1. P O R T F O L I O
CABRERA LANTIGUA Jason
Architect
2. able of Contents
05
T
What’s inside?
10 12 14 17
Daycare
SantosAngeles
CustodioParish
ThomasVII
Residential
Casa106
LuxuryBahía
PrincpeHotel
3. A bout me
2008 2009 2010 2011 2012 2013 2014 2016
Colegio Juan XXIII PUCMM* Santiago, República Dominicana
2015
PUCMM* Santiago, República Dominicana
Santiago, República Dominicana Bávaro, República Dominicana
I’m Jason Cabrera, architect graduated in 2015 in Dominican Republic. My
work objective is to implement my knowledge, studies and skills in architecture
and construction in general to contribute decisively and effectively in the
development of activities and solutions of situations that arise in the
environment of United States of America. In search for a brilliant organization
where I can blend my skills and creativity in architectural design that will best
utilize my formal education and my hardworking ability.
SKILLS
»
SKILLS
02
Jason Cabrera Lantigua
201-912-0842
1310 34 Ave. Astoria, Queens, NY, USA cabrerajason38@gmail.com
Knowledge in preparation of
construction documents, drawings
and designs. Ability to read and
understand blueprints and technical
data and perform multiple task to
meet production deadlines.0 20 40 60 80 100
Photoshop
Autodesk Revit
SketchUp
AutoCAD 2D
Office
Responsible
Proactive
Teamwork
Communication
5. The main objective was designed through
modular and combinable a system of
childcare facilities functional units.
ay CareD
“
04
“
6. Among the specific objectives there are:
Create open spaces where children can develop their creativity and curiosity. Provide
a healty recreation spaces for children with more direct contact with the enviroment
around them.
Provide all children a basic education to develop creativity, abilities and skills of
the age as learning abiliy, In order to other quality education that can boost
economic growth.
Design spaces wich can be adapted to any environment.
Establish a system that helps to invest in projects like this.
05
FACADE
FACADE
SITE PLAN
7. NM
+0.04 MT
N.P.T
O
M´
BF. Salon de clases 2-5 años
Capacidad para 25 niños
57.55 mt²
P
Jardinera
N'
BF. Salon de clases 2-5
+0.04 MT
N.P.T
UF Baños para Niños
+0.03 MT
N.P.T
Baño niños
Baño niñas Duchas
Duchas
Casilleros
Casilleros
Capacidad para 25 niños
57.55 mt²
+0.04 MT
N.P.T
+0.04 MT
N.P.T
+0.03 MT
N.P.T
CasillerosCasilleros
J´
Capacidad para 16 niños
51.7 mt²
Duchas
I
K´
BF. Salon de clases para
lactantes 0-11 meses
BF. Salon de clases para
lactantes 0-11 meses
Duchas
L´
H
Capacidad para 16 niños
51.7 mt²
12
GF
11
D
+0.03 MT
N.P.T
17.2 mt²
11.8 mt²
13.8 mt²13.9 mt²
16.3 mt²
+0.04 MT
N.P.T
UF Area Administrativa
Espera
Director
Psicología Enfermería Secretaria
Sala de Reuniones
Contador
06
11°11°
2.80
3.70
´ ´
11°
´ ´
11°
´ ´
11°
SECTION A-A'
0.90
0.7495
2.60
0.3000
11°
2.80
1.05
0.60
2.80
2.501.55 2.10
2.90
11°
3.70
2.10
2.52
2.10
0.50
1.6000
0.9137
4.50
2.10
1.202.80
´
0.6000
0.50
1.45
´
2.81
´ ´
SECTION B-B'
DIMENSION PLANS
10. antos Ángeles Custodio ParishS
In this project an expansion and remodeling of this chapel
was made, which already existed but was small for the
activities carried out. Also, the chapel was old and required
a more modern design, which integrated the landscape
and was adapted to the context.
09
»
FACADE
14. H ouse 106
This was my first project as an intern where I had the task of
working the structural part: calculation of beams, steel and
modifications of the plans; I also made the three-dimensional
model of the house.
When I graduated I was employed in the construction, I was
assigned a job in the office where all the plans passed through
my hands, I was responsible for modifications of facades and
interiors, architectural and structural details.
Baja
01 Garage
02 Hall
03 Living room
04 Family room
05 Guest room
06 Dinning room
07 Kitchen
08 Kitchen 2
09 Laundry
10 Master bedroom
11 Walking closet
12 Master bathroom
13 Studio
14 Bedroom 1
15 Walking closet
16 Bathroom
17 Bedroom 2
18 Walking closet
19 Bathroom
20 Bedroom
FLOOR PLAN LEVEL 1 FLOOR PLAN LEVEL 2
13
FACADE
17. uxury Bahía Príncipe Esmeralda Don Pablo CollectionL
Source: https://goo.gl/iBkBfk
16
18. In the first stage of construction I worked everything
related to the project stakeout, excavation, reinforced
slabs and everything related to what we call gray Works
up a level every 10 days.
In the second stage we applied stucco walls, plaster
ceilings of the facilities sheetrock, ceiling, cerámica
floors and bathrooms.
1
2
It is a complex of hotel rooms consisting of 72 simple rooms and a luxury suite. I worked
for six months, directly in the construction and supervision of two of these villas where I
was assigned a Villa for directing the draft within a limited time.
17
19. In the third stage everything related to light fixures,
doors, Windows, air acondicioner, telecomunications
was performed, etc.
In the final stage we were delivered tiered romos and
picked every detail along with the technicians to
conclude this project.
3
4
18