NAB Docklands.
It was a pleasure to watch the quality Dexion team at work!
“With major projects like this, it is important to
         work with companies that can do the job and make
            you look good. It was a pleasure to watch quality
         engineers at work. They gave me the confidence to
              tell my client that everything was under control.”



Patrick Fahey was Senior Site Engineer            buildings set amongst sunlight filled
for Bovis Lend Lease on the newly                 atriums. There are no offices in the building,
completed, National @ Docklands project           nor are there any barriers to effective
in Melbourne. Describing the installation         communication.
of Mekdrive R Compactus file storage
                                                  According to NAB, deliberately planned
systems, he said: “Dexion Citiport has
                                                  “bump space” will create opportunities for
been really fantastic and professional.
                                                  people to meet, exchange ideas and
“With major projects like this, it is important   develop new relationships. When people
to work with companies that can do the job        “bump” into each other, they can discuss
and make you look good. It was a pleasure         their work on the spot, take advantage
to watch quality engineers at work. They          of an informal meeting space or discuss
gave me the confidence to tell my client          ideas over a coffee in the internal café.
that everything was under control.”               These five-minute interactions will
National @ Docklands is the National’s new        contribute to faster problem solving and
flagship building in Melbourne’s emerging         the generation of new ideas.                     With 3500 people moving in from 12             off-site storage etc.) to help them meet their
Docklands precinct.                               It is intended that the co-location of           different sites, National @ Docklands          target of an average of 1.5 lineal metres of
                                                  people from different areas within National      when signed, was the largest single tenant     storage per person. In real terms this means
More than just a building, the new
development will play an important role in        @ Docklands will increase efficiency             precommitment made in Australia’s              half a metre at your desk (excluding mobile
the National’s cultural change journey,           and productivity by improving face to face       leasing history.                               pedestals) and a metre in a perimeter
bringing together 3500 employees from             communication and ultimately reduce                                                             cabinet or Compactus (depending on the
                                                                                                   Over a period of 18 months, more than 80
across Melbourne under the one roof to            reliance on email.                                                                              type of business).
                                                                                                   storage champions worked with their teams
work more effectively and collaboratively                                                          to review the way that they approached the     NAB Occupational Health and Safety experts
                                                  Even the entrance foyer has been designed
to serve the needs of customers.                                                                   use, storage and ultimate disposal of paper.   were involved in every stage of planning and
                                                  so that visitors can look straight into the
The new complex features two                      working areas . The “human face” of NAB          As part of this process they evaluated all     development of the new facility. Intensive
interconnected low-rise, highly transparent       is on display and not hidden away.               potential alternatives (archiving, active      discussions were held between the OHS




Dexion Case Study – NAB Docklands
team, the interior designers and a user      Installation of the Mekdrive® Compactus
group drawn from those moving into           units was watched by NAB with interest
National @ Docklands. After considering      because it is a new product that has
OHS, aesthetics and economics, they          the potential to help more broadly with
decided that Mekdrive® Compactus units       document storage requirements in other
from Dexion would be more suitable and
                                             NAB facilities around Australia and
more cost effective than fully powered
                                             worldwide. Mekdrive® is the lightest
Compactus units. By working closely with
Dexion’s design and consultancy services     mechanically assisted storage system
the interior designers and architects were   available. It keeps floor loadings to a
provided with a quick turn around of costs   minimum, an important consideration
and drawings as well as accurate 3D views    when assessing alternative solutions.
of the finished project.
                                             The multiple tracks, which distribute the
Members of the user group visited the        floor loadings more evenly, can be simply
Dexion Citiport showroom to view the         laid above the carpet and easily adjusted
units and determine the finishes. They       to allow for settling or readily moved to
chose Warm Dark Grey powder coating to       new locations.
enhance the internal style established for
National @ Docklands.                        Filing is a group activity in the National @
                                             Docklands workplace culture. Unlike other
Colours and finishes were chosen carefully                                                  normally laid directly over the carpet but the   major project for Dexion. Installation was
                                             systems, Mekdrive® does not belong in the
to ensure a welcoming, easy to live with                                                    long runs of up to 17 metres at National @       undertaken in both buildings by a carefully
style that would not date quickly. This      back room, it’s designed to blend easily
                                                                                            Docklands required it to be laid on timber       selected team working during the final
was consistent with the NAB’s desire to      with modern office décor and because of
                                                                                            bases with ramps for wheelchair access.          furniture fit out stage of the project.
blur the division between work and home      this, most of the 26 Mekdrive® Compactus
by creating a pleasant and harmonious        units are out in the open, integrated with     At close to half a million dollars, the
work environment.                            the work areas. The systems’ track is          National @ Docklands installation was a




