 CONCEPT
 PAYMENT SYSTEMS FOR EXECUTION OF CONSTRUCTION PROJECT CASH FLOWS
 METHODOLOGIES OF ESTIMATING CONSTRUCTION CASH FLOWS
 ESTIMATED AND ACTUAL CONSTRUCTION CASH FLOWS
 VARIATIONS BETWEEN ACTUAL AND FORECASTED CONSTRUCTION CASH FLOWS
 RISK FACTORS CAUSING VARIATIONS ON FORECASTED CONSTRUCTION CASH
FLOWS
OVERVIEW
 The cash flow is basically the actual movement of
money in and out of a business such as construction
business.
 Money flowing into a business is called the positive
cash flow while monies paid out are named as
negative cash flow.
 The difference between the positive and negative
cash flows is called the net cash flow.
CONCEPT OF CONSTRUCTION CASH FLOWS
• Basically, there are payment systems which
replicate the delivery of payment to contractor
during execution of construction project cash
flows, such as Turnkey where payment occurs
at handover stage only (Turnkey cash flow), but
monthly progress payments (or monthly cash
flow) and staged payments (or staged cash
flows) are commonly used in project financial
management.
PAYMENT SYSTEMS FOR EXECUTION OF CONSTRUCTION PROJECT CASH FLOWS
CED, CECOS University, Peshawar. 6
In staged payment system (staged cash flow),
a builder is entitled only to payments at the
completion of certain work stages in the
progress of the works .
The more prescriptive the staged payments in
execution of the construction project the more
accurate the assessment of works will be in that
execution.
Therefore, in a staged cash flow, certification is
done once the work element is completed
(01) STAGED CASH FLOW
In monthly payment system (monthly cash
flow), the periodic positive cash flows are
derived mainly from funds received in the form
of monthly payments to the construction works
performed by contractor. Normally a third
party measures and values the works
performed at the site.
(02) MONTHLY CASH FLOW
A single payment is only provided for at the
conclusion of the project (i.e. at practical
completion of the project). This requires the
builder to finance the project during construction
phase, but this is rarely practiced compared to
the previous two payment systems in
construction industry.
(03) TURNKEY CASH FLOW
• There are many methods used in cash flow
forecasting, but these methods may be mainly
grouped into schedule-based or cost profile
methods.
• the forecasting methodologies are discussed
basing on the types of construction cash flows.
• Positive Cash Flow Methodologies.
• Negative Cash Flow Methodologies.
• Net Cash Flow Methodologies.
METHODOLOGIES OF ESTIMATING CONSTRUCTION CASH FLOWS
CED, CECOS University, Peshawar. 10
• construction project cash flows are the
amounts of money that the contractor will
receive from client after completion of various
work stages of the project. In that manner,
estimated construction cash flows in this study
means the estimated/projected amounts of
money to be received by contractor from client
after completion of various work stages of the
project. While actual construction cash flows
are the actual amounts of money paid to
contractor for the various completed work
stages of the project after being valued at the
site and certified.
ESTIMATED AND ACTUAL CONSTRUCTION CASH FLOWS
CED, CECOS University, Peshawar. 11
• the difference between actual and
forecasted construction cash flows in
executing the construction project is
referred as variations. These
variations are caused by risk factors
as discussed below.
VARIATIONS BETWEEN ACTUAL AND FORECASTED
CONSTRUCTION CASH FLOWS
CED, CECOS University, Peshawar. 12
• a. Incomplete project design and specifications .
• b. Changes in geological conditions .
• c. Project complexity, estimating error specifications .
• d. Inclement weather, shortage of key resources, compliance with
regulations, contractor’s lack of resources .
• e. Contractor’s lack of experience and technical skills, civil
disturbances .
• f. Unclarity of client’s requirements .
• g. Different meanings of specifications, changes in currency
exchange rates, misunderstanding of contract clauses .
• h. Level of bureaucracy .
RISK FACTORS CAUSING VARIATIONS ON FORECASTED
CONSTRUCTION CASH FLOWS
CED, CECOS University, Peshawar. 13
• i. Clients’ lack of financial resources .
• j. Consultants’ lack of experience and technical skills, incomplete
information at tender stage.
• k. Unethical practices .
• l. Design errors .
• m. Poor communication among project participants .
CED, CECOS University, Peshawar. 14
CED, CECOS University, Peshawar. 15

