Matching Material In-flow with Pace of Production to Avoid Stoppages
ERP – Microsoft AX
New business system
software to lay the
foundation to be able to
modernize processes
and take advantage of
tools such as MRP and
planned production
orders
Internal Supply Chain Redesign
Reworking the
inventory control
process (including
receiving and
delivering) and
designing a central
warehouse for storage
System Reliability
Proactively searching
out problematic areas
within the design
architecture and
addressing the most
critical and those with
the largest return
Define Concept Design Optimize Verify
Through interviews and
observation, we mapped
the system. Once the
context was understood,
recognizing that purchasing
was the bottleneck became
evident
We were scraping the
old ways and
redesigning everything.
We had to measure
physical dimensions for
warehouse spatial
estimates.
Two other designs were
considered before
selecting the one above.
Next we had to figure out
how the warehouse would
perform its functions.
Stocking the warehouse
ended up as above and next
we needed to set the levels
according to EOQ model
FEMA: We were not able to
pilot so we had to outsource
EOQ sensitivity analysis and
reorder trigger error-proofing
to two Yellow Belts.
We did not have the full
amount of required
resources so we will
implement in phases
Will add in visual aids and
routines in addition to
system/data monitoring
The front end can get messy; the important thing is see the
big picture so you can understand the context. Be quick to
absorb your self into their system.
Don’t assume design is a linear process and that you
complete it “one and done”. Design is an extremely
iterative process
Organizations are in these
positions because of their
habits; projects last
because they change habits
Manual, proactive
system to aid ERP
transition
Centralized control of
inventory
Quantitative-based
ordering method
Consolidated space,
inventory, and data
 Reactive, “tribal-
knowledge” based
ordering
 Shortages common
 All inventory stored
on floor
 Lots of NVA time
spent looking for
parts
 Employees take
parts from other
depts. to stock their
areas
Current State
 Manual,
proactive
ordering via
Kanban signal
 Shortages
mitigated with
safety stock
 Inventory
centrally
controlled in
warehouse
 Order quantity
based on data
 Parts are sent to
floor together as
a kit or in a
replenishment
bin
Design State
Sutphen is a family own and run
company that prides themselves
on production of high-quality,
dependable customizable fire
trucks of iconic design.
Used for KB
Dropboxes

More Related Content

What's hot

MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)Abdulrahman El-Sayed
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Planninmenonroopesh
 
Material requirement planning
  Material requirement planning  Material requirement planning
Material requirement planningbraydenmarco
 
Mrp1 prsntation-slides-1226827392037035-8
Mrp1 prsntation-slides-1226827392037035-8Mrp1 prsntation-slides-1226827392037035-8
Mrp1 prsntation-slides-1226827392037035-8arshadbashirjam
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planningAmalia Syafitri
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Callidus Software Product Installation And Performance Tuning
Callidus Software Product Installation And Performance TuningCallidus Software Product Installation And Performance Tuning
Callidus Software Product Installation And Performance TuningCallidus Software
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Mba ii pmom_unit-4.2 shop floor planning and control a
Mba ii pmom_unit-4.2 shop floor planning and control aMba ii pmom_unit-4.2 shop floor planning and control a
Mba ii pmom_unit-4.2 shop floor planning and control aRai University
 
Improve your company's performance with IMAFS
Improve your company's performance with IMAFSImprove your company's performance with IMAFS
Improve your company's performance with IMAFSIMAFS
 
Production planning & mrp
Production planning & mrpProduction planning & mrp
Production planning & mrpArisha Jamil
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planningAnila Vanguri
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyHaider Alkaisy
 
Application of PPC for Electronic Manufacturing Company
Application of PPC for Electronic Manufacturing CompanyApplication of PPC for Electronic Manufacturing Company
Application of PPC for Electronic Manufacturing CompanyDwip Saha
 

What's hot (20)

MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Oracle advanced supply chain planning
Oracle advanced supply chain planningOracle advanced supply chain planning
Oracle advanced supply chain planning
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
 
MRP.pptx
MRP.pptxMRP.pptx
MRP.pptx
 
Material requirement planning
  Material requirement planning  Material requirement planning
Material requirement planning
 
Mrp1 prsntation-slides-1226827392037035-8
Mrp1 prsntation-slides-1226827392037035-8Mrp1 prsntation-slides-1226827392037035-8
Mrp1 prsntation-slides-1226827392037035-8
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Callidus Software Product Installation And Performance Tuning
Callidus Software Product Installation And Performance TuningCallidus Software Product Installation And Performance Tuning
Callidus Software Product Installation And Performance Tuning
 
Physical inve
Physical invePhysical inve
Physical inve
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
Mba ii pmom_unit-4.2 shop floor planning and control a
Mba ii pmom_unit-4.2 shop floor planning and control aMba ii pmom_unit-4.2 shop floor planning and control a
Mba ii pmom_unit-4.2 shop floor planning and control a
 
Improve your company's performance with IMAFS
Improve your company's performance with IMAFSImprove your company's performance with IMAFS
Improve your company's performance with IMAFS
 