Dexion Case Study – NAB Docklands

More Related Content

Viewers also liked

Viewers also liked (11)

Pearson case study
Pearson case studyPearson case study
Pearson case study
 
St microelectronics case study
St microelectronics case studySt microelectronics case study
St microelectronics case study
 
Home centre case study
Home centre case studyHome centre case study
Home centre case study
 
Res med case study
Res med case studyRes med case study
Res med case study
 
Atap case study
Atap case studyAtap case study
Atap case study
 
Ausdoc case study
Ausdoc case studyAusdoc case study
Ausdoc case study
 
Recall case study
Recall case studyRecall case study
Recall case study
 
P&o case study
P&o case studyP&o case study
P&o case study
 
Ecuacion de van der waals
Ecuacion de van der waalsEcuacion de van der waals
Ecuacion de van der waals
 
Cat logistics case study
Cat logistics case studyCat logistics case study
Cat logistics case study
 
National library case study
National library case studyNational library case study
National library case study
 

Similar to Nab docklands case study

Knowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case StudyKnowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case StudyManal Rayess
 
Container World 2017!
Container World 2017!Container World 2017!
Container World 2017!kgraham32
 
nedbank-case-study1 (1)
nedbank-case-study1 (1)nedbank-case-study1 (1)
nedbank-case-study1 (1)Gordon Fraser
 
dropbox.uwupptxnsisjskajajoajaoajsnsjsjsksn
dropbox.uwupptxnsisjskajajoajaoajsnsjsjsksndropbox.uwupptxnsisjskajajoajaoajsnsjsjsksn
dropbox.uwupptxnsisjskajajoajaoajsnsjsjsksnrajgandhi33653
 
Alfresco DevCon 2019: Interaxo - A journey to Cloud Native
Alfresco DevCon 2019: Interaxo - A journey to Cloud NativeAlfresco DevCon 2019: Interaxo - A journey to Cloud Native
Alfresco DevCon 2019: Interaxo - A journey to Cloud NativeAsgeir Frimannsson
 
Western sydney records case study
Western sydney records case studyWestern sydney records case study
Western sydney records case studyJoeyDorrington
 
DSD - NJM Case Study efile
DSD - NJM Case Study efileDSD - NJM Case Study efile
DSD - NJM Case Study efilemvassallo
 
DataCore + Fujitsu Business Solutions
DataCore + Fujitsu Business SolutionsDataCore + Fujitsu Business Solutions
DataCore + Fujitsu Business SolutionsDataCore Software
 
HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...
HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...
HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...Dana Gardner
 
Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Stuart Macnab
 
Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Damir Pletikosa
 
Project Natick-Data centers under the sea
Project Natick-Data centers under the seaProject Natick-Data centers under the sea
Project Natick-Data centers under the seaVishnu Singh Chundawat
 
Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...
Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...
Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...OpenStack
 
MODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQMODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQRhonan OBrien
 
IMS WebRTC Workshop Metaswitch Project Clearwater
IMS WebRTC Workshop Metaswitch Project ClearwaterIMS WebRTC Workshop Metaswitch Project Clearwater
IMS WebRTC Workshop Metaswitch Project ClearwaterAlan Quayle
 

Similar to Nab docklands case study (20)

Knowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case StudyKnowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case Study
 
Toll ipec case study
Toll ipec case studyToll ipec case study
Toll ipec case study
 
CaseStudy_NAB-Service_
CaseStudy_NAB-Service_CaseStudy_NAB-Service_
CaseStudy_NAB-Service_
 
Container World 2017!
Container World 2017!Container World 2017!
Container World 2017!
 
nedbank-case-study1 (1)
nedbank-case-study1 (1)nedbank-case-study1 (1)
nedbank-case-study1 (1)
 
City of Rotterdam
City of Rotterdam City of Rotterdam
City of Rotterdam
 
Apg homes case study
Apg homes case studyApg homes case study
Apg homes case study
 
dropbox.uwupptxnsisjskajajoajaoajsnsjsjsksn
dropbox.uwupptxnsisjskajajoajaoajsnsjsjsksndropbox.uwupptxnsisjskajajoajaoajsnsjsjsksn
dropbox.uwupptxnsisjskajajoajaoajsnsjsjsksn
 
