Type of work undertaken
 
Resume%27-2
Resume%27-2Resume%27-2
Resume%27-2
 
Miguel Sahagun Sr _Resume_2016
Miguel Sahagun Sr _Resume_2016Miguel Sahagun Sr _Resume_2016
Miguel Sahagun Sr _Resume_2016
 
ZMcompleted2017
ZMcompleted2017ZMcompleted2017
ZMcompleted2017
 
PaulGodard2015
PaulGodard2015PaulGodard2015
PaulGodard2015
 
Girisha DN C V
Girisha DN C VGirisha DN C V
Girisha DN C V
 
John Blagdon CV
John Blagdon CVJohn Blagdon CV
John Blagdon CV
 
Sreehari_2016_06_Resume
Sreehari_2016_06_ResumeSreehari_2016_06_Resume
Sreehari_2016_06_Resume
 

Similar to JM Resume

Similar to JM Resume (20)

Resume2015
Resume2015Resume2015
Resume2015
 
randycordero
randycorderorandycordero
randycordero
 
resumegfp_2016
resumegfp_2016resumegfp_2016
resumegfp_2016
 
Michael A Hughes resume
Michael A Hughes resumeMichael A Hughes resume
Michael A Hughes resume
 
Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)John_William_Reeves_III_2014(1)
John_William_Reeves_III_2014(1)
 
Michael A Hughes resume
Michael A Hughes resumeMichael A Hughes resume
Michael A Hughes resume
 
Nikhil CV
Nikhil CVNikhil CV
Nikhil CV
 
Jorge Moll Resume
Jorge Moll ResumeJorge Moll Resume
Jorge Moll Resume
 
TYLER T. PATTERSON Lawrence Resume 2.4.2016
TYLER T. PATTERSON Lawrence Resume 2.4.2016TYLER T. PATTERSON Lawrence Resume 2.4.2016
TYLER T. PATTERSON Lawrence Resume 2.4.2016
 
E Ferraro Resume 061215
E Ferraro Resume 061215E Ferraro Resume 061215
E Ferraro Resume 061215
 
Jorge Moll Resume
Jorge Moll ResumeJorge Moll Resume
Jorge Moll Resume
 
Marie Bavin-resume 2015 Dec
Marie Bavin-resume 2015 DecMarie Bavin-resume 2015 Dec
Marie Bavin-resume 2015 Dec
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
BadenhorstJC.updated
BadenhorstJC.updatedBadenhorstJC.updated
BadenhorstJC.updated
 
a.Pankaj Pandey
a.Pankaj Pandeya.Pankaj Pandey
a.Pankaj Pandey
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
GMorrow3.10.15
GMorrow3.10.15GMorrow3.10.15
GMorrow3.10.15
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 

JM Resume

  • 1. John Marler 118 Downing St House Springs, MO 63051 PH: (573)701-5839 jmrlr@yahoo.com Experience The Harlan Company– St Louis, MO Warehouse Manager 5/2016 – Present • Track, Maintain Equipment and supplies • Schedule pick up & deliveries both at warehouse and job sites • Schedule equipment maintenance ConAgra Foods 6/2009 – 4/2016 Production Manager - St Louis, MO 3/2015 – 4/2016 • 24 Hour responsibility of plant operations • Accountable for SQPDCE results for entire plant • Manage 4 supervisors and 60 hourly employees 1st Shift Supervisor - St Louis, MO 5/2013 – 3/2015 • 24 hour accountability for performance of 3 pasteurization processes. Leveraged TPM tools to reduce 81% losses of sterility, 57% reduction in rate loss to the production lines, 7mm gal per yr. reduction in water usage, 86% reduction in demurrage cost per CSU, and 81% reduction in process related downtime. • Responsible for Continuous Improvement and Focused Improvement lead. Lead and train cross functional teams using TPM principals, focused improvement tools. Accountable to develop and implement Daily Direction Setting tools. • Leveraged TPM principles to deliver 6.5% increase in shift OEE. 3rd Shift Supervisor - St Louis, MO 7/2011 – 5/2013 • Leveraged TPM principles to deliver 8% increase in shift OEE • Developed operator cross-training rotation program • 24 hour accountability for performance of 3 pasteurization processes. Developed ownership culture among operators driving improved focus on resolving leading losses. Maintenance Technician - St Louis, MO 6/2009 – 7/2011 • Owner of EQ5 production line. Utilized Autonomous Maintenance tools to deliver 80% decrease in minor stops and 15% OEE improvement • Facilitated focused improvement processes to develop sustainable countermeasures to deliver annual savings of $375m and 30% reduction in weekly ramp up time • Early Management team member utilized tools such as FMECA and Vendor Acceptance Testing to deliver vertical start-up of a $2MM capital project • Worked with Preventative Maintenance Pillar Team to develop and improve preventative maintenance schedules
  • 2. Pressline Services– St Louis, MO Field Service Technician 2008 – 2009 • Travel to customer press sites to rebuild components and to perform equipment modifications to change paper web width • Read blue prints and mechanical drawings to rebuild equipment to manufacturer specifications • Use of precision measuring devices as well as hand and power tools to set up machinery Coca-Cola – Dallas, TX Maintenance Mechanic II 2006 – 2008 • Maintaining and troubleshooting equipment • Production line support and maintenance • Machinery and equipment rebuild and upgrades Ouellette Machinery – Fenton, MO Field Service Technician 2000 – 2006 • Travel to client sites to install, setup, modify, and repair palletizing and conveying equipment • Manage safety committee to ensure safe practices in accordance with OSHA regulations • Manage tool/part room, maintain inventories and order parts and supplies as needed • Schedule jobs in order to ensure projected delivery of machines to customers Therma Tron – X – Sturgeon Bay, WI Welder/Fitter 2000 – 2000 • Read blue prints and mechanical drawings to build equipment to specifications • Use of welding machines, precision measuring devices as well as hand and power tools build industrial finishing equipment Huffy Bicycle – Farmington, MO Team Leader, Paint and Powder coat Dept. 1994 – 2000 • Facilitated line and department start up (new plant) • Oversee production, quality, and scheduling (3 production lines and 75 employees) • Developed SOP’s for safety procedures, inventory/production tracking • Worked with vendors, design team, marketing to develop new/custom colors/designs References available upon request