J i-t
J i-tJ i-t
J i-t
 
Production planning & mrp
Production planning & mrpProduction planning & mrp
Production planning & mrp
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planning
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
 
Application of PPC for Electronic Manufacturing Company
Application of PPC for Electronic Manufacturing CompanyApplication of PPC for Electronic Manufacturing Company
Application of PPC for Electronic Manufacturing Company
 

Viewers also liked

Tugas mtk bab 4
Tugas mtk bab 4Tugas mtk bab 4
Tugas mtk bab 4andeki22
 
Mafer examen segundo bimestre
Mafer examen segundo bimestreMafer examen segundo bimestre
Mafer examen segundo bimestremafer_0390
 
Recurso de queja2
Recurso de queja2Recurso de queja2
Recurso de queja2fernandor80
 
Redovi ƒekanja na primarnom nivou zdravstvene zattite new
Redovi ƒekanja na primarnom nivou zdravstvene zattite newRedovi ƒekanja na primarnom nivou zdravstvene zattite new
Redovi ƒekanja na primarnom nivou zdravstvene zattite newEmir Bidžan
 
l8 cyberbullying
l8 cyberbullyingl8 cyberbullying
l8 cyberbullyingKawaii937
 
แนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศ
แนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศแนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศ
แนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศkidsana pajjaika
 
A patchwork of individual solutions (LOTE 5, 27 feb 2016)
A patchwork of individual solutions   (LOTE 5, 27 feb 2016)A patchwork of individual solutions   (LOTE 5, 27 feb 2016)
A patchwork of individual solutions (LOTE 5, 27 feb 2016)Mohamed Hegazy
 
6 лінгва 2016
6 лінгва 20166 лінгва 2016
6 лінгва 2016Rebbit2015
 

Viewers also liked (18)

Tugas mtk bab 4
Tugas mtk bab 4Tugas mtk bab 4
Tugas mtk bab 4
 
Mafer examen segundo bimestre
Mafer examen segundo bimestreMafer examen segundo bimestre
Mafer examen segundo bimestre
 
05_N110_40808 (1)
05_N110_40808 (1)05_N110_40808 (1)
05_N110_40808 (1)
 
Recurso de queja2
Recurso de queja2Recurso de queja2
Recurso de queja2
 
MarcucciJulioCV_ES
MarcucciJulioCV_ESMarcucciJulioCV_ES
MarcucciJulioCV_ES
 
La adolescencia
La adolescenciaLa adolescencia
La adolescencia
 
Redovi ƒekanja na primarnom nivou zdravstvene zattite new
Redovi ƒekanja na primarnom nivou zdravstvene zattite newRedovi ƒekanja na primarnom nivou zdravstvene zattite new
Redovi ƒekanja na primarnom nivou zdravstvene zattite new
 
CV-JB-G-16 (1)
CV-JB-G-16 (1)CV-JB-G-16 (1)
CV-JB-G-16 (1)
 
Digital Marketing
Digital MarketingDigital Marketing
Digital Marketing
 
ch 9
ch 9ch 9
ch 9
 
l8 cyberbullying
l8 cyberbullyingl8 cyberbullying
l8 cyberbullying
 
แนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศ
แนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศแนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศ
แนวข้อสอบนายทหารพระธรรมนูญ กองทัพอากาศ
 
Qno 2 (a)
Qno 2 (a)Qno 2 (a)
Qno 2 (a)
 
A patchwork of individual solutions (LOTE 5, 27 feb 2016)
A patchwork of individual solutions   (LOTE 5, 27 feb 2016)A patchwork of individual solutions   (LOTE 5, 27 feb 2016)
A patchwork of individual solutions (LOTE 5, 27 feb 2016)
 
Qno 2 (b)
Qno 2 (b)Qno 2 (b)
Qno 2 (b)
 
35615
3561535615
35615
 
6 лінгва 2016
6 лінгва 20166 лінгва 2016
6 лінгва 2016
 
Reaching consumers at the bottom of the pyramid - African case study
Reaching consumers at the bottom of the pyramid - African case studyReaching consumers at the bottom of the pyramid - African case study
Reaching consumers at the bottom of the pyramid - African case study
 

Similar to Hall of fame poster v_FINAL

Enterprise Resource Planning) Erp System2
Enterprise Resource Planning) Erp System2Enterprise Resource Planning) Erp System2
Enterprise Resource Planning) Erp System23abooodi
 
Erp case study
Erp case studyErp case study
Erp case studyUMaine
 
Erp case study
Erp case studyErp case study
Erp case studyUMaine
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource PlanningMayank Kashyap
 
Ewm training ppt
Ewm training pptEwm training ppt
Ewm training pptbabloo6
 
SCM CRP ERP Decision Support
SCM CRP ERP Decision SupportSCM CRP ERP Decision Support
SCM CRP ERP Decision Supportankit_sharma869
 
Sutphen Internal Supply Chain Restructuring Project_DFSS
Sutphen Internal Supply Chain Restructuring Project_DFSSSutphen Internal Supply Chain Restructuring Project_DFSS
Sutphen Internal Supply Chain Restructuring Project_DFSSJared Walter
 
ERP Software For Export
ERP Software For ExportERP Software For Export
ERP Software For ExportBuyerEase
 
Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...BatchMaster Software Pvt. Ltd.
 
Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8Pratik Van
 
ERP implementation at steel mill
ERP implementation at steel millERP implementation at steel mill
ERP implementation at steel millAsher Jawad
 
Best Practices and Lessons Learned on Our IBM Rational Insight Deployment
Best Practices and Lessons Learned on Our IBM Rational Insight DeploymentBest Practices and Lessons Learned on Our IBM Rational Insight Deployment
Best Practices and Lessons Learned on Our IBM Rational Insight DeploymentMarc Nehme
 
Cquential Brochure
Cquential  Brochure Cquential  Brochure
Cquential Brochure Rachel Bates
 

Similar to Hall of fame poster v_FINAL (20)

Enterprise Resource Planning) Erp System2
Enterprise Resource Planning) Erp System2Enterprise Resource Planning) Erp System2
Enterprise Resource Planning) Erp System2
 
Erp case study
Erp case studyErp case study
Erp case study
 
Erp case study
Erp case studyErp case study
Erp case study
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
Ewm training ppt
Ewm training pptEwm training ppt
Ewm training ppt
 
SCM CRP ERP Decision Support
SCM CRP ERP Decision SupportSCM CRP ERP Decision Support
SCM CRP ERP Decision Support
 
Sutphen Internal Supply Chain Restructuring Project_DFSS
Sutphen Internal Supply Chain Restructuring Project_DFSSSutphen Internal Supply Chain Restructuring Project_DFSS
Sutphen Internal Supply Chain Restructuring Project_DFSS
 
Erp in business
Erp in businessErp in business
Erp in business
 
Oracle ASCP Training
Oracle ASCP TrainingOracle ASCP Training
Oracle ASCP Training
 
ERP Software For Export
ERP Software For ExportERP Software For Export
ERP Software For Export
 
ERP
ERPERP
ERP
 
Erp
ErpErp
Erp
 
ERP, SAP
ERP, SAPERP, SAP
ERP, SAP
 
Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...Difference between Warehouse Management System (WMS) and Enterprise Resource ...
Difference between Warehouse Management System (WMS) and Enterprise Resource ...
 
Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8Enterprise resource-planning-erp-1218631405959212-8
Enterprise resource-planning-erp-1218631405959212-8
 
ERP implementation at steel mill
ERP implementation at steel millERP implementation at steel mill
ERP implementation at steel mill
 
Online erp
Online erpOnline erp
Online erp
 
ERP
ERPERP
ERP
 
Best Practices and Lessons Learned on Our IBM Rational Insight Deployment
Best Practices and Lessons Learned on Our IBM Rational Insight DeploymentBest Practices and Lessons Learned on Our IBM Rational Insight Deployment
Best Practices and Lessons Learned on Our IBM Rational Insight Deployment
 
Cquential Brochure
Cquential  Brochure Cquential  Brochure
Cquential Brochure
 

Hall of fame poster v_FINAL

  • 1. Matching Material In-flow with Pace of Production to Avoid Stoppages ERP – Microsoft AX New business system software to lay the foundation to be able to modernize processes and take advantage of tools such as MRP and planned production orders Internal Supply Chain Redesign Reworking the inventory control process (including receiving and delivering) and designing a central warehouse for storage System Reliability Proactively searching out problematic areas within the design architecture and addressing the most critical and those with the largest return Define Concept Design Optimize Verify Through interviews and observation, we mapped the system. Once the context was understood, recognizing that purchasing was the bottleneck became evident We were scraping the old ways and redesigning everything. We had to measure physical dimensions for warehouse spatial estimates. Two other designs were considered before selecting the one above. Next we had to figure out how the warehouse would perform its functions. Stocking the warehouse ended up as above and next we needed to set the levels according to EOQ model FEMA: We were not able to pilot so we had to outsource EOQ sensitivity analysis and reorder trigger error-proofing to two Yellow Belts. We did not have the full amount of required resources so we will implement in phases Will add in visual aids and routines in addition to system/data monitoring The front end can get messy; the important thing is see the big picture so you can understand the context. Be quick to absorb your self into their system. Don’t assume design is a linear process and that you complete it “one and done”. Design is an extremely iterative process Organizations are in these positions because of their habits; projects last because they change habits Manual, proactive system to aid ERP transition Centralized control of inventory Quantitative-based ordering method Consolidated space, inventory, and data  Reactive, “tribal- knowledge” based ordering  Shortages common  All inventory stored on floor  Lots of NVA time spent looking for parts  Employees take parts from other depts. to stock their areas Current State  Manual, proactive ordering via Kanban signal  Shortages mitigated with safety stock  Inventory centrally controlled in warehouse  Order quantity based on data  Parts are sent to floor together as a kit or in a replenishment bin Design State Sutphen is a family own and run company that prides themselves on production of high-quality, dependable customizable fire trucks of iconic design. Used for KB Dropboxes