Alfresco DevCon 2019: Interaxo - A journey to Cloud Native
Alfresco DevCon 2019: Interaxo - A journey to Cloud NativeAlfresco DevCon 2019: Interaxo - A journey to Cloud Native
Alfresco DevCon 2019: Interaxo - A journey to Cloud Native
 
Western sydney records case study
Western sydney records case studyWestern sydney records case study
Western sydney records case study
 
DSD - NJM Case Study efile
DSD - NJM Case Study efileDSD - NJM Case Study efile
DSD - NJM Case Study efile
 
DataCore + Fujitsu Business Solutions
DataCore + Fujitsu Business SolutionsDataCore + Fujitsu Business Solutions
DataCore + Fujitsu Business Solutions
 
HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...
HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...
HPE’s Erik Vogel on Key Factors for Driving Success in Hybrid Cloud Adoption ...
 
Telecom Times 2.0
Telecom Times 2.0Telecom Times 2.0
Telecom Times 2.0
 
Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)
 
Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)
 
Project Natick-Data centers under the sea
Project Natick-Data centers under the seaProject Natick-Data centers under the sea
Project Natick-Data centers under the sea
 
Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...
Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...
Making Openstack Really Easy - Why Build Open Source When You Can Buy? Danny ...
 
MODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQMODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQ
 
IMS WebRTC Workshop Metaswitch Project Clearwater
IMS WebRTC Workshop Metaswitch Project ClearwaterIMS WebRTC Workshop Metaswitch Project Clearwater
IMS WebRTC Workshop Metaswitch Project Clearwater
 

More from JoeyDorrington

Zuelig pharma corporation case study
Zuelig pharma corporation case studyZuelig pharma corporation case study
Zuelig pharma corporation case studyJoeyDorrington
 
Toll logistics & footlocker case study
Toll logistics & footlocker case studyToll logistics & footlocker case study
Toll logistics & footlocker case studyJoeyDorrington
 
Supercheap auto case study
Supercheap auto case studySupercheap auto case study
Supercheap auto case studyJoeyDorrington
 
Retail adventures case study
Retail adventures case studyRetail adventures case study
Retail adventures case studyJoeyDorrington
 
Quicksilver case study
Quicksilver case studyQuicksilver case study
Quicksilver case studyJoeyDorrington
 
New zealand case study
New zealand case studyNew zealand case study
New zealand case studyJoeyDorrington
 
Linfox kellogg's case study
Linfox kellogg's case studyLinfox kellogg's case study
Linfox kellogg's case studyJoeyDorrington
 
Linfox arnott's case study
Linfox arnott's case studyLinfox arnott's case study
Linfox arnott's case studyJoeyDorrington
 
Kimberly clark case study
Kimberly clark case studyKimberly clark case study
Kimberly clark case studyJoeyDorrington
 

More from JoeyDorrington (14)

Zuelig pharma corporation case study
Zuelig pharma corporation case studyZuelig pharma corporation case study
Zuelig pharma corporation case study
 
Universal case study
Universal case studyUniversal case study
Universal case study
 
Toyota case study
Toyota case studyToyota case study
Toyota case study
 
Toll logistics & footlocker case study
Toll logistics & footlocker case studyToll logistics & footlocker case study
Toll logistics & footlocker case study
 
Supercheap auto case study
Supercheap auto case studySupercheap auto case study
Supercheap auto case study
 
Stihl case study
Stihl case studyStihl case study
Stihl case study
 
Retail adventures case study
Retail adventures case studyRetail adventures case study
Retail adventures case study
 
Quicksilver case study
Quicksilver case studyQuicksilver case study
Quicksilver case study
 
New zealand case study
New zealand case studyNew zealand case study
New zealand case study
 
Linfox kellogg's case study
Linfox kellogg's case studyLinfox kellogg's case study
Linfox kellogg's case study
 
Linfox arnott's case study
Linfox arnott's case studyLinfox arnott's case study
Linfox arnott's case study
 
Kimberly clark case study
Kimberly clark case studyKimberly clark case study
Kimberly clark case study
 
Fort knox case study
Fort knox case studyFort knox case study
Fort knox case study
 