More Related Content

Similar to Cash Flow analysis presentation

Capital budgeting (1)- Management accounting
Capital budgeting (1)- Management accountingCapital budgeting (1)- Management accounting
Capital budgeting (1)- Management accounting
Jithin Zcs
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docx
pauline234567
 
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTMANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
Taiwo Okuselu
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016
sherif kadry
 
PROJECT PART ONE 1Part-1 Creati.docx
PROJECT PART ONE             1Part-1 Creati.docxPROJECT PART ONE             1Part-1 Creati.docx
PROJECT PART ONE 1Part-1 Creati.docx
simonlbentley59018
 

Similar to Cash Flow analysis presentation (20)

Capital budgeting (1)- Management accounting
Capital budgeting (1)- Management accountingCapital budgeting (1)- Management accounting
Capital budgeting (1)- Management accounting
 
Framework for Establishing Risk Impacts on Forecasted Construction Cash Flows...
Framework for Establishing Risk Impacts on Forecasted Construction Cash Flows...Framework for Establishing Risk Impacts on Forecasted Construction Cash Flows...
Framework for Establishing Risk Impacts on Forecasted Construction Cash Flows...
 
Lecture 4 Economic Assessment EDIT.pptx
Lecture 4 Economic Assessment EDIT.pptxLecture 4 Economic Assessment EDIT.pptx
Lecture 4 Economic Assessment EDIT.pptx
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
C8 financing affordable rental projects p pt - obie baker
C8 financing affordable rental projects   p pt - obie bakerC8 financing affordable rental projects   p pt - obie baker
C8 financing affordable rental projects p pt - obie baker
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docx
 
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTMANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
 
IFC Package Brantley Scan
IFC Package Brantley ScanIFC Package Brantley Scan
IFC Package Brantley Scan
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
 
Capital Budegting.pdf
Capital Budegting.pdfCapital Budegting.pdf
Capital Budegting.pdf
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
CAPITAL BUDGETING.pptx
CAPITAL BUDGETING.pptxCAPITAL BUDGETING.pptx
CAPITAL BUDGETING.pptx
 
Capital-Budgeting.pptx
Capital-Budgeting.pptxCapital-Budgeting.pptx
Capital-Budgeting.pptx
 
H1303055462
H1303055462H1303055462
H1303055462
 
PROJECT PART ONE 1Part-1 Creati.docx
PROJECT PART ONE             1Part-1 Creati.docxPROJECT PART ONE             1Part-1 Creati.docx
PROJECT PART ONE 1Part-1 Creati.docx
 
Project Finance
Project FinanceProject Finance
Project Finance
 
Project Costs, Budgeting and Appraisal
Project Costs, Budgeting and AppraisalProject Costs, Budgeting and Appraisal
Project Costs, Budgeting and Appraisal
 
Process of pre construction phase drawbacks
Process of pre construction phase drawbacksProcess of pre construction phase drawbacks
Process of pre construction phase drawbacks
 
ACH 216 Lecture 07 (Project Funding)
ACH 216 Lecture 07 (Project Funding)ACH 216 Lecture 07 (Project Funding)
ACH 216 Lecture 07 (Project Funding)
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Cash Flow analysis presentation