Fonterra case study
Fonterra case studyFonterra case study
Fonterra case study
 

Nab docklands case study

  • 1. NAB Docklands. It was a pleasure to watch the quality Dexion team at work!
  • 2.
  • 3. “With major projects like this, it is important to work with companies that can do the job and make you look good. It was a pleasure to watch quality engineers at work. They gave me the confidence to tell my client that everything was under control.” Patrick Fahey was Senior Site Engineer buildings set amongst sunlight filled for Bovis Lend Lease on the newly atriums. There are no offices in the building, completed, National @ Docklands project nor are there any barriers to effective in Melbourne. Describing the installation communication. of Mekdrive R Compactus file storage According to NAB, deliberately planned systems, he said: “Dexion Citiport has “bump space” will create opportunities for been really fantastic and professional. people to meet, exchange ideas and “With major projects like this, it is important develop new relationships. When people to work with companies that can do the job “bump” into each other, they can discuss and make you look good. It was a pleasure their work on the spot, take advantage to watch quality engineers at work. They of an informal meeting space or discuss gave me the confidence to tell my client ideas over a coffee in the internal café. that everything was under control.” These five-minute interactions will National @ Docklands is the National’s new contribute to faster problem solving and flagship building in Melbourne’s emerging the generation of new ideas. With 3500 people moving in from 12 off-site storage etc.) to help them meet their Docklands precinct. It is intended that the co-location of different sites, National @ Docklands target of an average of 1.5 lineal metres of people from different areas within National when signed, was the largest single tenant storage per person. In real terms this means More than just a building, the new development will play an important role in @ Docklands will increase efficiency precommitment made in Australia’s half a metre at your desk (excluding mobile the National’s cultural change journey, and productivity by improving face to face leasing history. pedestals) and a metre in a perimeter bringing together 3500 employees from communication and ultimately reduce cabinet or Compactus (depending on the Over a period of 18 months, more than 80 across Melbourne under the one roof to reliance on email. type of business). storage champions worked with their teams work more effectively and collaboratively to review the way that they approached the NAB Occupational Health and Safety experts Even the entrance foyer has been designed to serve the needs of customers. use, storage and ultimate disposal of paper. were involved in every stage of planning and so that visitors can look straight into the The new complex features two working areas . The “human face” of NAB As part of this process they evaluated all development of the new facility. Intensive interconnected low-rise, highly transparent is on display and not hidden away. potential alternatives (archiving, active discussions were held between the OHS Dexion Case Study – NAB Docklands
  • 4. team, the interior designers and a user Installation of the Mekdrive® Compactus group drawn from those moving into units was watched by NAB with interest National @ Docklands. After considering because it is a new product that has OHS, aesthetics and economics, they the potential to help more broadly with decided that Mekdrive® Compactus units document storage requirements in other from Dexion would be more suitable and NAB facilities around Australia and more cost effective than fully powered worldwide. Mekdrive® is the lightest Compactus units. By working closely with Dexion’s design and consultancy services mechanically assisted storage system the interior designers and architects were available. It keeps floor loadings to a provided with a quick turn around of costs minimum, an important consideration and drawings as well as accurate 3D views when assessing alternative solutions. of the finished project. The multiple tracks, which distribute the Members of the user group visited the floor loadings more evenly, can be simply Dexion Citiport showroom to view the laid above the carpet and easily adjusted units and determine the finishes. They to allow for settling or readily moved to chose Warm Dark Grey powder coating to new locations. enhance the internal style established for National @ Docklands. Filing is a group activity in the National @ Docklands workplace culture. Unlike other Colours and finishes were chosen carefully normally laid directly over the carpet but the major project for Dexion. Installation was systems, Mekdrive® does not belong in the to ensure a welcoming, easy to live with long runs of up to 17 metres at National @ undertaken in both buildings by a carefully style that would not date quickly. This back room, it’s designed to blend easily Docklands required it to be laid on timber selected team working during the final was consistent with the NAB’s desire to with modern office décor and because of bases with ramps for wheelchair access. furniture fit out stage of the project. blur the division between work and home this, most of the 26 Mekdrive® Compactus by creating a pleasant and harmonious units are out in the open, integrated with At close to half a million dollars, the work environment. the work areas. The systems’ track is National @ Docklands installation was a Dexion Case Study – NAB Docklands