  • 2. CE-2015 Construction Management Presenter: Jawad Ahmad Department of Civil Engineering CECOS University, Peshawar.
  • 3.
  • 4.  CONCEPT  PAYMENT SYSTEMS FOR EXECUTION OF CONSTRUCTION PROJECT CASH FLOWS  METHODOLOGIES OF ESTIMATING CONSTRUCTION CASH FLOWS  ESTIMATED AND ACTUAL CONSTRUCTION CASH FLOWS  VARIATIONS BETWEEN ACTUAL AND FORECASTED CONSTRUCTION CASH FLOWS  RISK FACTORS CAUSING VARIATIONS ON FORECASTED CONSTRUCTION CASH FLOWS OVERVIEW
  • 5.  The cash flow is basically the actual movement of money in and out of a business such as construction business.  Money flowing into a business is called the positive cash flow while monies paid out are named as negative cash flow.  The difference between the positive and negative cash flows is called the net cash flow. CONCEPT OF CONSTRUCTION CASH FLOWS
  • 6. • Basically, there are payment systems which replicate the delivery of payment to contractor during execution of construction project cash flows, such as Turnkey where payment occurs at handover stage only (Turnkey cash flow), but monthly progress payments (or monthly cash flow) and staged payments (or staged cash flows) are commonly used in project financial management. PAYMENT SYSTEMS FOR EXECUTION OF CONSTRUCTION PROJECT CASH FLOWS CED, CECOS University, Peshawar. 6
  • 7. In staged payment system (staged cash flow), a builder is entitled only to payments at the completion of certain work stages in the progress of the works . The more prescriptive the staged payments in execution of the construction project the more accurate the assessment of works will be in that execution. Therefore, in a staged cash flow, certification is done once the work element is completed (01) STAGED CASH FLOW
  • 8. In monthly payment system (monthly cash flow), the periodic positive cash flows are derived mainly from funds received in the form of monthly payments to the construction works performed by contractor. Normally a third party measures and values the works performed at the site. (02) MONTHLY CASH FLOW
  • 9. A single payment is only provided for at the conclusion of the project (i.e. at practical completion of the project). This requires the builder to finance the project during construction phase, but this is rarely practiced compared to the previous two payment systems in construction industry. (03) TURNKEY CASH FLOW
  • 10. • There are many methods used in cash flow forecasting, but these methods may be mainly grouped into schedule-based or cost profile methods. • the forecasting methodologies are discussed basing on the types of construction cash flows. • Positive Cash Flow Methodologies. • Negative Cash Flow Methodologies. • Net Cash Flow Methodologies. METHODOLOGIES OF ESTIMATING CONSTRUCTION CASH FLOWS CED, CECOS University, Peshawar. 10
  • 11. • construction project cash flows are the amounts of money that the contractor will receive from client after completion of various work stages of the project. In that manner, estimated construction cash flows in this study means the estimated/projected amounts of money to be received by contractor from client after completion of various work stages of the project. While actual construction cash flows are the actual amounts of money paid to contractor for the various completed work stages of the project after being valued at the site and certified. ESTIMATED AND ACTUAL CONSTRUCTION CASH FLOWS CED, CECOS University, Peshawar. 11
  • 12. • the difference between actual and forecasted construction cash flows in executing the construction project is referred as variations. These variations are caused by risk factors as discussed below. VARIATIONS BETWEEN ACTUAL AND FORECASTED CONSTRUCTION CASH FLOWS CED, CECOS University, Peshawar. 12
  • 13. • a. Incomplete project design and specifications . • b. Changes in geological conditions . • c. Project complexity, estimating error specifications . • d. Inclement weather, shortage of key resources, compliance with regulations, contractor’s lack of resources . • e. Contractor’s lack of experience and technical skills, civil disturbances . • f. Unclarity of client’s requirements . • g. Different meanings of specifications, changes in currency exchange rates, misunderstanding of contract clauses . • h. Level of bureaucracy . RISK FACTORS CAUSING VARIATIONS ON FORECASTED CONSTRUCTION CASH FLOWS CED, CECOS University, Peshawar. 13
  • 14. • i. Clients’ lack of financial resources . • j. Consultants’ lack of experience and technical skills, incomplete information at tender stage. • k. Unethical practices . • l. Design errors . • m. Poor communication among project participants . CED, CECOS University, Peshawar. 14
  • 15. CED, CECOS University, Peshawar. 15